OPERATION MEETING NPI
WW1122
ENGINEERING TEAM
AMMAR & MARAN
CONTENTS
1. TASK SUMMARY (PASS & CURRENT)
2. TASK (PLAN FOR NEXT)
3. COST SAVING
TASK TASK DESCRIPTION(ASM PROJEK)
STATUS
( DONE/ IN-PROGRESS)
1
RF BAR/BRANCH(1024-401-1)- PROCESS DRAWING
-JOB ROUTER DONE
2
BRKT-SP HEATER(1016-463-1)- PROCESS DRAWING
-JOB ROUTER
DONE
3
SENSOR JOB/SUS(1015-947-1)- PROCESS DRAWING
-JOB ROUTER DONE
4
RF BAR /LOWER RC(1016-233-1)- PROCESS DRAWING
-JOB ROUTER
DONE
5
FIXER(1032-471-1)- PROCESS DRAWING
-JOB ROUTER DONE
TASK SUMMARY (PASS & CURRENT)
TASK DESCRIPTION ELABORATION
RF BAR/BRANCH(1024-401-1)
MATERIAL: A5052 4MM
PROCESS
1.LASERCUT
2.BUFFING
3.IPQA BUYOFF
4. MACHINING COUNTERSUNK
5.IPQA BUYOFF
6. BENDING
7.IPQA BUYOFF
8. IQA BUYOFF
9.FINISHING:CHROMATE
10. IQA BUYOFF
11. WIP STORE
PICTURE (If Available)
TASK 1
TASK DESCRIPTION ELABORATION
BRKT-SP HEATER(1016-463-1)
MATERIAL: SUS304 1MM
PROCESS
1.LASERCUT
2.BUFFING
3.IPQA BUYOFF
4. BENDING
5.IPQA BUYOFF
6.IQA BUYOFF
7. FINISHING: PICKLING AND
PASSIVATE
8.IQA BUYOFF
9. WIP STORE
PICTURE (If Available)
TASK 2
TASK DESCRIPTION ELABORATION
SENSOR JOB/SUS(1015-947-1)
MATERIAL: SUS304 1.5MM
PROCESS
1.LASERCUT
2.BUFFING
3.IPQA BUYOFF
4. BENDING
5.IPQA BUYOFF
6.IQA BUYOFF
7. FINISHING: PICKLING AND
PASSIVATE
8.IQA BUYOFF
9. WIP STORE
PICTURE (If Available)
TASK 3
TASK DESCRIPTION ELABORATION
RF BAR /LOWER RC(1016-233-1)
MATERIAL: A5052 4.0MM
PROCESS
1.LASERCUT
2.BUFFING
3.IPQA BUYOFF
4.IQA BUYOFF
5.FINISHING:CHROMATE
6. IQA BUYOFF
7. WIP STORE
PICTURE (If Available)
TASK 4
TASK DESCRIPTION ELABORATION
FIXER(1032-471-1)
MATERIAL: SUS304 5MM, 10.0MM
PROCESS PART 1
1.LASERCUT
2.BUFFING
3.IPQA BUYOFF
4.BENDING
5. IPQA BUYOFF
6. WIP STORE
PROCESS PART 2
1.LASERCUT
2.BUFFING
3.IPQA BUYOFF
4. WIP STORE
ASSEMBLY
1.WELDING
2.BUFFING
3.IPQA BUYOFF
4.IQA BUYOFF
5. FINISHING: PICKLING AND PASSIVATE
6.IQA BUYOFF
PICTURE (If Available)
TASK 5
TASK TASK DISCRIPTION
TARGET DATE TO
COMPLETE
1
BENCHMARK
CARD CLAMP(EMP4260A80H03L-LF)- PROCESS DRAWING
-JOB ROUTER
23/3/2022
2
ASM
COVER-DUCT-A(1024-666-01)-PROCESS DRAWING
-JOB ROUTER
22/3/2022
3
ASM
STOPPER-DOOR(1036-074-01)-PROCESS DRAWING
-JOB ROUTER
24/3/2022
4
ASM
COVER-/RF-R(1023-557-01)-PROCESS DRAWING
-JOB ROUTER
25/3/2022
ASM
COVER-/RF-L(1023-558-01)-PROCESS DRAWING 26/3/2022
TASK (PLAN FOR NEXT)
COST SAVING
SLOT TAB
Tab and slot
- Reduce cost for fabricate jig to positioning
and clamp the part
- Reduce cycle time

OPERATION MEETING NPI WORK WEEK1122.pptx

  • 1.
  • 2.
    CONTENTS 1. TASK SUMMARY(PASS & CURRENT) 2. TASK (PLAN FOR NEXT) 3. COST SAVING
  • 3.
    TASK TASK DESCRIPTION(ASMPROJEK) STATUS ( DONE/ IN-PROGRESS) 1 RF BAR/BRANCH(1024-401-1)- PROCESS DRAWING -JOB ROUTER DONE 2 BRKT-SP HEATER(1016-463-1)- PROCESS DRAWING -JOB ROUTER DONE 3 SENSOR JOB/SUS(1015-947-1)- PROCESS DRAWING -JOB ROUTER DONE 4 RF BAR /LOWER RC(1016-233-1)- PROCESS DRAWING -JOB ROUTER DONE 5 FIXER(1032-471-1)- PROCESS DRAWING -JOB ROUTER DONE TASK SUMMARY (PASS & CURRENT)
  • 4.
    TASK DESCRIPTION ELABORATION RFBAR/BRANCH(1024-401-1) MATERIAL: A5052 4MM PROCESS 1.LASERCUT 2.BUFFING 3.IPQA BUYOFF 4. MACHINING COUNTERSUNK 5.IPQA BUYOFF 6. BENDING 7.IPQA BUYOFF 8. IQA BUYOFF 9.FINISHING:CHROMATE 10. IQA BUYOFF 11. WIP STORE PICTURE (If Available) TASK 1
  • 5.
    TASK DESCRIPTION ELABORATION BRKT-SPHEATER(1016-463-1) MATERIAL: SUS304 1MM PROCESS 1.LASERCUT 2.BUFFING 3.IPQA BUYOFF 4. BENDING 5.IPQA BUYOFF 6.IQA BUYOFF 7. FINISHING: PICKLING AND PASSIVATE 8.IQA BUYOFF 9. WIP STORE PICTURE (If Available) TASK 2
  • 6.
    TASK DESCRIPTION ELABORATION SENSORJOB/SUS(1015-947-1) MATERIAL: SUS304 1.5MM PROCESS 1.LASERCUT 2.BUFFING 3.IPQA BUYOFF 4. BENDING 5.IPQA BUYOFF 6.IQA BUYOFF 7. FINISHING: PICKLING AND PASSIVATE 8.IQA BUYOFF 9. WIP STORE PICTURE (If Available) TASK 3
  • 7.
    TASK DESCRIPTION ELABORATION RFBAR /LOWER RC(1016-233-1) MATERIAL: A5052 4.0MM PROCESS 1.LASERCUT 2.BUFFING 3.IPQA BUYOFF 4.IQA BUYOFF 5.FINISHING:CHROMATE 6. IQA BUYOFF 7. WIP STORE PICTURE (If Available) TASK 4
  • 8.
    TASK DESCRIPTION ELABORATION FIXER(1032-471-1) MATERIAL:SUS304 5MM, 10.0MM PROCESS PART 1 1.LASERCUT 2.BUFFING 3.IPQA BUYOFF 4.BENDING 5. IPQA BUYOFF 6. WIP STORE PROCESS PART 2 1.LASERCUT 2.BUFFING 3.IPQA BUYOFF 4. WIP STORE ASSEMBLY 1.WELDING 2.BUFFING 3.IPQA BUYOFF 4.IQA BUYOFF 5. FINISHING: PICKLING AND PASSIVATE 6.IQA BUYOFF PICTURE (If Available) TASK 5
  • 9.
    TASK TASK DISCRIPTION TARGETDATE TO COMPLETE 1 BENCHMARK CARD CLAMP(EMP4260A80H03L-LF)- PROCESS DRAWING -JOB ROUTER 23/3/2022 2 ASM COVER-DUCT-A(1024-666-01)-PROCESS DRAWING -JOB ROUTER 22/3/2022 3 ASM STOPPER-DOOR(1036-074-01)-PROCESS DRAWING -JOB ROUTER 24/3/2022 4 ASM COVER-/RF-R(1023-557-01)-PROCESS DRAWING -JOB ROUTER 25/3/2022 ASM COVER-/RF-L(1023-558-01)-PROCESS DRAWING 26/3/2022 TASK (PLAN FOR NEXT)
  • 10.
    COST SAVING SLOT TAB Taband slot - Reduce cost for fabricate jig to positioning and clamp the part - Reduce cycle time