b-estDetailed Estimating For
Capital Projects In The
Oil And Gas Industry
OGCS INTRODUCING
TM
It provides a structured method of
obtaining reliable fixed price bids
where limited design definition is
available. Our extensive in-house
database of fabrication Quantities,
Norms and Pricing information for
Onshore and Offshore projects is
coupled with pricing data from all
major fabrication locations globally
including Europe, Gulf of Mexico,
Middle East and Asia Pacific.
The system also provides a detailed
method of measurement and pricing
preambles for each unit rate and
boq item. The tender process can
then be carried out on modeled
information at a very early stage in
the design cycle, determining fixed
pricing structures with fabricators
and providing accurate estimates of
out-turn fabrication cost.
boqsor™ provides a powerful tender
evaluation tool and the ability to
run “what if” sensitivity scenarios to
evaluate the impact of growth on
the relative tenders. As the design
develops Quantity information can
be updated and replaced throughout
the life of the design through to the
“as-built” stage. Interfaces between
boqsor™ and the design information
in design information in PDMS or
3D model can provide a Semi-
Automated Measurement process,
reducing time and manpower in
capturing Quantity Data.	
Historical data from previous similar
projects on outturn quantities to
create model Bills of Quantities and
Schedule of Rates for tendering
purposes
A structured method of obtaining
reliable fixed price bids where limited
design definition is available
A robust tender evaluation tool
that can process and capture large
amounts of pricing data from tenders
and provide detailed comparison
reports in a very short period of time.
A reliable basis for awarding contracts
and managing them commercially
throughout their duration
A mechanism for managing changes
during construction
A method for calculating progress
payments
The delivery of these services
is system driven with particular
emphasis on our two flagship
software packages boqsor™ and
b-est™. boqsor™ is a powerful
bill of quantity and unit rate
contracting tool and b-est™
provides accurate cost estimating
for major capital projects in the
industry.
boqsor™ can be used to support
the administration of unit rate
re-measurable contracts
throughout their lifecycle from
initial estimates, bid preparation,
electronic tendering and
evaluation, contract award and to
monitor and price the work post
contract.
b-est™ uses man-hour norms
from all of the global fabrication
locations along with access to
the boqsor™ as-built quantity
database to provide detailed class
I, II and III estimates for major
capital projects both offshore
and on-shore within the energy
industry
www.ogcsglobal.com OGCSOil and Gas Contracts Services
OGCS Global provides a complete Contracts and Supply
Chain Management Service, which includes Contracts
Engineering, Quantity Surveying, and Project Controls
to the Global Energy construction industry, with specific
focus on the Upstream Oil and Gas sector.
Our boqsor™ software package is a Unit Rate Contracting system
designed for producing Bill of Quantities and Schedule of Rates
specifically for the Oil, Gas and Energy sectors.
Introduction About boqsor™
The system provides
The original boqsor™ system was
developed during the early days of the
Oil and Gas industry in the UK North
Sea for the Commercial Management of
large scale Offshore Fabrication Projects.
This innovative concept was prompted
by the demand for a structured
approach to obtaining reliable fixed
price bids when little design definition
was available.
boqsor™ was the basis for the
benchmark publication “Spons –
Fabrication Norms for Offshore
Structures” which became the industry
bible in the 1980’s and 90’s for
estimating, tendering and commercial
administration of offshore fabrication
contracts. The structure and principles
developed by boqsor™ now form
the basis of most other software
applications in use within the industry,
yet it still retains its pedigree and
position as a market leader.
Today, continual development,
innovation and improvement mean that
boqsor™ is the Unit Rate Contracting
and Estimating package for the new era
of Global Fabrication Projects.
boqsor™ has been designed to interface with PDMS and most 3D design
model systems to efficiently harvest and apply cost codes to quantity
data as the design develops. Quantities are “measured” by discipline
and the flexibility of the boqsor™ system allows allocation of quantities
into a pre-developed Work Breakdown Structure (WBS) which can be by
module, deck, level, area etc. The WBS is designed to mirror the project
structure to provide information to seamlessly feed into the project
cost reporting systems. This interface provides a significate cost and
man-power saving over the traditional quantity measurement activity.
www.ogcsglobal.com OGCSOil and Gas Contracts Services
Harvesting Quantities as the design develops
PDMS/3D
Model Interface
boqsor™ history
OGCS has an extensive in-house database of fabrication Quantities across
all types of construction including Jackets, Topsides, FPSO’s FPU’s, Subsea
and Onshore Plants which can be modeled to produce accurate bills of
quantities where little or no design information is available.
It allows various levels of class
estimate to be prepared and refined
as more project engineering
information becomes available.
b-est™ has access to an extensive
library of historical out-turn quantity
data from global projects both
onshore and offshore as well as
man-hour norms for all major
global fabrication areas including
Gulf of Mexico, Far East and Korea,
Middle East, Northern and Southern
Europe.
With access to this unique set of
data, from projects similar by type
and/or location, coupled with the
extensive in-house experience
of OGCS personnel, accurate
estimates can be produced at all
levels of detail.
The b-est™ system is structured
to roll seamlessly up or down
between Class I, II or III estimates
as better definition on the project
design becomes available. The
system can therefore be utilised at
any point in the project lifecycle
from conceptual estimates at pre-
FEED, through the Detailed design
Phase and into Construction and
Execution
OGCS utilises man-hours in the
preparation of estimates because
in the very competitive world
fabrication market there can be
extreme price volatility whereas in
our experience hours to execute
work tend to be stable. Once the
man-hour content of the project
has been established then the most
appropriate commercial rates can
be used.
www.ogcsglobal.com OGCSOil and Gas Contracts Services
About b-est™
The boqsor™ estimating module b-est™ facilitates construction cost
estimates of Capex developments for major oil and gas projects.
b-est™ and boqsor™ are designed to interface seamlessly between
front end project estimating, a unit rate contracting model, electronic
tendering and tender evaluation and post contract administration and
management. Work Breakdown Structures can be structure to provide
consistency throughout these phases of the project and feed cost and
quantity data to the project and the project reporting functions
between b-est™ and boqsor™
Seamless
integration
Hookup and
Commissioning
ConstructionDetailed DesignFEEDPre-FEED
b-est™
Class III
Estimate
boqsor™
Bid Preparation
and Evaluation
boqsor™
Progress
Payments
Claims Defence
boqsor™
Agreed
Norms
Star Rates
boqsor™
Estimate
Workpacks
b-est™
Class II
Estimate
b-est™
Class I
Estimate
b-est™ and boqsor™ utilisation throughout the project
boqsor™ is an extremely powerful
tender evaluation tool. Once
the electronic priced schedules
are received from all the bidders
they are a loaded into the tender
evaluation module. boqsor™ can
then run detailed analysis and
comparison on a rate by rate basis
across all bidders highlighting where
an individual rate varies significantly
from the average or from the lowest
rate identifying rogue rates or
strategic bidding. Pre-determined
growth sensitivity scenarios can also
be run to identify the impact that
quantity chage (sp) +/- may have on
individual bids.
OGCS hold extensive in-house data
from previous projects providing
detailed Bills of Quantities across all
facilities including Jackets, Topsides,
FPSO, FPU and Subsea Equipment.
For new projects where little
design definition is available these
model bills can be manipulated
to become project specific using
key information such as weight
reports, P&ID’s, piping line lists,
specifications etc 	
Once the agreed project specific
schedules of rates and bills of
quantities have been incorporated
into the tender documents they can
be issued electronically to bidders
either with the boqsor™ tender
module or in excel format. Bidders
price all items within the schedules
both with manhour norms and
currency values. This automatically
prices the linked bills of quantities to
provide the tender value.	
the approximate bills of quantities
can be updated at strategic points
within the design process at AFC
and ultimately to reflect the as built
scenario. At all times the system will
automatically apply the fixed unit
rates to provide an updated contract
price. There are options within
the system to calculate progress
payments and any Variation Order
can be evaluated as a “mini bill
of quantities” priced at the unit
rates. boqsor™ will support all
commercial aspects of the project
through to final account.
www.ogcsglobal.com OGCSOil and Gas Contracts Services
Unit Rates
boqsor™ Functions & Capabilities
boqsor™ holds a library of discipline
unit rates that over the years have
become the standard commercial
breakdown structure within the oil and
gas industry. These rates can be modified
to be project specific and to cover
every possible eventuality that may be
encountered within a particular project
as the design develops. Each unit rate
will come with its own detailed method
of measurement and pricing preamble
which advises bidders exactly what cost
categories should be included. 	
In addition to quantity data OGCS
also have current unit rate norms and
pricing information from all the major
oil and gas fabrication locations globally
including Northern and Southern Europe,
Gulf of Mexico, Middle East, Asia Pacific
and Korea. Once an acceptable model
bill of quantities has been developed this
can then be populated at the detailed
level with the relevant unit rates and
norms to provide reliable conceptual and
bid check estimates.
Standard and Flexible Unit Rate Library
Bill of Quantity Production using historical data where
limited design information is available
Preparation of Feasibility and Bid Check Estimates
Electronic Tendering
Unit rates in both man-hours and currency values
Tender Evaluation
Detailed Rate Analysis and Comparison
Extensive Sensitivity Analysis
Post Contract Commercial Administration
Quantity Updates
Evaluation of Change and Variations
Progress Payments
Final Account
Estimates
Tender Evaluation Bill of Quantities Post Contract Administration
Electronic Tendering
The scope of the project is broken
down, discipline by discipline,
into each work unit activity. These
activities are tabulated in a grid
format which should cover every
eventuality that maybe anticipated
within the design.
The Unit Rate Schedules are priced
on the basis of completion of a
quantity of one by the contractor.
That may be metres of pipe or cable,
number of welds or terminations.
Each item in the bill of quantities
has an 11 digit code which extracts
the description and the rate directly
from the unit rate library and
automatically provides a priced bill
of quantities
As well as the currency rate the
contractor also provides the
manhour norm for each schedule
item so that the bills of quantities
can also be “priced” in manhours
and linked to the schedule for the
project
www.ogcsglobal.com OGCSOil and Gas Contracts Services
boqsor™ methodology
boqsor™ uses the .NET technology (Microsoft .net framework) and
currently supports Microsoft SQL Server 2012 multiple instances/
multiple database configurations. SQL Server allows data to be
centrally managed, with remote copies of the application displaying
and manipulating the BoQ information. With the .NET technology,
boqsor™ is a Multiple-Document Interface (MDI) application and
includes the Microsoft standard Windows menu controls.
boqsor™ is a menu driven database application which can
be run either from a stand-alone laptop or on a server. It
allows full data sharing for multiple users based on individual
security settings.
Specification
and technology
www.ogcsglobal.com
Oil and Gas Contracts Services
	
  
London Office
1607 Wellington Way
Brooklands Industrial Estate
Weybridge, Surrey KT13 0TT
Aberdeen Office
23 Rubislaw Den North
Aberdeen AB15 4AL
Oslo Office
Tjuvholmen allè 3
0252 Oslo
Houston Office
Suite 500, 16225
Park Ten Place,
Houston, Texas TX 77084
Singapore Office
Tower 2, 1 Raffles Place,
Singapore 048616
Dubai Office
Dubai Airport Free Zone
3rd East Wing 4th Floor
Dubai

More Related Content

Similar to OGCS boqsor b-est Brochure

Nomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas EstimatingNomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas EstimatingCisco
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group reportSyafiq Zariful
 
Nomitech: CostOs Construction Estimating
Nomitech: CostOs Construction EstimatingNomitech: CostOs Construction Estimating
Nomitech: CostOs Construction EstimatingCisco
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentationSyafiq Zariful
 
Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02Jun Keat
 
BOQ vs BOM: Definitions, Differences, and Process Explained
BOQ vs BOM: Definitions, Differences, and Process ExplainedBOQ vs BOM: Definitions, Differences, and Process Explained
BOQ vs BOM: Definitions, Differences, and Process ExplainedChandresh Chudasama
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewCisco
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Capex opex
Capex opexCapex opex
Capex opexRaju_p1
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesShze Hwa Lee
 
Construction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paperConstruction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paperPeter Cholakis
 

Similar to OGCS boqsor b-est Brochure (20)

Nomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas EstimatingNomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas Estimating
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Nomitech: CostOs Construction Estimating
Nomitech: CostOs Construction EstimatingNomitech: CostOs Construction Estimating
Nomitech: CostOs Construction Estimating
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02Softwareapplicationassignment 141204035809-conversion-gate02
Softwareapplicationassignment 141204035809-conversion-gate02
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
BOQ vs BOM: Definitions, Differences, and Process Explained
BOQ vs BOM: Definitions, Differences, and Process ExplainedBOQ vs BOM: Definitions, Differences, and Process Explained
BOQ vs BOM: Definitions, Differences, and Process Explained
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product Overview
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Capex opex
Capex opexCapex opex
Capex opex
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
 
ARQvision keynote
ARQvision keynoteARQvision keynote
ARQvision keynote
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software
Software Software
Software
 
Software
SoftwareSoftware
Software
 
Construction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paperConstruction cost data 2017 and beyond white paper
Construction cost data 2017 and beyond white paper
 
PP1 report
PP1 reportPP1 report
PP1 report
 

OGCS boqsor b-est Brochure

  • 1. OGCSOil and Gas Contracts Services TM Unit Rate Contracting For The Oil And Gas Industry boqsor b-estDetailed Estimating For Capital Projects In The Oil And Gas Industry OGCS INTRODUCING TM
  • 2. It provides a structured method of obtaining reliable fixed price bids where limited design definition is available. Our extensive in-house database of fabrication Quantities, Norms and Pricing information for Onshore and Offshore projects is coupled with pricing data from all major fabrication locations globally including Europe, Gulf of Mexico, Middle East and Asia Pacific. The system also provides a detailed method of measurement and pricing preambles for each unit rate and boq item. The tender process can then be carried out on modeled information at a very early stage in the design cycle, determining fixed pricing structures with fabricators and providing accurate estimates of out-turn fabrication cost. boqsor™ provides a powerful tender evaluation tool and the ability to run “what if” sensitivity scenarios to evaluate the impact of growth on the relative tenders. As the design develops Quantity information can be updated and replaced throughout the life of the design through to the “as-built” stage. Interfaces between boqsor™ and the design information in design information in PDMS or 3D model can provide a Semi- Automated Measurement process, reducing time and manpower in capturing Quantity Data. Historical data from previous similar projects on outturn quantities to create model Bills of Quantities and Schedule of Rates for tendering purposes A structured method of obtaining reliable fixed price bids where limited design definition is available A robust tender evaluation tool that can process and capture large amounts of pricing data from tenders and provide detailed comparison reports in a very short period of time. A reliable basis for awarding contracts and managing them commercially throughout their duration A mechanism for managing changes during construction A method for calculating progress payments The delivery of these services is system driven with particular emphasis on our two flagship software packages boqsor™ and b-est™. boqsor™ is a powerful bill of quantity and unit rate contracting tool and b-est™ provides accurate cost estimating for major capital projects in the industry. boqsor™ can be used to support the administration of unit rate re-measurable contracts throughout their lifecycle from initial estimates, bid preparation, electronic tendering and evaluation, contract award and to monitor and price the work post contract. b-est™ uses man-hour norms from all of the global fabrication locations along with access to the boqsor™ as-built quantity database to provide detailed class I, II and III estimates for major capital projects both offshore and on-shore within the energy industry www.ogcsglobal.com OGCSOil and Gas Contracts Services OGCS Global provides a complete Contracts and Supply Chain Management Service, which includes Contracts Engineering, Quantity Surveying, and Project Controls to the Global Energy construction industry, with specific focus on the Upstream Oil and Gas sector. Our boqsor™ software package is a Unit Rate Contracting system designed for producing Bill of Quantities and Schedule of Rates specifically for the Oil, Gas and Energy sectors. Introduction About boqsor™ The system provides
  • 3. The original boqsor™ system was developed during the early days of the Oil and Gas industry in the UK North Sea for the Commercial Management of large scale Offshore Fabrication Projects. This innovative concept was prompted by the demand for a structured approach to obtaining reliable fixed price bids when little design definition was available. boqsor™ was the basis for the benchmark publication “Spons – Fabrication Norms for Offshore Structures” which became the industry bible in the 1980’s and 90’s for estimating, tendering and commercial administration of offshore fabrication contracts. The structure and principles developed by boqsor™ now form the basis of most other software applications in use within the industry, yet it still retains its pedigree and position as a market leader. Today, continual development, innovation and improvement mean that boqsor™ is the Unit Rate Contracting and Estimating package for the new era of Global Fabrication Projects. boqsor™ has been designed to interface with PDMS and most 3D design model systems to efficiently harvest and apply cost codes to quantity data as the design develops. Quantities are “measured” by discipline and the flexibility of the boqsor™ system allows allocation of quantities into a pre-developed Work Breakdown Structure (WBS) which can be by module, deck, level, area etc. The WBS is designed to mirror the project structure to provide information to seamlessly feed into the project cost reporting systems. This interface provides a significate cost and man-power saving over the traditional quantity measurement activity. www.ogcsglobal.com OGCSOil and Gas Contracts Services Harvesting Quantities as the design develops PDMS/3D Model Interface boqsor™ history OGCS has an extensive in-house database of fabrication Quantities across all types of construction including Jackets, Topsides, FPSO’s FPU’s, Subsea and Onshore Plants which can be modeled to produce accurate bills of quantities where little or no design information is available.
  • 4. It allows various levels of class estimate to be prepared and refined as more project engineering information becomes available. b-est™ has access to an extensive library of historical out-turn quantity data from global projects both onshore and offshore as well as man-hour norms for all major global fabrication areas including Gulf of Mexico, Far East and Korea, Middle East, Northern and Southern Europe. With access to this unique set of data, from projects similar by type and/or location, coupled with the extensive in-house experience of OGCS personnel, accurate estimates can be produced at all levels of detail. The b-est™ system is structured to roll seamlessly up or down between Class I, II or III estimates as better definition on the project design becomes available. The system can therefore be utilised at any point in the project lifecycle from conceptual estimates at pre- FEED, through the Detailed design Phase and into Construction and Execution OGCS utilises man-hours in the preparation of estimates because in the very competitive world fabrication market there can be extreme price volatility whereas in our experience hours to execute work tend to be stable. Once the man-hour content of the project has been established then the most appropriate commercial rates can be used. www.ogcsglobal.com OGCSOil and Gas Contracts Services About b-est™ The boqsor™ estimating module b-est™ facilitates construction cost estimates of Capex developments for major oil and gas projects. b-est™ and boqsor™ are designed to interface seamlessly between front end project estimating, a unit rate contracting model, electronic tendering and tender evaluation and post contract administration and management. Work Breakdown Structures can be structure to provide consistency throughout these phases of the project and feed cost and quantity data to the project and the project reporting functions between b-est™ and boqsor™ Seamless integration Hookup and Commissioning ConstructionDetailed DesignFEEDPre-FEED b-est™ Class III Estimate boqsor™ Bid Preparation and Evaluation boqsor™ Progress Payments Claims Defence boqsor™ Agreed Norms Star Rates boqsor™ Estimate Workpacks b-est™ Class II Estimate b-est™ Class I Estimate b-est™ and boqsor™ utilisation throughout the project
  • 5. boqsor™ is an extremely powerful tender evaluation tool. Once the electronic priced schedules are received from all the bidders they are a loaded into the tender evaluation module. boqsor™ can then run detailed analysis and comparison on a rate by rate basis across all bidders highlighting where an individual rate varies significantly from the average or from the lowest rate identifying rogue rates or strategic bidding. Pre-determined growth sensitivity scenarios can also be run to identify the impact that quantity chage (sp) +/- may have on individual bids. OGCS hold extensive in-house data from previous projects providing detailed Bills of Quantities across all facilities including Jackets, Topsides, FPSO, FPU and Subsea Equipment. For new projects where little design definition is available these model bills can be manipulated to become project specific using key information such as weight reports, P&ID’s, piping line lists, specifications etc Once the agreed project specific schedules of rates and bills of quantities have been incorporated into the tender documents they can be issued electronically to bidders either with the boqsor™ tender module or in excel format. Bidders price all items within the schedules both with manhour norms and currency values. This automatically prices the linked bills of quantities to provide the tender value. the approximate bills of quantities can be updated at strategic points within the design process at AFC and ultimately to reflect the as built scenario. At all times the system will automatically apply the fixed unit rates to provide an updated contract price. There are options within the system to calculate progress payments and any Variation Order can be evaluated as a “mini bill of quantities” priced at the unit rates. boqsor™ will support all commercial aspects of the project through to final account. www.ogcsglobal.com OGCSOil and Gas Contracts Services Unit Rates boqsor™ Functions & Capabilities boqsor™ holds a library of discipline unit rates that over the years have become the standard commercial breakdown structure within the oil and gas industry. These rates can be modified to be project specific and to cover every possible eventuality that may be encountered within a particular project as the design develops. Each unit rate will come with its own detailed method of measurement and pricing preamble which advises bidders exactly what cost categories should be included. In addition to quantity data OGCS also have current unit rate norms and pricing information from all the major oil and gas fabrication locations globally including Northern and Southern Europe, Gulf of Mexico, Middle East, Asia Pacific and Korea. Once an acceptable model bill of quantities has been developed this can then be populated at the detailed level with the relevant unit rates and norms to provide reliable conceptual and bid check estimates. Standard and Flexible Unit Rate Library Bill of Quantity Production using historical data where limited design information is available Preparation of Feasibility and Bid Check Estimates Electronic Tendering Unit rates in both man-hours and currency values Tender Evaluation Detailed Rate Analysis and Comparison Extensive Sensitivity Analysis Post Contract Commercial Administration Quantity Updates Evaluation of Change and Variations Progress Payments Final Account Estimates Tender Evaluation Bill of Quantities Post Contract Administration Electronic Tendering
  • 6. The scope of the project is broken down, discipline by discipline, into each work unit activity. These activities are tabulated in a grid format which should cover every eventuality that maybe anticipated within the design. The Unit Rate Schedules are priced on the basis of completion of a quantity of one by the contractor. That may be metres of pipe or cable, number of welds or terminations. Each item in the bill of quantities has an 11 digit code which extracts the description and the rate directly from the unit rate library and automatically provides a priced bill of quantities As well as the currency rate the contractor also provides the manhour norm for each schedule item so that the bills of quantities can also be “priced” in manhours and linked to the schedule for the project www.ogcsglobal.com OGCSOil and Gas Contracts Services boqsor™ methodology boqsor™ uses the .NET technology (Microsoft .net framework) and currently supports Microsoft SQL Server 2012 multiple instances/ multiple database configurations. SQL Server allows data to be centrally managed, with remote copies of the application displaying and manipulating the BoQ information. With the .NET technology, boqsor™ is a Multiple-Document Interface (MDI) application and includes the Microsoft standard Windows menu controls. boqsor™ is a menu driven database application which can be run either from a stand-alone laptop or on a server. It allows full data sharing for multiple users based on individual security settings. Specification and technology
  • 7. www.ogcsglobal.com Oil and Gas Contracts Services   London Office 1607 Wellington Way Brooklands Industrial Estate Weybridge, Surrey KT13 0TT Aberdeen Office 23 Rubislaw Den North Aberdeen AB15 4AL Oslo Office Tjuvholmen allè 3 0252 Oslo Houston Office Suite 500, 16225 Park Ten Place, Houston, Texas TX 77084 Singapore Office Tower 2, 1 Raffles Place, Singapore 048616 Dubai Office Dubai Airport Free Zone 3rd East Wing 4th Floor Dubai