GO TO THE CONFERENCE WEBSITE:
http://bit.ly/CONFwebsiteGOT
Giant Offshore Wind Turbines
In the competition to lower the cost of energy, offshore wind turbines reach up to 5 MW and more. If you want to hear about case studies of current multi MW offshore wind turbine prototypes, park owners’ view on future offshore requirements and challenges for transport and installation then visit our International Conference Giant Offshore Wind Turbines from
24 – 26 November 2014, in Swissôtel Bremen, Germany.
1. Companies and institutes invited to speak:
• Aerodyn Engineering GmbH
• Alstom Renewable Germany
• AMSC Windtec GmbH
• Areva Wind
• DEWI-OCC Offshore Certification
Centre GmbH
• DTU
• EnBW Erneuerbare
Energien GmbH
• EON Climate and
Renewables
• EUROS Entwicklungs-
gesellschaft
• Gamesa Windpower
• Hyundai Heavy
Industries
• MHI Vestas
Offshore Wind A/S
• Ming Yang
Windpower
• Senvion SE
• Samsung Heavy
Industries
• Siemens Wind
Power A/S
• Vattenfall Europe
Windkraft GmbH
• XEMC Darwind B.V.
• Case studies of current multi MW
offshore wind turbine prototypes
• Park owners’ view on future offshore requirements
and outstanding projects
• Test and certification requirements to guarantee reliability
throughout the lifetime
• Challenges for transport and installation of multi MW turbines
• How to adjust wind turbine design for 66 kV components
Learn from these experts amongst others:
Henrik Bæk Jørgensen, Head of Product Management,
MHI Vestas Offshore Wind A/S, Denmark
Lars Engelmann, Head of Project Services Logisitcs & Vessels,
Vattenfall Europe Windkraft GmbH, Germany
Kees Versteegh, CTO,
XEMC Darwind B.V.,The Netherlands
Markus Rieck, Managing Director,
Alstom Renewable, Germany
Uli Behr, General Manager,
KNK Wind GmbH, Germany
Interactive Workshop Day | Wednesday, 26 November 2014
A: Transport and installation of multi MW offshore turbines
B: 66 kV transmission – impact on turbine design
C: Testing and certification
D: Supply chain for current prototypes
To Register | T +49 (0)30 20 91 33 88 | F +49 (0)30 20 91 32 10 | E eq@iqpc.de | www.giant-offshore-turbines.com/PM
GIANTOffshore
Wind Turbines
Operational experience and technical challenges for their introduction to the market
24 – 26 November 2014 | Swissôtel Bremen, Germany
International Conference
SA
V
E
up
to
€
500,-w
ith
our
Early
Birds
ifyou
book
and
pay
by
08
August2014!
The only event offering an
overview on large-scale
prototypes and related
challenges
66 kV for
Offshore Wind
International Conference
Co-located with: