SlideShare a Scribd company logo
9th Street Safety & Bicycle Project
         Park Slope, Brooklyn




         Division of Street Management & Safety
                Traffic Operations Bureau
              Presentation to CB 6, Brooklyn
                        March, 2007
DOT 3-Year Bicycle Network
       Expansion Plan
• 200 mile expansion of on-street network
• Targeted to:
  – Increase connectivity
  – Areas with high demand
  – Citywide backbone of routes
9th Street: Bicycle Network Link
Corridor Crashes




                                           2004-2006 Crashes
      Injured:    3rd Ave         4th Ave         5th Ave         6th Ave         7th Ave         8th Ave            PPW
Pedestrian       6         14%   9         12%   14        21%   5         14%   3         16%   7         23%   1        17%
Bicyclist        3         7%    2         3%    3         5%    3         8%    1         5%    1         3%    0         0%
Passenger        6         14%   13        18%   3         5%    8         22%   3         16%   10        33%   0         0%
No Injury        29        67%   50        68%   46        70%   20        56%   12        63%   12        40%   5        83%
Total Crashes         43              74              66              36              19              30              6
Primary 9th Street Issues
 1.   Uncomfortable Cycling Route
 2.   Pedestrian Safety Concerns
 3.   High Speeds
 4.   Interrupted Thru Movements
 5.   Challenging Left Turns

Project Goal: A Safer and More Comfortable 9th
      Street Corridor for ALL Street Users
Proposal Summary
•   4 Lane to 3 Lane “Road Diet”
     – Left Turn Bays
     – Bike Lanes
    Carries existing 3 lane configuration at 4th Ave to Prospect Park
•
•   Fast Implementation: July 2007
                                      Existing




                                       Proposed
Issue 1: Uncomfortable Cycling
                      Environment
     • Cyclist squeezes b/w                         • Cyclist separated from
       moving lane and parked                         travel lanes
       cars, or
     • “Takes” moving lane

                                         CENTER




                                                                                                        CENTER
SIDEWALK




                                                  SIDEWALK
             9’          10’      10’                          8’          5’         11’     Flush
           Parking     Moving   Moving                       Parking Bike Lane w/   Moving   Median
            Lane        Lane     Lane                         Lane     3’ buffer     Lane    (4’ / 2)


                                                                  Proposed Condition
                Existing Condition                                Proposed Condition
                Existing Condition
Issue 2: Pedestrian Safety Concerns

                • 3rd & 9th Fatality
                • Dizzy’s Crash (8th Ave)
                • CB 6 Complaints
Issue 2: Pedestrian Safety Concerns
• Lane Assignments, Speed
  Reduction & Simplified Operations
• Potential Refuge Islands at
  Crossings with One Way Avenues
Issue 3: Speeds
• Excess Capacity
  – Atlantic Ave (at Clinton): 26,000 vehicles per day (vpd)
  – Vanderbilt Ave (at Atlantic): 19,000 vpd
  – 9th St (at 6th Ave): 11,500 vpd

• Thru Lane Removal
  – 1 Lane: lead vehicle sets pace
  – Successful “4 to 3” reductions:
      • Vanderbilt Ave
      • Gerritsen Ave
Issue 4: Interrupted Thru Movement

Existing Condition
Existing Condition
                                  Double-parked auto
                                  Double-parked auto      Autos moving thru
                                                          Autos moving thru
                                     or bicyclist
                                      or bicyclist




                Left-turning vehicle
                Left-turning vehicle
                                             Right lane vehicles
                                             Right lane vehicles
                  waiting for gap
                  waiting for gap
                                             change lanes twice
                                             change lanes twice
Issue 4: Interrupted Thru Movement

Proposed Condition
Proposed Condition

                                       Bicyclist       Double-parked auto
                                       Bicyclist       Double-parked auto




                Left-turning vehicle               No lane changes
                Left-turning vehicle               No lane changes
                  waiting for gap
                  waiting for gap
Issue 5: Challenging Left Turns
                                  Left Turning Motorist Have
 Existing Condition
 Existing Condition
                                          4 Concerns
                                                1) Vehicles Approaching
                                                1) Vehicles Approaching
                                                      from Behind
                                                      from Behind
2) Identifying Gap in Left Lane
2) Identifying Gap in Left Lane




       3) ID’ing Gap in Right
       3) ID’ing Gap in Right
                Lane
                Lane
                                      4) ID’ing Pedestrians in
                                      4) ID’ing Pedestrians in
     (VISIBILITY HINDERED)
     (VISIBILITY HINDERED)
                                             Crosswalk
                                              Crosswalk
Issue 5: Challenging Left Turns
                                   Only 2 Points of Focus and
                                     No Visibility Problem
      Proposed Condition
      Proposed Condition
                                        Vehicles from behind in
                                        Vehicles from behind in
                                             different lane
                                             different lane




 Driver only needs ONE gap to
 Driver only needs ONE gap to
turn; can then look at crosswalk
turn; can then look at crosswalk
Bicycle Network Benefits
Implemented with Brooklyn Waterfront Greenway
    Connection to Columbia Street Promenade




                             t St




                                                     e
                                        t
                              ur




                                                Av
                                          S
                           Co
                Bay

                                      ith




                                              3 rd
                      St
                                    Sm




                                                                e
           St




                                                           Av
       bia




                                                         5 th
   lum




                                                                9 th
                                                                       St
Co
• July 2007 – Center of Brooklyn Connected to
  Prospect Park and Red Hook Waterfront on a
  Continuous Bike Route
Summary
Project Goal: A Safer and More Comfortable 9th
      Street Corridor for ALL Street Users
• Cyclists –
   – Dramatically improved experience
   – Connections to major attractors
• Pedestrians –
   – More Comfortable and Safe with Potential for Capital
     Improvements
• Motorists –
   – Simplified and Safer Operations
   – Center median reduces head on crash risk
• New Street in July
   – “Operational” Design Allows for Rapid Implementation
End of Presentation

More Related Content

More from streetsblog

Open Sundays on Prince Street
Open Sundays on Prince StreetOpen Sundays on Prince Street
Open Sundays on Prince Street
streetsblog
 
NYC Congestion Pricing Scenario Comparisons
NYC Congestion Pricing Scenario ComparisonsNYC Congestion Pricing Scenario Comparisons
NYC Congestion Pricing Scenario Comparisons
streetsblog
 
Congestion Mitigation Strategies: Alternatives to the City’s plan
Congestion Mitigation Strategies: Alternatives to the City’s planCongestion Mitigation Strategies: Alternatives to the City’s plan
Congestion Mitigation Strategies: Alternatives to the City’s plan
streetsblog
 
Decongesting New York
Decongesting New YorkDecongesting New York
Decongesting New York
streetsblog
 
Congestion Pricing Commission
Congestion Pricing CommissionCongestion Pricing Commission
Congestion Pricing Commissionstreetsblog
 
Applying the Road Diet for Livable Communities
Applying the Road Diet for Livable CommunitiesApplying the Road Diet for Livable Communities
Applying the Road Diet for Livable Communities
streetsblog
 
Rethinking Grand Army Plaza
Rethinking Grand Army PlazaRethinking Grand Army Plaza
Rethinking Grand Army Plaza
streetsblog
 
Grand Army Plaza: Southeastern Improvements
Grand Army Plaza: Southeastern ImprovementsGrand Army Plaza: Southeastern Improvements
Grand Army Plaza: Southeastern Improvements
streetsblog
 
NYCDOT - 9th Street Proposal
NYCDOT - 9th Street ProposalNYCDOT - 9th Street Proposal
NYCDOT - 9th Street Proposalstreetsblog
 
NYCDOT - Bleecker & Prince Bike Route
NYCDOT - Bleecker & Prince Bike RouteNYCDOT - Bleecker & Prince Bike Route
NYCDOT - Bleecker & Prince Bike Routestreetsblog
 
NYCDOT Proposed Conversions of 6th & 7th Avenues in Brooklyn
NYCDOT Proposed Conversions of 6th & 7th Avenues in BrooklynNYCDOT Proposed Conversions of 6th & 7th Avenues in Brooklyn
NYCDOT Proposed Conversions of 6th & 7th Avenues in Brooklynstreetsblog
 
NYC 2030: Accepting The Challenge
NYC 2030: Accepting The ChallengeNYC 2030: Accepting The Challenge
NYC 2030: Accepting The Challengestreetsblog
 

More from streetsblog (12)

Open Sundays on Prince Street
Open Sundays on Prince StreetOpen Sundays on Prince Street
Open Sundays on Prince Street
 
NYC Congestion Pricing Scenario Comparisons
NYC Congestion Pricing Scenario ComparisonsNYC Congestion Pricing Scenario Comparisons
NYC Congestion Pricing Scenario Comparisons
 
Congestion Mitigation Strategies: Alternatives to the City’s plan
Congestion Mitigation Strategies: Alternatives to the City’s planCongestion Mitigation Strategies: Alternatives to the City’s plan
Congestion Mitigation Strategies: Alternatives to the City’s plan
 
Decongesting New York
Decongesting New YorkDecongesting New York
Decongesting New York
 
Congestion Pricing Commission
Congestion Pricing CommissionCongestion Pricing Commission
Congestion Pricing Commission
 
Applying the Road Diet for Livable Communities
Applying the Road Diet for Livable CommunitiesApplying the Road Diet for Livable Communities
Applying the Road Diet for Livable Communities
 
Rethinking Grand Army Plaza
Rethinking Grand Army PlazaRethinking Grand Army Plaza
Rethinking Grand Army Plaza
 
Grand Army Plaza: Southeastern Improvements
Grand Army Plaza: Southeastern ImprovementsGrand Army Plaza: Southeastern Improvements
Grand Army Plaza: Southeastern Improvements
 
NYCDOT - 9th Street Proposal
NYCDOT - 9th Street ProposalNYCDOT - 9th Street Proposal
NYCDOT - 9th Street Proposal
 
NYCDOT - Bleecker & Prince Bike Route
NYCDOT - Bleecker & Prince Bike RouteNYCDOT - Bleecker & Prince Bike Route
NYCDOT - Bleecker & Prince Bike Route
 
NYCDOT Proposed Conversions of 6th & 7th Avenues in Brooklyn
NYCDOT Proposed Conversions of 6th & 7th Avenues in BrooklynNYCDOT Proposed Conversions of 6th & 7th Avenues in Brooklyn
NYCDOT Proposed Conversions of 6th & 7th Avenues in Brooklyn
 
NYC 2030: Accepting The Challenge
NYC 2030: Accepting The ChallengeNYC 2030: Accepting The Challenge
NYC 2030: Accepting The Challenge
 

Recently uploaded

Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
Kirill Klimov
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 

Recently uploaded (20)

Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024Organizational Change Leadership Agile Tour Geneve 2024
Organizational Change Leadership Agile Tour Geneve 2024
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 

NYCDOT - 9th Street Safety - 3-29-07

  • 1. 9th Street Safety & Bicycle Project Park Slope, Brooklyn Division of Street Management & Safety Traffic Operations Bureau Presentation to CB 6, Brooklyn March, 2007
  • 2. DOT 3-Year Bicycle Network Expansion Plan • 200 mile expansion of on-street network • Targeted to: – Increase connectivity – Areas with high demand – Citywide backbone of routes
  • 3. 9th Street: Bicycle Network Link
  • 4. Corridor Crashes 2004-2006 Crashes Injured: 3rd Ave 4th Ave 5th Ave 6th Ave 7th Ave 8th Ave PPW Pedestrian 6 14% 9 12% 14 21% 5 14% 3 16% 7 23% 1 17% Bicyclist 3 7% 2 3% 3 5% 3 8% 1 5% 1 3% 0 0% Passenger 6 14% 13 18% 3 5% 8 22% 3 16% 10 33% 0 0% No Injury 29 67% 50 68% 46 70% 20 56% 12 63% 12 40% 5 83% Total Crashes 43 74 66 36 19 30 6
  • 5. Primary 9th Street Issues 1. Uncomfortable Cycling Route 2. Pedestrian Safety Concerns 3. High Speeds 4. Interrupted Thru Movements 5. Challenging Left Turns Project Goal: A Safer and More Comfortable 9th Street Corridor for ALL Street Users
  • 6. Proposal Summary • 4 Lane to 3 Lane “Road Diet” – Left Turn Bays – Bike Lanes Carries existing 3 lane configuration at 4th Ave to Prospect Park • • Fast Implementation: July 2007 Existing Proposed
  • 7. Issue 1: Uncomfortable Cycling Environment • Cyclist squeezes b/w • Cyclist separated from moving lane and parked travel lanes cars, or • “Takes” moving lane CENTER CENTER SIDEWALK SIDEWALK 9’ 10’ 10’ 8’ 5’ 11’ Flush Parking Moving Moving Parking Bike Lane w/ Moving Median Lane Lane Lane Lane 3’ buffer Lane (4’ / 2) Proposed Condition Existing Condition Proposed Condition Existing Condition
  • 8. Issue 2: Pedestrian Safety Concerns • 3rd & 9th Fatality • Dizzy’s Crash (8th Ave) • CB 6 Complaints
  • 9. Issue 2: Pedestrian Safety Concerns • Lane Assignments, Speed Reduction & Simplified Operations • Potential Refuge Islands at Crossings with One Way Avenues
  • 10. Issue 3: Speeds • Excess Capacity – Atlantic Ave (at Clinton): 26,000 vehicles per day (vpd) – Vanderbilt Ave (at Atlantic): 19,000 vpd – 9th St (at 6th Ave): 11,500 vpd • Thru Lane Removal – 1 Lane: lead vehicle sets pace – Successful “4 to 3” reductions: • Vanderbilt Ave • Gerritsen Ave
  • 11. Issue 4: Interrupted Thru Movement Existing Condition Existing Condition Double-parked auto Double-parked auto Autos moving thru Autos moving thru or bicyclist or bicyclist Left-turning vehicle Left-turning vehicle Right lane vehicles Right lane vehicles waiting for gap waiting for gap change lanes twice change lanes twice
  • 12. Issue 4: Interrupted Thru Movement Proposed Condition Proposed Condition Bicyclist Double-parked auto Bicyclist Double-parked auto Left-turning vehicle No lane changes Left-turning vehicle No lane changes waiting for gap waiting for gap
  • 13. Issue 5: Challenging Left Turns Left Turning Motorist Have Existing Condition Existing Condition 4 Concerns 1) Vehicles Approaching 1) Vehicles Approaching from Behind from Behind 2) Identifying Gap in Left Lane 2) Identifying Gap in Left Lane 3) ID’ing Gap in Right 3) ID’ing Gap in Right Lane Lane 4) ID’ing Pedestrians in 4) ID’ing Pedestrians in (VISIBILITY HINDERED) (VISIBILITY HINDERED) Crosswalk Crosswalk
  • 14. Issue 5: Challenging Left Turns Only 2 Points of Focus and No Visibility Problem Proposed Condition Proposed Condition Vehicles from behind in Vehicles from behind in different lane different lane Driver only needs ONE gap to Driver only needs ONE gap to turn; can then look at crosswalk turn; can then look at crosswalk
  • 16. Implemented with Brooklyn Waterfront Greenway Connection to Columbia Street Promenade t St e t ur Av S Co Bay ith 3 rd St Sm e St Av bia 5 th lum 9 th St Co
  • 17. • July 2007 – Center of Brooklyn Connected to Prospect Park and Red Hook Waterfront on a Continuous Bike Route
  • 18. Summary Project Goal: A Safer and More Comfortable 9th Street Corridor for ALL Street Users • Cyclists – – Dramatically improved experience – Connections to major attractors • Pedestrians – – More Comfortable and Safe with Potential for Capital Improvements • Motorists – – Simplified and Safer Operations – Center median reduces head on crash risk • New Street in July – “Operational” Design Allows for Rapid Implementation