Planning for Future Flood Risks
Marks Point and Belmont South
Information for residents
JANUARY 2015 - NEWSLETTER 4
Actions proposed to
protect your community
against current and future
flooding
Look inside
Find out how your Community Working Group and Council are working together to develop
a Local Adaptation Plan to address current and future lake flooding hazards.
The Marks Point and Belmont South Local Adaptation Plan will help guide future decisions, such as how we design
and maintain roads and drainage systems, how to make buildings safe and durable, and how we manage erosion and
maintain a healthy lake. The Plan will help Council and the community:
•	 manage the risk of current and future flooding and tidal inundation resulting from rising lake levels;
•	 provide certainty about future development in Marks Point and Belmont South; and
•	 address issues of insurance affordability.
Your Community Working Group
In April 2014 Council invited residents to join a Community Working
Group to collaboratively assess actions suggested by the community
to reduce the risk of current and future flooding and tidal inundation in
Marks Point and Belmont South resulting from rising lake levels.
Members of the working group assessed each of the 39 proposed
actions based on four simple “show-stopper” criteria:
• 	 will it work to reduce the risk from flooding and inundation?
• 	 will it help maintain community lifestyle?
• 	 are the environmental effects manageable?
• 	 do the benefits outweigh the costs?
After 12 meetings, 22 actions were identified that met these criteria. Five actions
form the basis of a strategy that will protect Marks Point and Belmont South
from future flooding and rising lake levels. Together, all 22 actions will form the
Marks Point and Belmont South Local Adaptation Plan.
Project progress
Identify management options
Community working group forms
Develop plan objectives
Assess management options
Consult wider Marks Point Belmont
South community on proposed
adaptation actions
Draft Local Adaptation Plan to
Council for public exhibition
Exhibition for public comment
and submissions on Draft Local
Adaptation Plan
Draft Local Adaptation
Plan to Council
✓
✓
✓
✓
Get involved! How to have your say
Community
drop-in sessions
Thursday 26 February
4.30-7.30pm
Marks Point Public School
OR
Saturday 28 February
10am-1pm
Marks Point Public School
Talk to Council staff and members
of the Community Working Group
about the proposed adaptation
actions and provide your comments
and suggestions
Online at
http://haveyoursaylakemac.
com.au/future-flood-planning
• Make comments and
suggestion on the
proposed adaptation
actions
• View the full list of
proposed management
actions
• Ask a question
How will the proposed adaptation actions affect me?
The adaptation actions do not require any changes to your home or land in the short-term. They are triggered by a
gradual and long-term change in lake levels. An essential element of the proposal is to plan for the future by preparing for
the worst and to take action when necessary. However, there are some immediate actions we can take now to prepare for
future adaptation.
What actions are required now?
What actions will be triggered in future?
Establish “trigger points” for actions
(see ‘What actions will be triggered in
future?’ below)
Investigate and pursue funding to
implement actions
Review planning and development policies
to reflect changes in technology or in the risk
from flooding and tidal innundation
Continue to engage local residents in
implementing and reviewing the strategy and
finding solutions to community issues such
as property values and insurance costs
Include allowance for adaptation to future
hazards in the design and construction of
new assets
Complete drain audit and modelling and
include proposed drainage improvements
into Council’s forward works register
Investigate and assess new and alternative
options to manage risks from flooding and
todal innundation
The Community Working Group
and Council now want to hear
what you think about the proposed
adaptation actionsPossible lake level rise scenarios
	
Based on the upper range of
scientific projections (scenario
1 see right), the height of the
foreshore revetment would
have to be raised sometime
before 2030
	
However, if lake levels
continue to rise at their
current rate (scenario 2),
action is only necessary
sometime before 2080
Some actions, such as raising house floor levels or road levels, are done most easily and cheaply when a building or a road
is scheduled for replacement or major reconstruction, usually about once every 50 years.
Other actions will only be implemented when the increase in risk from flooding or rising lake levels makes them necessary.
The timing of these actions will vary according to changes in measurements and projections of lake levels.
For example, revetments (sloping rock seawalls) which protect the lake foreshore from erosion, must be at least 0.5 metres
higher than the lake. So, if a revetment is already 0.7 metres above the current lake level, it will continue to protect the lake
foreshore until lake levels rise by another 0.2 metres.
The time to raise the seawall will depend on the lake level (as illustrated below).
Lakelevel(metres)
Projected lake rise
Projected flood
Projected lake rise
Projected flood
Current lake level
Lake flood
Year 2100 projection Year 2100 projection
Year 2100 projection Year 2100 projection
Present day Present day
Projected lake rise
Projected flood
Projected lake rise
Projected flood
Current lake level
Lake flood
Year 2100 projection Year 2100 projection
Year 2100 projection Year 2100 projection
Present day Present day
A
Construct revetments (sloping rock seawalls) to
protect the foreshore from tidal inundation and erosion
Rock revetment
protecting filled
foreshore land at
Speers Point
B
Fill land to maintain ground levels above the lake
and groundwater
Units built on filled
land at Haddon
Crescent, Marks Point
C
Raise and improve the design of infrastructure
such as drains and roads to match landfilling and
to maintain their function
A stormwater drain
at Swansea filled with
lake water at high tide.
Rising lake levels
will make draining
low-lying areas more
difficult
D
Construct new buildings with floor levels above
projected flood levels
A new home at
Belmont South with
floors built above
the 1-in-100-year
flood level including
an allowance for the
projected rise
in lake levels
E
Raise remaining old homes above projected flood
levels (if required)
An old home raised
above flood levels in
Townsville, Queensland
There are 16 additional management actions
to reduce current and future hazards from lake
flooding, local nuisance flooding, and rising lake
levels. Want to know more about the additional
management options?
Visit http://haveyoursaylakemac.com.au/
future-flood-planning
The community identified seven essential elements
to the Marks Point and Belmont South adaptation
strategy.
Protection is viable
Protecting the foreshore and filling low-lying land
is the best option to prevent inundation from rising
lake levels.
Retreat is not warranted
‘Business as usual’ results in unplanned retreat,
which is not warranted at Marks Point and
Belmont South.
Plan ahead
Plan for the worst, but only act when necessary.
An adaptive approach
Setting the triggers for future actions (“act when
necessary”) is a work in progress (see back page).
We’ve got time
Assets (houses, roads) are likely to be renewed twice
in 100 years, so action can be taken at the time of
rebuilding - when it’s cheapest and most convenient.
When you’re ready
People won’t have to act until they are ready –
no change to existing homes is required.   
Collaboration is key
Start preparing for future actions now, with
continued collaboration between local residents,
business, Council, and other agencies to resolve
outstanding issues and implement actions.
Proposed Marks Point and Belmont South adaptation actions
Actions to be taken over time How it will work Adaptation essentials
Adapted community
The Marks Point and Belmont South
community can be adapted to an
increase in lake levels by building
a revetment for protection, filling
to prevent tidal inundation, raising
drains and roads to match landfilling,
and building houses with floors
above projected flood levels.Adapted community raises floor levels above lake floods
Adapted community under normal conditions protects
against permanent inundation from increased lake levels
A
B C
A
B
C
D
E
E D
Projected lake rise
Projected flood
Projected lake rise
Projected flood
Current lake level
Lake flood
Year 2100 projection Year 2100 projection
Year 2100 projection Year 2100 projection
Present day Present day
Projected lake rise
Projected flood
Projected lake rise
Projected flood
Current lake level
Lake flood
Year 2100 projection Year 2100 projection
Year 2100 projection Year 2100 projection
Present day Present day
Projected lake rise
Projected flood
Projected lake rise
Projected flood
Current lake level
Lake flood
Year 2100 projection Year 2100 projection
Year 2100 projection Year 2100 projection
Present day Present day
Projected lake rise
Projected flood
Projected lake rise
Projected flood
Current lake level
Lake flood
Year 2100 projection Year 2100 projection
Year 2100 projection Year 2100 projection
Present day Present day
If we follow the proposed Marks Point and Belmont South adaptation actions...
If we do nothing...
Higher lake levels mean lake floods will worsen, flooding
foreshore homes
New homes are built above the flood level to manage
lake flood risk
Lake levels are gradually rising, a trend that is expected to
continue and accelerate, permanently inundating low-lying
foreshores
Example of a typical foreshore community
For more information about planning for future flood risks:
Visit www.lakemac.com.au/future-flood-planning
Call Council on 4921 0333
Email council@lakemac.nsw.gov.au
Box 1906 Hunter Region Mail Centre 2310
M&C 15816
Planning for Future Flood Risks
Marks Point and Belmont South
Information for residents
JANUARY 2015 - NEWSLETTER 4
Actions proposed to
protect your community
against current and future
flooding
Look inside
Find out how your Community Working Group and Council are working together to develop
a Local Adaptation Plan to address current and future lake flooding hazards.
The Marks Point and Belmont South Local Adaptation Plan will help guide future decisions, such as how we design
and maintain roads and drainage systems, how to make buildings safe and durable, and how we manage erosion and
maintain a healthy lake. The Plan will help Council and the community:
•	 manage the risk of current and future flooding and tidal inundation resulting from rising lake levels;
•	 provide certainty about future development in Marks Point and Belmont South; and
•	 address issues of insurance affordability.
Your Community Working Group
In April 2014 Council invited residents to join a Community Working
Group to collaboratively assess actions suggested by the community
to reduce the risk of current and future flooding and tidal inundation in
Marks Point and Belmont South resulting from rising lake levels.
Members of the working group assessed each of the 39 proposed
actions based on four simple “show-stopper” criteria:
• 	 will it work to reduce the risk from flooding and inundation?
• 	 will it help maintain community lifestyle?
• 	 are the environmental effects manageable?
• 	 do the benefits outweigh the costs?
After 12 meetings, 22 actions were identified that met these criteria. Five actions
form the basis of a strategy that will protect Marks Point and Belmont South
from future flooding and rising lake levels. Together, all 22 actions will form the
Marks Point and Belmont South Local Adaptation Plan.
Project progress
Identify management options
Community working group forms
Develop plan objectives
Assess management options
Consult wider Marks Point Belmont
South community on proposed
adaptation actions
Draft Local Adaptation Plan to
Council for public exhibition
Exhibition for public comment
and submissions on Draft Local
Adaptation Plan
Draft Local Adaptation
Plan to Council
✓
✓
✓
✓
Get involved! How to have your say
Community
drop-in sessions
Thursday 26 February
4.30-7.30pm
Marks Point Public School
OR
Saturday 28 February
10am-1pm
Marks Point Public School
Talk to Council staff and members
of the Community Working Group
about the proposed adaptation
actions and provide your comments
and suggestions
Online at
http://haveyoursaylakemac.
com.au/future-flood-planning
• Make comments and
suggestion on the
proposed adaptation
actions
• View the full list of
proposed management
actions
• Ask a question
How will the proposed adaptation actions affect me?
The adaptation actions do not require any changes to your home or land in the short-term. They are triggered by a
gradual and long-term change in lake levels. An essential element of the proposal is to plan for the future by preparing for
the worst and to take action when necessary. However, there are some immediate actions we can take now to prepare for
future adaptation.
What actions are required now?
What actions will be triggered in future?
Establish “trigger points” for actions
(see ‘What actions will be triggered in
future?’ below)
Investigate and pursue funding to
implement actions
Review planning and development policies
to reflect changes in technology or in the risk
from flooding and tidal innundation
Continue to engage local residents in
implementing and reviewing the strategy and
finding solutions to community issues such
as property values and insurance costs
Include allowance for adaptation to future
hazards in the design and construction of
new assets
Complete drain audit and modelling and
include proposed drainage improvements
into Council’s forward works register
Investigate and assess new and alternative
options to manage risks from flooding and
todal innundation
The Community Working Group
and Council now want to hear
what you think about the proposed
adaptation actionsPossible lake level rise scenarios
	
Based on the upper range of
scientific projections (scenario
1 see right), the height of the
foreshore revetment would
have to be raised sometime
before 2030
	
However, if lake levels
continue to rise at their
current rate (scenario 2),
action is only necessary
sometime before 2080
Some actions, such as raising house floor levels or road levels, are done most easily and cheaply when a building or a road
is scheduled for replacement or major reconstruction, usually about once every 50 years.
Other actions will only be implemented when the increase in risk from flooding or rising lake levels makes them necessary.
The timing of these actions will vary according to changes in measurements and projections of lake levels.
For example, revetments (sloping rock seawalls) which protect the lake foreshore from erosion, must be at least 0.5 metres
higher than the lake. So, if a revetment is already 0.7 metres above the current lake level, it will continue to protect the lake
foreshore until lake levels rise by another 0.2 metres.
The time to raise the seawall will depend on the lake level (as illustrated below).
Lakelevel(metres)

More Related Content

What's hot

Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Fairfax County
 
Cynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds CreekCynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds CreekTony Smith
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Fairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Fairfax County
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream ImprovementFairfax County
 
Belle View/New Alexandria/River Towers-Flood Risk Management Status Update
Belle View/New Alexandria/River Towers-Flood Risk Management Status UpdateBelle View/New Alexandria/River Towers-Flood Risk Management Status Update
Belle View/New Alexandria/River Towers-Flood Risk Management Status UpdateFairfax County
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectFairfax County
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationFairfax County
 
Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Fairfax County
 
Moving a Town: The Story of Gays Mills
Moving a Town: The Story of Gays MillsMoving a Town: The Story of Gays Mills
Moving a Town: The Story of Gays MillsMatthew Hahm
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Fairfax County
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Fairfax County
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Fairfax County
 
RBD_Briefing_Book
RBD_Briefing_BookRBD_Briefing_Book
RBD_Briefing_BookRoni Meryl
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationFairfax County
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012Erin Vieira
 

What's hot (20)

Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Vinalhaven, Maine Resilience Strategy
Vinalhaven, Maine Resilience StrategyVinalhaven, Maine Resilience Strategy
Vinalhaven, Maine Resilience Strategy
 
Making Connections Across Our Watersheds
Making Connections Across Our WatershedsMaking Connections Across Our Watersheds
Making Connections Across Our Watersheds
 
Coastal Best Practices - July21
Coastal Best Practices - July21Coastal Best Practices - July21
Coastal Best Practices - July21
 
Cynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds CreekCynefin meets the Maribyrnong and Moonee Ponds Creek
Cynefin meets the Maribyrnong and Moonee Ponds Creek
 
Cameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream RestorationCameron Run Tributary At La Vista Drive: Stream Restoration
Cameron Run Tributary At La Vista Drive: Stream Restoration
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
Belle View/New Alexandria/River Towers-Flood Risk Management Status Update
Belle View/New Alexandria/River Towers-Flood Risk Management Status UpdateBelle View/New Alexandria/River Towers-Flood Risk Management Status Update
Belle View/New Alexandria/River Towers-Flood Risk Management Status Update
 
Huntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation ProjectHuntsman Lake Dam Rehabilitation Project
Huntsman Lake Dam Rehabilitation Project
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and RestorationWoodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust” Huntsman Lake “Pardon Our Dust”
Huntsman Lake “Pardon Our Dust”
 
Moving a Town: The Story of Gays Mills
Moving a Town: The Story of Gays MillsMoving a Town: The Story of Gays Mills
Moving a Town: The Story of Gays Mills
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016Contractor Awareness Training Stormwater Facilities Introduction 2016
Contractor Awareness Training Stormwater Facilities Introduction 2016
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
RBD_Briefing_Book
RBD_Briefing_BookRBD_Briefing_Book
RBD_Briefing_Book
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
 

Similar to Newsletter 4 - Planning for Futire Flood Risks

Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesSMRPC
 
Community engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeCommunity engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeNeil Dufty
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNew Jersey Future
 
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Libby Zemaitis
 
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Climate Resilience in the Hudson Valley
 
GM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, EssexGM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, Essexgreenbelt82
 
Stormwater Presentation
Stormwater PresentationStormwater Presentation
Stormwater PresentationFrank Miles
 
Welland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationWelland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationMichael Reles
 
Nichi.11-12-13.bostonharbor.juliewormser
Nichi.11-12-13.bostonharbor.juliewormserNichi.11-12-13.bostonharbor.juliewormser
Nichi.11-12-13.bostonharbor.juliewormserNICHI_USA
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018VictoriaColangelo
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Fairfax County
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectFairfax County
 
Preview_SLR_Presentation_1_14_14_Commission1
Preview_SLR_Presentation_1_14_14_Commission1Preview_SLR_Presentation_1_14_14_Commission1
Preview_SLR_Presentation_1_14_14_Commission1nesmia
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseYourAlberta
 
ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)
ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)
ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)glennmcgillivray
 
Working with the Mississippi River for Sustainable Storm Protection
Working with the Mississippi River for Sustainable Storm ProtectionWorking with the Mississippi River for Sustainable Storm Protection
Working with the Mississippi River for Sustainable Storm ProtectionGeoEngineers, Inc.
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Fairfax County
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxJohnathanSHill
 

Similar to Newsletter 4 - Planning for Futire Flood Risks (20)

Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Community engagement on adaptation to sea level change
Community engagement on adaptation to sea level changeCommunity engagement on adaptation to sea level change
Community engagement on adaptation to sea level change
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
 
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
 
GM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, EssexGM Symposium 2016: Brendhan Zubricki, Essex
GM Symposium 2016: Brendhan Zubricki, Essex
 
Stormwater Presentation
Stormwater PresentationStormwater Presentation
Stormwater Presentation
 
Welland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationWelland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information Presentation
 
Nichi.11-12-13.bostonharbor.juliewormser
Nichi.11-12-13.bostonharbor.juliewormserNichi.11-12-13.bostonharbor.juliewormser
Nichi.11-12-13.bostonharbor.juliewormser
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018
 
backgrounder_lmfls
backgrounder_lmflsbackgrounder_lmfls
backgrounder_lmfls
 
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
Rabbit Branch at Collingham Drive Stream Restoration Information Meeting - Ju...
 
Paul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration ProjectPaul Spring Branch at Sherwood Hall Stream Restoration Project
Paul Spring Branch at Sherwood Hall Stream Restoration Project
 
Preview_SLR_Presentation_1_14_14_Commission1
Preview_SLR_Presentation_1_14_14_Commission1Preview_SLR_Presentation_1_14_14_Commission1
Preview_SLR_Presentation_1_14_14_Commission1
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)
ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)
ICLR: Lessons learned from the 2013 Calgary floods (March 26, 2015)
 
Working with the Mississippi River for Sustainable Storm Protection
Working with the Mississippi River for Sustainable Storm ProtectionWorking with the Mississippi River for Sustainable Storm Protection
Working with the Mississippi River for Sustainable Storm Protection
 
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
Hunting Creek at Fairchild MVCCA-Meeting March 7, 2018
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 
SMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptxSMP_FinalPublicMeeting_FINAL_083022.pptx
SMP_FinalPublicMeeting_FINAL_083022.pptx
 

More from ang_felty

Photobooth for Belmont and Edgeworth Libraries
Photobooth for Belmont and Edgeworth LibrariesPhotobooth for Belmont and Edgeworth Libraries
Photobooth for Belmont and Edgeworth Librariesang_felty
 
For slide share
For slide shareFor slide share
For slide shareang_felty
 
Slideshare of a3 booklet
Slideshare of a3 bookletSlideshare of a3 booklet
Slideshare of a3 bookletang_felty
 
Slideshare of a3 booklet
Slideshare of a3 bookletSlideshare of a3 booklet
Slideshare of a3 bookletang_felty
 
33 0107 community consultation - charlestown
33 0107 community consultation - charlestown33 0107 community consultation - charlestown
33 0107 community consultation - charlestownang_felty
 
33 0107 community consultation (4)
33 0107 community consultation (4)33 0107 community consultation (4)
33 0107 community consultation (4)ang_felty
 
33 0107 community consultation (4)
33 0107 community consultation (4)33 0107 community consultation (4)
33 0107 community consultation (4)ang_felty
 

More from ang_felty (7)

Photobooth for Belmont and Edgeworth Libraries
Photobooth for Belmont and Edgeworth LibrariesPhotobooth for Belmont and Edgeworth Libraries
Photobooth for Belmont and Edgeworth Libraries
 
For slide share
For slide shareFor slide share
For slide share
 
Slideshare of a3 booklet
Slideshare of a3 bookletSlideshare of a3 booklet
Slideshare of a3 booklet
 
Slideshare of a3 booklet
Slideshare of a3 bookletSlideshare of a3 booklet
Slideshare of a3 booklet
 
33 0107 community consultation - charlestown
33 0107 community consultation - charlestown33 0107 community consultation - charlestown
33 0107 community consultation - charlestown
 
33 0107 community consultation (4)
33 0107 community consultation (4)33 0107 community consultation (4)
33 0107 community consultation (4)
 
33 0107 community consultation (4)
33 0107 community consultation (4)33 0107 community consultation (4)
33 0107 community consultation (4)
 

Recently uploaded

Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…nishakur201
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
Goa Escorts WhatsApp Number South Goa Call Girl … 8588052666…
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
Russian Call Girls Service Ashiyana Colony { Lucknow Call Girls Service 95482...
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 

Newsletter 4 - Planning for Futire Flood Risks

  • 1. For more information about planning for future flood risks: Visit www.lakemac.com.au/future-flood-planning Call Council on 4921 0333 Email council@lakemac.nsw.gov.au Box 1906 Hunter Region Mail Centre 2310 M&C 15816 Planning for Future Flood Risks Marks Point and Belmont South Information for residents JANUARY 2015 - NEWSLETTER 4 Actions proposed to protect your community against current and future flooding Look inside Find out how your Community Working Group and Council are working together to develop a Local Adaptation Plan to address current and future lake flooding hazards. The Marks Point and Belmont South Local Adaptation Plan will help guide future decisions, such as how we design and maintain roads and drainage systems, how to make buildings safe and durable, and how we manage erosion and maintain a healthy lake. The Plan will help Council and the community: • manage the risk of current and future flooding and tidal inundation resulting from rising lake levels; • provide certainty about future development in Marks Point and Belmont South; and • address issues of insurance affordability. Your Community Working Group In April 2014 Council invited residents to join a Community Working Group to collaboratively assess actions suggested by the community to reduce the risk of current and future flooding and tidal inundation in Marks Point and Belmont South resulting from rising lake levels. Members of the working group assessed each of the 39 proposed actions based on four simple “show-stopper” criteria: • will it work to reduce the risk from flooding and inundation? • will it help maintain community lifestyle? • are the environmental effects manageable? • do the benefits outweigh the costs? After 12 meetings, 22 actions were identified that met these criteria. Five actions form the basis of a strategy that will protect Marks Point and Belmont South from future flooding and rising lake levels. Together, all 22 actions will form the Marks Point and Belmont South Local Adaptation Plan. Project progress Identify management options Community working group forms Develop plan objectives Assess management options Consult wider Marks Point Belmont South community on proposed adaptation actions Draft Local Adaptation Plan to Council for public exhibition Exhibition for public comment and submissions on Draft Local Adaptation Plan Draft Local Adaptation Plan to Council ✓ ✓ ✓ ✓ Get involved! How to have your say Community drop-in sessions Thursday 26 February 4.30-7.30pm Marks Point Public School OR Saturday 28 February 10am-1pm Marks Point Public School Talk to Council staff and members of the Community Working Group about the proposed adaptation actions and provide your comments and suggestions Online at http://haveyoursaylakemac. com.au/future-flood-planning • Make comments and suggestion on the proposed adaptation actions • View the full list of proposed management actions • Ask a question How will the proposed adaptation actions affect me? The adaptation actions do not require any changes to your home or land in the short-term. They are triggered by a gradual and long-term change in lake levels. An essential element of the proposal is to plan for the future by preparing for the worst and to take action when necessary. However, there are some immediate actions we can take now to prepare for future adaptation. What actions are required now? What actions will be triggered in future? Establish “trigger points” for actions (see ‘What actions will be triggered in future?’ below) Investigate and pursue funding to implement actions Review planning and development policies to reflect changes in technology or in the risk from flooding and tidal innundation Continue to engage local residents in implementing and reviewing the strategy and finding solutions to community issues such as property values and insurance costs Include allowance for adaptation to future hazards in the design and construction of new assets Complete drain audit and modelling and include proposed drainage improvements into Council’s forward works register Investigate and assess new and alternative options to manage risks from flooding and todal innundation The Community Working Group and Council now want to hear what you think about the proposed adaptation actionsPossible lake level rise scenarios Based on the upper range of scientific projections (scenario 1 see right), the height of the foreshore revetment would have to be raised sometime before 2030 However, if lake levels continue to rise at their current rate (scenario 2), action is only necessary sometime before 2080 Some actions, such as raising house floor levels or road levels, are done most easily and cheaply when a building or a road is scheduled for replacement or major reconstruction, usually about once every 50 years. Other actions will only be implemented when the increase in risk from flooding or rising lake levels makes them necessary. The timing of these actions will vary according to changes in measurements and projections of lake levels. For example, revetments (sloping rock seawalls) which protect the lake foreshore from erosion, must be at least 0.5 metres higher than the lake. So, if a revetment is already 0.7 metres above the current lake level, it will continue to protect the lake foreshore until lake levels rise by another 0.2 metres. The time to raise the seawall will depend on the lake level (as illustrated below). Lakelevel(metres)
  • 2. Projected lake rise Projected flood Projected lake rise Projected flood Current lake level Lake flood Year 2100 projection Year 2100 projection Year 2100 projection Year 2100 projection Present day Present day Projected lake rise Projected flood Projected lake rise Projected flood Current lake level Lake flood Year 2100 projection Year 2100 projection Year 2100 projection Year 2100 projection Present day Present day A Construct revetments (sloping rock seawalls) to protect the foreshore from tidal inundation and erosion Rock revetment protecting filled foreshore land at Speers Point B Fill land to maintain ground levels above the lake and groundwater Units built on filled land at Haddon Crescent, Marks Point C Raise and improve the design of infrastructure such as drains and roads to match landfilling and to maintain their function A stormwater drain at Swansea filled with lake water at high tide. Rising lake levels will make draining low-lying areas more difficult D Construct new buildings with floor levels above projected flood levels A new home at Belmont South with floors built above the 1-in-100-year flood level including an allowance for the projected rise in lake levels E Raise remaining old homes above projected flood levels (if required) An old home raised above flood levels in Townsville, Queensland There are 16 additional management actions to reduce current and future hazards from lake flooding, local nuisance flooding, and rising lake levels. Want to know more about the additional management options? Visit http://haveyoursaylakemac.com.au/ future-flood-planning The community identified seven essential elements to the Marks Point and Belmont South adaptation strategy. Protection is viable Protecting the foreshore and filling low-lying land is the best option to prevent inundation from rising lake levels. Retreat is not warranted ‘Business as usual’ results in unplanned retreat, which is not warranted at Marks Point and Belmont South. Plan ahead Plan for the worst, but only act when necessary. An adaptive approach Setting the triggers for future actions (“act when necessary”) is a work in progress (see back page). We’ve got time Assets (houses, roads) are likely to be renewed twice in 100 years, so action can be taken at the time of rebuilding - when it’s cheapest and most convenient. When you’re ready People won’t have to act until they are ready – no change to existing homes is required. Collaboration is key Start preparing for future actions now, with continued collaboration between local residents, business, Council, and other agencies to resolve outstanding issues and implement actions. Proposed Marks Point and Belmont South adaptation actions Actions to be taken over time How it will work Adaptation essentials Adapted community The Marks Point and Belmont South community can be adapted to an increase in lake levels by building a revetment for protection, filling to prevent tidal inundation, raising drains and roads to match landfilling, and building houses with floors above projected flood levels.Adapted community raises floor levels above lake floods Adapted community under normal conditions protects against permanent inundation from increased lake levels A B C A B C D E E D Projected lake rise Projected flood Projected lake rise Projected flood Current lake level Lake flood Year 2100 projection Year 2100 projection Year 2100 projection Year 2100 projection Present day Present day Projected lake rise Projected flood Projected lake rise Projected flood Current lake level Lake flood Year 2100 projection Year 2100 projection Year 2100 projection Year 2100 projection Present day Present day Projected lake rise Projected flood Projected lake rise Projected flood Current lake level Lake flood Year 2100 projection Year 2100 projection Year 2100 projection Year 2100 projection Present day Present day Projected lake rise Projected flood Projected lake rise Projected flood Current lake level Lake flood Year 2100 projection Year 2100 projection Year 2100 projection Year 2100 projection Present day Present day If we follow the proposed Marks Point and Belmont South adaptation actions... If we do nothing... Higher lake levels mean lake floods will worsen, flooding foreshore homes New homes are built above the flood level to manage lake flood risk Lake levels are gradually rising, a trend that is expected to continue and accelerate, permanently inundating low-lying foreshores Example of a typical foreshore community
  • 3. For more information about planning for future flood risks: Visit www.lakemac.com.au/future-flood-planning Call Council on 4921 0333 Email council@lakemac.nsw.gov.au Box 1906 Hunter Region Mail Centre 2310 M&C 15816 Planning for Future Flood Risks Marks Point and Belmont South Information for residents JANUARY 2015 - NEWSLETTER 4 Actions proposed to protect your community against current and future flooding Look inside Find out how your Community Working Group and Council are working together to develop a Local Adaptation Plan to address current and future lake flooding hazards. The Marks Point and Belmont South Local Adaptation Plan will help guide future decisions, such as how we design and maintain roads and drainage systems, how to make buildings safe and durable, and how we manage erosion and maintain a healthy lake. The Plan will help Council and the community: • manage the risk of current and future flooding and tidal inundation resulting from rising lake levels; • provide certainty about future development in Marks Point and Belmont South; and • address issues of insurance affordability. Your Community Working Group In April 2014 Council invited residents to join a Community Working Group to collaboratively assess actions suggested by the community to reduce the risk of current and future flooding and tidal inundation in Marks Point and Belmont South resulting from rising lake levels. Members of the working group assessed each of the 39 proposed actions based on four simple “show-stopper” criteria: • will it work to reduce the risk from flooding and inundation? • will it help maintain community lifestyle? • are the environmental effects manageable? • do the benefits outweigh the costs? After 12 meetings, 22 actions were identified that met these criteria. Five actions form the basis of a strategy that will protect Marks Point and Belmont South from future flooding and rising lake levels. Together, all 22 actions will form the Marks Point and Belmont South Local Adaptation Plan. Project progress Identify management options Community working group forms Develop plan objectives Assess management options Consult wider Marks Point Belmont South community on proposed adaptation actions Draft Local Adaptation Plan to Council for public exhibition Exhibition for public comment and submissions on Draft Local Adaptation Plan Draft Local Adaptation Plan to Council ✓ ✓ ✓ ✓ Get involved! How to have your say Community drop-in sessions Thursday 26 February 4.30-7.30pm Marks Point Public School OR Saturday 28 February 10am-1pm Marks Point Public School Talk to Council staff and members of the Community Working Group about the proposed adaptation actions and provide your comments and suggestions Online at http://haveyoursaylakemac. com.au/future-flood-planning • Make comments and suggestion on the proposed adaptation actions • View the full list of proposed management actions • Ask a question How will the proposed adaptation actions affect me? The adaptation actions do not require any changes to your home or land in the short-term. They are triggered by a gradual and long-term change in lake levels. An essential element of the proposal is to plan for the future by preparing for the worst and to take action when necessary. However, there are some immediate actions we can take now to prepare for future adaptation. What actions are required now? What actions will be triggered in future? Establish “trigger points” for actions (see ‘What actions will be triggered in future?’ below) Investigate and pursue funding to implement actions Review planning and development policies to reflect changes in technology or in the risk from flooding and tidal innundation Continue to engage local residents in implementing and reviewing the strategy and finding solutions to community issues such as property values and insurance costs Include allowance for adaptation to future hazards in the design and construction of new assets Complete drain audit and modelling and include proposed drainage improvements into Council’s forward works register Investigate and assess new and alternative options to manage risks from flooding and todal innundation The Community Working Group and Council now want to hear what you think about the proposed adaptation actionsPossible lake level rise scenarios Based on the upper range of scientific projections (scenario 1 see right), the height of the foreshore revetment would have to be raised sometime before 2030 However, if lake levels continue to rise at their current rate (scenario 2), action is only necessary sometime before 2080 Some actions, such as raising house floor levels or road levels, are done most easily and cheaply when a building or a road is scheduled for replacement or major reconstruction, usually about once every 50 years. Other actions will only be implemented when the increase in risk from flooding or rising lake levels makes them necessary. The timing of these actions will vary according to changes in measurements and projections of lake levels. For example, revetments (sloping rock seawalls) which protect the lake foreshore from erosion, must be at least 0.5 metres higher than the lake. So, if a revetment is already 0.7 metres above the current lake level, it will continue to protect the lake foreshore until lake levels rise by another 0.2 metres. The time to raise the seawall will depend on the lake level (as illustrated below). Lakelevel(metres)