Woodglen Lake Dredging and Restoration
Department of Public Works and Environmental Services
Project Update, September, 20...
Woodglen Lake: Meeting Agenda
 Project Goals and Status
 Woodglen Lake Conditions
 Project Overview
 Site Access and D...
Project Goals
 Restore sediment pool and create in-lake forebay
 Aesthetics
 Long-term downstream water quality benefit...
Woodglen Lake: Project Status
 Data collection completed
 Lake dredging and management plan completed
 Design plans and...
Woodglen Lake Facts
 Drainage area =
740 Acres (1.15 square miles)
 Lake surface area =
12.5 acres
 Sediment pool capac...
Woodglen Lake: Sediment Depth
Woodglen Lake: Water Depth
Woodglen Lake: Project Overview
Staging Area
Improved access
road
Sediment forebay
Lake dredging,
shoreline restoration,
l...
Dredging Approaches
1. Wet Dredging: Mechanically dredge deposited
sediment and haul wet. Normal pool maintained.
(Note: T...
Woodglen Lake: Site Access and Staging
Woodglen Lake: Decanting Basin Restoration
Realigned access
road and restored
decanting basin
Wet Dredging
 General Sequence
 Establish access and staging areas
 Conduct dredging utilizing barges
 Haul wet sedime...
Dry Dredging (Full or Partial Drawdown)
 General Sequence
 Initiate drawdown of lake
 Establish access and staging area...
Huntsman Lake Dam Rehabilitation Project Fish Relocation (May, 2013)
Woodglen Lake: Partial Drawdown
Staging Area
 A partial drawdown would leave a 3.5
acre pool with a maximum depth of 5
fe...
Lake Restoration
 In-lake forebay
 Wetland planting
 Shoreline stabilization
 Fish habitat
 Fish stocking
Lake Barton...
Chesapeake Bay Preservation Areas
 Buffer restoration in
deficient areas
Woodglen Lake: Shoreline Restoration
 Existing Shoreline Condition
Woodglen Lake: Shoreline Protection
Image Courtesy of North Fork Native Plants
Fish Habitat Structures
Photos Courtesy of the Pennsylvania Fish and Boat Commission
Nesting Structure
Porcupine Crib Jr.
...
Stream Stabilization
North Stream Stabilization Area
South Stream Stabilization Area
Stream Stabilization
Log Vane
Geolift
Imbricated Rock Wall
Access During Construction
 Pedestrian
access to
lake from
Zion Drive
will be
maintained
(after hours)
 Lake Barton
exam...
Woodglen Lake: Project Status and Timeline
 Data collection completed
 Lake dredging and management plan completed
 Des...
Woodglen Lake Dredging and Restoration
Project Timeline
 Early 2014: construction bid advertisement
 Spring 2014: begin ...
February Meeting Discussion Highlights
 Dry/Wet dredging: in order to ensure a competitive
bidding environment, both opti...
Huntsman Lake (29 acres)
Woodglen Lake Dredging and Restoration
Contacts
 Dipmani Kumar, Project
Manager
 703-324-4612
 Dipmani.Kumar@fairfaxcou...
Upcoming SlideShare
Loading in …5
×

Woodglen Lake Dredging and Restoration

2,145 views

Published on

Woodglen Lake Dredging and Restoration

Department of Public Works and Environmental Services
Project Update, September, 2013

  • Be the first to comment

Woodglen Lake Dredging and Restoration

  1. 1. Woodglen Lake Dredging and Restoration Department of Public Works and Environmental Services Project Update, September, 2013
  2. 2. Woodglen Lake: Meeting Agenda  Project Goals and Status  Woodglen Lake Conditions  Project Overview  Site Access and Decanting Basin Restoration  Dredging Approaches  Streambank Stabilization  Lake Habitat Restoration  Project Timeline  February Meeting highlights  Questions and Answers
  3. 3. Project Goals  Restore sediment pool and create in-lake forebay  Aesthetics  Long-term downstream water quality benefits  Improve lake water quality and habitat  Stabilize two stream locations to protect access road  Remove existing decanting basin and provide long term maintenance improvements
  4. 4. Woodglen Lake: Project Status  Data collection completed  Lake dredging and management plan completed  Design plans and specifications  Preliminary design – completed  Final design – current design phase  Permitting  Late 2013: complete final design  Begin construction in spring 2014
  5. 5. Woodglen Lake Facts  Drainage area = 740 Acres (1.15 square miles)  Lake surface area = 12.5 acres  Sediment pool capacity = 160,000 cubic yards (CY)  Current sediment in lake = 29,300 CY  Estimated annual sediment load = 1,200 CY / year 16.6 feet 29,300 CY
  6. 6. Woodglen Lake: Sediment Depth
  7. 7. Woodglen Lake: Water Depth
  8. 8. Woodglen Lake: Project Overview Staging Area Improved access road Sediment forebay Lake dredging, shoreline restoration, lake habitat improvement Removal and restoration of decanting basin Potential reforestation areas
  9. 9. Dredging Approaches 1. Wet Dredging: Mechanically dredge deposited sediment and haul wet. Normal pool maintained. (Note: This option will still require lake drawdown for a short period of time to build the forebay berms) 2. Dry Dredging: Drain the lake and dry deposited sediment in place prior to hauling 3. Project will be bid out with the option to dredge wet or dry Partial drawdown option for dry dredging: drawing the lake down by 9 feet would leave a 3.5 acre pool; sediment would be dried in the dewatered section of the lake in place prior to hauling. Approximately 1/2 of the deposited sediment volume would be removed.
  10. 10. Woodglen Lake: Site Access and Staging
  11. 11. Woodglen Lake: Decanting Basin Restoration Realigned access road and restored decanting basin
  12. 12. Wet Dredging  General Sequence  Establish access and staging areas  Conduct dredging utilizing barges  Haul wet sediment to disposal site for drying  Pros  Less weather dependent  Quicker initial start to dredging  Less potential for schedule extensions or delay  Cons  Increased sediment handling effort at disposal area  Potentially higher cost
  13. 13. Dry Dredging (Full or Partial Drawdown)  General Sequence  Initiate drawdown of lake  Establish access and staging areas  Establish diversion channels within lake  Conduct dredging  Pros  Higher daily sediment removal rates  Minimal sediment handling effort at disposal area  Potentially lower cost  Cons  Very weather dependent  Higher potential for delays due to weather  Even with a reduced pool, there will be a need to relocate/salvage fish
  14. 14. Huntsman Lake Dam Rehabilitation Project Fish Relocation (May, 2013)
  15. 15. Woodglen Lake: Partial Drawdown Staging Area  A partial drawdown would leave a 3.5 acre pool with a maximum depth of 5 feet with an average depth of 1 to 2 feet.  Approximate volume of sediment to be removed 15,000 CY
  16. 16. Lake Restoration  In-lake forebay  Wetland planting  Shoreline stabilization  Fish habitat  Fish stocking Lake Barton: Fish stocking by Virginia Game and Inland Fisheries Fish habitat created from salvaged trees
  17. 17. Chesapeake Bay Preservation Areas  Buffer restoration in deficient areas
  18. 18. Woodglen Lake: Shoreline Restoration  Existing Shoreline Condition
  19. 19. Woodglen Lake: Shoreline Protection Image Courtesy of North Fork Native Plants
  20. 20. Fish Habitat Structures Photos Courtesy of the Pennsylvania Fish and Boat Commission Nesting Structure Porcupine Crib Jr. Rock Rubble Piles Post Clusters
  21. 21. Stream Stabilization North Stream Stabilization Area South Stream Stabilization Area
  22. 22. Stream Stabilization Log Vane Geolift Imbricated Rock Wall
  23. 23. Access During Construction  Pedestrian access to lake from Zion Drive will be maintained (after hours)  Lake Barton example
  24. 24. Woodglen Lake: Project Status and Timeline  Data collection completed  Lake dredging and management plan completed  Design plans and specifications  Preliminary design – completed  Final design – current design phase  Permitting  Late 2013: complete final design  Begin construction in spring 2014
  25. 25. Woodglen Lake Dredging and Restoration Project Timeline  Early 2014: construction bid advertisement  Spring 2014: begin dredging  Dredging method will depend on bid results  Project duration: 6 to 7 months
  26. 26. February Meeting Discussion Highlights  Dry/Wet dredging: in order to ensure a competitive bidding environment, both options have to be allowed, with partial drawdown an option for dry dredging  Cheapest dredging method: depends on disposal site identified, either method could be cheaper  Project cost-effectiveness: forebay and maintenance enhancements make this project cost-effective from the viewpoint of downstream water quality improvements and long-term costs
  27. 27. Huntsman Lake (29 acres)
  28. 28. Woodglen Lake Dredging and Restoration Contacts  Dipmani Kumar, Project Manager  703-324-4612  Dipmani.Kumar@fairfaxcounty.gov  Matt Meyers, Branch Chief  703-324-5651  Matthew.Meyers@fairfaxcounty.gov  Partners:

×