Jerin John
Electrical Engineer
Mobile: +919633765732
E-mail: johnjerin880@gmail.com
Qualified Electrical Engineer with progressive work experience within Electrical contracting
companies, demonstrating expertise in site supervision and wide aspects of engineering.
Worked efficiently and consistently utilized total quality management principles including
safety standards in operating successfully in a fast paced, deadline – oriented work
environment. Tact to deal with clientele, contractors, consultants and all levels of
management with outstanding engineering skills. Well versed with Auto CADD & MEP
engineering software.
Strengths
 Flexible in assuming project responsibilities
 Excellent record of client interactions- relations
 Organizational skills to Budget time
Education
Bachelor of Electrical Engineering
Ilahia College of Engineering and Technology, Mahatma Gandhi University, Kottayam, India
12th
:- Biology Science
Fr.Joseph memorial Higher Secondary School Puthuppady, Board of Higher Secondary
Examination, Kerala
10th
:- S.S.L.C
Ebenezer Higher Secondary School Veettoor, Board of Public Examination, Kerala
Work Experience
Present
Design Engineer & Purchase Manager (Electrical) May 2017 to February 2018
Kareem’s Prime Panel Builders, Kattikunnu, Vaikom.
Kareem’s is the one of the leading electrical contractor in Kerala from a long period of time,
Projects undertaken for Madhyamam Vennala and Madhyamam Kozhikode and other Commercial
and Industrial Projects. Currently handling Project Fort Pearl Residence.
 Designed Panel Board Drawings & Make Quotations.
 Ordered the materials according to the requirements.
 Good knowledge & excellent understanding of industry.
 Arranged the work according to the schedule.
 Strong technical-engineering
competence
 Computer proficient with team playing
attitude
Site Engineer (Electrical) April 2016 to December 2016
Leela Electrical Power Services, Mulanthuruthy.
Leela Electrical Power Service is one of the leading Electrical Contractor in Kerala, which
have undertaken the works of OEN, ISRO and other Industrial and Commercial Projects.
- Finished the work according to the schedule.
- Good knowledge & excellent understanding of industry.
Project Handled
Madhyamam Vennala it has a PLC controlled M.S.B with 1000A ACB Incomer and other Sub
Electrical Panels.
 Well experienced in arranging equipment’s in suitable way and choosing different
range of components.
 Responsible for panel designing, material purchasing and supervising.
 Handled material Quality checking.
Madhyamam Kozhikode it has an AMF (ECRXA V2) controlled M.S.B with 630A MCCB and
Other Sub Electrical Panels.
 Well experienced in arranging equipment’s in suitable way and choosing different
range of components.
 Responsible for panel designing, material purchasing and supervising.
 Handled material Quality checking.
Also many other commercial and Industrial Projects
FCIOEN India Market leaders for Electro-Mechanical Components like Relays, Switches, and
custom-built assemblies.
 Conducted LT wiring in FCIOEN on behalf of Leela Electrical Power Services
 Experienced in LT wiring and LT cabling.
 Well experienced in Safety Features.
IT Skills: Well versed with MS-Office, Oracle Primavera, Revit MEP, Auto CADD, and
Electrical CADD Etc.
Extra-Curricular Activities
 Reading, Driving, Swimming, Listening Music, Watching films, Gardening, Cooking
and Photography
Personal Details
Nationality : Indian
Date of Birth : 19th
August 1994
Marital Status : Single
Passport No : L8516446
Languages : English, Hindi, Tamil & Malayalam
Address : Puthiyamadam H, Mudavoor P.O, Muvattupuzha
Ernakulam, Kerala, India, PIN:- 686669

My resume

  • 1.
    Jerin John Electrical Engineer Mobile:+919633765732 E-mail: johnjerin880@gmail.com Qualified Electrical Engineer with progressive work experience within Electrical contracting companies, demonstrating expertise in site supervision and wide aspects of engineering. Worked efficiently and consistently utilized total quality management principles including safety standards in operating successfully in a fast paced, deadline – oriented work environment. Tact to deal with clientele, contractors, consultants and all levels of management with outstanding engineering skills. Well versed with Auto CADD & MEP engineering software. Strengths  Flexible in assuming project responsibilities  Excellent record of client interactions- relations  Organizational skills to Budget time Education Bachelor of Electrical Engineering Ilahia College of Engineering and Technology, Mahatma Gandhi University, Kottayam, India 12th :- Biology Science Fr.Joseph memorial Higher Secondary School Puthuppady, Board of Higher Secondary Examination, Kerala 10th :- S.S.L.C Ebenezer Higher Secondary School Veettoor, Board of Public Examination, Kerala Work Experience Present Design Engineer & Purchase Manager (Electrical) May 2017 to February 2018 Kareem’s Prime Panel Builders, Kattikunnu, Vaikom. Kareem’s is the one of the leading electrical contractor in Kerala from a long period of time, Projects undertaken for Madhyamam Vennala and Madhyamam Kozhikode and other Commercial and Industrial Projects. Currently handling Project Fort Pearl Residence.  Designed Panel Board Drawings & Make Quotations.  Ordered the materials according to the requirements.  Good knowledge & excellent understanding of industry.  Arranged the work according to the schedule.  Strong technical-engineering competence  Computer proficient with team playing attitude
  • 2.
    Site Engineer (Electrical)April 2016 to December 2016 Leela Electrical Power Services, Mulanthuruthy. Leela Electrical Power Service is one of the leading Electrical Contractor in Kerala, which have undertaken the works of OEN, ISRO and other Industrial and Commercial Projects. - Finished the work according to the schedule. - Good knowledge & excellent understanding of industry. Project Handled Madhyamam Vennala it has a PLC controlled M.S.B with 1000A ACB Incomer and other Sub Electrical Panels.  Well experienced in arranging equipment’s in suitable way and choosing different range of components.  Responsible for panel designing, material purchasing and supervising.  Handled material Quality checking. Madhyamam Kozhikode it has an AMF (ECRXA V2) controlled M.S.B with 630A MCCB and Other Sub Electrical Panels.  Well experienced in arranging equipment’s in suitable way and choosing different range of components.  Responsible for panel designing, material purchasing and supervising.  Handled material Quality checking. Also many other commercial and Industrial Projects FCIOEN India Market leaders for Electro-Mechanical Components like Relays, Switches, and custom-built assemblies.  Conducted LT wiring in FCIOEN on behalf of Leela Electrical Power Services  Experienced in LT wiring and LT cabling.  Well experienced in Safety Features. IT Skills: Well versed with MS-Office, Oracle Primavera, Revit MEP, Auto CADD, and Electrical CADD Etc. Extra-Curricular Activities  Reading, Driving, Swimming, Listening Music, Watching films, Gardening, Cooking and Photography Personal Details Nationality : Indian Date of Birth : 19th August 1994 Marital Status : Single Passport No : L8516446 Languages : English, Hindi, Tamil & Malayalam Address : Puthiyamadam H, Mudavoor P.O, Muvattupuzha Ernakulam, Kerala, India, PIN:- 686669