CURRICULUM VITAE
Name : Mishar
Address : Perumnas Taman Surya Indah Blok.ENo.04
RT/RW 001/004 Teluk Sasah Seri Kuala Lobam
Bintan (Kepri) - Indonesia
Home Airport : Hang Nadim (Batam) or Raja Ali (Tg. Pinang)
Contact : Mobile +62 282382850611
: Home Mobile +6285274127705
: E-mail mishar_uban@yahoo.com
Date of Birth : 12June 1979
Marital Status : Married
Bank BCA Account : 8890357122
Code Bank BCA : CENAIDJA
Offshore survival Training : 1. HUET, M&O, Indonesia.
2. BOSIET & TSbB, M&O, Indonesia.
3. Flinders Diving, Offshore & Maritime
Medical Center, Novena Medical Center.
Singapure
Skills and Abilities:
Ability in heavy fabrication yard, oil and Gas Refinery Plant, Offshore
production, mechanical, and electrical.
Ability to operate the following equipment: Flooding pump, Air Dryer,
Compressor, lift pump, Buster Pump, bolt torque tensioning equipment.
Hydraulic equipment.
Familiar with Electronic Equipment; Function Generator, Signal Generator,
Spectrum Analyzer, Oscilloscope, Multimeter, Hand Soldering, compressor, and
contactor Mercury .
Summary of working Experience:
Carrying out Nitrogen Helium leak testing, Pigging, Hydro testing and Pneumatic
testing activities.safety procedures or issues during the operation. Read P & ID
Drawings and Isometric Drawing, Prepare and compile test reports. I possess
analytical and technical experience in problem solving and substantial experience
in working with multi-national company & international projects. I can also work
under pressure. Susceptible to absorb and learn new ideas and knowledge
quickly.
Employment History
Duration: January 2016 – June 2016
Company: Halliburton Indonesia
Process & Pipeline Services
Project: EPC-01 Banyu Urip Bojonegoro Indonesia.
Position: Snr. Operator Equipment
Job Description: Retrojeting, Chemical Cleaning Pipeline and pre-
commissioning and Operate Equipment Air Compressor
and Air Dryer Unit
Duration: November 2014 – April 2015
Company: GREENE’S ENERGY ASIA PASIFIC PTL.td
Process & Pipeline Services
Project: Petronas Carigali and Shell (D12 and Laila Platform.
Position: Electrician Mechanic and Operation
Job Description: Retrojeting, Chemical Cleaning Pipeline and pre-
commissioning, Performing on Pipeline Cleaning Hydrostatic testing, drying,
Setting and Operate Equipment Air Compressor and Air Dryer Unit
Duration: April 2014 – October2014
Company: GREENE’S ENERGY ASIA PASIFIC PTL.td
Process & Pipeline Services
Project: Esso PNG LNG Papua New Gienie
Position: Electrician Mechanic and Operation
Job Description: Pipeline Cleaning Hydrostatic testing, drying, Setting and
Operate Equipment Air Compressor and Air Dryer Unit
Duration: September 2013 – March 2014
Company: GREENE’S ENERGY ASIA PASIFIC PTL.td
Process & Pipeline Services
Project: Swistika onshore Myanmar,
Position: Electrician Mechanic and Operation
Job Description: Retrojeting, Chemical Cleaning Pipeline and pre-
commissioning, Performing on Pipeline Cleaning Hydrostatic testing, drying,
Setting and Operate Equipment Air Compressor and Air Dryer Unit
Duration: November 2012 – September 2013
Company: GREENE’S ENERGY ASIA PASIFIC PTL.td
Process & Pipeline Services
Project: Daewoo/SHHI onshore Myanmar, Daewoo SHP Platform
offshore Myanmar,
Position: Electrician Mechanic and Operation
Job Description: Retrojeting, Chemical Cleaning Pipeline and pre-
commissioning, Performing on Pipeline Cleaning
Hydrostatic testing, drying, Setting and Operate Equipment
Air Compressor and Air Dryer Unit
Duration: June 2006 - September 2009
Company: PT. AMC Bintan Indonesia
Position: Assistant Process Engineer
Job Description:
Washing Machine, Omega Meter Machine and familiar trouble shooting
machine any problem, Calibration internal and external, repaired equipment,
and handling Document for process control internal and external Audit.
Duration: September 2006 – October 2006
Company: PT HANINDO / BJ Process & Pipeline Services
Project: Santos Maleo Project Madura, Indonesia
Position: Technician
Job Description:
Pipe Line and pre-commissioning, Performing on Pipeline Cleaning Hydrostatic
testing, drying, Setting and Operate Equipment Air Compressor and Air Dryer
Unit.
Duration: March 2005 – January 2006
Company: PT HANINDO / BJ Process & Pipeline Services
Project: FPSO, Conoco Belanak Indonesia
Position: Technician
Job Description:
Retrojeting, Chemical Cleaning, And Hot Oil Flushing
Duration: October 2003 - Desember 2004
Company: PT. AMC Bintan Indonesia
Position: Technicianmechanical and electrical
Job Description:
Maintenance machines according standard of ISO 9001 –2000, Handling Trouble
shooting machine.
MISHAR CV
MISHAR CV
MISHAR CV
MISHAR CV
MISHAR CV
MISHAR CV

MISHAR CV

  • 1.
    CURRICULUM VITAE Name :Mishar Address : Perumnas Taman Surya Indah Blok.ENo.04 RT/RW 001/004 Teluk Sasah Seri Kuala Lobam Bintan (Kepri) - Indonesia Home Airport : Hang Nadim (Batam) or Raja Ali (Tg. Pinang) Contact : Mobile +62 282382850611 : Home Mobile +6285274127705 : E-mail mishar_uban@yahoo.com Date of Birth : 12June 1979 Marital Status : Married Bank BCA Account : 8890357122 Code Bank BCA : CENAIDJA Offshore survival Training : 1. HUET, M&O, Indonesia. 2. BOSIET & TSbB, M&O, Indonesia. 3. Flinders Diving, Offshore & Maritime Medical Center, Novena Medical Center. Singapure
  • 2.
    Skills and Abilities: Abilityin heavy fabrication yard, oil and Gas Refinery Plant, Offshore production, mechanical, and electrical. Ability to operate the following equipment: Flooding pump, Air Dryer, Compressor, lift pump, Buster Pump, bolt torque tensioning equipment. Hydraulic equipment. Familiar with Electronic Equipment; Function Generator, Signal Generator, Spectrum Analyzer, Oscilloscope, Multimeter, Hand Soldering, compressor, and contactor Mercury . Summary of working Experience: Carrying out Nitrogen Helium leak testing, Pigging, Hydro testing and Pneumatic testing activities.safety procedures or issues during the operation. Read P & ID Drawings and Isometric Drawing, Prepare and compile test reports. I possess analytical and technical experience in problem solving and substantial experience in working with multi-national company & international projects. I can also work under pressure. Susceptible to absorb and learn new ideas and knowledge quickly. Employment History Duration: January 2016 – June 2016 Company: Halliburton Indonesia Process & Pipeline Services Project: EPC-01 Banyu Urip Bojonegoro Indonesia. Position: Snr. Operator Equipment Job Description: Retrojeting, Chemical Cleaning Pipeline and pre- commissioning and Operate Equipment Air Compressor and Air Dryer Unit
  • 3.
    Duration: November 2014– April 2015 Company: GREENE’S ENERGY ASIA PASIFIC PTL.td Process & Pipeline Services Project: Petronas Carigali and Shell (D12 and Laila Platform. Position: Electrician Mechanic and Operation Job Description: Retrojeting, Chemical Cleaning Pipeline and pre- commissioning, Performing on Pipeline Cleaning Hydrostatic testing, drying, Setting and Operate Equipment Air Compressor and Air Dryer Unit Duration: April 2014 – October2014 Company: GREENE’S ENERGY ASIA PASIFIC PTL.td Process & Pipeline Services Project: Esso PNG LNG Papua New Gienie Position: Electrician Mechanic and Operation Job Description: Pipeline Cleaning Hydrostatic testing, drying, Setting and Operate Equipment Air Compressor and Air Dryer Unit Duration: September 2013 – March 2014 Company: GREENE’S ENERGY ASIA PASIFIC PTL.td Process & Pipeline Services Project: Swistika onshore Myanmar, Position: Electrician Mechanic and Operation Job Description: Retrojeting, Chemical Cleaning Pipeline and pre- commissioning, Performing on Pipeline Cleaning Hydrostatic testing, drying, Setting and Operate Equipment Air Compressor and Air Dryer Unit Duration: November 2012 – September 2013 Company: GREENE’S ENERGY ASIA PASIFIC PTL.td Process & Pipeline Services Project: Daewoo/SHHI onshore Myanmar, Daewoo SHP Platform offshore Myanmar, Position: Electrician Mechanic and Operation Job Description: Retrojeting, Chemical Cleaning Pipeline and pre- commissioning, Performing on Pipeline Cleaning Hydrostatic testing, drying, Setting and Operate Equipment Air Compressor and Air Dryer Unit
  • 4.
    Duration: June 2006- September 2009 Company: PT. AMC Bintan Indonesia Position: Assistant Process Engineer Job Description: Washing Machine, Omega Meter Machine and familiar trouble shooting machine any problem, Calibration internal and external, repaired equipment, and handling Document for process control internal and external Audit. Duration: September 2006 – October 2006 Company: PT HANINDO / BJ Process & Pipeline Services Project: Santos Maleo Project Madura, Indonesia Position: Technician Job Description: Pipe Line and pre-commissioning, Performing on Pipeline Cleaning Hydrostatic testing, drying, Setting and Operate Equipment Air Compressor and Air Dryer Unit. Duration: March 2005 – January 2006 Company: PT HANINDO / BJ Process & Pipeline Services Project: FPSO, Conoco Belanak Indonesia Position: Technician Job Description: Retrojeting, Chemical Cleaning, And Hot Oil Flushing Duration: October 2003 - Desember 2004 Company: PT. AMC Bintan Indonesia Position: Technicianmechanical and electrical Job Description: Maintenance machines according standard of ISO 9001 –2000, Handling Trouble shooting machine.