Overview of my Background




Thierry Verlhiac
  19/04/2012
                       March 2012
                              1
Several Backgrounds
1.    Technical
2.    Customers
3.    Markets
4.    Project Management
5.    Contract Management
6.    Site Procurement Manager
7.    Procurement Target achieved
8.    Strong and weak points
9.    Conclusion
19/04/2012                 Thierry Verlhiac   2
1. Technical




19/04/2012      Thierry Verlhiac   3
1 - Technical
1 – 1 First job: Turner
     – Horizontal
     – Vertical

But also on
     – Milling machine
     – Grinding machine




19/04/2012                Thierry Verlhiac   4
1 – Technical / Quality
        1 – 2 Organized and Managed Audit in
USA                                                         Middle East
•       West coast to East Coast,                           •        Israel,
                                                            •        Turkey,
Canada
                                                            Europe
•       Quebec and Ontario,
                                                            •        Switzerland,
Mexico                                                      •        UK,
•       Sonora state,                                       •        Germany,
India                                                       •        Benelux,
                                                            •        Austria,
•       Karnataka state (Bangalore and around),
                                                            •        Italy,
China                                                       •        Spain,
•       Liaoning (Shenyang), Guizhou (Liyang),              •        Norway.
        Shaanxi (Xi’an), Sichuan (Chengdu)



19/04/2012                                        Thierry Verlhiac                  5
1 – Technical / Products
            1 – 3 different categories of products
•         Forgings                                                       •            Small Assys
      –         Compressor blades, flash welding rings, die                       –       Sheet metals and machined parts
                press forgings, rolled forgings,                         •            Fasteners
      –         Titanium, steel, nickel-based alloy and aluminum,                 –       Bolts, nuts, Inserts, Studs, rivets, pins and
•         Castings                                                                        screws
      –         Die casting (lost wax)                                   •            Sheet Metals
      –         Titanium, steel base and aluminum                                 –       From a small bracket to a big frame
•         Machining                                                      •            Harnesses
      –         All types of machining (Turning, milling, grinding,               –       Electrical harnesses
                drilling (deep), polishing,….)
      –         All materials
                                                                         •            Special processes
•         R/M
                                                                                  –       FPI, Coating, anodizing, painting, shoot peening,
      –         Plates, sheets, strip, bars,                                              heat treatment, marking, X-ray, welding…




    19/04/2012                                                 Thierry Verlhiac                                                           6
1 – Technical / Documentation
      1 – 4 type of customers documentation

• Mainly built to print
But also
• Built to specification




19/04/2012                     Thierry Verlhiac   7
2. Customers




19/04/2012      Thierry Verlhiac   8
2 - Customers
• For Snecma                                        Corbeil/ Evry and Gennevilliers
      – General Electric (CFM56, CF6-50, 80A, C & E LM2500, 6000)
      – Snecma (All programs)

• For RUAG Aerospace                                Plan-Les-Ouates
      –      Snecma (SAM146, TP400, GP7200)
      –      General Electric (CFM56, CF34-10A & E, F404 )
      –      Dassault ( Falcon 900 & 7X )
      –      Eurocopter (NH90)
      –      Boeing (F/A 18 C/D & E/F)
      –      Nortrop Grumann (F/A 18 C/D)

• For RUAG Technology                               Emmen (Lucerne)
      –      Airbus -UK, Germany and France- (A320/330/340/380)
      –      General Electric (CF34-10E)
      –      Dassault (( Falcon 900 & 7X & Rafale)
      –      Bombardier (CRJ700/900 & 1000)
      –      Boeing Military (F/A 18 C/D )
      –      Nortrop Grumann (F/A 18 C/D)
      –      SAAB (Gripen)
      –      Pilatus (PC12, 21)
19/04/2012                                        Thierry Verlhiac                    9
3. Markets




19/04/2012     Thierry Verlhiac   10
3 - Markets
• Sourcing
      – India March 2011
      – Engineering and production approach
• Benchmarking
      – Sheet Metals for Bombardier CRJ series project
             • Started in July 2009
             • October 2009 proposals
                 –   80 suppliers approached
                 –   60 NDA and RFI received
                 –   42 quoted (partial or completed): +400 P/Ns
                 –   4 recommendations to the RUAG Management
                        » South Africa, South Korea, Los Angeles and France (Tunisia)
                           (Aerosud) (-)              ( Swift Cor)   (Auvergne Aeronautique)

19/04/2012                                   Thierry Verlhiac                                  11
3 - Markets
• Surveillance
      – Visit Air show
      – Aerospace network open
• Technological watch
      – During suppliers or customers visit
• RFI
      – regularly sent RFI in the market for new suppliers
• Suppliers data base up-to-date
      – Request to my suppliers yearly update of their qualification,
             machines, new customers contracts, etc…
19/04/2012                          Thierry Verlhiac                    12
4. Project Management




19/04/2012           Thierry Verlhiac   13
4 - Project Management
  4 – 1 Snecma                                                               1998 – 2005
• Canada, Israel                                                                 1998 - 2000
      – Team:      Leader: Myself - Quality product
      – FAI and Ramp up
• China (3 different locations)               K-Projects: Offset                 2000 - 2005
      – Team:       Leader: Myself - Quality product - Expatriate in China – Local Engineers
      – FAI and Ramp up
• Turkey                                      K-Projects: Offset                 2000 - 2005
      – Team:       Leader: Myself - Quality product
      – FAI and Ramp up
• USA, Europe                                                                    2000 - 2005
      – Team:        Leader: Myself - Quality product
      – FAI and Ramp up
• Norway K-Projects: most competitive Snecma Competitor                          2003
      – Team:         Leader: Myself - Quality product – Production - Engineering
      – Productivity plan
19/04/2012                                   Thierry Verlhiac                                  14
4 - Project Management
    4 – 2 RUAG                                                                      2005 - 2011
• Sheet Metals welded
    – Production Transfer from UK to Canada                                   8 P/Ns
          •    Transfer of tooling with modification
          •    B/P not updated from the latest customer
          •    Continue to deliver the assembly line (old source had a delay > 4 months)
          •    Approved the new FAIR and have a very quick ramp up


• Sheet Metals
    – Production Transfer from UK to US (Los Angeles)                        300 P/Ns
          •    Transfer of tooling without modification
          •    Build a buffer stock (from 1 to 4 months: depending of the complexity of the parts)
          •    Approved the new FAIR and have a quick ramp up
          •    Build a buffer stock of 3 months production in 6 months




  19/04/2012                                              Thierry Verlhiac                           15
4 - Project Management
  4 – 3 RUAG                                                                 2010 - 2011
• Lead a built to spec project
      – Participate to the Customer reporting meeting                 (Quarterly meeting)
             • responsible for purchasing procedures up-to-date
      – Report to the project Leader                                  (Weekly meeting)
      – Managed all the procurement issues                            (Weekly meeting)
             • 4 strategic Buyers and their operative
                   1.     Turning, Milling and R/M
                   2.     Fasteners
                   3.      Tooling
                   4.     Sheet Metals, Harnesses (myself)
             •     Keep the prices into the Budget
             •     Suppliers approvals
             •     Lead-times
             •     Export / import Licenses
             •     KPI’s for the Project Leader
             •     Provisory B/P’s with the engineering

19/04/2012                                         Thierry Verlhiac                         16
5. Contract Management




19/04/2012           Thierry Verlhiac   17
5 – Contract Management
• Snecma
     – Negotiated and signed LTA
             • 3 years in general, 5 for few                 CFM56-7B

                 – New         or
                 – Renewal frame contract (China)
             • 10 years for spare parts
• RUAG
     – Negotiated and signed LTA
             • 5 years

19/04/2012                                Thierry Verlhiac              18
6. Site Procurement Manager




19/04/2012              Thierry Verlhiac   19
6 – Site Procurement Manager
• Plan-Les-Ouates                                              2005 – 2009
             • Managed 2 Buyers
                 – One was responsible for all the cutting tools (10% of the budget)
                 – One for the indirect procurement (5% of the budget)




19/04/2012                                  Thierry Verlhiac                           20
7. Procurement Target achieved




19/04/2012               Thierry Verlhiac     21
7. Procurement Target achieved 1/8
• 1990 – 1994: Strategic and operative (Diamonds, abrasives, graphite and copper electrodes &
  broaching tools)
      – In 1990: 1000 P/Os – 100 suppliers
             1.   Put 90% of my portfolios in contract (15 suppliers)
             2.   The rest of 10% in 2 brokers
             3.   In average between -4% to -20% for the prices per commodity
             4.   Sold my strategy to the main stakeholders in 2 sites


• 1994 – 1996: Strategic and operative (Turbine Castings)
      1.     For the department
             •    Recovered 60% of the cost of the Non Quality Events of the suppliers – 1989/1994 (3 M€)
      2.     Reduced the delay of my 3 suppliers
             • In binomial with quality representative
                   – Weekly reports and phone call
                   – Monthly visit to check physically the production
                        » Inventory
                        » Final quality inspection


19/04/2012                                              Thierry Verlhiac                                    22
7. Procurement Target achieved 2/8
• 1996 – 1998: Strategic (Flash Welded Ring)
      – Benchmarking of the commodity (5 suppliers in the world)
          1. Renegotiated 3 years LTA’s with 2 main suppliers + one for
              specific production
          2. Put in place buffer stock of 2 weeks in the suppliers
          3. In average -2% for the prices per year
• 1998 – 2000: Strategic (Compressor blades and Vanes)
      – Transfer parts from a end customer facility to a monopolistic supplier (quality and price
        issues)
      – Renegotiated a LTA with a monopolistic supplier in Israel
             • Mainly formula for the titanium R/M (50% of the price) and labor +1%/year
             • Reduce drastically the assembly line stoppage by
                   – Buffer stock in the suppliers (partially successful)
                   – Daily phone call + Excel reporting then weekly
                   – Quarterly visit with one assembly line operative buyer for a complete week


19/04/2012                                              Thierry Verlhiac                            23
7. Procurement Target achieved 3/8
• 2000 - 2005: Strategic (Rotating parts: Disks, Blisks, shafts, spools, shrouds, etc…)
    – Renegotiated LTA 3 (years) with 3 companies in China with Offset obligations for:
        – Parts still in development
        – New parts transferred from
             – French suppliers: divide the price by 2
             – Internal production: divide the price by 2.5
        – Mass production parts for 80% of the volume (20% in France) of the program.
        – Small volume 100%
        – Most of the operative business was thru our expatriate and local Snecma representative in
           China with weekly reporting to me.
        – Responsible of the KPI’s with reporting to the top management monthly




   19/04/2012                               Thierry Verlhiac                                   24
7. Procurement Target achieved 4/8
• 2000 - 2005: Strategic (in addition)
    – Negotiated a LTA (5 years) in Turkey
       – By Make or buy approach
            – Price reduced by 40% for the 1st year then -2% /year,
       – Mass production parts from 20% (3rd supplier) to 100% of the program,
           – Quarterly visit with a quality products representative for a complete week,
           – Responsible of the KPI’s with reporting to the top management monthly,
    – Negotiated a LTA (10 years) in Switzerland
       – End life Spare parts
    – Negotiated several LTA (3 years) in USA, Germany, Italy,



  19/04/2012                                  Thierry Verlhiac                             25
7. Procurement Target achieved 5/8
• 2000 - 2005: Strategic (in addition)
      – Negotiated a productivity plan in Norway,
          – Leader for a group of 3 persons: Quality + Engineer
          – Study the process in detail


• 2005 – 2009: Strategic
      – Negotiated LTA with forging and casting companies
                   – logistics and quality issues for Customers LTA
                   – 5 years LTA for titanium plates
      – Formalized all the special processes strategy
             • Initiated Double sources,
             • Used new approved customer sources,
             • Negotiated logistics terms and reporting



19/04/2012                                         Thierry Verlhiac   26
7. Procurement Target achieved 6/8
 2005 – 2009: Site Procurement Manager (Engine and structure parts)

Re-organized the department
• Before:                                                                • After:
  –       R/M were managed by the CEO,                                         –   I was responsible for the R/M (for the division from
  –       the special processes by the logistic (reporting to the                  2006: 3 sites),
          production manager) and                                              –   had one specific technical buyer for the cutting tools
  –       the rest by the engineering                                              (1MFr./year) and
                                                                               –   One operative buyer for the indirect procurement .
                                                                               –   Create and put in place internal procedures

  • Before:                                                              • After:
      –     R/M P/O placed when the suppliers had capacities or                –   R/M: Linked between sales P/O the lead-times for
            when some stock of plates of titanium were available                   the production and our subcontractor . With in
            and prices interesting (stock till 5 years of                          addition a buffer stock to avoid the production
            production)                                                            stoppage (divide by 5 the value the stock in 3 years).
      –     The parts shipped in express (from France and USA)                 –   Schedule the parts for our subcontractors with
            –      when available from the suppliers (no respect                   weekly forecasts (+/- 2 days) and a shuttle for the
                   of the schedule of the P/O)                                     transport (France)
            –      After a request from somebody from the                      –   Create a procurement request to be signed by the
                   production (free production capacity)                           M+1 for the requirement, yearly prices and
                                                                                   conditions approved with the suppliers with 2
                                                                                   suppliers maximum per main products.

 19/04/2012                                                 Thierry Verlhiac                                                      27
7. Procurement Target achieved 6/8
 2005 – 2009: Site Procurement Manager (Engine and structure parts)

• Before:
  –   R/M P/O placed when the suppliers had capacities or         • After:
      when some stock of plates of titanium were available              –   R/M: Linked between sales P/O the lead-times for
      and prices interesting (stock till 5 years of                         the production and our subcontractor . With in
      production)                                                           addition a buffer stock to avoid the production
  –   The parts shipped in express (from France and USA)                    stoppage (divide by 5 the value the stock in 3 years).
      –      when available from the suppliers (no respect              –   Schedule the parts for our subcontractors with
             of the schedule of the P/O)                                    weekly forecasts (+/- 2 days) and a shuttle for the
      –      After a request from somebody from the                         transport (France)
             production (free production capacity)                      –   Create a procurement request to be signed by the
                                                                            M+1 for the requirement, yearly prices and
                                                                            conditions approved with the suppliers with 2
                                                                            suppliers maximum per main products.




 19/04/2012                                          Thierry Verlhiac                                                      28
7. Procurement Target achieved 7/8
• 2005 – 2009: Site Procurement Manager (in addition)
          • Develop the synergies with the division by using the umbrella contracts
          • “Sold” the procurement to all the internal Leaders (complete new approach for the
            site)
                   – Production , Quality, engineering, program, finance and Site Manager

• 2009 – 2011: Strategic procurement manager (structure parts)
               • Managed an UK supplier unable to deliver 500 FAIRs in 6 months
               • In parallel, launched a world benchmarking (see slide 11)
                   – Shown that the Low Cost market is not necessary in China but can be somewhere else.
                        » 55% in average of reduction of the cost by transferring 400 P/Ns in L.A. in a supplier
                           already approved for the complex parts with the customers (Transfer plan: 6 months for all
                           the FAIRs with 100 parts using tooling from the old source).
                   – Procurement Leader for a “Built to Spec” project /Dassault
                        » Managed the schedule of this project with the procurement team (See slide 16)


  19/04/2012                                         Thierry Verlhiac                                             29
7. Procurement Target achieved 8/8
• Nov. 2011 to Now: Procurement Business Partner at Syngenta Crop Protection
      1.     Direct leadership of major categories/sub-categories of indirect procurement (Capex
             and Opex)
             • Piping,
             • Civil Construction,
      3.         Sourcing projects strategy by market analysis,
             • Fire protection/detection
      4.         Support stakeholders for suppliers choice,
      5.         Contracts negotiation,
      6.         Improvement of the performance of the Key suppliers,
             •       Simplification of processes
             •       Load / capacity analysis
             •       SRM
      7.         Propose global approach strategy to my colleagues
      8.         Procurement co-leader for the preparation of the
                 ISO 9001 certification,

19/04/2012                                         Thierry Verlhiac                                30
8. Strong and weak points




19/04/2012             Thierry Verlhiac   31
8. Strong points                                      1/2
• Some characteristics which describe my personality (In disorder):
    –   Has the ability to predict accurate results.
    –   Trustworthy and has a stabilizing presence.
    –   Loyal, conscientious and work hard to produce results.
    –   A good mediator in the settlement of conflicts.
    –   Seen by most as a person of integrity and sincerity.
    –   Fits assuming its function and responsibilities.
    –   Comfortable in personal reflection and in relations with others
    –   Good listening. Can help others achieve their goals.
    –   Tolerant and generous.
    –   Respectful of the needs of others.

19/04/2012                         Thierry Verlhiac                       32
8. Weak points                                       2/2
• Some characteristics which describe my personality (In disorder):

    –   Tendency to focus on past failures rather than successes,
    –   May unknowingly sacrifice her own needs for others,
    –   Often feel responsible for others,
    –   Has a low level of German




 19/04/2012                        Thierry Verlhiac                 33
To Summarize                                  30 years in the
                                                Aerospace
                                                 Business




                                              12 years in Project


                                                 Management




                                              Only 48 Years old


                                              w ith my strong and


                                                 w eak points



             22 years of
             experience
                 3


              Markets



19/04/2012                 Thierry Verlhiac                         34
9. Conclusion




19/04/2012       Thierry Verlhiac   35
8. Conclusion
• Experiment Professional with
             • Focus in
                 –   Stakeholders satisfaction,
                 –   Partnership with the suppliers
                 –   Objective and result oriented
                 –   Work for the Team and the company not for me
             • Motivated and young spirit
             • Like to transfer my knowhow to the group


• Would be happy to enter in a strong Aerospace company

19/04/2012                                 Thierry Verlhiac         36

More Related Content

Viewers also liked

131023 instrumentos-de-los-parques
131023 instrumentos-de-los-parques131023 instrumentos-de-los-parques
131023 instrumentos-de-los-parquesÀlex Brossa Enrique
 
Software educativo. sebran abc
Software educativo. sebran abcSoftware educativo. sebran abc
Software educativo. sebran abcFabiana Suárez
 
Catálogo de cursos de tantra. Agosto y septiembre 2016
Catálogo de cursos de tantra. Agosto y septiembre 2016Catálogo de cursos de tantra. Agosto y septiembre 2016
Catálogo de cursos de tantra. Agosto y septiembre 2016Tantra y Amor Consciente
 
Productos tradicionales y denominaciones consagradas por el uso
Productos tradicionales y denominaciones consagradas por el usoProductos tradicionales y denominaciones consagradas por el uso
Productos tradicionales y denominaciones consagradas por el usoainia centro tecnológico
 
Threesides CollabIT - Digital Marketing Lifestages
Threesides CollabIT  - Digital Marketing LifestagesThreesides CollabIT  - Digital Marketing Lifestages
Threesides CollabIT - Digital Marketing LifestagesThreesides Marketing
 
Grupo de presion ccpp
Grupo de presion ccppGrupo de presion ccpp
Grupo de presion ccppsamy2628
 
Téléassurances
TéléassurancesTéléassurances
TéléassurancesEASYRECRUE
 
Big Data: Explore Hadoop and BigInsights self-study lab
Big Data:  Explore Hadoop and BigInsights self-study labBig Data:  Explore Hadoop and BigInsights self-study lab
Big Data: Explore Hadoop and BigInsights self-study labCynthia Saracco
 
Presentacion consultoria empresarial pyme jica
Presentacion consultoria empresarial pyme jicaPresentacion consultoria empresarial pyme jica
Presentacion consultoria empresarial pyme jicaLuis Lopez Acosta
 
Apuntes Ventilacion en Incendios estructurales
Apuntes Ventilacion en Incendios estructuralesApuntes Ventilacion en Incendios estructurales
Apuntes Ventilacion en Incendios estructuralesEduardo Carrión
 

Viewers also liked (12)

131023 instrumentos-de-los-parques
131023 instrumentos-de-los-parques131023 instrumentos-de-los-parques
131023 instrumentos-de-los-parques
 
Software educativo. sebran abc
Software educativo. sebran abcSoftware educativo. sebran abc
Software educativo. sebran abc
 
Catálogo de cursos de tantra. Agosto y septiembre 2016
Catálogo de cursos de tantra. Agosto y septiembre 2016Catálogo de cursos de tantra. Agosto y septiembre 2016
Catálogo de cursos de tantra. Agosto y septiembre 2016
 
Productos tradicionales y denominaciones consagradas por el uso
Productos tradicionales y denominaciones consagradas por el usoProductos tradicionales y denominaciones consagradas por el uso
Productos tradicionales y denominaciones consagradas por el uso
 
Threesides CollabIT - Digital Marketing Lifestages
Threesides CollabIT  - Digital Marketing LifestagesThreesides CollabIT  - Digital Marketing Lifestages
Threesides CollabIT - Digital Marketing Lifestages
 
Grupo de presion ccpp
Grupo de presion ccppGrupo de presion ccpp
Grupo de presion ccpp
 
Téléassurances
TéléassurancesTéléassurances
Téléassurances
 
Pg systems fr f700 fr-f740 fr-f746 mitsubishi
Pg systems fr f700 fr-f740 fr-f746 mitsubishiPg systems fr f700 fr-f740 fr-f746 mitsubishi
Pg systems fr f700 fr-f740 fr-f746 mitsubishi
 
Big Data: Explore Hadoop and BigInsights self-study lab
Big Data:  Explore Hadoop and BigInsights self-study labBig Data:  Explore Hadoop and BigInsights self-study lab
Big Data: Explore Hadoop and BigInsights self-study lab
 
Ligres
LigresLigres
Ligres
 
Presentacion consultoria empresarial pyme jica
Presentacion consultoria empresarial pyme jicaPresentacion consultoria empresarial pyme jica
Presentacion consultoria empresarial pyme jica
 
Apuntes Ventilacion en Incendios estructurales
Apuntes Ventilacion en Incendios estructuralesApuntes Ventilacion en Incendios estructurales
Apuntes Ventilacion en Incendios estructurales
 

Similar to My Background Thierry Verlhiac

Oneia baird & associates presentation
Oneia baird & associates presentationOneia baird & associates presentation
Oneia baird & associates presentationONEIA
 
Fastrax presentation money talksforum online
Fastrax presentation money talksforum onlineFastrax presentation money talksforum online
Fastrax presentation money talksforum onlineTechnopolis Plc
 
Ray Amin - Professional Achievements
Ray Amin - Professional AchievementsRay Amin - Professional Achievements
Ray Amin - Professional AchievementsRefayet "Ray" Amin
 
Corporate Presentation 2012 Compressed
Corporate Presentation 2012 CompressedCorporate Presentation 2012 Compressed
Corporate Presentation 2012 Compressedbrettmccoy
 
OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...
OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...
OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...Yole Developpement
 
Faspro Technologies - General 9.2013
Faspro Technologies - General 9.2013Faspro Technologies - General 9.2013
Faspro Technologies - General 9.2013Molly R Morrison
 
NL Precision Metal Technologies, Inc 2016
NL Precision Metal Technologies, Inc 2016NL Precision Metal Technologies, Inc 2016
NL Precision Metal Technologies, Inc 2016Timothy Perry
 
Sierra Circuits PCB Fabrication Capabilities
Sierra Circuits PCB Fabrication CapabilitiesSierra Circuits PCB Fabrication Capabilities
Sierra Circuits PCB Fabrication CapabilitiesSierra Circuits, Inc.
 
HENGLI-THT BELT FURNACE- FRENCH VERSION
HENGLI-THT BELT FURNACE- FRENCH VERSIONHENGLI-THT BELT FURNACE- FRENCH VERSION
HENGLI-THT BELT FURNACE- FRENCH VERSIONDaniel García
 
Mba 513 final carpenter
Mba 513 final carpenterMba 513 final carpenter
Mba 513 final carpenterguest7ce8cf
 
Aspocomp Oulu Company Presentation Ss2
Aspocomp Oulu Company Presentation Ss2Aspocomp Oulu Company Presentation Ss2
Aspocomp Oulu Company Presentation Ss2guest5412de
 
Tht Presentation Furnaces Spanish
Tht Presentation Furnaces SpanishTht Presentation Furnaces Spanish
Tht Presentation Furnaces SpanishDaniel García
 
Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019Franco D. Biella
 
Nanowire LED patent investigation Sample
Nanowire LED patent investigation SampleNanowire LED patent investigation Sample
Nanowire LED patent investigation SampleKnowmade
 
Pipeline pdf brochure
Pipeline pdf brochurePipeline pdf brochure
Pipeline pdf brochurehydrobolt
 

Similar to My Background Thierry Verlhiac (20)

Oneia baird & associates presentation
Oneia baird & associates presentationOneia baird & associates presentation
Oneia baird & associates presentation
 
Fastrax presentation money talksforum online
Fastrax presentation money talksforum onlineFastrax presentation money talksforum online
Fastrax presentation money talksforum online
 
Ray Amin - Professional Achievements
Ray Amin - Professional AchievementsRay Amin - Professional Achievements
Ray Amin - Professional Achievements
 
Nalco ppt
Nalco pptNalco ppt
Nalco ppt
 
Corporate Presentation 2012 Compressed
Corporate Presentation 2012 CompressedCorporate Presentation 2012 Compressed
Corporate Presentation 2012 Compressed
 
OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...
OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...
OLED for Lighting - Technology, Industry and Market Trends 2016 Report by Yol...
 
Faspro Technologies - General 9.2013
Faspro Technologies - General 9.2013Faspro Technologies - General 9.2013
Faspro Technologies - General 9.2013
 
NL Precision Metal Technologies, Inc 2016
NL Precision Metal Technologies, Inc 2016NL Precision Metal Technologies, Inc 2016
NL Precision Metal Technologies, Inc 2016
 
Sierra Circuits PCB Fabrication Capabilities
Sierra Circuits PCB Fabrication CapabilitiesSierra Circuits PCB Fabrication Capabilities
Sierra Circuits PCB Fabrication Capabilities
 
HENGLI-THT BELT FURNACE- FRENCH VERSION
HENGLI-THT BELT FURNACE- FRENCH VERSIONHENGLI-THT BELT FURNACE- FRENCH VERSION
HENGLI-THT BELT FURNACE- FRENCH VERSION
 
Mba 513 final carpenter
Mba 513 final carpenterMba 513 final carpenter
Mba 513 final carpenter
 
Aspocomp Oulu Company Presentation Ss2
Aspocomp Oulu Company Presentation Ss2Aspocomp Oulu Company Presentation Ss2
Aspocomp Oulu Company Presentation Ss2
 
Tht Presentation Furnaces Spanish
Tht Presentation Furnaces SpanishTht Presentation Furnaces Spanish
Tht Presentation Furnaces Spanish
 
CAM Esprit
CAM EspritCAM Esprit
CAM Esprit
 
Rare earth demand drivers
Rare earth demand driversRare earth demand drivers
Rare earth demand drivers
 
Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019Leghe Leggere Lavorate Brochure 2019
Leghe Leggere Lavorate Brochure 2019
 
Nanowire LED patent investigation Sample
Nanowire LED patent investigation SampleNanowire LED patent investigation Sample
Nanowire LED patent investigation Sample
 
TTI overview slideshow
TTI overview slideshowTTI overview slideshow
TTI overview slideshow
 
PRESENTATION.pptx
PRESENTATION.pptxPRESENTATION.pptx
PRESENTATION.pptx
 
Pipeline pdf brochure
Pipeline pdf brochurePipeline pdf brochure
Pipeline pdf brochure
 

My Background Thierry Verlhiac

  • 1. Overview of my Background Thierry Verlhiac 19/04/2012 March 2012 1
  • 2. Several Backgrounds 1. Technical 2. Customers 3. Markets 4. Project Management 5. Contract Management 6. Site Procurement Manager 7. Procurement Target achieved 8. Strong and weak points 9. Conclusion 19/04/2012 Thierry Verlhiac 2
  • 3. 1. Technical 19/04/2012 Thierry Verlhiac 3
  • 4. 1 - Technical 1 – 1 First job: Turner – Horizontal – Vertical But also on – Milling machine – Grinding machine 19/04/2012 Thierry Verlhiac 4
  • 5. 1 – Technical / Quality 1 – 2 Organized and Managed Audit in USA Middle East • West coast to East Coast, • Israel, • Turkey, Canada Europe • Quebec and Ontario, • Switzerland, Mexico • UK, • Sonora state, • Germany, India • Benelux, • Austria, • Karnataka state (Bangalore and around), • Italy, China • Spain, • Liaoning (Shenyang), Guizhou (Liyang), • Norway. Shaanxi (Xi’an), Sichuan (Chengdu) 19/04/2012 Thierry Verlhiac 5
  • 6. 1 – Technical / Products 1 – 3 different categories of products • Forgings • Small Assys – Compressor blades, flash welding rings, die – Sheet metals and machined parts press forgings, rolled forgings, • Fasteners – Titanium, steel, nickel-based alloy and aluminum, – Bolts, nuts, Inserts, Studs, rivets, pins and • Castings screws – Die casting (lost wax) • Sheet Metals – Titanium, steel base and aluminum – From a small bracket to a big frame • Machining • Harnesses – All types of machining (Turning, milling, grinding, – Electrical harnesses drilling (deep), polishing,….) – All materials • Special processes • R/M – FPI, Coating, anodizing, painting, shoot peening, – Plates, sheets, strip, bars, heat treatment, marking, X-ray, welding… 19/04/2012 Thierry Verlhiac 6
  • 7. 1 – Technical / Documentation 1 – 4 type of customers documentation • Mainly built to print But also • Built to specification 19/04/2012 Thierry Verlhiac 7
  • 8. 2. Customers 19/04/2012 Thierry Verlhiac 8
  • 9. 2 - Customers • For Snecma Corbeil/ Evry and Gennevilliers – General Electric (CFM56, CF6-50, 80A, C & E LM2500, 6000) – Snecma (All programs) • For RUAG Aerospace Plan-Les-Ouates – Snecma (SAM146, TP400, GP7200) – General Electric (CFM56, CF34-10A & E, F404 ) – Dassault ( Falcon 900 & 7X ) – Eurocopter (NH90) – Boeing (F/A 18 C/D & E/F) – Nortrop Grumann (F/A 18 C/D) • For RUAG Technology Emmen (Lucerne) – Airbus -UK, Germany and France- (A320/330/340/380) – General Electric (CF34-10E) – Dassault (( Falcon 900 & 7X & Rafale) – Bombardier (CRJ700/900 & 1000) – Boeing Military (F/A 18 C/D ) – Nortrop Grumann (F/A 18 C/D) – SAAB (Gripen) – Pilatus (PC12, 21) 19/04/2012 Thierry Verlhiac 9
  • 10. 3. Markets 19/04/2012 Thierry Verlhiac 10
  • 11. 3 - Markets • Sourcing – India March 2011 – Engineering and production approach • Benchmarking – Sheet Metals for Bombardier CRJ series project • Started in July 2009 • October 2009 proposals – 80 suppliers approached – 60 NDA and RFI received – 42 quoted (partial or completed): +400 P/Ns – 4 recommendations to the RUAG Management » South Africa, South Korea, Los Angeles and France (Tunisia) (Aerosud) (-) ( Swift Cor) (Auvergne Aeronautique) 19/04/2012 Thierry Verlhiac 11
  • 12. 3 - Markets • Surveillance – Visit Air show – Aerospace network open • Technological watch – During suppliers or customers visit • RFI – regularly sent RFI in the market for new suppliers • Suppliers data base up-to-date – Request to my suppliers yearly update of their qualification, machines, new customers contracts, etc… 19/04/2012 Thierry Verlhiac 12
  • 13. 4. Project Management 19/04/2012 Thierry Verlhiac 13
  • 14. 4 - Project Management 4 – 1 Snecma 1998 – 2005 • Canada, Israel 1998 - 2000 – Team: Leader: Myself - Quality product – FAI and Ramp up • China (3 different locations) K-Projects: Offset 2000 - 2005 – Team: Leader: Myself - Quality product - Expatriate in China – Local Engineers – FAI and Ramp up • Turkey K-Projects: Offset 2000 - 2005 – Team: Leader: Myself - Quality product – FAI and Ramp up • USA, Europe 2000 - 2005 – Team: Leader: Myself - Quality product – FAI and Ramp up • Norway K-Projects: most competitive Snecma Competitor 2003 – Team: Leader: Myself - Quality product – Production - Engineering – Productivity plan 19/04/2012 Thierry Verlhiac 14
  • 15. 4 - Project Management 4 – 2 RUAG 2005 - 2011 • Sheet Metals welded – Production Transfer from UK to Canada 8 P/Ns • Transfer of tooling with modification • B/P not updated from the latest customer • Continue to deliver the assembly line (old source had a delay > 4 months) • Approved the new FAIR and have a very quick ramp up • Sheet Metals – Production Transfer from UK to US (Los Angeles) 300 P/Ns • Transfer of tooling without modification • Build a buffer stock (from 1 to 4 months: depending of the complexity of the parts) • Approved the new FAIR and have a quick ramp up • Build a buffer stock of 3 months production in 6 months 19/04/2012 Thierry Verlhiac 15
  • 16. 4 - Project Management 4 – 3 RUAG 2010 - 2011 • Lead a built to spec project – Participate to the Customer reporting meeting (Quarterly meeting) • responsible for purchasing procedures up-to-date – Report to the project Leader (Weekly meeting) – Managed all the procurement issues (Weekly meeting) • 4 strategic Buyers and their operative 1. Turning, Milling and R/M 2. Fasteners 3. Tooling 4. Sheet Metals, Harnesses (myself) • Keep the prices into the Budget • Suppliers approvals • Lead-times • Export / import Licenses • KPI’s for the Project Leader • Provisory B/P’s with the engineering 19/04/2012 Thierry Verlhiac 16
  • 17. 5. Contract Management 19/04/2012 Thierry Verlhiac 17
  • 18. 5 – Contract Management • Snecma – Negotiated and signed LTA • 3 years in general, 5 for few CFM56-7B – New or – Renewal frame contract (China) • 10 years for spare parts • RUAG – Negotiated and signed LTA • 5 years 19/04/2012 Thierry Verlhiac 18
  • 19. 6. Site Procurement Manager 19/04/2012 Thierry Verlhiac 19
  • 20. 6 – Site Procurement Manager • Plan-Les-Ouates 2005 – 2009 • Managed 2 Buyers – One was responsible for all the cutting tools (10% of the budget) – One for the indirect procurement (5% of the budget) 19/04/2012 Thierry Verlhiac 20
  • 21. 7. Procurement Target achieved 19/04/2012 Thierry Verlhiac 21
  • 22. 7. Procurement Target achieved 1/8 • 1990 – 1994: Strategic and operative (Diamonds, abrasives, graphite and copper electrodes & broaching tools) – In 1990: 1000 P/Os – 100 suppliers 1. Put 90% of my portfolios in contract (15 suppliers) 2. The rest of 10% in 2 brokers 3. In average between -4% to -20% for the prices per commodity 4. Sold my strategy to the main stakeholders in 2 sites • 1994 – 1996: Strategic and operative (Turbine Castings) 1. For the department • Recovered 60% of the cost of the Non Quality Events of the suppliers – 1989/1994 (3 M€) 2. Reduced the delay of my 3 suppliers • In binomial with quality representative – Weekly reports and phone call – Monthly visit to check physically the production » Inventory » Final quality inspection 19/04/2012 Thierry Verlhiac 22
  • 23. 7. Procurement Target achieved 2/8 • 1996 – 1998: Strategic (Flash Welded Ring) – Benchmarking of the commodity (5 suppliers in the world) 1. Renegotiated 3 years LTA’s with 2 main suppliers + one for specific production 2. Put in place buffer stock of 2 weeks in the suppliers 3. In average -2% for the prices per year • 1998 – 2000: Strategic (Compressor blades and Vanes) – Transfer parts from a end customer facility to a monopolistic supplier (quality and price issues) – Renegotiated a LTA with a monopolistic supplier in Israel • Mainly formula for the titanium R/M (50% of the price) and labor +1%/year • Reduce drastically the assembly line stoppage by – Buffer stock in the suppliers (partially successful) – Daily phone call + Excel reporting then weekly – Quarterly visit with one assembly line operative buyer for a complete week 19/04/2012 Thierry Verlhiac 23
  • 24. 7. Procurement Target achieved 3/8 • 2000 - 2005: Strategic (Rotating parts: Disks, Blisks, shafts, spools, shrouds, etc…) – Renegotiated LTA 3 (years) with 3 companies in China with Offset obligations for: – Parts still in development – New parts transferred from – French suppliers: divide the price by 2 – Internal production: divide the price by 2.5 – Mass production parts for 80% of the volume (20% in France) of the program. – Small volume 100% – Most of the operative business was thru our expatriate and local Snecma representative in China with weekly reporting to me. – Responsible of the KPI’s with reporting to the top management monthly 19/04/2012 Thierry Verlhiac 24
  • 25. 7. Procurement Target achieved 4/8 • 2000 - 2005: Strategic (in addition) – Negotiated a LTA (5 years) in Turkey – By Make or buy approach – Price reduced by 40% for the 1st year then -2% /year, – Mass production parts from 20% (3rd supplier) to 100% of the program, – Quarterly visit with a quality products representative for a complete week, – Responsible of the KPI’s with reporting to the top management monthly, – Negotiated a LTA (10 years) in Switzerland – End life Spare parts – Negotiated several LTA (3 years) in USA, Germany, Italy, 19/04/2012 Thierry Verlhiac 25
  • 26. 7. Procurement Target achieved 5/8 • 2000 - 2005: Strategic (in addition) – Negotiated a productivity plan in Norway, – Leader for a group of 3 persons: Quality + Engineer – Study the process in detail • 2005 – 2009: Strategic – Negotiated LTA with forging and casting companies – logistics and quality issues for Customers LTA – 5 years LTA for titanium plates – Formalized all the special processes strategy • Initiated Double sources, • Used new approved customer sources, • Negotiated logistics terms and reporting 19/04/2012 Thierry Verlhiac 26
  • 27. 7. Procurement Target achieved 6/8 2005 – 2009: Site Procurement Manager (Engine and structure parts) Re-organized the department • Before: • After: – R/M were managed by the CEO, – I was responsible for the R/M (for the division from – the special processes by the logistic (reporting to the 2006: 3 sites), production manager) and – had one specific technical buyer for the cutting tools – the rest by the engineering (1MFr./year) and – One operative buyer for the indirect procurement . – Create and put in place internal procedures • Before: • After: – R/M P/O placed when the suppliers had capacities or – R/M: Linked between sales P/O the lead-times for when some stock of plates of titanium were available the production and our subcontractor . With in and prices interesting (stock till 5 years of addition a buffer stock to avoid the production production) stoppage (divide by 5 the value the stock in 3 years). – The parts shipped in express (from France and USA) – Schedule the parts for our subcontractors with – when available from the suppliers (no respect weekly forecasts (+/- 2 days) and a shuttle for the of the schedule of the P/O) transport (France) – After a request from somebody from the – Create a procurement request to be signed by the production (free production capacity) M+1 for the requirement, yearly prices and conditions approved with the suppliers with 2 suppliers maximum per main products. 19/04/2012 Thierry Verlhiac 27
  • 28. 7. Procurement Target achieved 6/8 2005 – 2009: Site Procurement Manager (Engine and structure parts) • Before: – R/M P/O placed when the suppliers had capacities or • After: when some stock of plates of titanium were available – R/M: Linked between sales P/O the lead-times for and prices interesting (stock till 5 years of the production and our subcontractor . With in production) addition a buffer stock to avoid the production – The parts shipped in express (from France and USA) stoppage (divide by 5 the value the stock in 3 years). – when available from the suppliers (no respect – Schedule the parts for our subcontractors with of the schedule of the P/O) weekly forecasts (+/- 2 days) and a shuttle for the – After a request from somebody from the transport (France) production (free production capacity) – Create a procurement request to be signed by the M+1 for the requirement, yearly prices and conditions approved with the suppliers with 2 suppliers maximum per main products. 19/04/2012 Thierry Verlhiac 28
  • 29. 7. Procurement Target achieved 7/8 • 2005 – 2009: Site Procurement Manager (in addition) • Develop the synergies with the division by using the umbrella contracts • “Sold” the procurement to all the internal Leaders (complete new approach for the site) – Production , Quality, engineering, program, finance and Site Manager • 2009 – 2011: Strategic procurement manager (structure parts) • Managed an UK supplier unable to deliver 500 FAIRs in 6 months • In parallel, launched a world benchmarking (see slide 11) – Shown that the Low Cost market is not necessary in China but can be somewhere else. » 55% in average of reduction of the cost by transferring 400 P/Ns in L.A. in a supplier already approved for the complex parts with the customers (Transfer plan: 6 months for all the FAIRs with 100 parts using tooling from the old source). – Procurement Leader for a “Built to Spec” project /Dassault » Managed the schedule of this project with the procurement team (See slide 16) 19/04/2012 Thierry Verlhiac 29
  • 30. 7. Procurement Target achieved 8/8 • Nov. 2011 to Now: Procurement Business Partner at Syngenta Crop Protection 1. Direct leadership of major categories/sub-categories of indirect procurement (Capex and Opex) • Piping, • Civil Construction, 3. Sourcing projects strategy by market analysis, • Fire protection/detection 4. Support stakeholders for suppliers choice, 5. Contracts negotiation, 6. Improvement of the performance of the Key suppliers, • Simplification of processes • Load / capacity analysis • SRM 7. Propose global approach strategy to my colleagues 8. Procurement co-leader for the preparation of the ISO 9001 certification, 19/04/2012 Thierry Verlhiac 30
  • 31. 8. Strong and weak points 19/04/2012 Thierry Verlhiac 31
  • 32. 8. Strong points 1/2 • Some characteristics which describe my personality (In disorder): – Has the ability to predict accurate results. – Trustworthy and has a stabilizing presence. – Loyal, conscientious and work hard to produce results. – A good mediator in the settlement of conflicts. – Seen by most as a person of integrity and sincerity. – Fits assuming its function and responsibilities. – Comfortable in personal reflection and in relations with others – Good listening. Can help others achieve their goals. – Tolerant and generous. – Respectful of the needs of others. 19/04/2012 Thierry Verlhiac 32
  • 33. 8. Weak points 2/2 • Some characteristics which describe my personality (In disorder): – Tendency to focus on past failures rather than successes, – May unknowingly sacrifice her own needs for others, – Often feel responsible for others, – Has a low level of German 19/04/2012 Thierry Verlhiac 33
  • 34. To Summarize 30 years in the Aerospace Business 12 years in Project Management Only 48 Years old w ith my strong and w eak points 22 years of experience 3 Markets 19/04/2012 Thierry Verlhiac 34
  • 35. 9. Conclusion 19/04/2012 Thierry Verlhiac 35
  • 36. 8. Conclusion • Experiment Professional with • Focus in – Stakeholders satisfaction, – Partnership with the suppliers – Objective and result oriented – Work for the Team and the company not for me • Motivated and young spirit • Like to transfer my knowhow to the group • Would be happy to enter in a strong Aerospace company 19/04/2012 Thierry Verlhiac 36