introduction
• We are making an operations Research
  project using Linear Programming to take
  decision what type of UPS we have to make
  more which utilize our full resources and will
  help to increase our profit.
Data
   UPS TYPE          400volt 875volt 1025volt   1550volt        Available



Bettery constraint     1       2        3          4       <=     950



   plug socket         2       2        4          4       <=     1150



       fuse            1       1        2          2       <=     300



   transfamer          1       1        2          3       <=     550
Basically we have four type of UPS 400VOLT, 875 VOLT, 1025 VOLT,
1550 VOLT
we have to use 1 battery in 400 VOLT UPS, 2 Battery in 875 VOLT UPS,
3 Battery in 1025VOLT UPS, 4 Battery in 1550VOLT UPS. From the
available battery (i.e.- 950)
we have to use 2 Plug Socket in 400 VOLT UPS, 2 Plug Socket in 875
VOLT UPS, 3 Plug Socket in 1025VOLT UPS, 4 Plug Socket in 1550VOLT
UPS. From the available Plug Socket (i.e.- 1150)
we have to use 1 Fuse in 400 VOLT UPS, 1 Fuse in 875 VOLT UPS, 2
Fuse in 1025VOLT UPS, 3 Fuse in 1550VOLT UPS. From the available
Fuse (i.e.- 300)
we have to use 1 trans farmer in 400 VOLT UPS, 1 Trans farmer in 875
VOLT UPS, 2 Trans farmer in 1025VOLT UPS, 3 Trans farmer in
1550VOLT UPS. From the available Trans farmer (i.e.- 550)
• We have gaining unit profit Rs 200 for
  400VOLT UPS, Rs 250 for 875VOLT UPS, Rs 350
  for 1025 VOLT UPS, Rs 500 for 1550 VOLT UPS
Constraint and Objective Function
By the above Data Our Constraint is :-
1X 2X1 3X3 4X4           <=950
2X 2X 3X3 4X4            <=1150
1X 1X 2X3 2X4            <=300
1X 1X 2X3 3X4            <=550
(Objective Function)Z=
200X+250X2+350X3+500X4
Solution by Solver
 objective
                0        300         0        0
 function

Unit Profit    200       250        350      500      75000




                                                                   Availab
UPS TYPE      400volt   875volt   1025volt 1550volt   used
                                                                     le
 Bettery
                1         2          3        4        600    <=    950
constraint

plug socket     2         2          4        4        600    <=    1150

   fuse         1         1          2        2        300    <=    300

transfamer      1         1          2        3        300    <=    550
Senstivity Report
Microsoft Excel 14.0 Sensitivity Report
Worksheet: [Book1]Sheet1
Report Created: 29-May-12 10:01:09 AM


Variable Cells
                                          Final Reduced     Objective   Allowable Allowable
     Cell               Name              Value   Cost     Coefficient   Increase    Decrease
   $E$4     objective function                 0       -50          200           50      1E+30
   $F$4     objective function               300         0          250       1E+30           0
   $G$4     objective function                 0     -150           350         150       1E+30
   $H$4     objective function                 0         0          500            0      1E+30

Constraints
                                          Final  Shadow    Constraint   Allowable Allowable
     Cell               Name              Value   Price     R.H. Side    Increase   Decrease
   $I$8     Bettery constraint used          600         0          950       1E+30        350
   $I$9     plug socket used                 600         0         1150       1E+30        550
   $I$10    fuse used                        300       250          300         175        300
   $I$11    transfamer used                  300         0          550       1E+30        250
Interpretation
• According to Sensitivity Report:-
• In Constraint View:-
• Battery, Plug Socket, Transfarmer have ‘0’
  shadow Price that’s mean these are not Binding.
  We increase these constraint up to ‘1E+30’ as
  (allowance increase is 1E+30) . They will not
  effect the optimum solution because they have
  slack value( resource that are unused):- 350 for
  Battery,550 for Plug Socket,250 for Transfarmer.
• If we talk about Wire than it is not binding its
  shadow price is 250.
• It’s Allowable increase is 175 so we increase
  the use of wire up to 140. After increasing of
  140 it will effect the optimum solution with
  250/unit.
• It’s Allowable Decrease is 300 so We can
  Decrease it up to 300 after that it will effect
  the optimum solution.
Variable Cell:-
Reduced Cost
The amount an objective function coefficent must change before we
would make any of the product.

or, the amount the profit would change if you made at least one unit of
the product x
200 was not a high enough profit on 400VOLT UPS to make any. Its
profit must increase to 200+50or 250 before we would make 400VOLT
UPS . [ reduced cost is -50 . till 50 unit cost is valid after this we cannot
say.
For Product X3 1025VOLT UPS )= profit must increase to 350+150=500
 [ reduced cost is -150 . till 150 unit cost is valid after this we cannot
say.

We are already making 875VOLT UPS , so their reduced costs are 0.
Ms2

More Related Content

Similar to Ms2

Load characteristics and Economic Aspects
Load characteristics and Economic AspectsLoad characteristics and Economic Aspects
Load characteristics and Economic Aspects
Abha Tripathi
 
ATG Electronics iBright E58i
ATG Electronics iBright E58iATG Electronics iBright E58i
ATG Electronics iBright E58i
Green Supply
 
115, 180-240 Amp Heavy Duty Bus Alternator
115, 180-240 Amp Heavy Duty Bus Alternator115, 180-240 Amp Heavy Duty Bus Alternator
115, 180-240 Amp Heavy Duty Bus Alternator
elregdistributors
 
Eco Volt Catalogue
Eco Volt CatalogueEco Volt Catalogue
Eco Volt Catalogue
Raaman Pillay
 
5220 l11
5220 l115220 l11
5220 l11
Gilberto Mejía
 
Chave 2: Power-One: Vista geral
Chave 2: Power-One: Vista geralChave 2: Power-One: Vista geral
Chave 2: Power-One: Vista geral
Krannich Solar Portugal
 
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
Sandia National Laboratories: Energy & Climate: Renewables
 
Commscope-Andrew AVA5-50FX
Commscope-Andrew AVA5-50FXCommscope-Andrew AVA5-50FX
Commscope-Andrew AVA5-50FX
savomir
 
48Vdc Power Source Circuit
48Vdc Power Source Circuit48Vdc Power Source Circuit
48Vdc Power Source Circuit
Tsuyoshi Horigome
 
Andrew SFX-500
Andrew SFX-500Andrew SFX-500
Andrew SFX-500
savomir
 
Commscope-Andrew LDF5-50A
Commscope-Andrew LDF5-50ACommscope-Andrew LDF5-50A
Commscope-Andrew LDF5-50A
savomir
 
Andrew FXL-1480
Andrew FXL-1480Andrew FXL-1480
Andrew FXL-1480
savomir
 
Commscope-Andrew LDF12-50
Commscope-Andrew LDF12-50Commscope-Andrew LDF12-50
Commscope-Andrew LDF12-50
savomir
 
Commscope-Andrew FSJ4-50B
Commscope-Andrew FSJ4-50BCommscope-Andrew FSJ4-50B
Commscope-Andrew FSJ4-50B
savomir
 
Competitive data science: A tale of two web services
Competitive data science: A tale of two web servicesCompetitive data science: A tale of two web services
Competitive data science: A tale of two web services
David Thompson
 
Commscope-Andrew FXL-540
Commscope-Andrew FXL-540Commscope-Andrew FXL-540
Commscope-Andrew FXL-540
savomir
 
Commscope-Andrew FSJ4RN-50B
Commscope-Andrew FSJ4RN-50BCommscope-Andrew FSJ4RN-50B
Commscope-Andrew FSJ4RN-50B
savomir
 
Andrew LDF4-50A
Andrew LDF4-50AAndrew LDF4-50A
Andrew LDF4-50A
savomir
 
My Report to NJP
My Report to NJPMy Report to NJP
My Report to NJP
Louwie Bonifacio
 

Similar to Ms2 (19)

Load characteristics and Economic Aspects
Load characteristics and Economic AspectsLoad characteristics and Economic Aspects
Load characteristics and Economic Aspects
 
ATG Electronics iBright E58i
ATG Electronics iBright E58iATG Electronics iBright E58i
ATG Electronics iBright E58i
 
115, 180-240 Amp Heavy Duty Bus Alternator
115, 180-240 Amp Heavy Duty Bus Alternator115, 180-240 Amp Heavy Duty Bus Alternator
115, 180-240 Amp Heavy Duty Bus Alternator
 
Eco Volt Catalogue
Eco Volt CatalogueEco Volt Catalogue
Eco Volt Catalogue
 
5220 l11
5220 l115220 l11
5220 l11
 
Chave 2: Power-One: Vista geral
Chave 2: Power-One: Vista geralChave 2: Power-One: Vista geral
Chave 2: Power-One: Vista geral
 
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
 
Commscope-Andrew AVA5-50FX
Commscope-Andrew AVA5-50FXCommscope-Andrew AVA5-50FX
Commscope-Andrew AVA5-50FX
 
48Vdc Power Source Circuit
48Vdc Power Source Circuit48Vdc Power Source Circuit
48Vdc Power Source Circuit
 
Andrew SFX-500
Andrew SFX-500Andrew SFX-500
Andrew SFX-500
 
Commscope-Andrew LDF5-50A
Commscope-Andrew LDF5-50ACommscope-Andrew LDF5-50A
Commscope-Andrew LDF5-50A
 
Andrew FXL-1480
Andrew FXL-1480Andrew FXL-1480
Andrew FXL-1480
 
Commscope-Andrew LDF12-50
Commscope-Andrew LDF12-50Commscope-Andrew LDF12-50
Commscope-Andrew LDF12-50
 
Commscope-Andrew FSJ4-50B
Commscope-Andrew FSJ4-50BCommscope-Andrew FSJ4-50B
Commscope-Andrew FSJ4-50B
 
Competitive data science: A tale of two web services
Competitive data science: A tale of two web servicesCompetitive data science: A tale of two web services
Competitive data science: A tale of two web services
 
Commscope-Andrew FXL-540
Commscope-Andrew FXL-540Commscope-Andrew FXL-540
Commscope-Andrew FXL-540
 
Commscope-Andrew FSJ4RN-50B
Commscope-Andrew FSJ4RN-50BCommscope-Andrew FSJ4RN-50B
Commscope-Andrew FSJ4RN-50B
 
Andrew LDF4-50A
Andrew LDF4-50AAndrew LDF4-50A
Andrew LDF4-50A
 
My Report to NJP
My Report to NJPMy Report to NJP
My Report to NJP
 

Recently uploaded

PM pre reads for the product manager framework
PM pre reads for the product manager frameworkPM pre reads for the product manager framework
PM pre reads for the product manager framework
KishoreKatta6
 
13 Jun 24 ILC Retirement Income Summit - slides.pptx
13 Jun 24 ILC Retirement Income Summit - slides.pptx13 Jun 24 ILC Retirement Income Summit - slides.pptx
13 Jun 24 ILC Retirement Income Summit - slides.pptx
ILC- UK
 
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory FrameworksKYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
Any kyc Account
 
1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样
1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样
1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样
28xo7hf
 
China's Investment Leader - Dr. Alyce SU
China's Investment Leader - Dr. Alyce SUChina's Investment Leader - Dr. Alyce SU
China's Investment Leader - Dr. Alyce SU
msthrill
 
3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf
3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf
3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf
Riadh ASSOUAK
 
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
taqyea
 
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
mukeshomran942
 
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
Falcon Invoice Discounting
 
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptxExploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
cosmo-soil
 
Chapter 25: Economic Growth Summary from Samuelson and Nordhaus
Chapter 25: Economic Growth Summary from Samuelson and NordhausChapter 25: Economic Growth Summary from Samuelson and Nordhaus
Chapter 25: Economic Growth Summary from Samuelson and Nordhaus
iraangeles4
 
Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...
Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...
Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...
Suomen Pankki
 
What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?
Newman Leech
 
Initial Public Offering (IPO) Process.ppt
Initial Public Offering (IPO) Process.pptInitial Public Offering (IPO) Process.ppt
Initial Public Offering (IPO) Process.ppt
ribhi87
 
Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]
Commonwealth
 
Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...
Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...
Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...
nimaruinazawa258
 
Macroeconomic-digest-of-Ukraine-0624-Eng.pdf
Macroeconomic-digest-of-Ukraine-0624-Eng.pdfMacroeconomic-digest-of-Ukraine-0624-Eng.pdf
Macroeconomic-digest-of-Ukraine-0624-Eng.pdf
olaola5673
 
BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...
BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...
BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...
Neil Day
 
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
yeuwffu
 
How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...
How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...
How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...
beulahfernandes8
 

Recently uploaded (20)

PM pre reads for the product manager framework
PM pre reads for the product manager frameworkPM pre reads for the product manager framework
PM pre reads for the product manager framework
 
13 Jun 24 ILC Retirement Income Summit - slides.pptx
13 Jun 24 ILC Retirement Income Summit - slides.pptx13 Jun 24 ILC Retirement Income Summit - slides.pptx
13 Jun 24 ILC Retirement Income Summit - slides.pptx
 
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory FrameworksKYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
KYC Compliance: A Cornerstone of Global Crypto Regulatory Frameworks
 
1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样
1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样
1比1复刻(ksu毕业证书)美国堪萨斯州立大学毕业证本科文凭证书原版一模一样
 
China's Investment Leader - Dr. Alyce SU
China's Investment Leader - Dr. Alyce SUChina's Investment Leader - Dr. Alyce SU
China's Investment Leader - Dr. Alyce SU
 
3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf
3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf
3-الملخصات الهيكلية للمعايير المراجعة المصرية.pdf
 
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
一比一原版美国新罕布什尔大学(unh)毕业证学历认证真实可查
 
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
欧洲杯足彩-欧洲杯足彩押注-欧洲杯足彩押注官网|【​网址​🎉ac99.net🎉​】
 
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
falcon-invoice-discounting-a-premier-investment-platform-for-superior-returns...
 
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptxExploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
Exploring-Madhya-Pradesh-Culture-Heritage-and-Land-Records.pptx
 
Chapter 25: Economic Growth Summary from Samuelson and Nordhaus
Chapter 25: Economic Growth Summary from Samuelson and NordhausChapter 25: Economic Growth Summary from Samuelson and Nordhaus
Chapter 25: Economic Growth Summary from Samuelson and Nordhaus
 
Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...
Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...
Governor Olli Rehn: Inflation down and recovery supported by interest rate cu...
 
What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?What Lessons Can New Investors Learn from Newman Leech’s Success?
What Lessons Can New Investors Learn from Newman Leech’s Success?
 
Initial Public Offering (IPO) Process.ppt
Initial Public Offering (IPO) Process.pptInitial Public Offering (IPO) Process.ppt
Initial Public Offering (IPO) Process.ppt
 
Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]Monthly Market Risk Update: June 2024 [SlideShare]
Monthly Market Risk Update: June 2024 [SlideShare]
 
Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...
Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...
Tdasx: Interpreting the 2024 Cryptocurrency Market Funding Trends and Technol...
 
Macroeconomic-digest-of-Ukraine-0624-Eng.pdf
Macroeconomic-digest-of-Ukraine-0624-Eng.pdfMacroeconomic-digest-of-Ukraine-0624-Eng.pdf
Macroeconomic-digest-of-Ukraine-0624-Eng.pdf
 
BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...
BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...
BIHC Briefing June 2024 from Bank+Insurance Hybrid Capital in association wit...
 
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
快速办理(RWTH毕业证书)德国亚琛工业大学毕业证录取通知书一模一样
 
How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...
How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...
How Poonawalla Fincorp and IndusInd Bank’s Co-Branded RuPay Credit Card Cater...
 

Ms2

  • 1. MANAGEMENT SCIENCE Project Report Submitted to Management Department, ITM University, Gwalior For the Fulfillment of 3rd Trimester SUBMITTED TO:- SUBMITTEDD BY:- SUBMITTEDD BY:- PUNEET GUPTA PUNEET GUPTA PRADEEP KUMAR PRADEEP KUMAR MD ATTULLAH MD ATTULLAH MANISH SINGH MANISH SINGH SAGAR JADHAV SAGAR JADHAV
  • 2. introduction • We are making an operations Research project using Linear Programming to take decision what type of UPS we have to make more which utilize our full resources and will help to increase our profit.
  • 3. Data UPS TYPE 400volt 875volt 1025volt 1550volt Available Bettery constraint 1 2 3 4 <= 950 plug socket 2 2 4 4 <= 1150 fuse 1 1 2 2 <= 300 transfamer 1 1 2 3 <= 550
  • 4. Basically we have four type of UPS 400VOLT, 875 VOLT, 1025 VOLT, 1550 VOLT we have to use 1 battery in 400 VOLT UPS, 2 Battery in 875 VOLT UPS, 3 Battery in 1025VOLT UPS, 4 Battery in 1550VOLT UPS. From the available battery (i.e.- 950) we have to use 2 Plug Socket in 400 VOLT UPS, 2 Plug Socket in 875 VOLT UPS, 3 Plug Socket in 1025VOLT UPS, 4 Plug Socket in 1550VOLT UPS. From the available Plug Socket (i.e.- 1150) we have to use 1 Fuse in 400 VOLT UPS, 1 Fuse in 875 VOLT UPS, 2 Fuse in 1025VOLT UPS, 3 Fuse in 1550VOLT UPS. From the available Fuse (i.e.- 300) we have to use 1 trans farmer in 400 VOLT UPS, 1 Trans farmer in 875 VOLT UPS, 2 Trans farmer in 1025VOLT UPS, 3 Trans farmer in 1550VOLT UPS. From the available Trans farmer (i.e.- 550)
  • 5. • We have gaining unit profit Rs 200 for 400VOLT UPS, Rs 250 for 875VOLT UPS, Rs 350 for 1025 VOLT UPS, Rs 500 for 1550 VOLT UPS
  • 6. Constraint and Objective Function By the above Data Our Constraint is :- 1X 2X1 3X3 4X4 <=950 2X 2X 3X3 4X4 <=1150 1X 1X 2X3 2X4 <=300 1X 1X 2X3 3X4 <=550 (Objective Function)Z= 200X+250X2+350X3+500X4
  • 7. Solution by Solver objective 0 300 0 0 function Unit Profit 200 250 350 500 75000 Availab UPS TYPE 400volt 875volt 1025volt 1550volt used le Bettery 1 2 3 4 600 <= 950 constraint plug socket 2 2 4 4 600 <= 1150 fuse 1 1 2 2 300 <= 300 transfamer 1 1 2 3 300 <= 550
  • 8. Senstivity Report Microsoft Excel 14.0 Sensitivity Report Worksheet: [Book1]Sheet1 Report Created: 29-May-12 10:01:09 AM Variable Cells Final Reduced Objective Allowable Allowable Cell Name Value Cost Coefficient Increase Decrease $E$4 objective function 0 -50 200 50 1E+30 $F$4 objective function 300 0 250 1E+30 0 $G$4 objective function 0 -150 350 150 1E+30 $H$4 objective function 0 0 500 0 1E+30 Constraints Final Shadow Constraint Allowable Allowable Cell Name Value Price R.H. Side Increase Decrease $I$8 Bettery constraint used 600 0 950 1E+30 350 $I$9 plug socket used 600 0 1150 1E+30 550 $I$10 fuse used 300 250 300 175 300 $I$11 transfamer used 300 0 550 1E+30 250
  • 9. Interpretation • According to Sensitivity Report:- • In Constraint View:- • Battery, Plug Socket, Transfarmer have ‘0’ shadow Price that’s mean these are not Binding. We increase these constraint up to ‘1E+30’ as (allowance increase is 1E+30) . They will not effect the optimum solution because they have slack value( resource that are unused):- 350 for Battery,550 for Plug Socket,250 for Transfarmer.
  • 10. • If we talk about Wire than it is not binding its shadow price is 250. • It’s Allowable increase is 175 so we increase the use of wire up to 140. After increasing of 140 it will effect the optimum solution with 250/unit. • It’s Allowable Decrease is 300 so We can Decrease it up to 300 after that it will effect the optimum solution.
  • 11. Variable Cell:- Reduced Cost The amount an objective function coefficent must change before we would make any of the product. or, the amount the profit would change if you made at least one unit of the product x 200 was not a high enough profit on 400VOLT UPS to make any. Its profit must increase to 200+50or 250 before we would make 400VOLT UPS . [ reduced cost is -50 . till 50 unit cost is valid after this we cannot say. For Product X3 1025VOLT UPS )= profit must increase to 350+150=500 [ reduced cost is -150 . till 150 unit cost is valid after this we cannot say. We are already making 875VOLT UPS , so their reduced costs are 0.