Mostafa Mohamed Ali Raheem El Feel is seeking a position that allows him to utilize his civil engineering skills and qualifications. He has a bachelor's degree in civil engineering from Tanta University with excellent grades. His graduation project involved designing various concrete structures and he overcame design limits on a project. He has work experience as a site engineer and civil engineer on construction projects.
Respected Sir,
I am Muhammad Saleem Ashraf from Pakistan. I am LAND SURVEYOR and have 11.6 years experience in total in High-rise building ,infra-structure(highway, road etc),cement plant erection, treatment plant,132KV grid station, bridge, under-passes, fly-over. I am willing to join your prestigious organization under your kind supervision. I will try my best to come up to your expectations. I hope that you will consider me during the unbiased process of recruitment. Looking forward to your kind favor. Thanks!
Your sincerely,
• Prepare reconciliation of materials on a weekly/ monthly basis, calculate quantities of materials for ordering, i.e. concrete, block work etc.
• Monitoring and Supervising of Shuttering and finishing works (Block work, Plastering, Tiling, Waterproofing, False ceiling, Stone Cladding, Marble and Granite Flooring etc.
• Control of Materials, Manpower and Vehicle movements.
• Monitor and communicate all technical requirements of the works to Foreman on site throughout the construction process.
• Raise inspection request and carried out inspection on site liaison with the QA/QC Engineer.
• Progress & Monitoring of works on site to ensure technical compliance with the specifications and drawings
• Monitoring and recording day to day progress and resources on site.
• Identify & Monitor the Critical activities and guide the execution team accordingly.
• Coordination with Project team, Consultants, Client and Subcontractors on Project control issues and management of project key deliverables.
• Certifying the sub contractor’s monthly valuations & Forwarding to Commercial Department for Payments certificate preparation
Aquest és el primer estudi de L’Observatori que analitza de manera monogràfica la realitat de les persones d’origen immigrant que atén la Creu Roja en els seus programes de lluita contra la pobresa davant la situació de llarga crisi socioeconòmica que està patint el país.
L'Observatori vol conèixer les situacions, realitats i dificultats socials a les quals han de fer front les persones immigrades. La finalitat és poder elaborar accions més específiques que ajudin a guanyar major eficàcia i eficiència als serveis i programes que duem a terme per a aquest col·lectiu.
Respected Sir,
I am Muhammad Saleem Ashraf from Pakistan. I am LAND SURVEYOR and have 11.6 years experience in total in High-rise building ,infra-structure(highway, road etc),cement plant erection, treatment plant,132KV grid station, bridge, under-passes, fly-over. I am willing to join your prestigious organization under your kind supervision. I will try my best to come up to your expectations. I hope that you will consider me during the unbiased process of recruitment. Looking forward to your kind favor. Thanks!
Your sincerely,
• Prepare reconciliation of materials on a weekly/ monthly basis, calculate quantities of materials for ordering, i.e. concrete, block work etc.
• Monitoring and Supervising of Shuttering and finishing works (Block work, Plastering, Tiling, Waterproofing, False ceiling, Stone Cladding, Marble and Granite Flooring etc.
• Control of Materials, Manpower and Vehicle movements.
• Monitor and communicate all technical requirements of the works to Foreman on site throughout the construction process.
• Raise inspection request and carried out inspection on site liaison with the QA/QC Engineer.
• Progress & Monitoring of works on site to ensure technical compliance with the specifications and drawings
• Monitoring and recording day to day progress and resources on site.
• Identify & Monitor the Critical activities and guide the execution team accordingly.
• Coordination with Project team, Consultants, Client and Subcontractors on Project control issues and management of project key deliverables.
• Certifying the sub contractor’s monthly valuations & Forwarding to Commercial Department for Payments certificate preparation
Aquest és el primer estudi de L’Observatori que analitza de manera monogràfica la realitat de les persones d’origen immigrant que atén la Creu Roja en els seus programes de lluita contra la pobresa davant la situació de llarga crisi socioeconòmica que està patint el país.
L'Observatori vol conèixer les situacions, realitats i dificultats socials a les quals han de fer front les persones immigrades. La finalitat és poder elaborar accions més específiques que ajudin a guanyar major eficàcia i eficiència als serveis i programes que duem a terme per a aquest col·lectiu.
Container desiccant - Escort for your goods safe during long vessel shipping ...Scott Zhong
1. Ship Your Product Safely With Container Desiccant
2. What is Desiccants Desiccant is a substance which helps substance in achieving complete dryness. Pharma Desiccants help protect products from moisture degradation and odor in pharmaceutical packaging. Desiccants are an effective way to protect your product from moisture
3. Shipping Industry Shipping products around the world come across different temperatures and humidity conditions. This variation causes damage to cargo due to moisture. Every year thousands of containerized cargos are damaged by moisture problems like metal parts arrive corroded, Cardboard boxes mould and wet. Food commodities are found to be unfit for consumption.
4. Damage Caused by Mold Mildew Fungus Corrosion Loose Carton and peeling labels
5. Facing the Problems of Loose Carton Black Mold Bad Smells
6. Shipping Container Desiccants Cargo Dry Pak will take care of mold , mildew , fungus development , condensation and container rain in your export container. Keep Your Shipping Dry and Safe 100 % Absorption Capacity Non-Toxic Desiccant
7. Moisture Balance in Shipping Container Moisture in the air in the container derives from the outside and from the cargo. Desiccants remove moisture from the air.
8. When the temperature drops, the pressure in the container drops, When the temperature goes up, the opposite happens (breathing-out).
9. General Recommendations The number of cargo dry pak to be used may Very depending on shipping conditions and The nature of the products being protected. General Recommendations : For 20 feet Container : 1000 gms x 8-10 Nos. Or 2000 gms x10-12 Nos. For 40 feet container : 1000 gms x 16-18 Nos. Or 2000 gms x 16-20 Nos.
10. Plus Points Using Cargo Dry Pak Environmentally Safe Ship goods without the threat of Container Rain Absorb up to 158% of its weight in moisture Inhibits the formation of mold, mildew rust and corrosion Provides 50 days or more of moisture protection Prevents weak cartons and loose lables caused by moisture Easy to install with convenient hook
11. Check List Before Shipping Close the vent holes with tape when you have a dry cargo. The container will still breathe, but more slowly. Moist cargo may be shipped with vent holes open or closed. No corrosion or holes on any side , doors and seals are in good conditions. Check that the container floor, pallets and packaging are dry. Softwood packaging should have maximum 18-19 % moisture not more than that. Cargo in pallets must be able to dry. Check that any shrink wrap or other plastic packaging does not cover completely. Check that the Cargo Dry pack are not covered. There should be at least a few cm of free space in front of most of the grille area. Check that all Bags are securely hung and that any Bags will not be crushed by the cargo .
For my Product School Capstone Project, I applied the skills and frameworks I learned to create a product feature for a company of my choosing. Given my depth of experience in financial services and desired opportunities in software and technology, I selected Square, Inc. The company does so many things well - could I find an opportunity for improvement that had potential to positively impact Square’s business? I explored this question and walk through the development process here.
1. Mostafa Mohamed Ali Raheem El Feel
Personal Information
Date of birth: 11/1/1992
Address: 99-Hafez Wahbe st.,-Tanta -Egypt
Mobile: +201289885905
E-mail: mostafarohaem@gmail.com
Objectives:
Working in a progressive organization which can expand all my knowledge
and provided me opportunities to utilize my skills and qualification to be
effective in productive development environment.
Education:
University: Tanta University
Faculty: Civil Engineering
Graduation year: 2014
Grade : Good (72.5%)
Graduation Project: Excellent
Role: Leader Graduation project team
Project Field: Design of Concrete Structure.
Duration: 5 months.
Description:
1- First Module is designing all elements for compound consist of 11 typical
stories and ground story and basement Under Earthquake loads .
2-Second Module is designing a Long span covering five Halls with (Arch slap,
Arch girder,Hollow block slap,Frames,Skew panelled Beams).
3-Third Module is designing Circular Elevated Tank.
Evaluation: Excellent with grade 96.66 %.
Success Story: We are asked to make a Skew panelled Beams to Cover 750 m2
which Contradicts with Skew panelled Beams Limit (450 - 500) m2 so
we in overcome this limit by Modify Panelled beams system to adapt
the situation.
2. High school: El Ahmadeya Secondary School,Tanta,Egypt
High school grade: 97.5%
Technical Knowledge: Microsoft Excel , Autocad ,Sap ,Word ,Shop Drawing.
Soft Skills:
Team work
Work under pressure
Creative thinking
Ability to learn quickly
Languages:
Arabic (native language).
English (very good).
Training:
Company: Kasaab company Company: Arab contractors
Start date: July/2011 Start date: July/2012
End date: August/2011 End date: October/2012
Role: Site Engineer Role: Site Engineer
Job description: Checking and approving Job description: Checking and
All Civil Items According To Specification approving all civil items according
to specification.
Company: Cairo Oil Refining.
Role: Site Engineer
Start date: July/2013
End date: August/2013
Job description: The main task is preliminary design for concrete dimension,
creating and analyzing the Structural model on Sap for design vertical elements
(Columns, cores and shear walls…..,etc.) SAFE for design of slabs & foundation
(Flat slab, solid slab, , shallow Foundation),
Technology used: (AutoCAD – SAP – PCA Column).
Experience:
Civil engineer at Al-Qema construction company.
Start date: August/2014
Role: Civil Engineer
3. Job description:
-Site managing and execution for civil works, which includes structural and finishing
works.
-Responsible for all technical office in site works. That include: quantity surveying
and project scheduling. -New sub-contractors agreements and credence of materials
and shop drawings submitted by me.
-Responsible for all contracts and sub-contractors invoices.
-Work with the electrical and plumbing installation in building according to the drawings.
Projects:
Project Name: Tower of Al hoda
Project Idea: Construction tower of hoda which consist of 6 typical with basement.
Project Date: September 2014 to february 2014.
Project Name: Towers of Al-Qema.
Project Idea: Construction towers of Al-Qema on area 1500 m2 which consist of basement
and ground and 9 typical stories and 25% services.
Project Date: March 2015 to present.
Any documents are available upon request.