Curriculum vitae
Hytham Hashem M Sheta-
engineerCIVIL-
Qualifications:-
engineeringB .sc in Civil
Dear Sir/Madam,
I'm writing to express my interest in introducing myself as a candidate for a position of a civil
engineer. I am seeking to develop my skills in my next challenge and am very interested in joining
the engineering team at your company.
I am civil engineer currently working with saudi binladin group in KSA;
self- motivated engineer with a Bachelor of civil Engineering at Banha University in Egypt in 2008.
Having experience related to my work involved in site , Post Tension technology, Hugh Building,
minarets, Infrastructure, Landscape, Temporary work, having experience related to my work as a
sales engineer and able to work with multi national groups in a multi billion projects.
My present in Saudi binladin and Contractors advanced group so far has allowed me to develop a
sound knowledge and understanding of many civil techniques (specially Construction Field),
including the construction and management principles.
My continued progression in the engineering field has put me in good stead of fulfilling my aim of
becoming a much respected member of the Civil engineer society as well as putting my academic skills
into practice, I have proven to be a confident, competent and efficient member of the team. I
approach my work in a positive and pro-active manner and always aim to excel in my role.
I have enclosed my CV for your consideration and review, many thanks and regards;
Hytham h sheta.
Hytham Hashem Sheta
Shekh-Hseen Atya st, kafr El7:Egypt
kah.kMa,Elroshn , kakeya:KSA
&(work)966541462667(home), +473230137+20:Tel
hytham_sheta@hotmail.com:Email(personal)+966562337383
OBJECTIVE:
Seeking a challenging position in a multinational company, where my academic background can be
utilized and developed in a way that results in a mutual benefit.
Personal Data:
 Marital status: Married.
 Nationality: Egyptian.
 Date of Birth: 17nd December 1982.
 Place of Birth: Egypt.
 Military Service: Exempted.
 Driving License: Valid (Egyptian & KSA).
EDUCATION:
 Bachelor of civil engineering from Banha University in 2008, Egypt.
 Overall cumulative grade: PASS.
 Project Description :
 Strengthening of concrete structures using carbon-fiber
 Project grade: Excellent.
 University activities:
 Representing my colleagues as a member of college students union.
 A member of the team College Basketball
PROFILE
 Six plus years of practical construction engineering experience.
 Knowledgeable in building field experience to control construction site activities.
 Strong verbal and written communication skills, decision making ability to work within a team
under pressure.
COMPUTER SKILLS& SURVEY PROGRAMES:
 ICDL.
 Core Programs :( AutoCAD 3D).
 Advanced Programs :(AutoCAD 2D, Surfer)
 Basic IT and Hardware, and excellent internet research skills
Work EXPERIENCE:
1) Haram Expansion Projects (Mataf expansion Project).
Scope of Work:-
Mataf expansion Project is the most important project in Islamic World, it’s a part of Haram expansion Projects, The Project
aim to increase (the circumambulation area around the Holy Kaaba) 20 meters wide into the Ottoman portico of the
present Grand Mosque at all levels of the building. The ground floor of the new building and a large part of the adjacent
areas will be utilized to accommodate a capacity from more than 50,000 pilgrims per hour to 130,000 when the expansion is
completed, the project will be divided into 3 phases,
First floor and Second Floor Beams depend on Post tension technology to reduce the number of column in the circle of
Circumambulation.
to:My Duties is including but not limited-
 Reported Directly to Project Manager.
 Responsible for all workers safety works in the site.
 Manage the Department contracting and procurement in Whole project.
 Contracting with companies.
 renewal of contracts with contractors.
 Review Payment Certificate.
 Material List processing and Purchase order processing.
 Follow up the supply of materials.
 Solving problems suppliers with head office.
.
2) Haram Expansion Projects (Mataf expansion Project).
Location Saudi Arabia – Makkah.
Client Saudi Ministry of Finance.
Project Consultant Dar Al-Handasa.
initial cost 10.5 Billion USD
Position Senior civil Engineer.
Duration February 2013 till Feb.2015
Scope of Work:-
Mataf expansion Project is the most important project in Islamic World, it’s a part of Haram expansion Projects, The Project
aim to increase (the circumambulation area around the Holy Kaaba) 20 meters wide into the Ottoman portico of the
present Grand Mosque at all levels of the building. The ground floor of the new building and a large part of the adjacent
areas will be utilized to accommodate a capacity from more than 50,000 pilgrims per hour to 130,000 when the expansion is
completed, the project will be divided into 3 phases,
First floor and Second Floor Beams depend on Post tension technology to reduce the number of column in the circle of
Circumambulation.
to:My Duties is including but not limited-
 Reported Directly to Project Manager.
 Responsible for all workers works in the site.
 Manage the work teams in Whole project.
 Responsible for any coordination with mechanical, electrical and architect departments.
 Dealing with most of project drawings (structure , mechanical , architect , shop drawings and marble drawings)
 Assisted as a planning engineer to put a steps & time schedules for all project items
 Responsible for setting out the Steel arches special details.
 Responsible for Setting out Pre-Stressed Beams Cable profile, Sections and Details.
Location Saudi Arabia – Makkah.
Client Saudi Ministry of Finance.
Project Consultant Dar Al-Handasa.
initial cost 10.5 Billion USD
Position Director of contracts and purchases
Duration February 2015 till present.
3) Advanced Builders Company (Al Hidaya Towers) .
Location Saudi Arabia – Makkah.
Client Nasel Group.
Project Consultant El sheref.
initial cost 2 Billion USD
Position civil Engineer.
Duration feb 2010 till feb 2013.
--Scope of Work:
Al Hidaya Towers is one of the most important project in makkah, , aim to adding Increase the number of visitors to 20,000
pilgrims.
Project Consist of 13 towers, on (25000 m2 of area)
My Duties is including but not limited to:-
 Main contractor`s civil engineer at Al Hidaya Towers.
 Responsible about six towers ( T5& T6&T7&T8&T9&T9' ) with two basements, ground , Mezzanine, Restaurant,
Pray, Technical, halls and 19 Typical floors.
 Following Steel and carpentry works with the sub-contractor in order to be delivered to the consultants engineer as
per the specifications.
 Arrangements of concrete pouring with the supplier.
 Calculation and following the delivery of site materials (steel,cement,paints…) .
 Dealing with most of project drawings (structure , mechanical , architect , shop drawings and marble drawings)
 . Responsible for any coordination with mechanical , electrical and architect departments.
-------------------------------------------------------------------------------------------------------------------------------------------------------
4) wade alnel Contracting and Real Estate Investment (Prison Gamasa Project).
Location Egypt – gamasa.
Position civil Engineer.
Department Construction
Duration Nov 2008 till jan 2010.
:Scope of Work--
Is to build a prison Gamasa public
- My Duties is including but not limited to:
 Main contractor`s civil engineer at Prison Gamasa
 Responsible for dormitory its entirety by 24 rooms on two levels
 Responsible for the coordination of the site
Training Experience:
 Arab Contractors Company
Summer training from: 01/8/2004 to: 26/ 8 / 2004
Summer training from: 30/7/2006 to: 17/ 8 / 2006
Language:
 English
References will be made available on request.

hytham hashem sheta2

  • 1.
    Curriculum vitae Hytham HashemM Sheta- engineerCIVIL- Qualifications:- engineeringB .sc in Civil Dear Sir/Madam, I'm writing to express my interest in introducing myself as a candidate for a position of a civil engineer. I am seeking to develop my skills in my next challenge and am very interested in joining the engineering team at your company. I am civil engineer currently working with saudi binladin group in KSA; self- motivated engineer with a Bachelor of civil Engineering at Banha University in Egypt in 2008. Having experience related to my work involved in site , Post Tension technology, Hugh Building, minarets, Infrastructure, Landscape, Temporary work, having experience related to my work as a sales engineer and able to work with multi national groups in a multi billion projects. My present in Saudi binladin and Contractors advanced group so far has allowed me to develop a sound knowledge and understanding of many civil techniques (specially Construction Field), including the construction and management principles. My continued progression in the engineering field has put me in good stead of fulfilling my aim of becoming a much respected member of the Civil engineer society as well as putting my academic skills into practice, I have proven to be a confident, competent and efficient member of the team. I approach my work in a positive and pro-active manner and always aim to excel in my role. I have enclosed my CV for your consideration and review, many thanks and regards; Hytham h sheta.
  • 2.
    Hytham Hashem Sheta Shekh-HseenAtya st, kafr El7:Egypt kah.kMa,Elroshn , kakeya:KSA &(work)966541462667(home), +473230137+20:Tel hytham_sheta@hotmail.com:Email(personal)+966562337383 OBJECTIVE: Seeking a challenging position in a multinational company, where my academic background can be utilized and developed in a way that results in a mutual benefit. Personal Data:  Marital status: Married.  Nationality: Egyptian.  Date of Birth: 17nd December 1982.  Place of Birth: Egypt.  Military Service: Exempted.  Driving License: Valid (Egyptian & KSA). EDUCATION:  Bachelor of civil engineering from Banha University in 2008, Egypt.  Overall cumulative grade: PASS.  Project Description :  Strengthening of concrete structures using carbon-fiber  Project grade: Excellent.  University activities:  Representing my colleagues as a member of college students union.  A member of the team College Basketball PROFILE  Six plus years of practical construction engineering experience.  Knowledgeable in building field experience to control construction site activities.  Strong verbal and written communication skills, decision making ability to work within a team under pressure. COMPUTER SKILLS& SURVEY PROGRAMES:  ICDL.  Core Programs :( AutoCAD 3D).  Advanced Programs :(AutoCAD 2D, Surfer)  Basic IT and Hardware, and excellent internet research skills
  • 3.
    Work EXPERIENCE: 1) HaramExpansion Projects (Mataf expansion Project). Scope of Work:- Mataf expansion Project is the most important project in Islamic World, it’s a part of Haram expansion Projects, The Project aim to increase (the circumambulation area around the Holy Kaaba) 20 meters wide into the Ottoman portico of the present Grand Mosque at all levels of the building. The ground floor of the new building and a large part of the adjacent areas will be utilized to accommodate a capacity from more than 50,000 pilgrims per hour to 130,000 when the expansion is completed, the project will be divided into 3 phases, First floor and Second Floor Beams depend on Post tension technology to reduce the number of column in the circle of Circumambulation. to:My Duties is including but not limited-  Reported Directly to Project Manager.  Responsible for all workers safety works in the site.  Manage the Department contracting and procurement in Whole project.  Contracting with companies.  renewal of contracts with contractors.  Review Payment Certificate.  Material List processing and Purchase order processing.  Follow up the supply of materials.  Solving problems suppliers with head office. . 2) Haram Expansion Projects (Mataf expansion Project). Location Saudi Arabia – Makkah. Client Saudi Ministry of Finance. Project Consultant Dar Al-Handasa. initial cost 10.5 Billion USD Position Senior civil Engineer. Duration February 2013 till Feb.2015 Scope of Work:- Mataf expansion Project is the most important project in Islamic World, it’s a part of Haram expansion Projects, The Project aim to increase (the circumambulation area around the Holy Kaaba) 20 meters wide into the Ottoman portico of the present Grand Mosque at all levels of the building. The ground floor of the new building and a large part of the adjacent areas will be utilized to accommodate a capacity from more than 50,000 pilgrims per hour to 130,000 when the expansion is completed, the project will be divided into 3 phases, First floor and Second Floor Beams depend on Post tension technology to reduce the number of column in the circle of Circumambulation. to:My Duties is including but not limited-  Reported Directly to Project Manager.  Responsible for all workers works in the site.  Manage the work teams in Whole project.  Responsible for any coordination with mechanical, electrical and architect departments.  Dealing with most of project drawings (structure , mechanical , architect , shop drawings and marble drawings)  Assisted as a planning engineer to put a steps & time schedules for all project items  Responsible for setting out the Steel arches special details.  Responsible for Setting out Pre-Stressed Beams Cable profile, Sections and Details. Location Saudi Arabia – Makkah. Client Saudi Ministry of Finance. Project Consultant Dar Al-Handasa. initial cost 10.5 Billion USD Position Director of contracts and purchases Duration February 2015 till present.
  • 4.
    3) Advanced BuildersCompany (Al Hidaya Towers) . Location Saudi Arabia – Makkah. Client Nasel Group. Project Consultant El sheref. initial cost 2 Billion USD Position civil Engineer. Duration feb 2010 till feb 2013. --Scope of Work: Al Hidaya Towers is one of the most important project in makkah, , aim to adding Increase the number of visitors to 20,000 pilgrims. Project Consist of 13 towers, on (25000 m2 of area) My Duties is including but not limited to:-  Main contractor`s civil engineer at Al Hidaya Towers.  Responsible about six towers ( T5& T6&T7&T8&T9&T9' ) with two basements, ground , Mezzanine, Restaurant, Pray, Technical, halls and 19 Typical floors.  Following Steel and carpentry works with the sub-contractor in order to be delivered to the consultants engineer as per the specifications.  Arrangements of concrete pouring with the supplier.  Calculation and following the delivery of site materials (steel,cement,paints…) .  Dealing with most of project drawings (structure , mechanical , architect , shop drawings and marble drawings)  . Responsible for any coordination with mechanical , electrical and architect departments. ------------------------------------------------------------------------------------------------------------------------------------------------------- 4) wade alnel Contracting and Real Estate Investment (Prison Gamasa Project). Location Egypt – gamasa. Position civil Engineer. Department Construction Duration Nov 2008 till jan 2010. :Scope of Work-- Is to build a prison Gamasa public - My Duties is including but not limited to:  Main contractor`s civil engineer at Prison Gamasa  Responsible for dormitory its entirety by 24 rooms on two levels  Responsible for the coordination of the site Training Experience:  Arab Contractors Company Summer training from: 01/8/2004 to: 26/ 8 / 2004 Summer training from: 30/7/2006 to: 17/ 8 / 2006 Language:  English References will be made available on request.