This document contains a summary of a student's project which included dividing a development area into 9 zones and calculating the floor area, expenditures, and withdrawals for each zone. The student's name and supervising professors are listed. Tables are provided showing the number of residential units, floor area of offices, and calculated expenditures and withdrawals for each zone. Formulas are provided for calculating averages and a matrix is shown for allocating the transportation costs between zones.