What were they thinking?

    Structure ✓




                                 }
•
•   Weather Barrier ?
•   Insulation ✗
•   Airtightness ✗
•   Moisture Management ✓
•   Ventilation/ Air Quality ✗       GIT-R DONE
•   Comfort ✗ ✗
•   Daylight ✗
•   Durability (30 years?)
•   Design (Sign of the Times)
Where are we?
•   2 stories + basement
•   1,200 finished SF
•   2 bedrooms
•   1 bath
•   5 people
Envelope
Windows
Airtightness
8.5 ACH50 [2,100 CFM50]
Mechanical systems
Mechanical systems
Where do we go?
Laundry List

•   + 3 Bedrooms
•   + 2 Baths
•   + Mudroom
•   Better kitchen
•   Better living areas
•   Homeschool room
•   Safe stairs
•   Weather-tight envelope
•   Durable structure
•   Healthy interiors
•   Comfort & daylight
•   Low operating cost
•   Energy performance
How do we get there?
Sports car?
Holistic Approach

•   Set goals for performance and design
•   Overlay architectural program
•   Make the home safe for people (code compliance)
•   Control temperature, air, and moisture
•   Add ventilation
•   Make the envelope air- and weather-tight
•   Add continuous insulation to meet the energy goals
•   Assess moisture transfer through shell
•   Design robust climate zone-appropriate assemblies
Basic
Concept
Schematic
DEEP
ENERGY
REDUCTION
RETROFIT
(AFTER)                             TYPICAL
EXISTING
BUILDING
(BEFORE)

                             OPTIONAL
SOLAR
THERMAL
                             OR
SOLAR
PHOTOVOLTAIC
             SO ADIN R)
              SH MM
               LA
               (SU




                                                      SUPPLY
AIR
                  R
                    G
                    E




      PAS
           SIVE
      HEA        
S
          T
GA OLAR
     (WIN       IN
          TER S                     EXTRACT
AIR
              )

RETROFIT
CONDITION                                                                         EXISTING
CONDITION
                                   INTERNAL
-
ADVANCED
WINDOWS                                                                         -
INSUFFICIENT
INSULATION
                                   HEAT
GAINS


AND
DOORS                                                                                -
LOW-PERFORMANCE
                                   -
PEOPLE
-
AIR-TIGHTNESS
LAYER                                                                      

WINDOWS
AND
DOORS
                                   -
EQUIPMT.
-
CONTINUOUS
INSULATION                                                                    -
AIR
LEAKAGE


PACKAGE                                                                                  -
NO
VENTILATION
                  EXHAUST
                AIR-INTAKE
RETROFIT
CONDITION                                                                         EXISTING
CONDITION
                                       HEAT-RECOVERY                 LARGE
"ACTIVE"
-
WATER
PROOFING                                                                           -
NO
WATER
PROOFING
                                       VENTILATION
&                 MECHANICAL
SYSTEM


AND
MANAGEMENT                                                                           

AND
MANAGEMENT
                                       SMALL
HEATER                  -
FURNACE
OR
BOILER
-
ADDED
INSULATION                                                                         -
NO
INSULATION
AT
AND
-
MITIGATION
OF                                                                            

BELOW
GRADE


THERMAL
BRIDGES                                                                          -
THERMAL
BRIDGES
First Floor Plan

                                                                       1. Entry
                                                                       2. Powder room
                                                                       3. Mud room/ laundry
                                                                       4. Living room
                                 DN


8   1       2           3             9                                5. Kitchen
                                                                       6. Dining area
                                                                       7. Family area
                UP          DN
                                                                       8. Covered entry
                                                             DN
                                                                       9. Rear entry
                                                                       10.Patio
                                          6                       10




        4               5




                                          7




                                                                   N
                                              0 2' 4'   8'
Basement Floor Plan

                          1. Homeschool Room
                          2. Mechanical
                          3. Unexcavated
          3
     UP




1             2   3
Second Floor Plan

                           1. Bedroom 1
                           2. Bedroom 2
                           3. Master BR
           1               4. Master Clo.
                           5. Master Bath
                           6. Bedroom 3
                           7. Kid’s Bath
                           8. Toilet Room
                       2
7



       8



6              4       3
       5           7
TYPICAL VENTED COLD ROOF ASSEMBLY (R-77)




                                                                                                                                                                                            TRUSS BEARING
              Typical
                                                                                                                                                                                                                                                                           NOTE: REMOVE EXISTING ROOF STRUCTURE,
                                                                                                                                                                                                                                                                           BUILD PERIMETER KNEE WALL AND SET NEW
                                                                                                                                                                                                                                                                           TRUSSED HIP ROOF PER STRUCTURAL DRAWINGS

                                                                                                                                                                                                                                                                           EXTERIOR
                                                                                                                                                                                                                                                                           • STANDING SEAM METAL ROOFING @ 16" O.C.
                                                                                                                                                                                                                                                                           • GRACE ICE & WATER SHIELD HT
                                                                                                                                                                                                                                                                              ROOFING UNDERLAYMENT,




              Assemblies
                                                                                                                                                                                                                                                                              WEATHER RESISTANT BARRIER
                                                                                                                                                                                                                                                                           • 3/4" PLYWOOD STRUCTURAL SHEATHING
                                                                                                                                                                                                                                                                           • ATTIC AIRSPACE, OR VENT CHUTES
                                                                                                                                                                                                                                                                           • STRUC. TRUSSES @ 24" O.C. WITH MIN.
                                                                                                                                                                                                                                                                              20" CELLULOSE INSULATION
                                                                                                                                                                                                                                                                           • 5/8" OSB SHEATHING, SEAL JOINTS AIRTIGHT
                                                                                                                                                                                                                                                                              VAPOR BARRIER, AIRTIGHTNESS LAYER
                                                                                                                                                                                                                                                                           • 6" INSTALLATION CAVITY WITH SUSPENSION
                                                                                                                                                                                                                                                                              SYSTEM
                                                                                                                                                                                                                                                                           • 5/8" WALLBOARD CEILING
                                                                                                                                                                                                                                                                           INTERIOR




                                                                                                                                                                                                            @ OUTSIDE OF STUDWALL
              •   Walls a/ grade: R-44                                                                                                                                                                                                                                                                          SNOW GUARDS PER MANUF.




                                                                                                                                                                                                                      20"
                                                                                                                                         MAINTAIN CONT. AIR BARRIER W/ SIGA                                                                                                                                         VENT CHUTES
                                                                                                                                      BRAND TAPE AT SHEATHING TO TOP PLATE




              •   Walls b/ grade: R-30+                                                                                                                                                                                             10 3/4"


                                                                                                                                                                                                                                                                                                   2
                                                                                                                                                                                                                                                                                                                        T.O. KNEEWALL
                                                                                                                                                                                                                                                                                                                        +1'-8"




                                                                                                                                                    CLEAR
                                                                                                                                                                                                                                                                                                   10




                                                                                                                                                    5 1/2"
              •   Roof: R-77




                                                                                                                                                                                                                                                       7"
                                                                                                                                                                                                                                                                    CONT. VENTING
                                                                                                                                                                                                                                                                                                                    GUTTER

                                                                                                                                      EXIST. ROOF FRAMING                                                                                                                      24"
                                                                                                                                              TO BE DEMO'D




                                                                                                                                                                                                                                                       9 1/4"
              •   Slab: R-25                                                                                            MAINTAIN CONT. AIR BARRIER W/ SIGA
                                                                                                                     BRAND TAPE AT SHEATHING TO TOP PLATE




                                                                                                                                                                                                                                                                  1 1/2"
                                                                                                                                                                                                                                                                                                                        T.O. ADDITION R.O.s
                                                                                                                                                                                                                                                                                                                        +0'-0 1/2"
                                                                                                                                                             RETROFIT FRAMING
                                                                                                                                                                                                                                                                                                                        T.O. EXISTING WALL
                                                                                                                                                                                                                                                                                                                        0'-0"
                                                                                                                                                                   EXIST. WALL                                                                                                                                          T.O. EXISTING R.O.




                                                                                                                                                                                                                                                       ± 9 1/4"
                                                                                                                                                                                                                                                                                                                        -0'-3"




                                                                                                                                                                                                                                       RETROFIT WALL
                                                                                                                                                                                             EXIST. WALL
                        TYPICAL ABOVE GRADE WALL RETROFIT (R-44)
                        INTERIOR
                        • EXISTING WALLBOARD & FINISH                                                                                                                                                                                                                       TYPICAL ABOVE GRADE RETROFIT (R-44)
                        • EXISTING FRAMING WITH
                          3-1/2" DENSE PACK INSULATION, 3.5 LBS/ CU FT                                                                                                                                                                                                      ASSUMED EXISTING WALL ASSEMBLY
                        • EXISTING SHEATHING                                                                                                                                                                                                                                INTERIOR
                        • 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT                                                                                                                                                                                                          • PLASTER
                          VAPOR BARRIER, AIRTIGHTNESS LAYER                                                                                                                                                                                                                 • WALLBOARD
                        • 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH                                                                                                                                                                                                        • 2X4 FRAMING,
                          DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT                                                                                                                                                                                                      DENSE-PACK WITH CELLULOSE INSULATION (ADDED)
                        • 1/2" BUILDRITE SHEATHING                                                                                                                                                                                                                             3.5 LBS/ CU FT
                        • WINDWASH BARRIER                                                                                                                                                                                                                                  • EXTERIOR SHEATHING
                          WEATHER RESISTANT BARRIER
                        • 3/4" VENT SPACE (1X FRAMING)                                                                                                                                                                                                                      RETROFIT WALL ASSEMBLY
                        • CEMENT BOARD LAP SIDING                                                                                                                                                                                                                           • 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT
                        EXTERIOR                                                                                                                                                                                                                                              VAPOR BARRIER, AIRTIGHTNESS LAYER
                                                                            CONTINUOUS 5/8" SHEATHING                                                                                                                                                                       • 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH
                                                                            CONNECTS EXISTING AND NEW CONSTRUCTION                                                                                                                                                            DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT
                                                                            VAPOR BARRIER & AIRTIGHTNESS LAYER                              WEATHER RESISTANT BARRIER (WRB)                                                                                                 • 1/2" FIBERBOARD SHEATHING (BILDRITE OR SIM.)
                                                                                                                                            AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)                                                                                   • WINDWASH BARRIER
                                                                                                                                                                                                                                                                              WEATHER RESISTANT BARRIER
                                                                                                                                                                                                                                                                            • 3/4" VENT SPACE (1X FRAMING)
                                                                                                                                                                                                                                                                            • CEMENT BOARD LAP SIDING
                                                                                                                                                                                                                                                                            EXTERIOR




                                                                                                                                                                                                                                                                            INSECT SCREEN
7-1/2" TRIM

                                                                                                                                                                                                                                                                            BACKFILL




                                                                                                                       TYPICAL SLAB RETROFIT (R-25)
                                                                                                                       NOTE: REMOVE EXISTING SLAB & EXCAVATE TO
                                                                                                                       ACCOMODATE RETROFIT ASSEMBLY

                                                                                                                       INTERIOR
                                                                                                                       • 4" CONCRETE SLAB WITH
                                                                                                                          RADIANT IN-FLOOR HEATING SYSTEM
                                                                                                                       • 6-MIL POLY
                                                                                                                                                                                                                                                                           TYPICAL BELOW GRADE RETROFIT (R-40)
                                                                                                                          VAPOR BARRIER & AIRTIGHTNESS LAYER
                                                                                                                          SEAL AIRTIGHT AT ALL JOINTS AND PROTRUSIONS                                                                                                      INTERIOR
                                                                                                                       • 6" BELOW GRADE EPS INSULATION BOARD,                                                                                                              • 5/8" WALL BOARD
                                                                                                                         COMPRESSIVE STRENGTH PER SE                                                                                                                       • 3-1/2" STEEL FRAMING @ 24" O.C. WITH
                                                                                                                       • MIN. 2" GRAVEL                                                                                                                                       MIN. 2" CLOSED CELL SPRAY FOAM INSULATION
                                                                                                                       EXTERIOR                                                                                                                                               VAPOR BARRIER & AIRTIGHTNESS LAYER
                                                                                                                                                                                                                                                                           • EXIST. CONCRETE WALL
                                                                                                                                                                                                                                                                           • (2) 3" EXTERIOR GRADE EPS INSULATION (EIFS)
                                                                                                                                                                                                                                                                           • STO FLEXYL (EIFS)
                                                                                                                                                                                                                                                                              WEATHER RESISTANT BARRIER & FINISH
                                                                                                                                                                                                                                                                              (TIE TO FACE OF FOOTING)
                                                                                                                                                                                                                                                                           EXTERIOR
Value Engineering


 Hea$ng'Transmi$on'Losses'
                2%$

                                 Walls$a/g$

                          34%$   Walls$b/g$
  32%$
                                 Roof$

                                 Slab$

                                 Windows$
                         7%$
         15%$                    Doors$
                  10%$
Energy Balance


                     Hea)ng&Energy&Use&vs.&Input&
         12000.00#

         10000.00#
                                                          Ac7ve#Hea7ng#
          8000.00#
                                                          Internal#Gains#
kWh/a&




          6000.00#
                                                          Solar#Gains#
          4000.00#                                        Ven7la7on#Losses#

          2000.00#                                        Transmission#Losses#

             0.00#
                     Losses#in#kWh/a#   Gains#in#kWh/a#
Performance Numbers



Specific Space Heat Demand:
24 kWh/m2 a [7.6 kBTU/ft² a]


Heating Load:
19 W/m2 [6.0 Btu/h/ft²]
                               ≤25
                               ≤130.8
3.75 kW [12.8 kBtu]


Specific Primary Energy Demand:
115 kWh/m2 a [36.5 kBTU/ft² a]


                                 QP ≤ 120 kWh/m2a + ((QH - 15 kWh/(m2a)) * 1.2)
Mechanical Response
What does it all look like?
≤1.0   Airtightness
       0.88 ACH50 [267 CFM50]
2011
What are we thinking?




                                  }
•   Structure ✓
•   Weather Barrier ✓
•   Insulation ✓
•   Airtightness ✓
•   Moisture Management ✓
•   Ventilation/ Air Quality ✓
•   Comfort ✓
                                      HOLISTIC
•   Daylight ✓
                                       DESIGN
•   Durability (50-100 years) ✓
•   Design ✓
•   Lifecycle Cost ✓
•   Environmental Impact ✓
•   Deconstructability ✓
Thank you!


   testudio.com
minnePHithouse.com

More Related Content

Viewers also liked

2010 Living Green Expo Slidshow
2010 Living Green Expo Slidshow2010 Living Green Expo Slidshow
2010 Living Green Expo Slidshow
TE Studio
 
ネットマーケティング最適化コンサルティング Apiなし
ネットマーケティング最適化コンサルティング Apiなしネットマーケティング最適化コンサルティング Apiなし
ネットマーケティング最適化コンサルティング Apiなしspike100
 
Presentatie 'De Marketing van Communicatie' @ POP 2008
Presentatie 'De Marketing van Communicatie' @ POP 2008Presentatie 'De Marketing van Communicatie' @ POP 2008
Presentatie 'De Marketing van Communicatie' @ POP 2008
Draftfcb Amsterdam
 
2009 Passive House Conference Presentation (PH in the Woods)
2009 Passive House Conference Presentation (PH in the Woods)2009 Passive House Conference Presentation (PH in the Woods)
2009 Passive House Conference Presentation (PH in the Woods)
TE Studio
 
First Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseFirst Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit House
TE Studio
 

Viewers also liked (7)

2010 Living Green Expo Slidshow
2010 Living Green Expo Slidshow2010 Living Green Expo Slidshow
2010 Living Green Expo Slidshow
 
Ldc2008 Pdfpresentation
Ldc2008 PdfpresentationLdc2008 Pdfpresentation
Ldc2008 Pdfpresentation
 
ネットマーケティング最適化コンサルティング Apiなし
ネットマーケティング最適化コンサルティング Apiなしネットマーケティング最適化コンサルティング Apiなし
ネットマーケティング最適化コンサルティング Apiなし
 
Presentatie 'De Marketing van Communicatie' @ POP 2008
Presentatie 'De Marketing van Communicatie' @ POP 2008Presentatie 'De Marketing van Communicatie' @ POP 2008
Presentatie 'De Marketing van Communicatie' @ POP 2008
 
2009 Passive House Conference Presentation (PH in the Woods)
2009 Passive House Conference Presentation (PH in the Woods)2009 Passive House Conference Presentation (PH in the Woods)
2009 Passive House Conference Presentation (PH in the Woods)
 
First Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit HouseFirst Passive House Retrofit in a Cold Climate: The MinnePHit House
First Passive House Retrofit in a Cold Climate: The MinnePHit House
 
operations management
operations managementoperations management
operations management
 

More from TE Studio

Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
TE Studio
 
Rochester Sustainability Series - Passive House
Rochester Sustainability Series - Passive HouseRochester Sustainability Series - Passive House
Rochester Sustainability Series - Passive House
TE Studio
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House Plus
TE Studio
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy Haus
TE Studio
 
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report PresentationMinneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
TE Studio
 
CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)
TE Studio
 
MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018
TE Studio
 
The American Dream Renewed - Passive House for Everyone
The American Dream Renewed - Passive House for EveryoneThe American Dream Renewed - Passive House for Everyone
The American Dream Renewed - Passive House for Everyone
TE Studio
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
TE Studio
 
Passive House & the Low Carbon Lifestyle
Passive House & the Low Carbon LifestylePassive House & the Low Carbon Lifestyle
Passive House & the Low Carbon Lifestyle
TE Studio
 
Commercial Passive House Case Studies
Commercial Passive House Case StudiesCommercial Passive House Case Studies
Commercial Passive House Case Studies
TE Studio
 
TE Studio - Intep Portfolio
TE Studio - Intep PortfolioTE Studio - Intep Portfolio
TE Studio - Intep Portfolio
TE Studio
 
Nordeast Nest Project
Nordeast Nest ProjectNordeast Nest Project
Nordeast Nest Project
TE Studio
 
Passive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI ConferencePassive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI Conference
TE Studio
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House Projects
TE Studio
 
2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture
TE Studio
 
Passive house in the woods slideshow
Passive house in the woods slideshowPassive house in the woods slideshow
Passive house in the woods slideshow
TE Studio
 
MinnePHit House Lecture
MinnePHit House LectureMinnePHit House Lecture
MinnePHit House Lecture
TE Studio
 
Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)
Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)
Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)
TE Studio
 
Intep: 24th St Passive House (Student Workshop #1)
Intep: 24th St Passive House (Student Workshop #1)Intep: 24th St Passive House (Student Workshop #1)
Intep: 24th St Passive House (Student Workshop #1)
TE Studio
 

More from TE Studio (20)

Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
 
Rochester Sustainability Series - Passive House
Rochester Sustainability Series - Passive HouseRochester Sustainability Series - Passive House
Rochester Sustainability Series - Passive House
 
Lexington Pkwy Passive House Plus
Lexington Pkwy Passive House PlusLexington Pkwy Passive House Plus
Lexington Pkwy Passive House Plus
 
Good Energy Haus
Good Energy HausGood Energy Haus
Good Energy Haus
 
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report PresentationMinneapolis Passive House and Zero Energy Ready Home Report Presentation
Minneapolis Passive House and Zero Energy Ready Home Report Presentation
 
CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)CEE Passive House Lecture (April 23, 2020)
CEE Passive House Lecture (April 23, 2020)
 
MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018MN ASHRAE Spring Seminar 2018
MN ASHRAE Spring Seminar 2018
 
The American Dream Renewed - Passive House for Everyone
The American Dream Renewed - Passive House for EveryoneThe American Dream Renewed - Passive House for Everyone
The American Dream Renewed - Passive House for Everyone
 
MinnePHit House Case Study
MinnePHit House Case StudyMinnePHit House Case Study
MinnePHit House Case Study
 
Passive House & the Low Carbon Lifestyle
Passive House & the Low Carbon LifestylePassive House & the Low Carbon Lifestyle
Passive House & the Low Carbon Lifestyle
 
Commercial Passive House Case Studies
Commercial Passive House Case StudiesCommercial Passive House Case Studies
Commercial Passive House Case Studies
 
TE Studio - Intep Portfolio
TE Studio - Intep PortfolioTE Studio - Intep Portfolio
TE Studio - Intep Portfolio
 
Nordeast Nest Project
Nordeast Nest ProjectNordeast Nest Project
Nordeast Nest Project
 
Passive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI ConferencePassive House in a Cold Climate @ BBBB 2015 WI Conference
Passive House in a Cold Climate @ BBBB 2015 WI Conference
 
24th Street Passive House Projects
24th Street Passive House Projects24th Street Passive House Projects
24th Street Passive House Projects
 
2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture2013 University of Minnesota Passive House Lecture
2013 University of Minnesota Passive House Lecture
 
Passive house in the woods slideshow
Passive house in the woods slideshowPassive house in the woods slideshow
Passive house in the woods slideshow
 
MinnePHit House Lecture
MinnePHit House LectureMinnePHit House Lecture
MinnePHit House Lecture
 
Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)
Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)
Passive House In The Woods Monitoring (for 2012 PH Conference, Denver, CO)
 
Intep: 24th St Passive House (Student Workshop #1)
Intep: 24th St Passive House (Student Workshop #1)Intep: 24th St Passive House (Student Workshop #1)
Intep: 24th St Passive House (Student Workshop #1)
 

Recently uploaded

Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
eloprejohn333
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
pmgdscunsri
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
h7j5io0
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
Febless Hernane
 
一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
peuce
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
ameli25062005
 

Recently uploaded (20)

Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
一比一原版(Bolton毕业证书)博尔顿大学毕业证成绩单如何办理
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
 
一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理一比一原版(BU毕业证)波士顿大学毕业证如何办理
一比一原版(BU毕业证)波士顿大学毕业证如何办理
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf20 slides of research movie and artists .pdf
20 slides of research movie and artists .pdf
 

MinnePHit House Presentation

  • 1. holistic design for sustainable homes • comfort • economy • ecology • quality • durability • beauty • functionality • health STUDIO: 3429 Benjamin St. NE Minneapolis, MN 55418 612-246-4670 testudio.com CERTIFIED PASSIVE HOUSE™ CONSULTANT
  • 2.
  • 4. What were they thinking? Structure ✓ } • • Weather Barrier ? • Insulation ✗ • Airtightness ✗ • Moisture Management ✓ • Ventilation/ Air Quality ✗ GIT-R DONE • Comfort ✗ ✗ • Daylight ✗ • Durability (30 years?) • Design (Sign of the Times)
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. 2 stories + basement • 1,200 finished SF • 2 bedrooms • 1 bath • 5 people
  • 11.
  • 12.
  • 13.
  • 14.
  • 20. Where do we go?
  • 21. Laundry List • + 3 Bedrooms • + 2 Baths • + Mudroom • Better kitchen • Better living areas • Homeschool room • Safe stairs • Weather-tight envelope • Durable structure • Healthy interiors • Comfort & daylight • Low operating cost • Energy performance
  • 22.
  • 23. How do we get there?
  • 25. Holistic Approach • Set goals for performance and design • Overlay architectural program • Make the home safe for people (code compliance) • Control temperature, air, and moisture • Add ventilation • Make the envelope air- and weather-tight • Add continuous insulation to meet the energy goals • Assess moisture transfer through shell • Design robust climate zone-appropriate assemblies
  • 27. Schematic DEEP
ENERGY
REDUCTION
RETROFIT
(AFTER) TYPICAL
EXISTING
BUILDING
(BEFORE) OPTIONAL
SOLAR
THERMAL OR
SOLAR
PHOTOVOLTAIC SO ADIN R) SH MM LA (SU SUPPLY
AIR R G E PAS SIVE HEA 
S T
GA OLAR (WIN IN TER S EXTRACT
AIR ) RETROFIT
CONDITION EXISTING
CONDITION INTERNAL -
ADVANCED
WINDOWS -
INSUFFICIENT
INSULATION HEAT
GAINS 

AND
DOORS -
LOW-PERFORMANCE -
PEOPLE -
AIR-TIGHTNESS
LAYER 

WINDOWS
AND
DOORS -
EQUIPMT. -
CONTINUOUS
INSULATION -
AIR
LEAKAGE 

PACKAGE -
NO
VENTILATION EXHAUST AIR-INTAKE RETROFIT
CONDITION EXISTING
CONDITION HEAT-RECOVERY LARGE
"ACTIVE" -
WATER
PROOFING -
NO
WATER
PROOFING VENTILATION
& MECHANICAL
SYSTEM 

AND
MANAGEMENT 

AND
MANAGEMENT SMALL
HEATER -
FURNACE
OR
BOILER -
ADDED
INSULATION -
NO
INSULATION
AT
AND -
MITIGATION
OF 

BELOW
GRADE 

THERMAL
BRIDGES -
THERMAL
BRIDGES
  • 28. First Floor Plan 1. Entry 2. Powder room 3. Mud room/ laundry 4. Living room DN 8 1 2 3 9 5. Kitchen 6. Dining area 7. Family area UP DN 8. Covered entry DN 9. Rear entry 10.Patio 6 10 4 5 7 N 0 2' 4' 8'
  • 29. Basement Floor Plan 1. Homeschool Room 2. Mechanical 3. Unexcavated 3 UP 1 2 3
  • 30. Second Floor Plan 1. Bedroom 1 2. Bedroom 2 3. Master BR 1 4. Master Clo. 5. Master Bath 6. Bedroom 3 7. Kid’s Bath 8. Toilet Room 2 7 8 6 4 3 5 7
  • 31. TYPICAL VENTED COLD ROOF ASSEMBLY (R-77) TRUSS BEARING Typical NOTE: REMOVE EXISTING ROOF STRUCTURE, BUILD PERIMETER KNEE WALL AND SET NEW TRUSSED HIP ROOF PER STRUCTURAL DRAWINGS EXTERIOR • STANDING SEAM METAL ROOFING @ 16" O.C. • GRACE ICE & WATER SHIELD HT ROOFING UNDERLAYMENT, Assemblies WEATHER RESISTANT BARRIER • 3/4" PLYWOOD STRUCTURAL SHEATHING • ATTIC AIRSPACE, OR VENT CHUTES • STRUC. TRUSSES @ 24" O.C. WITH MIN. 20" CELLULOSE INSULATION • 5/8" OSB SHEATHING, SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER • 6" INSTALLATION CAVITY WITH SUSPENSION SYSTEM • 5/8" WALLBOARD CEILING INTERIOR @ OUTSIDE OF STUDWALL • Walls a/ grade: R-44 SNOW GUARDS PER MANUF. 20" MAINTAIN CONT. AIR BARRIER W/ SIGA VENT CHUTES BRAND TAPE AT SHEATHING TO TOP PLATE • Walls b/ grade: R-30+ 10 3/4" 2 T.O. KNEEWALL +1'-8" CLEAR 10 5 1/2" • Roof: R-77 7" CONT. VENTING GUTTER EXIST. ROOF FRAMING 24" TO BE DEMO'D 9 1/4" • Slab: R-25 MAINTAIN CONT. AIR BARRIER W/ SIGA BRAND TAPE AT SHEATHING TO TOP PLATE 1 1/2" T.O. ADDITION R.O.s +0'-0 1/2" RETROFIT FRAMING T.O. EXISTING WALL 0'-0" EXIST. WALL T.O. EXISTING R.O. ± 9 1/4" -0'-3" RETROFIT WALL EXIST. WALL TYPICAL ABOVE GRADE WALL RETROFIT (R-44) INTERIOR • EXISTING WALLBOARD & FINISH TYPICAL ABOVE GRADE RETROFIT (R-44) • EXISTING FRAMING WITH 3-1/2" DENSE PACK INSULATION, 3.5 LBS/ CU FT ASSUMED EXISTING WALL ASSEMBLY • EXISTING SHEATHING INTERIOR • 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT • PLASTER VAPOR BARRIER, AIRTIGHTNESS LAYER • WALLBOARD • 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH • 2X4 FRAMING, DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT DENSE-PACK WITH CELLULOSE INSULATION (ADDED) • 1/2" BUILDRITE SHEATHING 3.5 LBS/ CU FT • WINDWASH BARRIER • EXTERIOR SHEATHING WEATHER RESISTANT BARRIER • 3/4" VENT SPACE (1X FRAMING) RETROFIT WALL ASSEMBLY • CEMENT BOARD LAP SIDING • 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT EXTERIOR VAPOR BARRIER, AIRTIGHTNESS LAYER CONTINUOUS 5/8" SHEATHING • 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH CONNECTS EXISTING AND NEW CONSTRUCTION DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT VAPOR BARRIER & AIRTIGHTNESS LAYER WEATHER RESISTANT BARRIER (WRB) • 1/2" FIBERBOARD SHEATHING (BILDRITE OR SIM.) AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR) • WINDWASH BARRIER WEATHER RESISTANT BARRIER • 3/4" VENT SPACE (1X FRAMING) • CEMENT BOARD LAP SIDING EXTERIOR INSECT SCREEN 7-1/2" TRIM BACKFILL TYPICAL SLAB RETROFIT (R-25) NOTE: REMOVE EXISTING SLAB & EXCAVATE TO ACCOMODATE RETROFIT ASSEMBLY INTERIOR • 4" CONCRETE SLAB WITH RADIANT IN-FLOOR HEATING SYSTEM • 6-MIL POLY TYPICAL BELOW GRADE RETROFIT (R-40) VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT ALL JOINTS AND PROTRUSIONS INTERIOR • 6" BELOW GRADE EPS INSULATION BOARD, • 5/8" WALL BOARD COMPRESSIVE STRENGTH PER SE • 3-1/2" STEEL FRAMING @ 24" O.C. WITH • MIN. 2" GRAVEL MIN. 2" CLOSED CELL SPRAY FOAM INSULATION EXTERIOR VAPOR BARRIER & AIRTIGHTNESS LAYER • EXIST. CONCRETE WALL • (2) 3" EXTERIOR GRADE EPS INSULATION (EIFS) • STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING) EXTERIOR
  • 32. Value Engineering Hea$ng'Transmi$on'Losses' 2%$ Walls$a/g$ 34%$ Walls$b/g$ 32%$ Roof$ Slab$ Windows$ 7%$ 15%$ Doors$ 10%$
  • 33. Energy Balance Hea)ng&Energy&Use&vs.&Input& 12000.00# 10000.00# Ac7ve#Hea7ng# 8000.00# Internal#Gains# kWh/a& 6000.00# Solar#Gains# 4000.00# Ven7la7on#Losses# 2000.00# Transmission#Losses# 0.00# Losses#in#kWh/a# Gains#in#kWh/a#
  • 34. Performance Numbers Specific Space Heat Demand: 24 kWh/m2 a [7.6 kBTU/ft² a] Heating Load: 19 W/m2 [6.0 Btu/h/ft²] ≤25 ≤130.8 3.75 kW [12.8 kBtu] Specific Primary Energy Demand: 115 kWh/m2 a [36.5 kBTU/ft² a] QP ≤ 120 kWh/m2a + ((QH - 15 kWh/(m2a)) * 1.2)
  • 36. What does it all look like?
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60. ≤1.0 Airtightness 0.88 ACH50 [267 CFM50]
  • 61.
  • 62. 2011
  • 63. What are we thinking? } • Structure ✓ • Weather Barrier ✓ • Insulation ✓ • Airtightness ✓ • Moisture Management ✓ • Ventilation/ Air Quality ✓ • Comfort ✓ HOLISTIC • Daylight ✓ DESIGN • Durability (50-100 years) ✓ • Design ✓ • Lifecycle Cost ✓ • Environmental Impact ✓ • Deconstructability ✓
  • 64.