SlideShare a Scribd company logo
MIDAS CIVIL
Integrated Design System for Building and General Structures
1
MIDAS CIVIL
Integrated Design System for Building and General Structures
Daftar Isi :
1. Pendahuluan
2. Dimensi Pier
3. Material Properties
4. Penentuan Material Properties dan Section
5. Pemodelan Geometrik
6. Boundary / Perletakan
7. Pembebanan
8. Kombinasi Pembebanan
9. Gaya Dalam
2
MIDAS CIVIL
Integrated Design System for Building and General Structures
1. Pendahuluan
Akan direncanakan suatu struktur pier pada jembatan dengan dimensi dan geometrik
sebagai berikut.
3
MIDAS CIVIL
Integrated Design System for Building and General Structures
2. Dimensi Pier
2.5m
0.75m 0.75m
0.75m 0.75m
1m
4.14m
0.75m
1.5m
8m
4.14m
0.75m
1.22m 1.22m
4.7m
1.875m 0.325m
0.325m 1.875m
1.85m
1.5m 1.5m
4
MIDAS CIVIL
Integrated Design System for Building and General Structures
3. Material Properties
Kuat Mutu beton yang digunakan dalam analisis struktur pier ini : Pier Head, Kolom
dan Pile Cap (K-350/fc’=29.05 Mpa).
PILE CAP
KOLOM
PIER HEAD
5
MIDAS CIVIL
Integrated Design System for Building and General Structures
4. Pemodelan Material Properties dan Section
a. Buka file dan setting units kN,m (SI)
6
MIDAS CIVIL
Integrated Design System for Building and General Structures
b. Model – Properties – Material – add material – Name isi K-350 – Pilih type of
design concrete – Concrete standar pilih none – Isikan Modulus Elasticity E =
25332000 kN/m2 , Poisson’s ratio 0.2, thermal coefficient 10-5 , weight density 25 –
lalu OK.
4. Pemodelan Material Properties dan Section
7
MIDAS CIVIL
Integrated Design System for Building and General Structures
4. Pemodelan Material Properties dan Section
8
MIDAS CIVIL
Integrated Design System for Building and General Structures
c. Model – Section – add – Name isi Pile Cap – pilih bentuk solid rectangle - pilih user
– masukan dimensi section angka 8 (H) dan 4.7 (B) – lalu apply .
4. Pemodelan Material Properties dan Section
9
MIDAS CIVIL
Integrated Design System for Building and General Structures
d. Pilih Tappered – Name isi Pile Cap Tap – pilih bentuk solid rectangle – pilih user –
section i masukan dimensi section angka 8 (H) dan 4.7 (B) I – masukan dimensi
section j angka 1.5 (H) dan 1.5 (B) – lalu apply.
4. Pemodelan Material Properties dan Section
10
MIDAS CIVIL
Integrated Design System for Building and General Structures
e. Pilih DB/user – Name isi Kolom– pilih bentuk solid rectangle – pilih user – masukan
dimensi section angka 1.5 (H) dan 1.5 (B) – lalu apply.
4. Pemodelan Material Properties dan Section
11
MIDAS CIVIL
Integrated Design System for Building and General Structures
f. Pilih DB/user – Name isi Pier Head– pilih bentuk T - section – pilih user – masukan
dimensi section angka 1.97 (H) ,2.5 (B), 1 (tw), 0.75 (tf) – lalu OK – kemudian close.
Ganti center of top
4. Pemodelan Material Properties dan Section
12
MIDAS CIVIL
Integrated Design System for Building and General Structures
5. Pemodelan Geometrik
a. Pilih Model – Nodes – Create Nodes – section – Coordinates (x,y,x) – masukan
(0,0,0) – lalu apply.
Koordinat (0,0,0)
13
MIDAS CIVIL
Integrated Design System for Building and General Structures
b. Pilih Model – Nodes – Translate Nodes – (1) pilih titik (0,0,0) (sorot) – (2) masukan
(0,0,1) – (3) lalu apply – (4) Node berikutnya telah muncul.
1
2
3
4
5. Pemodelan Geometrik
14
MIDAS CIVIL
Integrated Design System for Building and General Structures
c. Dengan cara yang sama diatas diaplikasikan ke 10 titik, seperti pada gambar
dibawah.
1 (0,0,0)
2 (0,0,1)
3 (0,0,1.5)
4 (0,0,5.64)
8 (0,0.925,5.64) 5 (0, -0.925,5.64)
9 (0,2.8,5.64)
10 (0,3.125,5.64)
6 (0,-2.8,5.64)
7 (0,-3.125,5.64)
Node 1 (0,0,0)
Node 2 (0,0,1)
Node 3 (0,0,1.5)
Node 4 (0,0,5.64)
Node 5 (0,-0.925,5.64)
Node 6 (0,-2.8,5.64)
Node 7 (0,-3.125,5.64)
Node 8 (0,0.925,5.64)
Node 9 (0,2.8,5.64)
Node 10 (0,3.125,5.64)
5. Pemodelan Geometrik
15
MIDAS CIVIL
Integrated Design System for Building and General Structures
d. Pilih Model – Element – Create Element – Pilih Material K-350 – Pilih Section Pile
cap – klik node 1 ke node 2.
5. Pemodelan Geometrik
16
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 1 ke
node 2
5. Pemodelan Geometrik
17
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 2 ke
node 3
5. Pemodelan Geometrik
18
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 3 ke
node 4
5. Pemodelan Geometrik
19
MIDAS CIVIL
Integrated Design System for Building and General Structures
Klik node 10 ke
node 7
5. Pemodelan Geometrik
20
MIDAS CIVIL
Integrated Design System for Building and General Structures
Bentuk Penampang
tidak sesuai dengan
geometri desain
Klik untuk melihat
penampang.
5. Pemodelan Geometrik
21
MIDAS CIVIL
Integrated Design System for Building and General Structures
e. Pilih Element Pier Head – Model – Elements – Change Element Parameters – Pilih
Element Local Axis – Mode, Ganti Beta Angle jadi 180 Deg – kemudian Apply.
Sorot element Pier
Head
5. Pemodelan Geometrik
22
MIDAS CIVIL
Integrated Design System for Building and General Structures
5. Pemodelan Geometrik
23
MIDAS CIVIL
Integrated Design System for Building and General Structures
5. Pemodelan Geometrik
24
MIDAS CIVIL
Integrated Design System for Building and General Structures
6. Boundary/Perletakan
Pilih Node 1 – Model – Boundary – Support – Ceklist D-ALL dan R-ALL (perlekan jepit)
– kemudian Apply.
25
MIDAS CIVIL
Integrated Design System for Building and General Structures
6. Boundary/Perletakan
26
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Pembebanan yang terjadi Pada struktur Pier Jembatan dapat dibagi menjadi 4 bagian,
yaitu :
1. Beban akibat strukturnya sendiri (SW).
2. Beban DL (Dead Load) akibat beban Girder L=35.6m (Interior dan Eksterior), rc
pelat, digfragma dan pelat.
3. Beban SDL (Super Imposed Dead Load) akibat aspalt, median, trotoar dan railing.
4. Beban LL (Live Load) akibat beban UDL (Uniform Dead Load) dan KEL (Knife Edge
Load) dan beban rem.
DL + SDL + UDL + KEL
DL + SDL + UDL + KEL No Jenis
Beban (kN) Arah
Interior Eksterior Global Axis
1RDL 500 600
z
2RSDL 50 200
3RUDL 250
4RKEL 60
5RREM 4 x
REM
27
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Load – Static Load Case – Isikan name, type dan description - klik close
28
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
a.Pilih node 5,6,8,9– Model – Node – Translate Node – pilih copy – isikan (0.85,0,0.75)
– apply – pilih ikon select previous - isikan (-0.85,0,0.75) – apply – maka akan
muncul node baru 11 – 18 (sebagai node untuk assign beban yang direncanakan).
Node baru (11-18)
29
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
b. Load – Selfweight – isikan pada Z (-1) – kemudian klik add – klik close – maka
program akan menghitung otomotis program tersebut.
30
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Pilih node 11,13,15,17 – Load – Nodal Load – Pilih Load Case Name DL – tulis di FZ (-
500) (Beban DL interior) – klik apply – pilih node 12,14,16,18 - tulis di FZ (-600)
(Beban DL eksterior) – klik apply.
31
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Dengan cara yang sama seperti sebelumnya maka beban - beban telah diaplikasikan
terhadap struktur pier tersebut.
Assign Node Beban (kN) Jenis Beban Global Axis
11,13,15,17 -600
RDL
Eksterior
Z
12,14,16,18 -500 Interior
11,13,15,17 -200
RSDL
Eksterior
12,14,16,18 -50 Interior
11 to 18
-250 RUDL
-60 RKEL
4 RREM X
RDL RSDL
RUDL
RKEL RREM
32
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Untuk menghubungkan node beban dengan element strukturnya maka diberi
bondary condition yaitu elastic link. Model – Boundary – pilih Elastic Link – Link Type
– Pilih Rigid – pada tabel 2 nodes pilih titik yang di link contoh node 9 dengan 18 –
klik node 18 ke node 9 – Maka elastik link akan muncul.
Klik node 18 ke 9
33
MIDAS CIVIL
Integrated Design System for Building and General Structures
7. Pembebanan
Dengan cara yang sama lakukan untuk node 14 -9 , 17 – 8 , 13 – 8, 15 – 5, 11 – 5, 16 –
6 dan 12 – 6.
34
MIDAS CIVIL
Integrated Design System for Building and General Structures
8. Kombinasi Pembebanan
(1). Result – Combination – tulis pada kolom Name ULS 1 di Load Kombination List –
Pilih SW pada Load Case tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2.
(2). Tulis pada kolom Name ULS 2 di Load Kombination List – Pilih SW pada Load Case
tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2 – Pilih UDL tulis 1.8 – Pilih
KEL tulis 1.8 – Pilih REM tulis 1.8.
(3). Tulis pada kolom Name ENV-ULS – ganti type add jadi Envelope – Pada kolom
Load Case and factor pilih ULS1 dan ULS2 tulis 1 – kemudian close.
KOMBINASI PEMBEBANAN
ULS-1 1.3SW + 1.3RDL + 2SDL
ULS-2 1.3SW + 1.3RDL + 2SDL + 1.8UDL + 1.8KEL + 1.8REM
35
MIDAS CIVIL
Integrated Design System for Building and General Structures
8. Kombinasi Pembebanan
36
MIDAS CIVIL
Integrated Design System for Building and General Structures
9. Analisis Struktur Gaya Dalam
Setelah material dan section didefiniskan, geometri dan dimensi telah digambar,
boundary telah ditentukan lalu kemudian beban dan load sudah dimasukan, maka
tahap terakhir adalah analisis gaya dalam struktur tersebut. Pilih ikon run analysis
Apabila berhasil di run maka akan keluar tulisan your midas job is successfully
completed.
Klik
Run OK
37
MIDAS CIVIL
Integrated Design System for Building and General Structures
9. Analisis Struktur Gaya Dalam
Untuk melihat gaya dalam yang terjadi pada pier, pilih result – forces – beam diagram
– klik load cases/combination pilih Cball : ENV –ULS – Pilih Fx (Gaya Aksial) – Solid fill
– type of display ceklis countur , legend pilih fixed tulis decimal point 2 – kemudian
OK.
38
MIDAS CIVIL
Integrated Design System for Building and General Structures
9. Analisis Struktur Gaya Dalam
39
Bidang Momen Pada Pier Head
Bidang Geser Pada Pier Head
Bidang Momen Pada Kolom
Bidang Geser Pada Kolom
MIDAS CIVIL
Integrated Design System for Building and General Structures
40
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Terdapat cara lain untuk menggambar atau mendefiniskan section penampang selain
menggunakan menu Section Data yaitu dengan program SPC. Program SPC ini
digunakan untuk menggambar section penampang serta menghitung section
propertiesnya. Program ini berguna sekali apabila bentuk penampang sudah tidak
simetri lagi.
41
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Sebagai contoh akan dibuat section pier head yang sudah di desain pada section data
midas, akan dicoba dengan menggunakan program SPC.
Node 1 (-0.5,0)
Node 2 (0.5,0)
Node 3 (0.5,-1.22)
Node 4 (1.25,-1.22)
Node 5 (1.25,-1.97)
Node 6 (-1.25,-1.97)
Node 7 (-1.25,-1.22)
Node 8 (-0.5,-1.22)
2.5m
X
Y
1 2
3
4
5
6
7 8
0.75m
0.75m 0.75m
1m
1.22m
0.75m
42
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
a. Buka Program SPC – Setting – General – Unit System Force (kN) – Length ganti jadi
m – Klik OK.
43
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
b. Model – Curve – Create – Line – isi point 1 (-0.5,0) – isi point 2 (0.5,0) – klik Apply.
44
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
c. Model – Curve – Create – Line – isi point 1 (0.5,0) – isi point 2 (0.5,-1.22) – klik
Apply.
45
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
d. Model – Curve – Create – Line – isi point 1 (0.5,-1.22) – isi point 2 (1.25,-1.22) – klik
Apply.
46
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
e. Model – Curve – Create – Line – isi point 1 (1.25,-1.22) – isi point 2 (1.25,-1.97) –
klik Apply.
47
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
f. Model – Curve – Create – Line – isi point 1 (1.25,-1.97) – isi point 2 (-1.25,-1.97) –
klik Apply.
48
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
g. Model – Curve – Create – Line – isi point 1 (-1.25,-1.97) – isi point 2 (-1.25,-1.22) –
klik Apply.
49
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
h. Model – Curve – Create – Line – isi point 1 (-1.25,-1.22) – isi point 2 (-0.5,-1.22) –
klik Apply.
50
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
i. Model – Curve – Create – Line – isi point 1 (-0.5,-1.22) – isi point 2 (-0.50) – klik
Apply – kemudian Close.
51
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
i. Pilih Model – Section – Generate – Sorot semua Line yang telah dibuat sampai
garisnya berwarna merah – ceklist calculates properties now – kemudian pilih apply.
52
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Program akan secara otomatis menghitung section penampang tersebut, bila benar
akan muncul tulisan new plane section {section – P1} is generated and its properties
are calculated.
53
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Untuk melihat propertiesnya dapat dilihat pada ikon maka akan keluar tabel
properties penampang yang kita buat.
54
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Penampang yang telah dibuat sekarang akan di eksport ke program MIDAS pada data
section list caranya adalah pilih Model – Section – Eksport – Pilih Midas Section File –
lalu klik ikon beri nama Pier Head SPC – lalu sorot section yang kita buat sampai
berubah jadi warna merah – klik apply – maka section penampang telah disimpan
pada section list pada program MIDAS.
55
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Buka program Midas buka file modul 1 yang telah dibuat – Model – Properties –
Section – Add – klik Value – Cari section penampang General Section – klik import
form SPC – cari file dengan nama Pier Head SPC – klik open – pilih section P1 – klik
OK.
56
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
57
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Maka akan muncul section penampang yang telah dibuat tadi pada program SPC
beserta tabel section propertiesnya – beri nama Pier Head SPC – ubah offsetnya jadi
center of bottom – lalu klik apply – lalu klik cancel.
58
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Pilih section element 4,5,6,7,8,9 yang sebelumnya dengan nama Pier Head ganti Pier
Head SPC dengan sistem drag and drop.
Drag and Drop
59
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
Ubah dahalu element local axisnya di model – element - change element parameters
– pilih element local axis – Mode beta angle pilih 0 – Apply.
60
MIDAS CIVIL
Integrated Design System for Building and General Structures
Program SPC dari MIDAS untuk Penggambaran Section
Penampang
61

More Related Content

What's hot

Laporan Struktur Rumah Tinggal
Laporan Struktur Rumah TinggalLaporan Struktur Rumah Tinggal
Laporan Struktur Rumah Tinggal
Ali Hasan
 
Penyaluran tulangan beton
Penyaluran tulangan betonPenyaluran tulangan beton
Penyaluran tulangan beton
Achmat Nasrulloh
 
Sambungan baut
Sambungan bautSambungan baut
Sambungan baut
Ilham Maryadi
 
Perancangan underpass
Perancangan underpass Perancangan underpass
Perancangan underpass
Poten Novo
 
Buku etabs
Buku etabsBuku etabs
Buku etabs
Gilang Ramadhani
 
Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda
Rian Irvandi
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
WSKT
 
Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...
Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...
Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...
AndriArrahman1
 
perhitungan-atap
perhitungan-atapperhitungan-atap
perhitungan-atap
pratamadika3
 
Dokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pileDokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pile
DariYanto2
 
Balok lentur dan geser baja
Balok lentur dan geser  bajaBalok lentur dan geser  baja
Balok lentur dan geser baja
Shaleh Afif Hasibuan
 
Sni tali kawat baja
Sni tali kawat bajaSni tali kawat baja
Sni tali kawat baja
yefta kambuno
 
Lecture note on column design
Lecture note on column designLecture note on column design
Lecture note on column design
Niyogakiza Philemon
 
Bab 4. balok sederhana statis tak tentu
Bab 4. balok sederhana statis tak tentuBab 4. balok sederhana statis tak tentu
Bab 4. balok sederhana statis tak tentu
Yoon Tua Simbolon
 
Desain struktur portal baja dan detailing
Desain struktur portal baja dan detailingDesain struktur portal baja dan detailing
Desain struktur portal baja dan detailing
rhtrusli
 
PERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPA
PERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPAPERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPA
PERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPA
Sumarno Feriyal
 
Modul dpib pb 5
Modul dpib pb 5Modul dpib pb 5
Design of floor slab
Design of floor slabDesign of floor slab
Design of floor slab
sathananthankartheep
 
Pelaksanaan pondasi dalam
Pelaksanaan pondasi dalamPelaksanaan pondasi dalam
Pelaksanaan pondasi dalam
Ahmad Nur Ilham Yahya
 
Laporan tugas besar struktur bangunan baja
Laporan tugas besar struktur bangunan bajaLaporan tugas besar struktur bangunan baja
Laporan tugas besar struktur bangunan baja
Andhika Fajar
 

What's hot (20)

Laporan Struktur Rumah Tinggal
Laporan Struktur Rumah TinggalLaporan Struktur Rumah Tinggal
Laporan Struktur Rumah Tinggal
 
Penyaluran tulangan beton
Penyaluran tulangan betonPenyaluran tulangan beton
Penyaluran tulangan beton
 
Sambungan baut
Sambungan bautSambungan baut
Sambungan baut
 
Perancangan underpass
Perancangan underpass Perancangan underpass
Perancangan underpass
 
Buku etabs
Buku etabsBuku etabs
Buku etabs
 
Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda Rencana Atap dan Detail Kuda Kuda
Rencana Atap dan Detail Kuda Kuda
 
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedungSni 1727 2013 tata cara pembebanan untuk rumah dan gedung
Sni 1727 2013 tata cara pembebanan untuk rumah dan gedung
 
Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...
Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...
Analisis perhitungankapasitas daya dukung pondasi tiang pancang diameter 50 c...
 
perhitungan-atap
perhitungan-atapperhitungan-atap
perhitungan-atap
 
Dokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pileDokumen.tips detail tulangan spun pile
Dokumen.tips detail tulangan spun pile
 
Balok lentur dan geser baja
Balok lentur dan geser  bajaBalok lentur dan geser  baja
Balok lentur dan geser baja
 
Sni tali kawat baja
Sni tali kawat bajaSni tali kawat baja
Sni tali kawat baja
 
Lecture note on column design
Lecture note on column designLecture note on column design
Lecture note on column design
 
Bab 4. balok sederhana statis tak tentu
Bab 4. balok sederhana statis tak tentuBab 4. balok sederhana statis tak tentu
Bab 4. balok sederhana statis tak tentu
 
Desain struktur portal baja dan detailing
Desain struktur portal baja dan detailingDesain struktur portal baja dan detailing
Desain struktur portal baja dan detailing
 
PERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPA
PERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPAPERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPA
PERENCANAAN GEDUNG BETON BERTULANG TAHAN GEMPA
 
Modul dpib pb 5
Modul dpib pb 5Modul dpib pb 5
Modul dpib pb 5
 
Design of floor slab
Design of floor slabDesign of floor slab
Design of floor slab
 
Pelaksanaan pondasi dalam
Pelaksanaan pondasi dalamPelaksanaan pondasi dalam
Pelaksanaan pondasi dalam
 
Laporan tugas besar struktur bangunan baja
Laporan tugas besar struktur bangunan bajaLaporan tugas besar struktur bangunan baja
Laporan tugas besar struktur bangunan baja
 

Similar to midas-civil-integrated-design-system-for-building-and-general-structures.pdf

Materi-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfMateri-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdf
Arif Matondang
 
Struktur Atap gedung
Struktur Atap gedungStruktur Atap gedung
Struktur Atap gedung
Octo Qomarullah
 
Sap2000
Sap2000Sap2000
Sap2000
nisa20091993
 
Its paper-32776-4107100041-paper
Its paper-32776-4107100041-paperIts paper-32776-4107100041-paper
Its paper-32776-4107100041-paper
lina meliana
 
PAPARAN RSUD.ppt
PAPARAN RSUD.pptPAPARAN RSUD.ppt
PAPARAN RSUD.ppt
FatkhuRozak2
 
Desainstrukturportalbajadandetailing
DesainstrukturportalbajadandetailingDesainstrukturportalbajadandetailing
Desainstrukturportalbajadandetailing
dicky budiyanto
 
06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur
Devian Tri Andriana
 
221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its
Roni Fauzi
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Remigius1984
 
Modul sap seffope For Traning
Modul sap seffope For TraningModul sap seffope For Traning
Modul sap seffope For Traning
reysbere1987
 
Modul sap seffope (1)
Modul sap seffope (1)Modul sap seffope (1)
Modul sap seffope (1)
reysbere1987
 
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
TriMardianto3
 
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d23 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
Dewi Gultom
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivity
Fatimatuzzahra Zaza
 
TUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptxTUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptx
ssuser942fdb
 
Tutorial sap v11
Tutorial sap v11Tutorial sap v11
Tutorial sap v11
safaruddin kurnia
 
109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be
siswoST
 
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap200053309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000Botak Doohan Jr
 
2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan
ahmad fuadi
 
Its undergraduate-14786-presentationpdf
Its undergraduate-14786-presentationpdfIts undergraduate-14786-presentationpdf
Its undergraduate-14786-presentationpdfRudi Hermana
 

Similar to midas-civil-integrated-design-system-for-building-and-general-structures.pdf (20)

Materi-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdfMateri-Bahan Presentasi_013362.pdf
Materi-Bahan Presentasi_013362.pdf
 
Struktur Atap gedung
Struktur Atap gedungStruktur Atap gedung
Struktur Atap gedung
 
Sap2000
Sap2000Sap2000
Sap2000
 
Its paper-32776-4107100041-paper
Its paper-32776-4107100041-paperIts paper-32776-4107100041-paper
Its paper-32776-4107100041-paper
 
PAPARAN RSUD.ppt
PAPARAN RSUD.pptPAPARAN RSUD.ppt
PAPARAN RSUD.ppt
 
Desainstrukturportalbajadandetailing
DesainstrukturportalbajadandetailingDesainstrukturportalbajadandetailing
Desainstrukturportalbajadandetailing
 
06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur06. bab 6 kajian perencanaan struktur
06. bab 6 kajian perencanaan struktur
 
221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its221096408 dasar-dasar-sap-2000-puski-its
221096408 dasar-dasar-sap-2000-puski-its
 
Manual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptxManual Desain Perkerasan jalan 2017 FINAL.pptx
Manual Desain Perkerasan jalan 2017 FINAL.pptx
 
Modul sap seffope For Traning
Modul sap seffope For TraningModul sap seffope For Traning
Modul sap seffope For Traning
 
Modul sap seffope (1)
Modul sap seffope (1)Modul sap seffope (1)
Modul sap seffope (1)
 
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx6. FORMAT Lampiran C AP DIKMATA REVISI.docx
6. FORMAT Lampiran C AP DIKMATA REVISI.docx
 
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d23 body part_234aee85-51e9-49da-bb77-1756f0b137d2
3 body part_234aee85-51e9-49da-bb77-1756f0b137d2
 
Ship building process & shipyard productivity
Ship building process & shipyard productivityShip building process & shipyard productivity
Ship building process & shipyard productivity
 
TUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptxTUTORIAL kapal arif.pptx
TUTORIAL kapal arif.pptx
 
Tutorial sap v11
Tutorial sap v11Tutorial sap v11
Tutorial sap v11
 
109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be109922 id-perencanaan-alternatif-struktur-beton-be
109922 id-perencanaan-alternatif-struktur-beton-be
 
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap200053309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
53309952 utf-8-desain-struktur-beton-bertulang-dengan-sap2000
 
2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan2006 06-pengukuran dan pematokan
2006 06-pengukuran dan pematokan
 
Its undergraduate-14786-presentationpdf
Its undergraduate-14786-presentationpdfIts undergraduate-14786-presentationpdf
Its undergraduate-14786-presentationpdf
 

Recently uploaded

PROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdf
PROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdfPROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdf
PROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdf
afifsalim12
 
Sistem Proteksi Jawa Bali untuk gardu induk
Sistem Proteksi Jawa Bali untuk gardu indukSistem Proteksi Jawa Bali untuk gardu induk
Sistem Proteksi Jawa Bali untuk gardu induk
ssuser0b6eb8
 
PROYEK PEMBANGUNAN TRANSMISI 150 KV PLN
PROYEK PEMBANGUNAN TRANSMISI 150 KV  PLNPROYEK PEMBANGUNAN TRANSMISI 150 KV  PLN
PROYEK PEMBANGUNAN TRANSMISI 150 KV PLN
tejakusuma17
 
Perencanaan Anggaran Biaya dan penjadwalan
Perencanaan Anggaran Biaya dan penjadwalanPerencanaan Anggaran Biaya dan penjadwalan
Perencanaan Anggaran Biaya dan penjadwalan
MarvinPatrick1
 
Paparan Pengawasan Bangunan Gedung.pptx
Paparan  Pengawasan Bangunan Gedung.pptxPaparan  Pengawasan Bangunan Gedung.pptx
Paparan Pengawasan Bangunan Gedung.pptx
RifkiAbrar2
 
DAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdf
DAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdfDAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdf
DAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdf
benediktusmaksy
 
BAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptx
BAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptxBAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptx
BAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptx
ssuser5e48eb
 
ANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdf
ANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdfANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdf
ANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdf
narayafiryal8
 
1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx
1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx
1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx
ymikhael4
 

Recently uploaded (9)

PROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdf
PROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdfPROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdf
PROGRAM PERCEPATAN PENINGKATAN TATA GUNA AIR IRIGASI 2024.pdf
 
Sistem Proteksi Jawa Bali untuk gardu induk
Sistem Proteksi Jawa Bali untuk gardu indukSistem Proteksi Jawa Bali untuk gardu induk
Sistem Proteksi Jawa Bali untuk gardu induk
 
PROYEK PEMBANGUNAN TRANSMISI 150 KV PLN
PROYEK PEMBANGUNAN TRANSMISI 150 KV  PLNPROYEK PEMBANGUNAN TRANSMISI 150 KV  PLN
PROYEK PEMBANGUNAN TRANSMISI 150 KV PLN
 
Perencanaan Anggaran Biaya dan penjadwalan
Perencanaan Anggaran Biaya dan penjadwalanPerencanaan Anggaran Biaya dan penjadwalan
Perencanaan Anggaran Biaya dan penjadwalan
 
Paparan Pengawasan Bangunan Gedung.pptx
Paparan  Pengawasan Bangunan Gedung.pptxPaparan  Pengawasan Bangunan Gedung.pptx
Paparan Pengawasan Bangunan Gedung.pptx
 
DAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdf
DAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdfDAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdf
DAMPAK POLUSI UDARA TERHADAP KESEHATAN MASYARAKAT.pdf
 
BAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptx
BAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptxBAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptx
BAHAN KULIUAH BAHAN TAMBAHAN MAKANANTM 03.pptx
 
ANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdf
ANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdfANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdf
ANALISIS PENGARUH INDUSTRI BATU BARA TERHADAP PENCEMARAN UDARA.pdf
 
1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx
1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx
1 - Metode Pelaksanaan Pondasi Tiang Pancang-1.pptx
 

midas-civil-integrated-design-system-for-building-and-general-structures.pdf

  • 1. MIDAS CIVIL Integrated Design System for Building and General Structures 1
  • 2. MIDAS CIVIL Integrated Design System for Building and General Structures Daftar Isi : 1. Pendahuluan 2. Dimensi Pier 3. Material Properties 4. Penentuan Material Properties dan Section 5. Pemodelan Geometrik 6. Boundary / Perletakan 7. Pembebanan 8. Kombinasi Pembebanan 9. Gaya Dalam 2
  • 3. MIDAS CIVIL Integrated Design System for Building and General Structures 1. Pendahuluan Akan direncanakan suatu struktur pier pada jembatan dengan dimensi dan geometrik sebagai berikut. 3
  • 4. MIDAS CIVIL Integrated Design System for Building and General Structures 2. Dimensi Pier 2.5m 0.75m 0.75m 0.75m 0.75m 1m 4.14m 0.75m 1.5m 8m 4.14m 0.75m 1.22m 1.22m 4.7m 1.875m 0.325m 0.325m 1.875m 1.85m 1.5m 1.5m 4
  • 5. MIDAS CIVIL Integrated Design System for Building and General Structures 3. Material Properties Kuat Mutu beton yang digunakan dalam analisis struktur pier ini : Pier Head, Kolom dan Pile Cap (K-350/fc’=29.05 Mpa). PILE CAP KOLOM PIER HEAD 5
  • 6. MIDAS CIVIL Integrated Design System for Building and General Structures 4. Pemodelan Material Properties dan Section a. Buka file dan setting units kN,m (SI) 6
  • 7. MIDAS CIVIL Integrated Design System for Building and General Structures b. Model – Properties – Material – add material – Name isi K-350 – Pilih type of design concrete – Concrete standar pilih none – Isikan Modulus Elasticity E = 25332000 kN/m2 , Poisson’s ratio 0.2, thermal coefficient 10-5 , weight density 25 – lalu OK. 4. Pemodelan Material Properties dan Section 7
  • 8. MIDAS CIVIL Integrated Design System for Building and General Structures 4. Pemodelan Material Properties dan Section 8
  • 9. MIDAS CIVIL Integrated Design System for Building and General Structures c. Model – Section – add – Name isi Pile Cap – pilih bentuk solid rectangle - pilih user – masukan dimensi section angka 8 (H) dan 4.7 (B) – lalu apply . 4. Pemodelan Material Properties dan Section 9
  • 10. MIDAS CIVIL Integrated Design System for Building and General Structures d. Pilih Tappered – Name isi Pile Cap Tap – pilih bentuk solid rectangle – pilih user – section i masukan dimensi section angka 8 (H) dan 4.7 (B) I – masukan dimensi section j angka 1.5 (H) dan 1.5 (B) – lalu apply. 4. Pemodelan Material Properties dan Section 10
  • 11. MIDAS CIVIL Integrated Design System for Building and General Structures e. Pilih DB/user – Name isi Kolom– pilih bentuk solid rectangle – pilih user – masukan dimensi section angka 1.5 (H) dan 1.5 (B) – lalu apply. 4. Pemodelan Material Properties dan Section 11
  • 12. MIDAS CIVIL Integrated Design System for Building and General Structures f. Pilih DB/user – Name isi Pier Head– pilih bentuk T - section – pilih user – masukan dimensi section angka 1.97 (H) ,2.5 (B), 1 (tw), 0.75 (tf) – lalu OK – kemudian close. Ganti center of top 4. Pemodelan Material Properties dan Section 12
  • 13. MIDAS CIVIL Integrated Design System for Building and General Structures 5. Pemodelan Geometrik a. Pilih Model – Nodes – Create Nodes – section – Coordinates (x,y,x) – masukan (0,0,0) – lalu apply. Koordinat (0,0,0) 13
  • 14. MIDAS CIVIL Integrated Design System for Building and General Structures b. Pilih Model – Nodes – Translate Nodes – (1) pilih titik (0,0,0) (sorot) – (2) masukan (0,0,1) – (3) lalu apply – (4) Node berikutnya telah muncul. 1 2 3 4 5. Pemodelan Geometrik 14
  • 15. MIDAS CIVIL Integrated Design System for Building and General Structures c. Dengan cara yang sama diatas diaplikasikan ke 10 titik, seperti pada gambar dibawah. 1 (0,0,0) 2 (0,0,1) 3 (0,0,1.5) 4 (0,0,5.64) 8 (0,0.925,5.64) 5 (0, -0.925,5.64) 9 (0,2.8,5.64) 10 (0,3.125,5.64) 6 (0,-2.8,5.64) 7 (0,-3.125,5.64) Node 1 (0,0,0) Node 2 (0,0,1) Node 3 (0,0,1.5) Node 4 (0,0,5.64) Node 5 (0,-0.925,5.64) Node 6 (0,-2.8,5.64) Node 7 (0,-3.125,5.64) Node 8 (0,0.925,5.64) Node 9 (0,2.8,5.64) Node 10 (0,3.125,5.64) 5. Pemodelan Geometrik 15
  • 16. MIDAS CIVIL Integrated Design System for Building and General Structures d. Pilih Model – Element – Create Element – Pilih Material K-350 – Pilih Section Pile cap – klik node 1 ke node 2. 5. Pemodelan Geometrik 16
  • 17. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 1 ke node 2 5. Pemodelan Geometrik 17
  • 18. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 2 ke node 3 5. Pemodelan Geometrik 18
  • 19. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 3 ke node 4 5. Pemodelan Geometrik 19
  • 20. MIDAS CIVIL Integrated Design System for Building and General Structures Klik node 10 ke node 7 5. Pemodelan Geometrik 20
  • 21. MIDAS CIVIL Integrated Design System for Building and General Structures Bentuk Penampang tidak sesuai dengan geometri desain Klik untuk melihat penampang. 5. Pemodelan Geometrik 21
  • 22. MIDAS CIVIL Integrated Design System for Building and General Structures e. Pilih Element Pier Head – Model – Elements – Change Element Parameters – Pilih Element Local Axis – Mode, Ganti Beta Angle jadi 180 Deg – kemudian Apply. Sorot element Pier Head 5. Pemodelan Geometrik 22
  • 23. MIDAS CIVIL Integrated Design System for Building and General Structures 5. Pemodelan Geometrik 23
  • 24. MIDAS CIVIL Integrated Design System for Building and General Structures 5. Pemodelan Geometrik 24
  • 25. MIDAS CIVIL Integrated Design System for Building and General Structures 6. Boundary/Perletakan Pilih Node 1 – Model – Boundary – Support – Ceklist D-ALL dan R-ALL (perlekan jepit) – kemudian Apply. 25
  • 26. MIDAS CIVIL Integrated Design System for Building and General Structures 6. Boundary/Perletakan 26
  • 27. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Pembebanan yang terjadi Pada struktur Pier Jembatan dapat dibagi menjadi 4 bagian, yaitu : 1. Beban akibat strukturnya sendiri (SW). 2. Beban DL (Dead Load) akibat beban Girder L=35.6m (Interior dan Eksterior), rc pelat, digfragma dan pelat. 3. Beban SDL (Super Imposed Dead Load) akibat aspalt, median, trotoar dan railing. 4. Beban LL (Live Load) akibat beban UDL (Uniform Dead Load) dan KEL (Knife Edge Load) dan beban rem. DL + SDL + UDL + KEL DL + SDL + UDL + KEL No Jenis Beban (kN) Arah Interior Eksterior Global Axis 1RDL 500 600 z 2RSDL 50 200 3RUDL 250 4RKEL 60 5RREM 4 x REM 27
  • 28. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Load – Static Load Case – Isikan name, type dan description - klik close 28
  • 29. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan a.Pilih node 5,6,8,9– Model – Node – Translate Node – pilih copy – isikan (0.85,0,0.75) – apply – pilih ikon select previous - isikan (-0.85,0,0.75) – apply – maka akan muncul node baru 11 – 18 (sebagai node untuk assign beban yang direncanakan). Node baru (11-18) 29
  • 30. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan b. Load – Selfweight – isikan pada Z (-1) – kemudian klik add – klik close – maka program akan menghitung otomotis program tersebut. 30
  • 31. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Pilih node 11,13,15,17 – Load – Nodal Load – Pilih Load Case Name DL – tulis di FZ (- 500) (Beban DL interior) – klik apply – pilih node 12,14,16,18 - tulis di FZ (-600) (Beban DL eksterior) – klik apply. 31
  • 32. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Dengan cara yang sama seperti sebelumnya maka beban - beban telah diaplikasikan terhadap struktur pier tersebut. Assign Node Beban (kN) Jenis Beban Global Axis 11,13,15,17 -600 RDL Eksterior Z 12,14,16,18 -500 Interior 11,13,15,17 -200 RSDL Eksterior 12,14,16,18 -50 Interior 11 to 18 -250 RUDL -60 RKEL 4 RREM X RDL RSDL RUDL RKEL RREM 32
  • 33. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Untuk menghubungkan node beban dengan element strukturnya maka diberi bondary condition yaitu elastic link. Model – Boundary – pilih Elastic Link – Link Type – Pilih Rigid – pada tabel 2 nodes pilih titik yang di link contoh node 9 dengan 18 – klik node 18 ke node 9 – Maka elastik link akan muncul. Klik node 18 ke 9 33
  • 34. MIDAS CIVIL Integrated Design System for Building and General Structures 7. Pembebanan Dengan cara yang sama lakukan untuk node 14 -9 , 17 – 8 , 13 – 8, 15 – 5, 11 – 5, 16 – 6 dan 12 – 6. 34
  • 35. MIDAS CIVIL Integrated Design System for Building and General Structures 8. Kombinasi Pembebanan (1). Result – Combination – tulis pada kolom Name ULS 1 di Load Kombination List – Pilih SW pada Load Case tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2. (2). Tulis pada kolom Name ULS 2 di Load Kombination List – Pilih SW pada Load Case tulis 1.3 pada Factor – Pilih RDL tulis 1.3 – Pilih SDL tulis 2 – Pilih UDL tulis 1.8 – Pilih KEL tulis 1.8 – Pilih REM tulis 1.8. (3). Tulis pada kolom Name ENV-ULS – ganti type add jadi Envelope – Pada kolom Load Case and factor pilih ULS1 dan ULS2 tulis 1 – kemudian close. KOMBINASI PEMBEBANAN ULS-1 1.3SW + 1.3RDL + 2SDL ULS-2 1.3SW + 1.3RDL + 2SDL + 1.8UDL + 1.8KEL + 1.8REM 35
  • 36. MIDAS CIVIL Integrated Design System for Building and General Structures 8. Kombinasi Pembebanan 36
  • 37. MIDAS CIVIL Integrated Design System for Building and General Structures 9. Analisis Struktur Gaya Dalam Setelah material dan section didefiniskan, geometri dan dimensi telah digambar, boundary telah ditentukan lalu kemudian beban dan load sudah dimasukan, maka tahap terakhir adalah analisis gaya dalam struktur tersebut. Pilih ikon run analysis Apabila berhasil di run maka akan keluar tulisan your midas job is successfully completed. Klik Run OK 37
  • 38. MIDAS CIVIL Integrated Design System for Building and General Structures 9. Analisis Struktur Gaya Dalam Untuk melihat gaya dalam yang terjadi pada pier, pilih result – forces – beam diagram – klik load cases/combination pilih Cball : ENV –ULS – Pilih Fx (Gaya Aksial) – Solid fill – type of display ceklis countur , legend pilih fixed tulis decimal point 2 – kemudian OK. 38
  • 39. MIDAS CIVIL Integrated Design System for Building and General Structures 9. Analisis Struktur Gaya Dalam 39 Bidang Momen Pada Pier Head Bidang Geser Pada Pier Head Bidang Momen Pada Kolom Bidang Geser Pada Kolom
  • 40. MIDAS CIVIL Integrated Design System for Building and General Structures 40
  • 41. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Terdapat cara lain untuk menggambar atau mendefiniskan section penampang selain menggunakan menu Section Data yaitu dengan program SPC. Program SPC ini digunakan untuk menggambar section penampang serta menghitung section propertiesnya. Program ini berguna sekali apabila bentuk penampang sudah tidak simetri lagi. 41
  • 42. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Sebagai contoh akan dibuat section pier head yang sudah di desain pada section data midas, akan dicoba dengan menggunakan program SPC. Node 1 (-0.5,0) Node 2 (0.5,0) Node 3 (0.5,-1.22) Node 4 (1.25,-1.22) Node 5 (1.25,-1.97) Node 6 (-1.25,-1.97) Node 7 (-1.25,-1.22) Node 8 (-0.5,-1.22) 2.5m X Y 1 2 3 4 5 6 7 8 0.75m 0.75m 0.75m 1m 1.22m 0.75m 42
  • 43. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang a. Buka Program SPC – Setting – General – Unit System Force (kN) – Length ganti jadi m – Klik OK. 43
  • 44. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang b. Model – Curve – Create – Line – isi point 1 (-0.5,0) – isi point 2 (0.5,0) – klik Apply. 44
  • 45. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang c. Model – Curve – Create – Line – isi point 1 (0.5,0) – isi point 2 (0.5,-1.22) – klik Apply. 45
  • 46. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang d. Model – Curve – Create – Line – isi point 1 (0.5,-1.22) – isi point 2 (1.25,-1.22) – klik Apply. 46
  • 47. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang e. Model – Curve – Create – Line – isi point 1 (1.25,-1.22) – isi point 2 (1.25,-1.97) – klik Apply. 47
  • 48. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang f. Model – Curve – Create – Line – isi point 1 (1.25,-1.97) – isi point 2 (-1.25,-1.97) – klik Apply. 48
  • 49. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang g. Model – Curve – Create – Line – isi point 1 (-1.25,-1.97) – isi point 2 (-1.25,-1.22) – klik Apply. 49
  • 50. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang h. Model – Curve – Create – Line – isi point 1 (-1.25,-1.22) – isi point 2 (-0.5,-1.22) – klik Apply. 50
  • 51. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang i. Model – Curve – Create – Line – isi point 1 (-0.5,-1.22) – isi point 2 (-0.50) – klik Apply – kemudian Close. 51
  • 52. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang i. Pilih Model – Section – Generate – Sorot semua Line yang telah dibuat sampai garisnya berwarna merah – ceklist calculates properties now – kemudian pilih apply. 52
  • 53. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Program akan secara otomatis menghitung section penampang tersebut, bila benar akan muncul tulisan new plane section {section – P1} is generated and its properties are calculated. 53
  • 54. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Untuk melihat propertiesnya dapat dilihat pada ikon maka akan keluar tabel properties penampang yang kita buat. 54
  • 55. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Penampang yang telah dibuat sekarang akan di eksport ke program MIDAS pada data section list caranya adalah pilih Model – Section – Eksport – Pilih Midas Section File – lalu klik ikon beri nama Pier Head SPC – lalu sorot section yang kita buat sampai berubah jadi warna merah – klik apply – maka section penampang telah disimpan pada section list pada program MIDAS. 55
  • 56. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Buka program Midas buka file modul 1 yang telah dibuat – Model – Properties – Section – Add – klik Value – Cari section penampang General Section – klik import form SPC – cari file dengan nama Pier Head SPC – klik open – pilih section P1 – klik OK. 56
  • 57. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang 57
  • 58. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Maka akan muncul section penampang yang telah dibuat tadi pada program SPC beserta tabel section propertiesnya – beri nama Pier Head SPC – ubah offsetnya jadi center of bottom – lalu klik apply – lalu klik cancel. 58
  • 59. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Pilih section element 4,5,6,7,8,9 yang sebelumnya dengan nama Pier Head ganti Pier Head SPC dengan sistem drag and drop. Drag and Drop 59
  • 60. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang Ubah dahalu element local axisnya di model – element - change element parameters – pilih element local axis – Mode beta angle pilih 0 – Apply. 60
  • 61. MIDAS CIVIL Integrated Design System for Building and General Structures Program SPC dari MIDAS untuk Penggambaran Section Penampang 61