SlideShare a Scribd company logo
1 of 11
Download to read offline
MSOM 5108 / Mark Gershon
Final Paper
David Powell
August 16, 2013
1.) Project Management is vital to the development of Medical Devices. According to
industry expert David Kolesar, “For medical devices, the project scope is usually
relatively large and thus requires multiple communication channels across multiple
functional areas. A company must also establish an internal quality system that ensures
compliance with design controls and applies risk management principles” (Kolesar,
May).
Project Management has been used in the Medical Device Development for over 30
years. The industry has recently begun to use the Stage Gate Process. The concept is
simple. There are activities recommended for each project from a “master check list”
(Danzyger, May), which form a stage. If the project meets certain criteria, it can move
forward through the gate, which acts as a checkpoint. “Gate keepers provide an
independent review of project merits, guide the team, and make gate decisions
(Danzyger, May).
The Stage-Gate diagram below was created by the Product Development Institute, Inc.
It shows how the Stage-Gate process can take a new medical device from an idea, to a
plan, to development, and finally to the market. For this discussion, I will be discussing
mostly Stage 3, Development, and part of Stage 4, testing and validation. The process
appears linear, but in reality there may be other projects that should be done in parallel.
For example, as the product moves through stage 4, Testing and Validation, the
Marketing Strategic Plan will need to begin, in order to be ready for the product launch.
2.) In selecting a project for the Medical Device industry, a primary category is
feasibility. The product must be able to be produced at a realistic cost. Also, it must have
a high probability of being safe for human use, and of being cleared by the FDA. Lastly,
before selecting a project, a company needs to know that is will be profitable. The best
indicator is the percentage of market share the company can gain in a 5 year period.
After 5 years, there may be a better device that enters the market. Also, the company
does not want to enter a market that is over crowded with many competitors fighting for a
small percentage of the market.
a.) In order to cost justify the Endograft, the company needs to make a
noticeable profit. More than a positive NPV, the company needs to increase
the overall sales revenue of the company by 10%. For any product that gains
less than 10%, there will be a huge opportunity loss. Essentially, the 2 years
spent on this project could have been used on another product that will
increase revenue by greater than 10%.
3.) Selection of the Team Structure, Project Manager, and Team.
The structure chosen for this project is a Matrix structure, because almost every
department in the company is involved. “Because it incorporates all functions and
departments, a matrix management style is ideally suited for medical device projects”
(Kolesar, May).
Additionally, a matrix organization can facilitate better collaboration, and
communication. “Unlike a traditional top-down management style, matrix management
involves cross-functional interactions with authority and responsibility being shared
among the participating departments” (Kolesar, May).
The project manager chosen is from the production department. In my opinion, that
department would be the most neutral of any of the departments. Their careers aren’t as
closely tied to the success of the project. However, this department also needs new
products for the good of the company, and their own longevity. They would be the best
go between of R &D, Marketing, and Engineering.
If at all possible Collaborative Production Management, CPM should be used in a Matrix
environment. This is the “management of the people, business processes, technology,
and capital assets involved in procuring and receiving raw materials; implementing
product designs, specifications, formulations, or recipes by manufacturing products;
distributing these products; and supporting them through their end-of-life” (Hyperion).
There are many software systems out there that can be used, such as “ HYSYS™,
Dynsim™, AspenPlus™ and OTISS™”(Hyperion). However, if a company is brand new
to CPM, then they should not try to initiate it for a large, high visibility project, such as
this one. See Matrix organization chart below.
4.) Create Work Breakdown Structure (WBS): The WBS is part of a hierarchical
planning process. It is essentially a list of all activities that must be accomplished, in the
general order they occur. I based this WBS on the typical Stage-Gates of a generic
product development process. This WBS is fairly general, and does not list specific
vendors, account numbers, etc. This would need to be broken down into more levels.
It’s possible that many of these tasks will need be broken down further.
5.) The Responsible, Accountable, Consult, Inform document (RACI), goes hand in
hand with the WBS. It lists every task in the WBS, and delineates which team
member is responsible for it. Moreover, it also lists who is accountable, who should
be informed, and who should be consulted. It can help a great deal by guiding the
team members in their communications.
6.) Project Budget: The project budget is key in developing new medical devices. The
company needs to know before moving an idea from concept, to new project that it will
be profitable. If the product costs too much, or takes too long to develop, the company
will shelve the concept. It may be work years later in another market, or with newer
technology. Additionally, many leading edge medical devices come from startup
companies. The products may be too risky for larger, more conservative companies.
However, if a startup can get a product half way to development, or get an FDA
clearance, they may be acquired by a larger company.
The total cost from idea to FDA clearance is: $1,105,924.00. This may be on the high end,
but it was difficult to calculate some of the costs. This budget was completed top down, by
estimating the work element costing. Each position’s hourly rate was multiplied by the number
of hours. In tasks where it would be divided among the team, it was extrapolated further. This
was activity budgeting, vs. Cost category budgeting. There is not enough detail at this level to
break the budget down by time period, and to create an S-curve. That would require breaking the
WBS items down into deeper levels, and creating individual time lines.
Additionally, the company wants a high, positive Net Present Value. Specifically, the company
wants to be able to increase its total revenue by 10% by the 5th
year. It is not worth developing
the product simply to break even. As mentioned previously, with the lost time, and capital
opportunity, the company could develop another product. Additionally, the company could use
that capital to acquire a device from another company.
7.) Schedule Project: A GANTT chart was created using OPEN project PM software. Only part of
the Gantt chart can be shown, since the project is 169 days long.
8.) Risk Management: The major risk for a Medical Device Development Project is that
the FDA clearance will be delayed, or worse, denied. The best way to reduce this risk is
to follow the plentiful guidance given by the FDA regarding submitting Medical Devices
for approval. The industry is highly regulated, and therefore gives a clearly defined path
for bringing a product to market.
Additionally, there is an International Organization for Standardization (ISO) number
dedicated strictly to risk management for Medical Device Manufacturers;
ISO14971:2007. The purpose is to assist manufacturers in establishing a medical device
risk management process.
Using a Failure Mode Effects Analysis (FMEA) ranking for this device would give us the
below table:
Following the ISO and FDA guidance will greatly reduce the chance for a delay in
clearance. The other red threat is an internal delay in development. With good project
management, and following the Project plan, that risk is also reduced.
References:
Speer, J. (May, 2011 9). Rules for medical device project management. Retrieved from
http://www.creoquality.com/2011/05/rules-for-medical-device-project-management/
(Speer, May)
Sastri, V. (October, 2005 1). Integrating-product-development-part-1: Design six sigma.
Retrieved from http://www.mddionline.com/article/integrating-product-development-
part-1-design-six-sigma
(Sastri, October)
Kolesar, D. (May, 2004 01). Effective project management for medical devices. Retrieved
from http://www.mddionline.com/article/effective-project-management-medical-devices
(Kolesar, May)
Danzyger, H. (May, 2012 02). New-product-development-stage-gate-process-overview.
Retrieved from http://www.slideshare.net/danzyger/new-product-development-stage-
gate-process-overview
(Danzyger, May)
Hyperion. (n.d.). Collaborative production management. Retrieved from
http://hyperionsystems.net/whatwedo/manufacturing-operations-management
(Hyperion)
http://www.expertbriefings.com/tips/effective-project-management-for-developing-
medical-devices/
http://www.asl.ethz.ch/research/zpe/come/Guideline

More Related Content

What's hot

Where to Play: A new addition to the Lean toolset
Where to Play: A new addition to the Lean toolsetWhere to Play: A new addition to the Lean toolset
Where to Play: A new addition to the Lean toolsetWhere to Play
 
Roles and-responsibilities-project manager
Roles and-responsibilities-project managerRoles and-responsibilities-project manager
Roles and-responsibilities-project managerobsession56
 
Stage Gate Product Launch Process PowerPoint Presentation Slides
Stage Gate Product Launch Process PowerPoint Presentation Slides Stage Gate Product Launch Process PowerPoint Presentation Slides
Stage Gate Product Launch Process PowerPoint Presentation Slides SlideTeam
 
12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management examJamil Faraj , PMP
 
Sequoia capital pitch deck template
Sequoia capital pitch deck templateSequoia capital pitch deck template
Sequoia capital pitch deck templateDan Godoy
 
Value proposition design
Value proposition designValue proposition design
Value proposition design1508 A/S
 
Pitch Deck For Pre Seed Funding PowerPoint Presentation Slides
Pitch Deck For Pre Seed Funding PowerPoint Presentation SlidesPitch Deck For Pre Seed Funding PowerPoint Presentation Slides
Pitch Deck For Pre Seed Funding PowerPoint Presentation SlidesSlideTeam
 
Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 
Strategic Role Product Management
Strategic Role Product ManagementStrategic Role Product Management
Strategic Role Product ManagementPragmatic Marketing
 
Project Management Challenges
Project Management Challenges Project Management Challenges
Project Management Challenges Mohan Arumugam
 
Innovation Games — The Seriously Fun Way to Do Work!
Innovation Games — The Seriously Fun Way to Do Work!Innovation Games — The Seriously Fun Way to Do Work!
Innovation Games — The Seriously Fun Way to Do Work!Michael Tarnowski
 
Startup Pitch Deck Templates - NextView Ventures
Startup Pitch Deck Templates - NextView VenturesStartup Pitch Deck Templates - NextView Ventures
Startup Pitch Deck Templates - NextView Venturespeerhack
 
A Dynamic Duo: Hacking the Product-Product Marketing Relationship
A Dynamic Duo: Hacking the Product-Product Marketing Relationship A Dynamic Duo: Hacking the Product-Product Marketing Relationship
A Dynamic Duo: Hacking the Product-Product Marketing Relationship Product School
 
10 project management knowledge areas
10 project management knowledge areas10 project management knowledge areas
10 project management knowledge areasInsaf Ali Soomro PMP
 
PMBOK 6th Processes Flow Main Lines
PMBOK 6th Processes Flow Main LinesPMBOK 6th Processes Flow Main Lines
PMBOK 6th Processes Flow Main LinesSasan Hosseyni
 

What's hot (20)

Where to Play: A new addition to the Lean toolset
Where to Play: A new addition to the Lean toolsetWhere to Play: A new addition to the Lean toolset
Where to Play: A new addition to the Lean toolset
 
Roles and-responsibilities-project manager
Roles and-responsibilities-project managerRoles and-responsibilities-project manager
Roles and-responsibilities-project manager
 
Stage Gate Product Launch Process PowerPoint Presentation Slides
Stage Gate Product Launch Process PowerPoint Presentation Slides Stage Gate Product Launch Process PowerPoint Presentation Slides
Stage Gate Product Launch Process PowerPoint Presentation Slides
 
12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management exam
 
Sequoia capital pitch deck template
Sequoia capital pitch deck templateSequoia capital pitch deck template
Sequoia capital pitch deck template
 
Value proposition design
Value proposition designValue proposition design
Value proposition design
 
Pitch Deck For Pre Seed Funding PowerPoint Presentation Slides
Pitch Deck For Pre Seed Funding PowerPoint Presentation SlidesPitch Deck For Pre Seed Funding PowerPoint Presentation Slides
Pitch Deck For Pre Seed Funding PowerPoint Presentation Slides
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Strategic Role Product Management
Strategic Role Product ManagementStrategic Role Product Management
Strategic Role Product Management
 
Project Management Challenges
Project Management Challenges Project Management Challenges
Project Management Challenges
 
Innovation Games — The Seriously Fun Way to Do Work!
Innovation Games — The Seriously Fun Way to Do Work!Innovation Games — The Seriously Fun Way to Do Work!
Innovation Games — The Seriously Fun Way to Do Work!
 
project management
project managementproject management
project management
 
Project management
Project managementProject management
Project management
 
Startup Pitch Deck Templates - NextView Ventures
Startup Pitch Deck Templates - NextView VenturesStartup Pitch Deck Templates - NextView Ventures
Startup Pitch Deck Templates - NextView Ventures
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
A Dynamic Duo: Hacking the Product-Product Marketing Relationship
A Dynamic Duo: Hacking the Product-Product Marketing Relationship A Dynamic Duo: Hacking the Product-Product Marketing Relationship
A Dynamic Duo: Hacking the Product-Product Marketing Relationship
 
10 project management knowledge areas
10 project management knowledge areas10 project management knowledge areas
10 project management knowledge areas
 
2_Project Scope Management
2_Project Scope Management2_Project Scope Management
2_Project Scope Management
 
PMBOK 6th Processes Flow Main Lines
PMBOK 6th Processes Flow Main LinesPMBOK 6th Processes Flow Main Lines
PMBOK 6th Processes Flow Main Lines
 
Product strategy
Product strategyProduct strategy
Product strategy
 

Viewers also liked

1.19.16 check# 431189 austin, tx
1.19.16 check# 431189 austin, tx1.19.16 check# 431189 austin, tx
1.19.16 check# 431189 austin, txKeithSelf1975
 
2.9.16 check# 432474 austin, tx
2.9.16 check# 432474 austin, tx2.9.16 check# 432474 austin, tx
2.9.16 check# 432474 austin, txKeithSelf1975
 
Ms.Power Point 2007 Bab 6
Ms.Power Point 2007 Bab 6Ms.Power Point 2007 Bab 6
Ms.Power Point 2007 Bab 6EVAN HAFIZH
 
1.20.15 check 412841 austin tx
1.20.15 check 412841 austin tx1.20.15 check 412841 austin tx
1.20.15 check 412841 austin txKeithSelf1975
 
IBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - Xebia
IBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - XebiaIBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - Xebia
IBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - XebiaIBM France Lab
 
Hôpital Universitaire de Mirebalais (HUM) Costing Study
Hôpital Universitaire de Mirebalais (HUM) Costing StudyHôpital Universitaire de Mirebalais (HUM) Costing Study
Hôpital Universitaire de Mirebalais (HUM) Costing StudyHFG Project
 
IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...
IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...
IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...IBM France Lab
 
AW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSION
AW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSIONAW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSION
AW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSIONAntony Wilshaw
 
Kết cấu nhà ở gia đình - Nguyễn Văn Khánh
Kết cấu nhà ở gia đình - Nguyễn Văn KhánhKết cấu nhà ở gia đình - Nguyễn Văn Khánh
Kết cấu nhà ở gia đình - Nguyễn Văn KhánhHuytraining
 

Viewers also liked (12)

1.19.16 check# 431189 austin, tx
1.19.16 check# 431189 austin, tx1.19.16 check# 431189 austin, tx
1.19.16 check# 431189 austin, tx
 
Artist Statement
Artist StatementArtist Statement
Artist Statement
 
2.9.16 check# 432474 austin, tx
2.9.16 check# 432474 austin, tx2.9.16 check# 432474 austin, tx
2.9.16 check# 432474 austin, tx
 
3 Notas
3 Notas3 Notas
3 Notas
 
Ms.Power Point 2007 Bab 6
Ms.Power Point 2007 Bab 6Ms.Power Point 2007 Bab 6
Ms.Power Point 2007 Bab 6
 
1.20.15 check 412841 austin tx
1.20.15 check 412841 austin tx1.20.15 check 412841 austin tx
1.20.15 check 412841 austin tx
 
IBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - Xebia
IBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - XebiaIBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - Xebia
IBM Bluemix Paris Meetup #15 - Ecole 42 - 20160622 - Xebia
 
Hôpital Universitaire de Mirebalais (HUM) Costing Study
Hôpital Universitaire de Mirebalais (HUM) Costing StudyHôpital Universitaire de Mirebalais (HUM) Costing Study
Hôpital Universitaire de Mirebalais (HUM) Costing Study
 
IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...
IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...
IBM Bluemix Paris meetup - Big Data & Analytics dans le Cloud - Epitech- 2016...
 
AW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSION
AW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSIONAW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSION
AW-MOD003606-STUDENT1518088-TAL-ID-PRESENTATION-FINAL-VERSION
 
Kết cấu nhà ở gia đình - Nguyễn Văn Khánh
Kết cấu nhà ở gia đình - Nguyễn Văn KhánhKết cấu nhà ở gia đình - Nguyễn Văn Khánh
Kết cấu nhà ở gia đình - Nguyễn Văn Khánh
 
GLASS GIVES ELEGANT LOOK
GLASS GIVES ELEGANT LOOKGLASS GIVES ELEGANT LOOK
GLASS GIVES ELEGANT LOOK
 

Similar to Medical Device Project Management MBA Powell

Business plan template
Business plan templateBusiness plan template
Business plan templateInsightory
 
HC Integration Build vs. Buy
HC Integration Build vs. BuyHC Integration Build vs. Buy
HC Integration Build vs. Buyrogerz3
 
Budget WorksheetDirections Complete the budget worksheet with a.docx
Budget WorksheetDirections Complete the budget worksheet with a.docxBudget WorksheetDirections Complete the budget worksheet with a.docx
Budget WorksheetDirections Complete the budget worksheet with a.docxrichardnorman90310
 
[Case Study] Launching Innocent + Developing a new product for the teeth whit...
[Case Study] Launching Innocent + Developing a new product for the teeth whit...[Case Study] Launching Innocent + Developing a new product for the teeth whit...
[Case Study] Launching Innocent + Developing a new product for the teeth whit...Riri Kusumarani
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association ProposalCheryl Litwinczuk
 
The Disaster Recovery Plan Sumanth Lagadapati[email protecte.docx
The Disaster Recovery Plan Sumanth Lagadapati[email protecte.docxThe Disaster Recovery Plan Sumanth Lagadapati[email protecte.docx
The Disaster Recovery Plan Sumanth Lagadapati[email protecte.docxtodd241
 
advanced project 5000 words copy 1.docx
advanced project 5000 words copy 1.docxadvanced project 5000 words copy 1.docx
advanced project 5000 words copy 1.docxNadiaRiaz5
 
Best Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service AnalyticsBest Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service AnalyticsMattSaxton5
 
Chaos Integration Perspectives within Google
Chaos Integration Perspectives within GoogleChaos Integration Perspectives within Google
Chaos Integration Perspectives within GoogleTagaris Cheikh Ali
 
Running head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docxRunning head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docxtodd521
 
_03 Experiences of Large Banks
_03 Experiences of Large Banks_03 Experiences of Large Banks
_03 Experiences of Large BanksJay van Zyl
 
MAALBS Big Data agile framwork
MAALBS Big Data agile framwork MAALBS Big Data agile framwork
MAALBS Big Data agile framwork balvis_ms
 
PLM_Funding_Options_White_Paper_PDF
PLM_Funding_Options_White_Paper_PDFPLM_Funding_Options_White_Paper_PDF
PLM_Funding_Options_White_Paper_PDFTodd Hostager
 
Best-Path EMT Whitepaper
Best-Path EMT WhitepaperBest-Path EMT Whitepaper
Best-Path EMT WhitepaperMark Rosneck
 
Medi sys corp._the_intenscare_product_development_team_case_analysis
Medi sys corp._the_intenscare_product_development_team_case_analysisMedi sys corp._the_intenscare_product_development_team_case_analysis
Medi sys corp._the_intenscare_product_development_team_case_analysis应龙 佟
 

Similar to Medical Device Project Management MBA Powell (20)

Business plan template
Business plan templateBusiness plan template
Business plan template
 
HC Integration Build vs. Buy
HC Integration Build vs. BuyHC Integration Build vs. Buy
HC Integration Build vs. Buy
 
Budget WorksheetDirections Complete the budget worksheet with a.docx
Budget WorksheetDirections Complete the budget worksheet with a.docxBudget WorksheetDirections Complete the budget worksheet with a.docx
Budget WorksheetDirections Complete the budget worksheet with a.docx
 
[Case Study] Launching Innocent + Developing a new product for the teeth whit...
[Case Study] Launching Innocent + Developing a new product for the teeth whit...[Case Study] Launching Innocent + Developing a new product for the teeth whit...
[Case Study] Launching Innocent + Developing a new product for the teeth whit...
 
Universal Association Proposal
Universal Association ProposalUniversal Association Proposal
Universal Association Proposal
 
The Disaster Recovery Plan Sumanth Lagadapati[email protecte.docx
The Disaster Recovery Plan Sumanth Lagadapati[email protecte.docxThe Disaster Recovery Plan Sumanth Lagadapati[email protecte.docx
The Disaster Recovery Plan Sumanth Lagadapati[email protecte.docx
 
Ijm 06 10_008
Ijm 06 10_008Ijm 06 10_008
Ijm 06 10_008
 
advanced project 5000 words copy 1.docx
advanced project 5000 words copy 1.docxadvanced project 5000 words copy 1.docx
advanced project 5000 words copy 1.docx
 
Best Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service AnalyticsBest Practices for Implementing Self-Service Analytics
Best Practices for Implementing Self-Service Analytics
 
Chaos Integration Perspectives within Google
Chaos Integration Perspectives within GoogleChaos Integration Perspectives within Google
Chaos Integration Perspectives within Google
 
Running head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docxRunning head UNIT III PROJECT1 UNIT III PROJECT2.docx
Running head UNIT III PROJECT1 UNIT III PROJECT2.docx
 
_03 Experiences of Large Banks
_03 Experiences of Large Banks_03 Experiences of Large Banks
_03 Experiences of Large Banks
 
MAALBS Big Data agile framwork
MAALBS Big Data agile framwork MAALBS Big Data agile framwork
MAALBS Big Data agile framwork
 
PLM_Funding_Options_White_Paper_PDF
PLM_Funding_Options_White_Paper_PDFPLM_Funding_Options_White_Paper_PDF
PLM_Funding_Options_White_Paper_PDF
 
5
55
5
 
Best-Path EMT Whitepaper
Best-Path EMT WhitepaperBest-Path EMT Whitepaper
Best-Path EMT Whitepaper
 
18 .docx
18                                  .docx18                                  .docx
18 .docx
 
NEW PRODUCT DEVELOPMENT
NEW PRODUCT DEVELOPMENTNEW PRODUCT DEVELOPMENT
NEW PRODUCT DEVELOPMENT
 
The Medical Device Milestone Map
The Medical Device Milestone MapThe Medical Device Milestone Map
The Medical Device Milestone Map
 
Medi sys corp._the_intenscare_product_development_team_case_analysis
Medi sys corp._the_intenscare_product_development_team_case_analysisMedi sys corp._the_intenscare_product_development_team_case_analysis
Medi sys corp._the_intenscare_product_development_team_case_analysis
 

Medical Device Project Management MBA Powell

  • 1. MSOM 5108 / Mark Gershon Final Paper David Powell August 16, 2013 1.) Project Management is vital to the development of Medical Devices. According to industry expert David Kolesar, “For medical devices, the project scope is usually relatively large and thus requires multiple communication channels across multiple functional areas. A company must also establish an internal quality system that ensures compliance with design controls and applies risk management principles” (Kolesar, May). Project Management has been used in the Medical Device Development for over 30 years. The industry has recently begun to use the Stage Gate Process. The concept is simple. There are activities recommended for each project from a “master check list” (Danzyger, May), which form a stage. If the project meets certain criteria, it can move forward through the gate, which acts as a checkpoint. “Gate keepers provide an independent review of project merits, guide the team, and make gate decisions (Danzyger, May). The Stage-Gate diagram below was created by the Product Development Institute, Inc. It shows how the Stage-Gate process can take a new medical device from an idea, to a plan, to development, and finally to the market. For this discussion, I will be discussing mostly Stage 3, Development, and part of Stage 4, testing and validation. The process appears linear, but in reality there may be other projects that should be done in parallel. For example, as the product moves through stage 4, Testing and Validation, the Marketing Strategic Plan will need to begin, in order to be ready for the product launch.
  • 2. 2.) In selecting a project for the Medical Device industry, a primary category is feasibility. The product must be able to be produced at a realistic cost. Also, it must have a high probability of being safe for human use, and of being cleared by the FDA. Lastly, before selecting a project, a company needs to know that is will be profitable. The best indicator is the percentage of market share the company can gain in a 5 year period. After 5 years, there may be a better device that enters the market. Also, the company does not want to enter a market that is over crowded with many competitors fighting for a small percentage of the market.
  • 3. a.) In order to cost justify the Endograft, the company needs to make a noticeable profit. More than a positive NPV, the company needs to increase the overall sales revenue of the company by 10%. For any product that gains less than 10%, there will be a huge opportunity loss. Essentially, the 2 years spent on this project could have been used on another product that will increase revenue by greater than 10%. 3.) Selection of the Team Structure, Project Manager, and Team. The structure chosen for this project is a Matrix structure, because almost every department in the company is involved. “Because it incorporates all functions and departments, a matrix management style is ideally suited for medical device projects” (Kolesar, May). Additionally, a matrix organization can facilitate better collaboration, and communication. “Unlike a traditional top-down management style, matrix management involves cross-functional interactions with authority and responsibility being shared among the participating departments” (Kolesar, May). The project manager chosen is from the production department. In my opinion, that department would be the most neutral of any of the departments. Their careers aren’t as closely tied to the success of the project. However, this department also needs new products for the good of the company, and their own longevity. They would be the best go between of R &D, Marketing, and Engineering. If at all possible Collaborative Production Management, CPM should be used in a Matrix environment. This is the “management of the people, business processes, technology, and capital assets involved in procuring and receiving raw materials; implementing product designs, specifications, formulations, or recipes by manufacturing products; distributing these products; and supporting them through their end-of-life” (Hyperion). There are many software systems out there that can be used, such as “ HYSYS™, Dynsim™, AspenPlus™ and OTISS™”(Hyperion). However, if a company is brand new to CPM, then they should not try to initiate it for a large, high visibility project, such as this one. See Matrix organization chart below.
  • 4. 4.) Create Work Breakdown Structure (WBS): The WBS is part of a hierarchical planning process. It is essentially a list of all activities that must be accomplished, in the general order they occur. I based this WBS on the typical Stage-Gates of a generic product development process. This WBS is fairly general, and does not list specific vendors, account numbers, etc. This would need to be broken down into more levels. It’s possible that many of these tasks will need be broken down further.
  • 5.
  • 6. 5.) The Responsible, Accountable, Consult, Inform document (RACI), goes hand in hand with the WBS. It lists every task in the WBS, and delineates which team member is responsible for it. Moreover, it also lists who is accountable, who should be informed, and who should be consulted. It can help a great deal by guiding the team members in their communications.
  • 7. 6.) Project Budget: The project budget is key in developing new medical devices. The company needs to know before moving an idea from concept, to new project that it will be profitable. If the product costs too much, or takes too long to develop, the company will shelve the concept. It may be work years later in another market, or with newer technology. Additionally, many leading edge medical devices come from startup companies. The products may be too risky for larger, more conservative companies. However, if a startup can get a product half way to development, or get an FDA clearance, they may be acquired by a larger company. The total cost from idea to FDA clearance is: $1,105,924.00. This may be on the high end, but it was difficult to calculate some of the costs. This budget was completed top down, by estimating the work element costing. Each position’s hourly rate was multiplied by the number of hours. In tasks where it would be divided among the team, it was extrapolated further. This was activity budgeting, vs. Cost category budgeting. There is not enough detail at this level to break the budget down by time period, and to create an S-curve. That would require breaking the WBS items down into deeper levels, and creating individual time lines. Additionally, the company wants a high, positive Net Present Value. Specifically, the company wants to be able to increase its total revenue by 10% by the 5th year. It is not worth developing the product simply to break even. As mentioned previously, with the lost time, and capital opportunity, the company could develop another product. Additionally, the company could use that capital to acquire a device from another company.
  • 8. 7.) Schedule Project: A GANTT chart was created using OPEN project PM software. Only part of the Gantt chart can be shown, since the project is 169 days long.
  • 9. 8.) Risk Management: The major risk for a Medical Device Development Project is that the FDA clearance will be delayed, or worse, denied. The best way to reduce this risk is to follow the plentiful guidance given by the FDA regarding submitting Medical Devices for approval. The industry is highly regulated, and therefore gives a clearly defined path for bringing a product to market.
  • 10. Additionally, there is an International Organization for Standardization (ISO) number dedicated strictly to risk management for Medical Device Manufacturers; ISO14971:2007. The purpose is to assist manufacturers in establishing a medical device risk management process. Using a Failure Mode Effects Analysis (FMEA) ranking for this device would give us the below table: Following the ISO and FDA guidance will greatly reduce the chance for a delay in clearance. The other red threat is an internal delay in development. With good project management, and following the Project plan, that risk is also reduced.
  • 11. References: Speer, J. (May, 2011 9). Rules for medical device project management. Retrieved from http://www.creoquality.com/2011/05/rules-for-medical-device-project-management/ (Speer, May) Sastri, V. (October, 2005 1). Integrating-product-development-part-1: Design six sigma. Retrieved from http://www.mddionline.com/article/integrating-product-development- part-1-design-six-sigma (Sastri, October) Kolesar, D. (May, 2004 01). Effective project management for medical devices. Retrieved from http://www.mddionline.com/article/effective-project-management-medical-devices (Kolesar, May) Danzyger, H. (May, 2012 02). New-product-development-stage-gate-process-overview. Retrieved from http://www.slideshare.net/danzyger/new-product-development-stage- gate-process-overview (Danzyger, May) Hyperion. (n.d.). Collaborative production management. Retrieved from http://hyperionsystems.net/whatwedo/manufacturing-operations-management (Hyperion) http://www.expertbriefings.com/tips/effective-project-management-for-developing- medical-devices/ http://www.asl.ethz.ch/research/zpe/come/Guideline