UPDATE : 02/06/2016
faulty OK
ASRS Faulty Equipment History :
- This fault history would be essential
on reviewing re-occuring faults that
may have the similar counter-measure
for us to rectify it on the fastest time as
possible.
- The equipment on the next graph are
the most trouble-sum of each month.
(please see accordingly)
CMT PERFORMANCE SUMMARY :
- PCHS sustained 99% since last month.
- while ASRS increases +2% gain from
94% to 96% performance.
Change Point
*Earlier fault detection before 8am
*Fault feedback every 11am & 2pm
WEEKLY KPI
CMT Availability Projection :
- PCHS will sustain its 99% performance
as it shows consistent average
performance on the next graph.
- ASRS will vary from -1% loss or will stay
at 96% performance based on Linear
interpolation method and the variation
behaviour from now and then.
ASRS - FAULTY EQUIPMENT HISTORY
PERFORMANCE : MAY 2016
ASRS - TOP FREQUENT FAULT (MAY 2016)
FIXED EQUIPMENT
dnata CMT
JAN FEB MAR APR 1WK 2WK 3WK 4WK 1WK 2WK 3WK 4WK
2016 MAY 2016 JUNE 2016
PROJECTION
PCHS 97% 98% 98% 99% 99% 99% 99% 99% 99%
ASRS 92% 94% 94% 94% 95% 96% 97% 97% 96%
90%
95%
100%
WEEKLY KPI
ASRS
PCHS
Legend
n : present
--- : projection
minor
faults
PCHS ASRS
CMT 99% 96%
99%
96%
90%
95%
100%
MAY 2016
90%
minimum target : 95%
12
0
2
T-CAR
19
2
STACKER
33
0
HOIST L51E01,
L51F01
R71A01,R72A01
BARCODE
POSITIONING
FAULT
90%
95%
100%
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2016
L55A01 - VERT BPS FAULT
L56E01 - HORIZ. DRIVE FAULT
L52A01 - PROX. SWITCH FORK IN CENTER
L61E01 - PROX. SWITCH FORK IN CENTER
+2%
R71A01 STACKERS - BARCODE POSITIONING FAULTS
prepared by : Stephen Austria

More Related Content

Viewers also liked

sunif Landside Presentation
sunif Landside Presentationsunif Landside Presentation
sunif Landside Presentation
AiDY
 
Keselamatankerja
KeselamatankerjaKeselamatankerja
Keselamatankerja
Panji Nugroho
 
6th smester
6th smester6th smester
6th smester
Rahul Chaudhary
 
QHSE
QHSEQHSE
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedungPembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Ardy Hermawan
 
Hira
HiraHira
Metode hirac
Metode hiracMetode hirac
Metode hirac
Lia Yuliana
 
Operation Research (Simplex Method)
Operation Research (Simplex Method)Operation Research (Simplex Method)
Operation Research (Simplex Method)
Shivani Gautam
 
Industrial management
Industrial managementIndustrial management
Industrial management
Akshay Yawale
 
SOP Pekerjaan Konstruksi
SOP Pekerjaan KonstruksiSOP Pekerjaan Konstruksi
SOP Pekerjaan Konstruksi
Jocky Nahor
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3
Al Marson
 
K3 Konstruksi Bangungan
K3 Konstruksi BangunganK3 Konstruksi Bangungan
K3 Konstruksi Bangungan
Al Marson
 
Industrial engineering presentation
Industrial engineering presentation Industrial engineering presentation
Industrial engineering presentation
Işıl Tabağ
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management System
RRChandran
 
SMS - Safety Management Systems
SMS - Safety Management SystemsSMS - Safety Management Systems
SMS - Safety Management Systems
JDA Aviation Technology Solutions
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
Yogita patil
 
Presentation On Warehousing
Presentation On WarehousingPresentation On Warehousing
Presentation On Warehousing
RRChandran
 
Workplace safety and health
Workplace safety and healthWorkplace safety and health
Workplace safety and health
shiva5717
 
Safety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: BasicsSafety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: Basics
FAA Safety Team Central Florida
 

Viewers also liked (20)

sunif Landside Presentation
sunif Landside Presentationsunif Landside Presentation
sunif Landside Presentation
 
Keselamatankerja
KeselamatankerjaKeselamatankerja
Keselamatankerja
 
6th smester
6th smester6th smester
6th smester
 
QHSE
QHSEQHSE
QHSE
 
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedungPembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
Pembuatan JSA, HIRA, SOP, WI pada konstruksi gedung
 
Hira
HiraHira
Hira
 
Metode hirac
Metode hiracMetode hirac
Metode hirac
 
Operation Research (Simplex Method)
Operation Research (Simplex Method)Operation Research (Simplex Method)
Operation Research (Simplex Method)
 
Sop hira
Sop hiraSop hira
Sop hira
 
Industrial management
Industrial managementIndustrial management
Industrial management
 
SOP Pekerjaan Konstruksi
SOP Pekerjaan KonstruksiSOP Pekerjaan Konstruksi
SOP Pekerjaan Konstruksi
 
Identifikasi Bahaya - K3
Identifikasi Bahaya - K3Identifikasi Bahaya - K3
Identifikasi Bahaya - K3
 
K3 Konstruksi Bangungan
K3 Konstruksi BangunganK3 Konstruksi Bangungan
K3 Konstruksi Bangungan
 
Industrial engineering presentation
Industrial engineering presentation Industrial engineering presentation
Industrial engineering presentation
 
Warehouse Management System
Warehouse Management SystemWarehouse Management System
Warehouse Management System
 
SMS - Safety Management Systems
SMS - Safety Management SystemsSMS - Safety Management Systems
SMS - Safety Management Systems
 
Quality Assurance Vs Quality Control
Quality Assurance Vs Quality ControlQuality Assurance Vs Quality Control
Quality Assurance Vs Quality Control
 
Presentation On Warehousing
Presentation On WarehousingPresentation On Warehousing
Presentation On Warehousing
 
Workplace safety and health
Workplace safety and healthWorkplace safety and health
Workplace safety and health
 
Safety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: BasicsSafety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: Basics
 

MAY2016 - CMT REPORT

  • 1. UPDATE : 02/06/2016 faulty OK ASRS Faulty Equipment History : - This fault history would be essential on reviewing re-occuring faults that may have the similar counter-measure for us to rectify it on the fastest time as possible. - The equipment on the next graph are the most trouble-sum of each month. (please see accordingly) CMT PERFORMANCE SUMMARY : - PCHS sustained 99% since last month. - while ASRS increases +2% gain from 94% to 96% performance. Change Point *Earlier fault detection before 8am *Fault feedback every 11am & 2pm WEEKLY KPI CMT Availability Projection : - PCHS will sustain its 99% performance as it shows consistent average performance on the next graph. - ASRS will vary from -1% loss or will stay at 96% performance based on Linear interpolation method and the variation behaviour from now and then. ASRS - FAULTY EQUIPMENT HISTORY PERFORMANCE : MAY 2016 ASRS - TOP FREQUENT FAULT (MAY 2016) FIXED EQUIPMENT dnata CMT JAN FEB MAR APR 1WK 2WK 3WK 4WK 1WK 2WK 3WK 4WK 2016 MAY 2016 JUNE 2016 PROJECTION PCHS 97% 98% 98% 99% 99% 99% 99% 99% 99% ASRS 92% 94% 94% 94% 95% 96% 97% 97% 96% 90% 95% 100% WEEKLY KPI ASRS PCHS Legend n : present --- : projection minor faults PCHS ASRS CMT 99% 96% 99% 96% 90% 95% 100% MAY 2016 90% minimum target : 95% 12 0 2 T-CAR 19 2 STACKER 33 0 HOIST L51E01, L51F01 R71A01,R72A01 BARCODE POSITIONING FAULT 90% 95% 100% JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2016 L55A01 - VERT BPS FAULT L56E01 - HORIZ. DRIVE FAULT L52A01 - PROX. SWITCH FORK IN CENTER L61E01 - PROX. SWITCH FORK IN CENTER +2% R71A01 STACKERS - BARCODE POSITIONING FAULTS prepared by : Stephen Austria