M.E, EEE I E E E PROJECTS
1. A Carrier-Based Neutral Voltage Modulation Strategy for Multilevel Cascaded Inverters
under Unbalanced DC Sources
2. A Cascaded Multilevel Inverter Based on Switched-Capacitor for High-Frequency AC
Power Distribution System
3. A Control Scheme for Storage less DVR
4. A Grid-Level High-Power BTB (Back-To-Back) System Using Modular Multilevel
Cascade Converters Without Common DC-Link Capacitor
5. A High-Frequency Link Multilevel Cascaded medium-voltage converter for direct grid
integration of renewable energy system
6. A Multifunctional DSTATCOM Operating Under Stiff Source
7. A New General Topology for Cascaded Multilevel Inverters With Reduced Number of
Components Based on Developed H-Bridge
8. A Nine-Level Grid-Connected Converter Topology
9. A Novel Control Method for Transformer less H-Bridge Cascaded STATCOM With Star
Configuration
10. A Novel Multilevel Inverter Based on switched DC sources
11. A Novel Reduced Switching Loss Bidirectional AC/DC control PWM strategy with feed
forward control for Grid-Tied Micro grid system
12. A Novel Three-Phase Buck–Boost AC–DC Converter
13. A Shunt Active Power Filter for a Medium-Voltage
14. A Simplified Control Technique for a Dual Unified power quality conditioner
15. A Speed-Sensor less Start-Up Method of an Induction Motor Driven by a Modular
Multilevel Cascade Inverter (MMCI-DSCC)
16. A Transformer less Active Voltage Quality Regulator With the Parasitic Boost Circuit
17. A Unified Control Strategy For Three-Phase Inverter In Distributed Generation
18. Active DC Voltage Balancing PWM Technique for High-Power Cascaded Multilevel
Converters
19. Adaptive Pi Control Of Statcom For Voltage Regulation
20. Advanced Control Scheme For An Ipm Synchronous Generator-Based Gearless Variable
Speed Wind Turbine
21. An Accurate Frequency Tracking Method Based On Short Current Detection For
Inductive
22. An Active Damper for Stabilizing Power-Electronics-Based AC Systems
23. An Active Harmonic Filter Based On One-Cycle Control
24. An Effective Control Method For Quasi-Z-Source Cascade Multilevel Inverter-Based
Grid-Tie Single-Phase Photovoltaic Power System
25. An Enhanced Grid Current Compensator for Grid-Connected Distributed Generation
under Nonlinear Loads and Grid Voltage Distortions
26. An Improved DC-Link Voltage Fast Control Scheme for a PWM Rectifier-Inverter
System
27. An Improved Hybrid DSTATCOM Topology to Compensate Reactive and Nonlinear
Loads
28. An Ultracapacitor Integrated Power Conditioner For Intermittency Smoothing And
Improving Powerquality Of Distribution Grid
29. Analysis and Suppression of Leakage Current in Cascaded-Multilevel-Inverter-Based PV
Systems
30. Analytical Method For Pattern Generation In Five-Level Cascaded H-Bridge Inverter
Using Selective Harmonic Elimination
31. Back-Propagation Control Algorithm For Power Quality Improvement Using Dstatcom
32. Cascaded Multilevel Inverter With Series Connection Of Novel H-Bridge Basic Units
33. Cascaded two-level inverter-based multilevel statcom for high-power applications
34. Control Of Reduced-Rating Dynamic Voltage Restorer With A Battery Energy Storage
System
35. Control Scheme For A Stand-Alone Wind Energy Conversion System
36. Dc Microgrid For Wind And Solar Power Integration
37. Development And Implementation Of A Simplified Self-Tuned Neuro–Fuzzy-Based Im
Drive
38. Direct Power Control Of Doubly Fed Induction Generator Under Distorted Grid Voltage
39. End User Voltage Regulation To Ease Urban Low-Voltage Distribution Congestion
40. Enhancing The Ride-Through Capability Of Dc-Link Voltage In Npc Multilevel Unified
Power-Flow Controllers
41. Equivalence Of Virtual Synchronous Machines And Frequency-Droops For Converter-
Based Micro Grids
42. Excitation Synchronous Wind Power Generators With Maximum Power Tracking
Scheme
43. Experimental Indicators Of Current Unbalance In Building-Integrated Photovoltaic
Systems
44. Five-Level Diode-Clamped Inverter With Three-Level Boost Converter
45. Flicker Mitigation By Individual Pitch Control Of Variable Speed Wind Turbines With
DFIG
46. High-Frequency Operation Of A Dcacdc System For Hvdc Applications
47. High-Performance Fault Diagnosis In Pwm Voltage-Source Inverters For Vector-
Controlled Induction Motor Drives
48. High-Voltage Gain Boost Converter Based On Three-State Commutation Cell For
Battery Charging Using Pv Panels In A Single Conversion Stage
49. Implementation Of Adaptive Filter In Distribution Static Compensator
50. Improved Active Power Filter Performance For Renewable Power Generation Systems
51. Improving Power Quality in Cascade Multilevel Converters Based on Single-Phase Non
regenerative Power Cells
52. Modeling and Design of Islanding Detection Using Phase-Locked Loops in Three-Phase
Grid-Interface Power Converters
53. Modeling, Control, and Implementation of DC–DC Converters for Variable Frequency
Operation
54. Modulation, Control and Capacitor Voltage Balancing of Alternate Arm Modular
Multilevel Converter With DC Fault Blocking Capability
55. Neural Network Based Conductance Estimation Control Algorithm for Shunt
Compensation
56. New Modulation Strategy to Balance the Neutral-Point Voltage for Three-Level Neutral-
Clamped Inverter Systems
57. New Three-Phase Multilevel Inverter With Reduced Number of Power Electronic
Components
58. Novel Topologies for Symmetric, Asymmetric, and Cascade Switched-Diode Multilevel
Converter With Minimum Number of Power Electronic Components
59. On electrical power evaluation in dq coordinates under sinusoidal unbalanced conditions
60. Optimal Sizing of UPQC Considering VA Loading and Maximum Utilization of Power-
Electronic Converters
61. Solar PV and Battery Storage Integration using a New Configuration of a Three-Level
NPC Inverter With Advanced Control Strategy
62. Space Vector Pulsewidth Amplitude Modulation for a Buck–Boost VoltageCurrent
Source
63. Study of Fault Current Characteristics of the DFIG
64. The Alternate Arm Converter A New Hybrid Multilevel Converter With DC-Fault
Blocking Capability
65. The Transformerless Single-Phase Universal Active Power Filter for Harmonic and
Reactive Power Compensation
66. Three-Phase Inverter for a Standalone Distributed Generation System: Adaptive Voltage
Control Design and Stability Analysis
67. Topology and Modulation for a New Multilevel Diode-Clamped Matrix Converter
68. Voltage Support Control Strategies for Static Synchronous Compensators Under
Unbalanced Voltage Sags
69. Wound Rotor Machine Fed By A Single-Phase Grid And Controlled By An Isolated
Inverter
VLSI M.E PROJECTS
1. High-Throughput Power-Efficient VLSI Architecture of Fractional Motion Estimation for
Ultra-HD HEVC Video Encoding
2. Graph-Based Transistor Network Generation Method for Super gate Design
3. Fault Tolerant Parallel Ffts Using Error Correction Codes And Parseval Checks
4. Recursive Approach to the Design of a Parallel Self-Timed Adder
5. Fully Reused VLSI Architecture of FM0/Manchester Encoding Using SOLS Technique
for DSRC Applications
6. Reliable Low-Power Multiplier Design Using Fixed-Width Replica Redundancy Block
7. A 5.8-GHz Wideband TSPC Divide-by-16/17 Dual Modulus Prescaler
8. An Accuracy-Adjustment Fixed-Width Booth Multiplier Based on Multilevel Conditional
Probability
9. Reverse Converter Design via Parallel-Prefix Adders: Novel Components, Methodology,
and Implementations
10. Wearout Resilience in NoCs Through an Aging Aware Adaptive Routing Algorithm
11. Low-Complexity Hardware Design for Fast Solving LSPs With Coordinated Polynomial
Solutions
12. Fast Sign Detection Algorithm for the RNS Moduli Set
13. Functional Constraint Extraction From Register Transfer Level for ATPG
14. Aging-Aware Reliable Multiplier Design With Adaptive Hold Logic
15. Flexible Low Complexity Uniform and Nonuniform Digital Filter Banks With High
Frequency Resolution for Multistandard Radios
16. A Low-Latency and Low-Power Hybrid Scheme for On-Chip Networks
17. A Low-Cost Low-Power All-Digital Spread-Spectrum Clock Generator
18. Energy and Area Efficient Three-Input XOR/XNORs With Systematic Cell Design
Methodology
19. In-Field Test for Permanent Faults in FIFO Buffers of NoC Routers
20. Reliable and Error Detection Architectures of Pomaranch for False-Alarm-Sensitive
Cryptographic Applications
21. Flexible DSP Accelerator Architecture Exploiting Carry-Save Arithmetic
22. A High-Performance FIR Filter Architecture for Fixed and Reconfigurable Applications
23. Design for Testability of Sleep Convention Logic
24. High-Throughput Power-Efficient VLSI Architecture of Fractional Motion Estimation for
Ultra-HD HEVC Video Encoding
25. Threshold Logic Computing: Memristive-CMOS Circuits for Fast Fourier Transform and
Vedic Multiplication
26. Fault Tolerant Parallel FFTs Using Error Correction Codes and Parseval Checks
27. Network-on-Chip for Turbo Decoders
28. Low-Cost High-Performance VLSI Architecture for Montgomery Modular Multiplication
29. Novel Design Algorithm for Low Complexity Programmable FIR Filters Based on
Extended Double Base Number System
30. One Minimum Only Trellis Decoder for Non-Binary Low-Density Parity-Check Codes
31. A Generalized Algorithm and Reconfigurable Architecture for Efficient and Scalable
Orthogonal Approximation of DCT
32. Read Performance: The Newest Barrier in Scaled STT-RAM
33. Power and Bandwidth Scalable 10-b 30-MS/s SAR ADC
34. Low-Power Programmable PRPG With Test Compression Capabilities
35. An Efficient VLSI Architecture of a Reconfigurable Pulse-Shaping FIR Interpolation
36. Energy-Efficient Approximate Multiplication for Digital Signal Processing and
Classification Applications
37. A Novel Memory-Based FFT Architecture for Real-Valued Signals Based on Radix-2
Decimation-In-Frequency Algorithm
38. Trade-offs for Threshold Implementations Illustrated on AES
39. Robust Learning based Camera Motion Characterization scheme with applications to
Video Stabilization
40. Distributed CRC Architecture for High-Radix Parallel Turbo Decoding in LTE-
Advanced
41. Algorithm and Architecture Design of the H.265/HEVC Intra Encoder
42. Area-Efficient Fixed-Width Squarer with Dynamic Error-Compensation Circuit
43. A Novel Wavefront-Based High Parallel Solution for HEVC
44. Low Energy yet Reliable Data Communication Scheme for Networks on Chip
45. A Proportionate Diffusion LMS Algorithm for Sparse Distributed Estimation
46. Lossless and Reversible Data Hiding in Encrypted Images with Public Key Cryptography
47. Efficient Coding Schemes for Fault Tolerant Parallel Filters
48. Architecture Design of the H.264/AVC Encoder based on Rate-Distortion Optimization
49. Comprehensive Analysis of Sequential and Combinational Soft Errors in an Embedded
Processor
50. Reversible Data Hiding in Encrypted Image with Distributed Source Encoding
51. A Novel Quantum-Dot Cellular Automata X-bit x 32-bit SRAM
52. A Flexible Energy- and Reliability-Aware Application Mapping for NoC-Based
Reconfigurable Architectures
53. Algorithm and Architecture of Configurable Joint Detection and Decoding for MIMO
Wireless Communications With Convolutional Codes
54. Fault Tolerant Parallel FFTs Using Error Correction Codes and Parseval Checks
55. High-Speed and Energy-Efficient Carry Skip Adder Operating Under a Wide Range of
Supply Voltage Levels
56. Threshold Logic Computing: Memristive-CMOS Circuits for Fast Fourier Transform and
Vedic Multiplication
57. Low-Complexity High-Throughput QR Decomposition Design for MIMO Systems
58. Novel Shared Multiplier Scheduling Scheme for Area-Efficient FFT/IFFT Processors
59. High-Throughput Trellis Processor for Multistandard FEC Decoding
60. High-Throughput Power-Efficient VLSI Architecture of Fractional Motion Estimation for
Ultra-HD HEVC Video Encoding
61. An Efficient List Decoder Architecture for Polar Codes
62. Energy and Area Efficient Three-Input XOR/XNORs With Systematic Cell Design
Methodology
63. Low-Cost High-Performance VLSI Architecture for Montgomery Modular Multiplication
64. A High-Performance FIR Filter Architecture for Fixed and Reconfigurable Applications
65. Combining Image Processing and Laser Fault Injections for Characterizing a Hardware
AES
66. Novel Approach to Protect Advanced Encryption Standard Algorithm Implementation
Against Differential Electromagnetic and Power Analysis
67. High throughput and secure advanced encryption standard on field programmable gate
array with fine pipelining and enhanced key expansion
68. An Efficient Constant Multiplier Architecture Based on Vertical-Horizontal Binary
Common Sub-expression Elimination Algorithm for Reconfigurable FIR Filter Synthesis
69. Optimal Factoring of FIR Filters
70. Novel Design Algorithm for Low Complexity Programmable FIR Filters Based on
Extended Double Base Number System
71. Design of Sparse FIR Filters With Joint Optimization of Sparsity and Filter Order
72. An Efficient VLSI Architecture of a Reconfigurable Pulse-Shaping FIR Interpolation
POWER ELECTRONICS,IEEE TRANSACTIONS
1. A Family of Two-Switch Boosting Switched-Capacitor Converters
2. A General Method for Analyzing Resonant and Soft-Charging Operation of Switched-
Capacitor Converters
3. A Highly Efficient P-SSHI Rectifier for Piezoelectric Energy Harvesting
4. A Measurement-Based Model of the Electromagnetic Emissions From a Power Inverter
5. A Method to Improve the Dynamic Performance of Moving Average Filter-Based PLL
6. A Model Predictive Direct Current Control Strategy With Predictive References for MV
Grid-Connected Converters With LCL –Filters
7. A Nanocurrent Power Management IC for Multiple Heterogeneous Energy Harvesting
Sources
8. A New Isolated Auxiliary Current Pump Module for Load Transient Mitigation of
IsolatedNonisolated Step-UpStep-Down DC–DC Converter
9. A New Railway Power Flow Control System Coupled With Asymmetric Double LC
Branches
10. A Novel Control Scheme of DCM Boost PFC Converter
11. A Reduced Switching Loss PWM Strategy to Eliminate Common-Mode Voltage in
Multilevel Inverters
12. A Secondary-Side Phase-Shift-Controlled LLC Resonant Converter With Reduced
Conduction Loss at Normal Operation for Hold-Up Time Compensation Application
13. A Three-Phase Isolated Bidirectional ACDC Converter and its Modified SVPWM
Algorithm
14. Accurate Evaluation of Leakage Inductance in High-Frequency Transformers Using an
Improved Frequency-Dependent Expression
15. Accurate Steady-State Representation of a Doubly Fed Induction Machine
16. Active Power and DC Voltage Coordinative Control for Cascaded DC–AC Converter
With Bidirectional Power Application
17. Advances in High-Precision Amplifiers—The Extra L Opposed Current Converter
18. An Improved LCLC Current-Source-Output Multistring LED Driver With Capacitive
Current Balancing
19. An Investigation Into the Use of Orthogonal Winding in Loosely Coupled Link for
Improving Power Transfer Efficiency Under Coil Misalignment
20. Analysis and Calculation of DC-Link Current and Voltage Ripples for Three-Phase
Inverter With Unbalanced Load
21. Analysis and Design of a Modular Multilevel Converter With Trapezoidal Modulation
for Medium and High Voltage DC-DC Transformers
22. Analysis and Design of Charge Pump-Assisted High Step-Up Tapped Inductor SEPIC
Converter With an “Inductorless” Regenerative Snubber
23. Analytical Model of the Forward Operation of 4H-SiC Vertical DMOSFET in the Safe
Operating Temperature Range
24. Auxiliary Circuits for Power Flow Control in Multifrequency Wireless Power Transfer
Systems With Multiple Receivers
25. Calculation of Leakage Inductance for High-Frequency Transformers
26. Comparison of Tolerance Controls for Open-Switch Fault in a Grid-Connected T-Type
Rectifier
27. Control and Disturbances Compensation for Doubly Fed Induction Generators Using the
Derivative-Free Nonlinear Kalman Filter
28. DC Capacitor-Less Inverter for Single-Phase Power Conversion With Minimum Voltage
and Current Stress
29. Direct Power Control of a Pulse Width Modulation Rectifier Using Space Vector
Modulation Under Unbalanced Grid Voltages
30. Efficiency Optimization by Considering the High-Voltage Flyback Transformer
Parasitics Using an Automatic Winding Layout Technique
31. Evaluation of Switching Performance of SiC Devices in PWM Inverter-Fed Induction
Motor Drives
32. Extended Boost Active-Switched-CapacitorSwitched-Inductor Quasi-Z-Source Inverters
33. High Efficiency on Si-Integrated Microtransformers for Isolated Power Conversion
Applications
34. High-Frequency Power Transformers With Foil Windings Maximum Interleaving and
Optimal Design
35. Hybrid Three-PhaseSingle-Phase Microgrid Architecture With Power Management
Capabilities
36. Individual Phase Current Control With the Capability to Avoid Overvoltage in Grid-
Connected Photovoltaic Power Plants Under Unbalanced Voltage Sags
37. Loss-Free Resistor-Based Power Factor Correction Using a Semi-Bridgeless Boost
Rectifier in Sliding-Mode Control
38. Low-Cost Drive Circuit for AC-Direct LED Lamps
39. Modeling, Design, and Fabrication of High-Inductance Bond Wire Microtransformers
With Toroidal Ferrite Core
40. Observer-Based Control of LLC DCDC Resonant Converter Using Extended Describing
Functions
41. Optimal Design Methodology for LLC Resonant Converter in Battery Charging
Applications Based on Time-Weighted Average Efficiency
42. Practical Application of the Wave-Trap Concept in Battery–Cell Equalizers
43. Proportional-Resonant Current Controllers Design Based on Desired Transient
Performance
44. Reduced Cost of Reactive Power in Doubly Fed Induction Generator Wind Turbine
System With Optimized Grid Filter
45. Reliability Evaluation of Conventional and Interleaved DC–DC Boost Converters
46. Secondary-Side Phase-Shift-Controlled Dual-Transformer-Based Asymmetrical Dual-
Bridge Converter With Wide Voltage Gain
47. Self-Reconfiguration Property of a Mixed Signal Controller for Improving Power Quality
Compensation During Light Loading
48. Single-Carrier Phase-Disposition PWM Implementation for Multilevel Flying Capacitor
Converters
49. Single-Phase Grid-Connected LiFePO _{bf 4} Battery–Supercapacitor Hybrid Energy
Storage System With Interleaved Boost Inverter
50. Small-Signal Modeling of Uniformly Sampled Phase-Shift Modulators
51. Small-Signal Stability Analysis of Three-Phase AC Systems in the Presence of Constant
Power Loads Based on Measured d-q Frame Impedances
52. Systematic Derivation of a Family of Output-Impedance Shaping Methods for Power
Converters—A Case Study Using Fuel Cell-Battery-Powered Single-Phase Inverter
System
53. Technical Assessment of Load Commutation Switch in Hybrid HVDC Breaker
54. The Hybrid-Cascaded DC–DC Converters Suitable for HVdc Applications
55. Three-Phase AC–AC Hexagonal Chopper System With Heterodyne Modulation for
Power Flow Control Enhancement
56. Ultralow-Loss Passive T5 Fluorescent Lamp Ballasts for Subzero Temperature Operation
57. v^1 Concept Designing a Voltage-Mode Control as Current Mode With Near Time-
Optimal Response for Buck-Type Converters
58. Weighted Efficiency Optimization of Fly back Micro inverter Under Improved Boundary
Conduction Mode (i-BCM)
IEEE TRANSACTIONS ON POWER SYSTEMS
1. A Centralized Reactive Power Compensation System for LV Distribution Networks
2. A Fast Nondominated Sorting Guided Genetic Algorithm for Multi-Objective Power
Distribution System Reconfiguration Problem
3. A Hierarchical Framework for Long-Term Power Planning Models
4. A Hybrid StochasticInterval Approach to Transmission-Constrained Unit Commitment
5. A Market-Based Transmission Planning for HVDC Grid—Case Study of the North Sea
6. A Probabilistic Risk Mitigation Model for Cyber-Attacks to PMU Networks
7. A Smart Strategy for Voltage Control Ancillary Service in Distribution Networks
8. A Stochastic Multi-Layer Agent-Based Model to Study Electricity Market Participants
Behavior
9. A Stochastic Two Settlement Equilibrium Model for Electricity Markets With Wind
Generation
10. Advanced Network Management Systems A Risk-Based AC OPF Approach
11. Aggregate Flexibility of Thermostatically Controlled Loads
12. An Adaptive Power Oscillation Damping Controller by STATCOM With Energy Storage
13. An Interaction Model for Simulation and Mitigation of Cascading Failures
14. An Isolated Industrial Power System Driven by Wind-Coal Power for Aluminum
Productions A Case Study of Frequency Control
15. An Online Measurement Approach of Generators’ Torsional Mechanical Damping
Coefficients for Subsynchronous Oscillation Analysis
16. Analysis and Impacts of Implementing Droop Control in DFIG-Based Wind Turbines on
MicrogridWeak-Grid Stability
17. Analysis of Hydro-Coupled Power Plants and Design of Robust Control to Damp
Oscillatory Modes
18. Application of a Real-Time Data Compression and Adapted Protocol Technique for
WAMS
19. Application of the Moment-SOS Approach to Global Optimization of the OPF Problem
20. Arbitraging Intraday Wholesale Energy Market Prices With Aggregations of
Thermostatic Loads
21. Artificial Immune Systems Optimization Approach for Multiobjective Distribution
System Reconfiguration
22. Artificial-Intelligence-Based Methodology for Load Disaggregation at Bulk Supply Point
23. Assessing the Potential of Network Reconfiguration to Improve Distributed Generation
Hosting Capacity in Active Distribution Systems
24. ATC-Based System Reduction for Planning Power Systems With Correlated Wind and
Loads
25. Business Process Model for Deriving CIM Profile A Case Study for Indian Utility
26. Capacity of Low-Voltage Grids for Distributed Generation Classification by Means of
Stochastic Simulations
27. Cascading Failure Analysis With DC Power Flow Model and Transient Stability Analysis
28. Computational Study of Security Constrained Economic Dispatch With Multi-Stage
Rescheduling
29. Convex Relaxation for Optimal Power Flow Problem Mesh Networks
30. Coordination Strategy for Decentralized Reactive Power Optimization Based on a
Probing Mechanism
31. Demand-Side Management Evaluation Tool
32. Development of Performance-Based Two-Part Regulating Reserve Compensation on
MISO Energy and Ancillary Service Market
33. Dynamic Reserve Zones for Day-Ahead Unit Commitment With Renewable Resources
34. Economic Allocation for Energy Storage System Considering Wind Power Distribution
35. Economic Dispatch With Non-Smooth Objectives—Part II Dimensional Steepest Decline
Method
36. Enhanced Security-Constrained OPF With Distributed Battery Energy Storage
37. Estimating Dynamic Model Parameters for Adaptive Protection and Control in Power
System
38. Estimating System-Wide Impacts of Smart Grid Demonstration
39. Evaluation of Wind Power Curtailment in Active Network Management Schemes
40. Exploring the Modeling Capacity of Two-Stage Robust Optimization Variants of Robust
Unit Commitment Model
41. Extracting Rare Failure Events in Composite System Reliability Evaluation Via Subset
Simulation
42. Extreme Value Analysis of Wet Snow Loads on Power Lines
43. Gas–Electricity Coordination in Competitive Markets Under Renewable Energy
Uncertainty
44. Hierarchical Decentralized Network Reconfiguration for Smart Distribution Systems—
Part I Problem Formulation and Algorithm Development
45. Hierarchical Decentralized Network Reconfiguration for Smart Distribution Systems—
Part II Applications to Test Systems
46. Hierarchical Risk Assessment of Transmission System Considering the Influence of
Active Distribution Network
47. Home Appliance Load Modeling From Aggregated Smart Meter Data
48. Impedance and Damping Characteristics of Grid-Connected VSCs With Power
Synchronization Control Strategy
49. Improved Recursive Electromechanical Oscillations Monitoring Scheme A Novel
Distributed Approach
50. Improving the Small Signal Stability of a PV-DE-Dynamic Load-Based Microgrid Using
an Auxiliary Signal in the PV Control Loop
51. Inertia Estimation of the GB Power System Using Synchrophasor Measurements
52. Initial Results in Using a Self-Coherence Method for Detecting Sustained Oscillations
53. Interval Power Flow Analysis Using Linear Relaxation and Optimality-Based Bounds
Tightening (OBBT) Method
54. Locational Reserve Disqualification for Distinct Scenarios
55. Long-Term Voltage Stability Analysis of Variable Speed Wind Generators
56. Low Carbon Oriented Expansion Planning of Integrated Gas and Power Systems
57. Managing Hydroelectric Reservoirs Over an Extended Horizon Using Benders
Decomposition With a Memory Loss Assumption
58. Marginal Pricing of Transmission Services Using Min-Max Fairness Policy
59. Modeling and Analysis of a Variable Speed Heat Pump for Frequency Regulation
Through Direct Load Control
60. Model-Predictive Cascade Mitigation in Electric Power Systems With Storage and
Renewables—Part I Theory and Implementation
61. Model-Predictive Cascade Mitigation in Electric Power Systems With Storage and
Renewables—Part II Case-Study
62. Multi-Agent System for Distributed Management of Microgrids
63. Multi-Objective Optimal Power Flow Considering Transient Stability Based on Parallel
NSGA-II
64. On the Use of Pumped Storage for Wind Energy Maximization in Transmission-
Constrained Power Systems
65. Online Adaptive Real-Time Optimal Dispatch of Privately Owned Energy Storage
Systems Using Public-Domain Electricity Market Prices
66. Online Optimal Generation Control Based on Constrained Distributed Gradient
Algorithm
67. Operational Adequacy Studies of a PV-Based and Energy Storage Stand-Alone
Microgrid
68. Optimal Charging of Electric Vehicles Taking Distribution Network Constraints Into
Account
69. Optimal ESS Allocation for Load Management Application
70. Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swapping
Station
71. Optimal Placement and Sizing of Distributed Generators in Unbalanced Distribution
Systems Using Supervised Big Bang-Big Crunch Method
72. Optimized Offers for Cascaded Hydroelectric Generators in a Market With Centralized
Dispatch
73. Optimizing Spinning Reserve Requirement of Power System With Carbon Capture Plants
74. Power Quality Assessment in Distribution Systems Embedded With Plug-In Hybrid and
Battery Electric Vehicles
75. Power System Voltage Stability Assessment Based on Branch Active Powers
76. Regional Carbon Emission Management Based on Probabilistic Power Flow With
Correlated Stochastic Variables
77. Reliability Analysis of Substation Monitoring Systems Based on Branch PMUs
78. Renewable Energies in Medium-Term Power Planning
79. Resistive Network Optimal Power Flow Uniqueness and Algorithms
80. Risk-Constrained Strategic Bidding of GenCos Considering Demand Response
81. Robust Optimization of Storage Investment on Transmission Networks
82. Security Enhancement With Nodal Criticality-Based Integration of Strategic Micro Grids
83. Security Games for Risk Minimization in Automatic Generation Control
84. Single-Phase Generation Headroom in Low-Voltage Distribution Networks Under
Reduced Circuit Characterization
85. Small Signal Analysis of Power Systems With Wind and Energy Storage Units
86. Statistical Analysis and Forecasting of Damping in the Nordic Power System
87. Stochastic Generation Capacity Expansion Planning Reducing Greenhouse Gas
Emissions
88. Stochastically Optimized, Carbon-Reducing Dispatch of Storage, Generation, and Loads
89. Strategic Bidding for a Large Consumer
90. Sub-Synchronous Interaction Damping Control for DFIG Wind Turbines
91. Switch Allocation Problems in Power Distribution Systems
92. The Influence of Modeling Transformer Age Related Failures on System Reliability
93. Thermal Profiling of Residential Energy Use
94. Tight Relaxation Method for Unit Commitment Problem Using Reformulation and Lift-
and-Project
95. Toward Fully Renewable Electric Energy Systems
96. Transmission, Variable Generation, and Power System Flexibility
97. Unifying Data Types of IEC 61850 and CIM
98. Valuation of Flexible Transmission Investment Options Under Uncertainty
99. Variable Resource Dispatch Through Do-Not-Exceed Limit
100. Zonal Reduction of Large Power Systems Assessment of an Optimal Grid Model
Accounting for Loop Flows
IEEE TRANSACTIONS ON ENERGY CONVERSION
1. 3-D FEM Calculation of Electromagnetic Properties of Single-Phase Induction Machines
2. A Differential Algebraic Estimator for Sensorless Permanent-Magnet Synchronous
Machine Drive
3. A Fault-Location Algorithm for Series-Compensated Double-Circuit Transmission Lines
Using the Distributed Parameter Line Model
4. A Hierarchical Control Strategy With Fault Ride-Through Capability for Variable
Frequency Transformer
5. A Low Component Count Series Voltage Compensation Scheme for DFIG WTs to
Enhance Fault Ride-Through Capability
6. A Lumped-Parameter Off-Axis-Capable Dynamic Switched Reluctance Machine Model
Including Unbalanced Radial Forces
7. A Model Predictive Direct Current Control Strategy With Predictive References for MV
Grid-Connected Converters With LCL –Filters
8. A New Solar Module Modeling for PV Applications Based on a Symmetrized and
Shifted Gompertz Model
9. A New Tool for Calculation of Lightning-Induced Voltages in Power Systems—Part I
Development of Circuit Model
10. A New Tool for Calculation of Lightning-Induced Voltages in Power Systems—Part II
Validation Study
11. A Prediction Error Method-Based Self-Commissioning Scheme for Parameter
Identification of Induction Motors in Sensorless Drives
12. A Straightforward Method for Wide-Area Fault Location on Transmission Networks
13. A Switched-Reluctance Generator With Interleaved Interface DC–DC Converter
14. A Temperature-Dependent Study of Sealed Lead-Acid Batteries Using Physical
Equivalent Circuit Modeling With Impedance Spectra Derived High CurrentPower
Correction
15. A Two-Level Framework to Fault Diagnosis and Decision Making for Power
Transformers
16. Adaptive Droop for Control of Multiterminal DC Bus Integrating Energy Storage
17. Advances in High-Precision Amplifiers—The Extra L Opposed Current Converter
18. Air-Flow Investigation for a Medium-Voltage Load Break Switch
19. Air-Gap Power-Based Sensorless Control in a DFIG Connected to a DC Link
20. An Analytical Procedure for Calculating Harmonics of Three-Phase Uncontrolled
Rectifiers Under Nonideal Conditions
21. An Experimental Design for Static Eccentricity Detection in Synchronous Machines
Using a Cramér–Rao Lower Bound Technique
22. An Improved Circuit-Based Model of a Grounding Electrode by Considering the Current
Rate of Rise and Soil Ionization Factors
23. An Online Early-Warning Method for Wind Swing Discharge of the Conductor Toward
the Tangent Tower and Jumper Toward the Strain Tower
24. An Updated Model to Determine the Life Remaining of Transformer Insulation
25. Analysis and Mitigation of Resonance Propagation in Grid-Connected and Islanding
Microgrids
26. Analysis of Switching Effects of Vacuum Circuit Breaker on Dry-Type Foil-Winding
Transformers Validated by Experiments
27. Analysis of Temporary Overvoltages During Open-Phase Faults in Distribution Networks
With Resonant Grounding
28. Analytic Approximation of Fault Current Contributions From Capacitive Components in
HVDC Cable Networks
29. Application of Frequency-Partitioning Fitting to the Phase-Domain Frequency-
Dependent Modeling of Overhead Transmission Lines
30. Calculating the Surface Potential Gradient of Overhead Line Conductors
31. Calculation of the Phase-Angle-Jump for Voltage Dips in Three-Phase Systems
32. Cold Start of a 240-MVA Generator Step-Up Transformer Filled With Natural Ester
Fluid
33. Con-Resistant Trust for Improved Reliability in a Smart-Grid Special Protection System
34. Constant-Parameter Voltage-Behind-Reactance Induction Machine Model Including
Main Flux Saturation
35. Contributions to Differences Between On-Site and Factory-Measured Noise Levels of
Power Transformers
36. Damaging Open-Phase Overvoltage Disturbance on a Shunt-Compensated 500-kV Line
Initiated by Unintended Trip
37. DC Current Limitation Principle Using a Helical Arc Arrangement
38. Decomposition of the Hot-Spot Factor
39. Decreasing Electric Field in Soil Near Grounding Device by Building an Underground
Insulating Wall
40. Design Methodology for High-Performance Segmented Rotor Switched Reluctance
Motors
41. Design of Variable-Speed Dish-Stirling Solar–Thermal Power Plant for Maximum
Energy Harness
42. Development and Implementation of a Supervisor Strategy and Sliding Mode Control
Setup for Fuel-Cell-Based Hybrid Generation Systems
43. Development of a Low-Cost Self-Diagnostic Module for Oil-Immerse Forced-Air
Cooling Transformers
44. Development of a Rare-Earth-Free SR Motor With High Torque Density for Hybrid
Vehicles
45. Development of Dynamic Estimators for Islanding Detection of Inverter-Based DG
46. Development of Power Interface With FPGA-Based Adaptive Control for PEM-FC
System
47. Diagnosis of Rotor Winding Interturn Short-Circuit in Turbine Generators Using Virtual
Power
48. Direct MPP Calculation in Terms of the Single-Diode PV Model Parameters
49. Distribution System Optimization Based on a Linear Power-Flow Formulation
50. Dynamic Energy Management of Hybrid Energy Storage System With High-Gain PV
Converter
51. Enhanced Transformer Model for Low- and Mid-Frequency Transients Part I
52. Enhanced Transformer Model for Low- and Mid-Frequency Transients—Part
II Validation and Simulation Results
53. Estimation of Fault Resistance Using Fault Record Data
54. Estimation of Single-Phase and Three-Phase Power-Quality Indices Using Empirical
Wavelet Transform
55. Experiment on Grid-Connection Process of Wind Turbines in Fractional Frequency
Wind
Power System
56. Experimental Design of Booster-Shed Parameters for Post Insulators under Heavy Icing
Conditions
57. Experimentally Validated Reversible Single-Phase Multiwinding Transformer Model
for the Accurate Calculation of Low-Frequency Transients
58. Fast Voltage-Balancing Control and Fast Numerical Simulation Model for the Modular
Multilevel Converter
59. Fractional Slot Concentrated Winding PMSM With Consequent Pole Rotor for a
Low- Speed Direct Drive Reduction of Rare Earth Permanent Magnet
60. Harmony Search Algorithm-Based Controller Parameters Optimization for a
Distributed- Generation System
61. High-Frequency Model of the Power Transformer Based on Frequency-Response
Measurements
62. Hybrid Design of Modular Multilevel Converters for HVDC Systems Based on Various
Submodule Circuits
63. Hybrid Electromagnetic Brakes Design and Performance Evaluation
64. Hybrid Microgrid Model Based on Solar Photovoltaic Battery Fuel Cell System for
Intermittent Load Applications
65. Impact of Electrode Shape on the Performance of a Gas Discharge Arrester
66. Improved Fault Diagnosis of Ball Bearings Based on the Global Spectrum of Vibration
Signals
67. Interruption in Air for Different Medium-Voltage Switching Duties
68. Investigating Operating Modes and Converter Options of Dual Winding Permanent
Magnet Synchronous Machines for Hybrid Electric Vehicles
69. Investigations on Requirements for UHVEHV AC Switchgear by CIGRE Study
Committee A3
70. Large Signal Stability Analysis at the Common Coupling Point of a DC Microgrid
A Grid Impedance Estimation Approach Based on a Recursive Method
71. Lightning Electromagnetic Fields and Their Induced Voltages on Overhead Lines The
Effect of a Horizontally Stratified Ground
72. Lightning Performance of Transmission Lines Methodology to Design Grounding
Electrodes to Ensure an Expected Outage Rate
73. Localization Algorithm for the PD Source in Substation Based on L-Shaped Antenna
Array Signal Processing
74. Magnetic Design Aspects of the Trans-Rotary Magnetic Gear
75. Measurement of Magnet Losses in a Surface Mounted Permanent Magnet Synchronous
Machine
76. Modeling and Simulations of Ferroresonance by Using BDFNDF Numerical Methods
77. Monte Carlo Simulation by Using a Systematic Approach to Assess Distribution System
Reliability Considering Intentional Islanding
78. New Rules Generation From Measurement Data Using an Expert System in a Power
Station
79. Nonlinear abc-Model for Electrical Machines Using N-D Lookup Tables
80. On Control Actions Effects by Using {rm QV} Curves
81. Operating Characteristics of the P&O Algorithm at High Perturbation Frequencies for
Standalone PV Systems
82. Optimal Signaling Scheme and Capacity Limit of PLC Under Bernoulli-Gaussian
Impulsive Noise
83. Optimal Sizing of Energy Storage for Regenerative Braking in Electric Railway Systems
84. Passive Filter Design for China High-Speed Railway With Considering Harmonic
Resonance and Characteristic Harmonics
85. Performance Evaluation of Radial- and Axial-Flux PM Wind Power Generators With
Mechanical Energy Storage System
86. PMSM Drive Position Estimation Contribution to the High-Frequency Injection Voltage
Selection Issue
87. Power Management System With Integrated Maximum Power Extraction Algorithm for
Microbial Fuel Cells
88. Power-Swing Detection Using Moving Window Averaging of Current Signals
89. Primary and Secondary Frequency Support by a Multi-Agent Demand Control System
90. Procedure for Determining Induction Motor Efficiency Working Under Distorted Grid
Voltages
91. Realistic Approach for Phasor Measurement Unit Placement Consideration of Practical
Hidden Costs
92. Secured Zone 3 Protection During Stressed Condition
93. Sensorless Direct Torque Control for Electrically Excited Synchronous Motor Based on
Injecting High-Frequency Ripple Current Into Rotor Winding
94. Study on the Influence of Space Charge on the Upward Leader Emerging From the
Conductors of UHVDC Transmission Lines
95. Subdomain Reduction by Dirichlet-to-Neumann Mappings in Time-Domain Electrical
Machine Modeling
96. Subspace-Based Identification of Acoustic Noise Spectra in Induction Motors
97. The Effect of an Ocean-Land Mixed Propagation Path on the Lightning Electromagnetic
Fields and Their Induced Voltages on Overhead Lines
98. Theoretical Analysis and Calculation Model of the Electromagnetic Torque of
Nonsalient-Pole Synchronous Machines With Interturn Short Circuit in Field Windings
99. Thermal-Electric Rating Method for Mass-Impregnated Paper-Insulated HVDC Cable
Circuits
100. Three-Dimensional Field Reconstruction Method for Modeling Axial Flux
Permanent Magnet Machines
101. Unbalanced Power in Four-Wire Systems and Its Reactive compensation
102. Utilization Improvement of Transformers Using Demand Response
IEEE TRANSACTIONS ON SMART GRID
1. A Multifunction Control Strategy for the Stable Operation of DG Units in Smart Grids
2. A Novel Flow Invariants-Based Approach to Microgrid Management
3. A Novel Method for Fault Location of Transmission Lines by Wide-Area Voltage
Measurements Considering Measurement Errors
4. A Two-Stage Margin-Based Algorithm for Optimal Plug-in Electric Vehicles
Scheduling
5. Availability and Flexibility of Loads for the Provision of Reserve
6. Balancing Energy in the Smart Grid Using Distributed Value Function (DVF)
7. Control of Island AC Microgrids Using a Fully Distributed Approach
8. CPIndex Cyber-Physical Vulnerability Assessment for Power-Grid Infrastructures
9. Decentralized Communication and Control Systems for Power System Operation
10. Decentralized Optimal Demand-Side Management for PHEV Charging in a Smart Grid
11. Detection and Location of High Impedance Faults in Multiconductor Overhead
Distribution Lines Using Power Line Communication Devices
12. Distribution Network Verification for Secure Restoration by Enumerating All Critical
Failures
13. Electric Vehicle Charging Stations With Renewable Power Generators A Game
Theoretical Analysis
14. Electric Vehicle Route Optimization Considering Time-of-Use Electricity Price by
Learnable Partheno-Genetic Algorithm
15. Experimental Evaluation of Frequency Regulation From Commercial Building
HVAC Systems
16. Feature Extraction for Load Identification Using Long-Term Operating Waveforms
17. Flexible Demand Control to Enhance the Dynamic Operation of Low Voltage Networks
18. Flexible Synchronized Measurement Technology-Based Fault Locator
19. Fuzzy Prediction Interval Models for Forecasting Renewable Resources and Loads in
Microgrids
20. Game-Theoretic Frameworks for Demand Response in Electricity Markets
21. Improving the Centralized Control of Thermostatically Controlled Appliances by
Obtaining the Right Information
22. Influence of Data Granularity on Smart Meter Privacy
23. Integrated Demand Side Management Game in Smart Energy Hubs
24. Integration of Distributed Generation in the VoltVAR Management System for Active
Distribution Networks
25. Microgrids Frequency Control Considerations Within the Framework of the Optimal
Generation Scheduling Problem
26. Mitigating Voltage and Frequency Fluctuation in Microgrids Using Electric Springs
27. Modeling Demand Response Capability by Internet Data Centers Processing Batch
Computing Jobs
28. Nonparametric Demand Forecasting and Detection of Energy Aware Consumers
29. Offshore DC Grids as an Interconnection of Radial Systems Protection and Control
Aspects
30. Optimal Charging of Electric Vehicles With Uncertain Departure Times A Closed-Form
Solution
31. Optimal Energy Management of Greenhouses in Smart Grids
32. Optimal Operation of Industrial Energy Hubs in Smart Grids
33. Optimizing Electric Vehicle Coordination Over a Heterogeneous Mesh Network in a
Scaled-Down Smart Grid Testbed
34. PEV Charging Control Considering Transformer Life and Experimental Validation of a
25 kVA Distribution Transformer
35. Resumable Load Data Compression in Smart Grids
36. Robust Control for Microgrid Frequency Deviation Reduction With Attached Storage
System
37. Robust Distribution Network Reconfiguration
38. Robust Restoration Decision-Making Model for Distribution Networks Based on
Information Gap Decision Theory
39. Router for Power Packet Distribution Network Design and Experimental Verification
40. Single-Phase On-Board Bidirectional PEV Charger for V2G Reactive Power Operation
41. Smart Distribution System Operations With Price-Responsive and Controllable Loads
42. Spatiotemporally Multiresolutional Optimization Toward Supply-Demand-Storage
Balancing Under PV Prediction Uncertainty
43. Toward Optimal Day-Ahead Scheduling and Operation Control of Microgrids Under
Uncertainty
44. User-Aware Game Theoretic Approach for Demand Management
45. Using Smart Meter Data to Improve the Accuracy of Intraday Load Forecasting
Considering Customer Behavior Similarities
46. Utilization of Flexible Demand in a Virtual Power Plant Set-Up
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY
1. 2-D-CFD Analysis of the Effect of Trailing Edge Shape on the Performance of a
Straight- Blade Vertical Axis Wind Turbine
2. A Balance-of-Plant Vanadium Redox Battery System Model
3. A Brushless Wound Rotor Induction Generator for Variable Speed Microhydel Plants
Without Ballast Load
4. A Comparative Study of Empirical Mode Decomposition-Based Short-Term Wind
Speed Forecasting Methods
5. A Grid-Connected Dual Voltage Source Inverter With Power Quality Improvement
Features
6. A Novel Multiagent Control Scheme for Voltage Regulation in DC Distribution Systems
7. A Parallel Capacitor Control Strategy for Enhanced FRT Capability of DFIG
8. A Semi-Markov Model for Control of Energy Storage in Utility Grids and Microgrids
With PV Generation
9. A Supervisory Load-Leveling Approach to Improve the Voltage Profile in
Distribution Network
10. A Temperature-Dependent Study of Sealed Lead-Acid Batteries Using Physical
Equivalent Circuit Modeling With Impedance Spectra Derived High
CurrentPower Correction
11. Active Rectifier With Integrated System Control for Microwind Power Systems
12. Adaptive Droop Control Strategy for Load Sharing and Circulating Current
Minimization in Low-Voltage Standalone DC Microgrid
13. Adjustable Robust Real-Time Power Dispatch With Large-Scale Wind Power
Integration.
14. Aggregation and Bidirectional Charging Power Control of Plug-in Hybrid Electric
Vehicles Generation System Adequacy Analysis
15. An Evaluation of Intraday Trading and Demand Response for a Predominantly
Hydro- Wind System Under Nordic Market Rules
16. An Improved Current Controller for Grid Connected Voltage Source Converter in
Microgrid Applications
17. An Improved Photovoltaic Power Forecasting Model With the Assistance of Aerosol
Index Data
18. An Optimal Maximum Power Point Tracking Algorithm for PV Systems With Climatic
Parameters Estimation
19. Automatic Contour-Based Road Network Design for Optimized Wind Farm
Micrositing
20. Closed-Form Solution of Time-Varying Model and Its Applications for Output Current
Harmonics in Two-Stage PV Inverter
21. Comparative Study of Advanced Signal Processing Techniques for Islanding Detection
in a Hybrid Distributed Generation System
22. Conditional Range Metric for Determining Wind Power Variability of Scarce or Noisy
Data
23. Control and Size Energy Storage Systems for Managing Energy Imbalance of Variable
Generation Resources
24. Control of PMSG-Based Wind Turbines for System Inertial Response and Power
Oscillation Damping
25. Control-Informed Optimal Array Layout for Wave Farms
26. Coordinated Operational Planning for Wind Farm With Battery Energy Storage System
27. Coordination of Hydro Units With Wind Power Generation Using Interval Optimization
28. Coordination of Interdependent Natural Gas and Electricity Infrastructures for
Firming the Variability of Wind Energy in Stochastic Day-Ahead Scheduling
29. Data Constrained Adequacy Assessment for Wind Resource Planning
30. Demand Response Management for Smart Grids With Wind Power
31. Demand Side Storage to Increase Hydroelectric Generation Efficiency
32. Effect of the Electrical Energy Conversion on Optimal Cycles for Pumping Airborne
Wind Energy
33. Enhanced Energy Output From a PV System Under Partial Shaded Conditions Through
Artificial Bee Colony
34. Game-Theoretic Formulation of Power Dispatch With Guaranteed Convergence and
Prioritized BestResponse
35. Grid Harmonics Suppression Scheme for LCL-Type Grid-Connected Inverters Based on
Output Admittance Revision
36. Grid Impact Indicators for Active Building Simulations
37. High-Precision Forecasting Model of Solar Irradiance Based on Grid Point Value Data
Analysis for an Efficient Photovoltaic System
38. Impact of Wind-Based Distributed Generation on Electric Energy in Distribution
Systems Embedded With Electric Vehicles
39. Impedance Model-Based SSR Analysis for TCSC Compensated Type-3 Wind Energy
Delivery Systems
40. Integrated Photovoltaic and Dynamic Voltage Restorer System Configuration
41. Load Balancing With EV Chargers and PV Inverters in Unbalanced Distribution Grids
42. Methods for Assessing Available Wind Primary Power Reserve
43. Microinverter Curtailment Strategy for Increasing Photovoltaic Penetration in
Low- Voltage Networks
44. Model Predictive Control of a Nonlinear 2-Body Point Absorber Wave Energy
Converter With Estimated State Feedback
45. Multiple Lightning Discharges in Wind Turbines Associated With Nearby Cloud-
to- Ground Lightning
46. Multitime-Scale Data-Driven Spatio-Temporal Forecast of Photovoltaic Generation
47. Numerical Optimal Control of Wave Energy Converters
48. Optimal Superconducting Coil Integrated Into DFIG Wind Turbine for Fault Ride
Through Capability Enhancement and Output Power Fluctuation Suppression
49. Partial Shading Analysis of Multistring PV Arrays and Derivation of Simplified MPP
Expressions
50. Performance of Medium-Voltage DC-Bus PV System Architecture Utilizing High-Gain
DC–DC Converter
51. Potential Harmonic Resonance Impacts of PV Inverter Filters on Distribution Systems
52. Preemptive Demand Response Management for Buildings
53. Qualification and Quantification of Reserves in Power Systems Under High Wind
Generation Penetration Considering Demand Response
54. Raw Wind Data Preprocessing A Data-Mining Approach
55. Reducing Generation Uncertainty by Integrating CSP With Wind Power An Adaptive
Robust Optimization-Based Analysis
56. Second-Order Cone Programming-Based Optimal Control Strategy for Wind Energy
Conversion Systems Over Complete Operating Regions
57. Simultaneous Reconfiguration, Optimal Placement of DSTATCOM, and Photovoltaic
Array in a Distribution System Based on Fuzzy-ACO Approach
58. Solar Power Shaping An Analytical Approach
59. Spatiotemporal Modeling of Wind Generation for Optimal Energy Storage Sizing
60. SSR Damping Controller Design and Optimal Placement in Rotor-Side and Grid-Side
Converters of Series-Compensated DFIG-Based Wind Farm
61. Stochastic Capacity Expansion Planning of Remote Microgrids With Wind Farms and
Energy Storage
62. Up-Wave and Autoregressive Methods for Short-Term Wave Forecasting for an
Oscillating Water Column
63. Wind Power Ramp Event Forecasting Using a Stochastic Scenario Generation Method

Maxpro infotech power system total titles 2015

  • 1.
    M.E, EEE IE E E PROJECTS 1. A Carrier-Based Neutral Voltage Modulation Strategy for Multilevel Cascaded Inverters under Unbalanced DC Sources 2. A Cascaded Multilevel Inverter Based on Switched-Capacitor for High-Frequency AC Power Distribution System 3. A Control Scheme for Storage less DVR 4. A Grid-Level High-Power BTB (Back-To-Back) System Using Modular Multilevel Cascade Converters Without Common DC-Link Capacitor 5. A High-Frequency Link Multilevel Cascaded medium-voltage converter for direct grid integration of renewable energy system 6. A Multifunctional DSTATCOM Operating Under Stiff Source 7. A New General Topology for Cascaded Multilevel Inverters With Reduced Number of Components Based on Developed H-Bridge 8. A Nine-Level Grid-Connected Converter Topology 9. A Novel Control Method for Transformer less H-Bridge Cascaded STATCOM With Star Configuration 10. A Novel Multilevel Inverter Based on switched DC sources 11. A Novel Reduced Switching Loss Bidirectional AC/DC control PWM strategy with feed forward control for Grid-Tied Micro grid system 12. A Novel Three-Phase Buck–Boost AC–DC Converter 13. A Shunt Active Power Filter for a Medium-Voltage 14. A Simplified Control Technique for a Dual Unified power quality conditioner 15. A Speed-Sensor less Start-Up Method of an Induction Motor Driven by a Modular Multilevel Cascade Inverter (MMCI-DSCC)
  • 2.
    16. A Transformerless Active Voltage Quality Regulator With the Parasitic Boost Circuit 17. A Unified Control Strategy For Three-Phase Inverter In Distributed Generation 18. Active DC Voltage Balancing PWM Technique for High-Power Cascaded Multilevel Converters 19. Adaptive Pi Control Of Statcom For Voltage Regulation 20. Advanced Control Scheme For An Ipm Synchronous Generator-Based Gearless Variable Speed Wind Turbine 21. An Accurate Frequency Tracking Method Based On Short Current Detection For Inductive 22. An Active Damper for Stabilizing Power-Electronics-Based AC Systems 23. An Active Harmonic Filter Based On One-Cycle Control 24. An Effective Control Method For Quasi-Z-Source Cascade Multilevel Inverter-Based Grid-Tie Single-Phase Photovoltaic Power System 25. An Enhanced Grid Current Compensator for Grid-Connected Distributed Generation under Nonlinear Loads and Grid Voltage Distortions 26. An Improved DC-Link Voltage Fast Control Scheme for a PWM Rectifier-Inverter System 27. An Improved Hybrid DSTATCOM Topology to Compensate Reactive and Nonlinear Loads 28. An Ultracapacitor Integrated Power Conditioner For Intermittency Smoothing And Improving Powerquality Of Distribution Grid 29. Analysis and Suppression of Leakage Current in Cascaded-Multilevel-Inverter-Based PV Systems 30. Analytical Method For Pattern Generation In Five-Level Cascaded H-Bridge Inverter Using Selective Harmonic Elimination
  • 3.
    31. Back-Propagation ControlAlgorithm For Power Quality Improvement Using Dstatcom 32. Cascaded Multilevel Inverter With Series Connection Of Novel H-Bridge Basic Units 33. Cascaded two-level inverter-based multilevel statcom for high-power applications 34. Control Of Reduced-Rating Dynamic Voltage Restorer With A Battery Energy Storage System 35. Control Scheme For A Stand-Alone Wind Energy Conversion System 36. Dc Microgrid For Wind And Solar Power Integration 37. Development And Implementation Of A Simplified Self-Tuned Neuro–Fuzzy-Based Im Drive 38. Direct Power Control Of Doubly Fed Induction Generator Under Distorted Grid Voltage 39. End User Voltage Regulation To Ease Urban Low-Voltage Distribution Congestion 40. Enhancing The Ride-Through Capability Of Dc-Link Voltage In Npc Multilevel Unified Power-Flow Controllers 41. Equivalence Of Virtual Synchronous Machines And Frequency-Droops For Converter- Based Micro Grids 42. Excitation Synchronous Wind Power Generators With Maximum Power Tracking Scheme 43. Experimental Indicators Of Current Unbalance In Building-Integrated Photovoltaic Systems 44. Five-Level Diode-Clamped Inverter With Three-Level Boost Converter 45. Flicker Mitigation By Individual Pitch Control Of Variable Speed Wind Turbines With DFIG 46. High-Frequency Operation Of A Dcacdc System For Hvdc Applications 47. High-Performance Fault Diagnosis In Pwm Voltage-Source Inverters For Vector- Controlled Induction Motor Drives
  • 4.
    48. High-Voltage GainBoost Converter Based On Three-State Commutation Cell For Battery Charging Using Pv Panels In A Single Conversion Stage 49. Implementation Of Adaptive Filter In Distribution Static Compensator 50. Improved Active Power Filter Performance For Renewable Power Generation Systems 51. Improving Power Quality in Cascade Multilevel Converters Based on Single-Phase Non regenerative Power Cells 52. Modeling and Design of Islanding Detection Using Phase-Locked Loops in Three-Phase Grid-Interface Power Converters 53. Modeling, Control, and Implementation of DC–DC Converters for Variable Frequency Operation 54. Modulation, Control and Capacitor Voltage Balancing of Alternate Arm Modular Multilevel Converter With DC Fault Blocking Capability 55. Neural Network Based Conductance Estimation Control Algorithm for Shunt Compensation 56. New Modulation Strategy to Balance the Neutral-Point Voltage for Three-Level Neutral- Clamped Inverter Systems 57. New Three-Phase Multilevel Inverter With Reduced Number of Power Electronic Components 58. Novel Topologies for Symmetric, Asymmetric, and Cascade Switched-Diode Multilevel Converter With Minimum Number of Power Electronic Components 59. On electrical power evaluation in dq coordinates under sinusoidal unbalanced conditions 60. Optimal Sizing of UPQC Considering VA Loading and Maximum Utilization of Power- Electronic Converters 61. Solar PV and Battery Storage Integration using a New Configuration of a Three-Level NPC Inverter With Advanced Control Strategy
  • 5.
    62. Space VectorPulsewidth Amplitude Modulation for a Buck–Boost VoltageCurrent Source 63. Study of Fault Current Characteristics of the DFIG 64. The Alternate Arm Converter A New Hybrid Multilevel Converter With DC-Fault Blocking Capability 65. The Transformerless Single-Phase Universal Active Power Filter for Harmonic and Reactive Power Compensation 66. Three-Phase Inverter for a Standalone Distributed Generation System: Adaptive Voltage Control Design and Stability Analysis 67. Topology and Modulation for a New Multilevel Diode-Clamped Matrix Converter 68. Voltage Support Control Strategies for Static Synchronous Compensators Under Unbalanced Voltage Sags 69. Wound Rotor Machine Fed By A Single-Phase Grid And Controlled By An Isolated Inverter
  • 6.
    VLSI M.E PROJECTS 1.High-Throughput Power-Efficient VLSI Architecture of Fractional Motion Estimation for Ultra-HD HEVC Video Encoding 2. Graph-Based Transistor Network Generation Method for Super gate Design 3. Fault Tolerant Parallel Ffts Using Error Correction Codes And Parseval Checks 4. Recursive Approach to the Design of a Parallel Self-Timed Adder 5. Fully Reused VLSI Architecture of FM0/Manchester Encoding Using SOLS Technique for DSRC Applications 6. Reliable Low-Power Multiplier Design Using Fixed-Width Replica Redundancy Block 7. A 5.8-GHz Wideband TSPC Divide-by-16/17 Dual Modulus Prescaler 8. An Accuracy-Adjustment Fixed-Width Booth Multiplier Based on Multilevel Conditional Probability 9. Reverse Converter Design via Parallel-Prefix Adders: Novel Components, Methodology, and Implementations 10. Wearout Resilience in NoCs Through an Aging Aware Adaptive Routing Algorithm 11. Low-Complexity Hardware Design for Fast Solving LSPs With Coordinated Polynomial Solutions 12. Fast Sign Detection Algorithm for the RNS Moduli Set 13. Functional Constraint Extraction From Register Transfer Level for ATPG 14. Aging-Aware Reliable Multiplier Design With Adaptive Hold Logic 15. Flexible Low Complexity Uniform and Nonuniform Digital Filter Banks With High Frequency Resolution for Multistandard Radios 16. A Low-Latency and Low-Power Hybrid Scheme for On-Chip Networks 17. A Low-Cost Low-Power All-Digital Spread-Spectrum Clock Generator
  • 7.
    18. Energy andArea Efficient Three-Input XOR/XNORs With Systematic Cell Design Methodology 19. In-Field Test for Permanent Faults in FIFO Buffers of NoC Routers 20. Reliable and Error Detection Architectures of Pomaranch for False-Alarm-Sensitive Cryptographic Applications 21. Flexible DSP Accelerator Architecture Exploiting Carry-Save Arithmetic 22. A High-Performance FIR Filter Architecture for Fixed and Reconfigurable Applications 23. Design for Testability of Sleep Convention Logic 24. High-Throughput Power-Efficient VLSI Architecture of Fractional Motion Estimation for Ultra-HD HEVC Video Encoding 25. Threshold Logic Computing: Memristive-CMOS Circuits for Fast Fourier Transform and Vedic Multiplication 26. Fault Tolerant Parallel FFTs Using Error Correction Codes and Parseval Checks 27. Network-on-Chip for Turbo Decoders 28. Low-Cost High-Performance VLSI Architecture for Montgomery Modular Multiplication
  • 8.
    29. Novel DesignAlgorithm for Low Complexity Programmable FIR Filters Based on Extended Double Base Number System 30. One Minimum Only Trellis Decoder for Non-Binary Low-Density Parity-Check Codes 31. A Generalized Algorithm and Reconfigurable Architecture for Efficient and Scalable Orthogonal Approximation of DCT 32. Read Performance: The Newest Barrier in Scaled STT-RAM 33. Power and Bandwidth Scalable 10-b 30-MS/s SAR ADC 34. Low-Power Programmable PRPG With Test Compression Capabilities 35. An Efficient VLSI Architecture of a Reconfigurable Pulse-Shaping FIR Interpolation 36. Energy-Efficient Approximate Multiplication for Digital Signal Processing and Classification Applications 37. A Novel Memory-Based FFT Architecture for Real-Valued Signals Based on Radix-2 Decimation-In-Frequency Algorithm 38. Trade-offs for Threshold Implementations Illustrated on AES 39. Robust Learning based Camera Motion Characterization scheme with applications to Video Stabilization 40. Distributed CRC Architecture for High-Radix Parallel Turbo Decoding in LTE- Advanced 41. Algorithm and Architecture Design of the H.265/HEVC Intra Encoder 42. Area-Efficient Fixed-Width Squarer with Dynamic Error-Compensation Circuit 43. A Novel Wavefront-Based High Parallel Solution for HEVC 44. Low Energy yet Reliable Data Communication Scheme for Networks on Chip 45. A Proportionate Diffusion LMS Algorithm for Sparse Distributed Estimation 46. Lossless and Reversible Data Hiding in Encrypted Images with Public Key Cryptography 47. Efficient Coding Schemes for Fault Tolerant Parallel Filters
  • 9.
    48. Architecture Designof the H.264/AVC Encoder based on Rate-Distortion Optimization 49. Comprehensive Analysis of Sequential and Combinational Soft Errors in an Embedded Processor 50. Reversible Data Hiding in Encrypted Image with Distributed Source Encoding 51. A Novel Quantum-Dot Cellular Automata X-bit x 32-bit SRAM 52. A Flexible Energy- and Reliability-Aware Application Mapping for NoC-Based Reconfigurable Architectures 53. Algorithm and Architecture of Configurable Joint Detection and Decoding for MIMO Wireless Communications With Convolutional Codes 54. Fault Tolerant Parallel FFTs Using Error Correction Codes and Parseval Checks 55. High-Speed and Energy-Efficient Carry Skip Adder Operating Under a Wide Range of Supply Voltage Levels 56. Threshold Logic Computing: Memristive-CMOS Circuits for Fast Fourier Transform and Vedic Multiplication 57. Low-Complexity High-Throughput QR Decomposition Design for MIMO Systems
  • 10.
    58. Novel SharedMultiplier Scheduling Scheme for Area-Efficient FFT/IFFT Processors 59. High-Throughput Trellis Processor for Multistandard FEC Decoding 60. High-Throughput Power-Efficient VLSI Architecture of Fractional Motion Estimation for Ultra-HD HEVC Video Encoding 61. An Efficient List Decoder Architecture for Polar Codes 62. Energy and Area Efficient Three-Input XOR/XNORs With Systematic Cell Design Methodology 63. Low-Cost High-Performance VLSI Architecture for Montgomery Modular Multiplication 64. A High-Performance FIR Filter Architecture for Fixed and Reconfigurable Applications 65. Combining Image Processing and Laser Fault Injections for Characterizing a Hardware AES 66. Novel Approach to Protect Advanced Encryption Standard Algorithm Implementation Against Differential Electromagnetic and Power Analysis 67. High throughput and secure advanced encryption standard on field programmable gate array with fine pipelining and enhanced key expansion 68. An Efficient Constant Multiplier Architecture Based on Vertical-Horizontal Binary Common Sub-expression Elimination Algorithm for Reconfigurable FIR Filter Synthesis 69. Optimal Factoring of FIR Filters 70. Novel Design Algorithm for Low Complexity Programmable FIR Filters Based on Extended Double Base Number System 71. Design of Sparse FIR Filters With Joint Optimization of Sparsity and Filter Order 72. An Efficient VLSI Architecture of a Reconfigurable Pulse-Shaping FIR Interpolation
  • 11.
    POWER ELECTRONICS,IEEE TRANSACTIONS 1.A Family of Two-Switch Boosting Switched-Capacitor Converters 2. A General Method for Analyzing Resonant and Soft-Charging Operation of Switched- Capacitor Converters 3. A Highly Efficient P-SSHI Rectifier for Piezoelectric Energy Harvesting 4. A Measurement-Based Model of the Electromagnetic Emissions From a Power Inverter 5. A Method to Improve the Dynamic Performance of Moving Average Filter-Based PLL 6. A Model Predictive Direct Current Control Strategy With Predictive References for MV Grid-Connected Converters With LCL –Filters 7. A Nanocurrent Power Management IC for Multiple Heterogeneous Energy Harvesting Sources 8. A New Isolated Auxiliary Current Pump Module for Load Transient Mitigation of IsolatedNonisolated Step-UpStep-Down DC–DC Converter 9. A New Railway Power Flow Control System Coupled With Asymmetric Double LC Branches 10. A Novel Control Scheme of DCM Boost PFC Converter 11. A Reduced Switching Loss PWM Strategy to Eliminate Common-Mode Voltage in Multilevel Inverters 12. A Secondary-Side Phase-Shift-Controlled LLC Resonant Converter With Reduced Conduction Loss at Normal Operation for Hold-Up Time Compensation Application 13. A Three-Phase Isolated Bidirectional ACDC Converter and its Modified SVPWM Algorithm 14. Accurate Evaluation of Leakage Inductance in High-Frequency Transformers Using an Improved Frequency-Dependent Expression 15. Accurate Steady-State Representation of a Doubly Fed Induction Machine 16. Active Power and DC Voltage Coordinative Control for Cascaded DC–AC Converter With Bidirectional Power Application 17. Advances in High-Precision Amplifiers—The Extra L Opposed Current Converter
  • 12.
    18. An ImprovedLCLC Current-Source-Output Multistring LED Driver With Capacitive Current Balancing 19. An Investigation Into the Use of Orthogonal Winding in Loosely Coupled Link for Improving Power Transfer Efficiency Under Coil Misalignment 20. Analysis and Calculation of DC-Link Current and Voltage Ripples for Three-Phase Inverter With Unbalanced Load 21. Analysis and Design of a Modular Multilevel Converter With Trapezoidal Modulation for Medium and High Voltage DC-DC Transformers 22. Analysis and Design of Charge Pump-Assisted High Step-Up Tapped Inductor SEPIC Converter With an “Inductorless” Regenerative Snubber 23. Analytical Model of the Forward Operation of 4H-SiC Vertical DMOSFET in the Safe Operating Temperature Range 24. Auxiliary Circuits for Power Flow Control in Multifrequency Wireless Power Transfer Systems With Multiple Receivers 25. Calculation of Leakage Inductance for High-Frequency Transformers 26. Comparison of Tolerance Controls for Open-Switch Fault in a Grid-Connected T-Type Rectifier 27. Control and Disturbances Compensation for Doubly Fed Induction Generators Using the Derivative-Free Nonlinear Kalman Filter 28. DC Capacitor-Less Inverter for Single-Phase Power Conversion With Minimum Voltage and Current Stress 29. Direct Power Control of a Pulse Width Modulation Rectifier Using Space Vector Modulation Under Unbalanced Grid Voltages 30. Efficiency Optimization by Considering the High-Voltage Flyback Transformer Parasitics Using an Automatic Winding Layout Technique 31. Evaluation of Switching Performance of SiC Devices in PWM Inverter-Fed Induction Motor Drives 32. Extended Boost Active-Switched-CapacitorSwitched-Inductor Quasi-Z-Source Inverters 33. High Efficiency on Si-Integrated Microtransformers for Isolated Power Conversion Applications
  • 13.
    34. High-Frequency PowerTransformers With Foil Windings Maximum Interleaving and Optimal Design 35. Hybrid Three-PhaseSingle-Phase Microgrid Architecture With Power Management Capabilities 36. Individual Phase Current Control With the Capability to Avoid Overvoltage in Grid- Connected Photovoltaic Power Plants Under Unbalanced Voltage Sags 37. Loss-Free Resistor-Based Power Factor Correction Using a Semi-Bridgeless Boost Rectifier in Sliding-Mode Control 38. Low-Cost Drive Circuit for AC-Direct LED Lamps 39. Modeling, Design, and Fabrication of High-Inductance Bond Wire Microtransformers With Toroidal Ferrite Core 40. Observer-Based Control of LLC DCDC Resonant Converter Using Extended Describing Functions 41. Optimal Design Methodology for LLC Resonant Converter in Battery Charging Applications Based on Time-Weighted Average Efficiency 42. Practical Application of the Wave-Trap Concept in Battery–Cell Equalizers 43. Proportional-Resonant Current Controllers Design Based on Desired Transient Performance 44. Reduced Cost of Reactive Power in Doubly Fed Induction Generator Wind Turbine System With Optimized Grid Filter 45. Reliability Evaluation of Conventional and Interleaved DC–DC Boost Converters 46. Secondary-Side Phase-Shift-Controlled Dual-Transformer-Based Asymmetrical Dual- Bridge Converter With Wide Voltage Gain 47. Self-Reconfiguration Property of a Mixed Signal Controller for Improving Power Quality Compensation During Light Loading 48. Single-Carrier Phase-Disposition PWM Implementation for Multilevel Flying Capacitor Converters
  • 14.
    49. Single-Phase Grid-ConnectedLiFePO _{bf 4} Battery–Supercapacitor Hybrid Energy Storage System With Interleaved Boost Inverter 50. Small-Signal Modeling of Uniformly Sampled Phase-Shift Modulators 51. Small-Signal Stability Analysis of Three-Phase AC Systems in the Presence of Constant Power Loads Based on Measured d-q Frame Impedances 52. Systematic Derivation of a Family of Output-Impedance Shaping Methods for Power Converters—A Case Study Using Fuel Cell-Battery-Powered Single-Phase Inverter System 53. Technical Assessment of Load Commutation Switch in Hybrid HVDC Breaker 54. The Hybrid-Cascaded DC–DC Converters Suitable for HVdc Applications 55. Three-Phase AC–AC Hexagonal Chopper System With Heterodyne Modulation for Power Flow Control Enhancement 56. Ultralow-Loss Passive T5 Fluorescent Lamp Ballasts for Subzero Temperature Operation 57. v^1 Concept Designing a Voltage-Mode Control as Current Mode With Near Time- Optimal Response for Buck-Type Converters 58. Weighted Efficiency Optimization of Fly back Micro inverter Under Improved Boundary Conduction Mode (i-BCM)
  • 15.
    IEEE TRANSACTIONS ONPOWER SYSTEMS 1. A Centralized Reactive Power Compensation System for LV Distribution Networks 2. A Fast Nondominated Sorting Guided Genetic Algorithm for Multi-Objective Power Distribution System Reconfiguration Problem 3. A Hierarchical Framework for Long-Term Power Planning Models 4. A Hybrid StochasticInterval Approach to Transmission-Constrained Unit Commitment 5. A Market-Based Transmission Planning for HVDC Grid—Case Study of the North Sea 6. A Probabilistic Risk Mitigation Model for Cyber-Attacks to PMU Networks 7. A Smart Strategy for Voltage Control Ancillary Service in Distribution Networks 8. A Stochastic Multi-Layer Agent-Based Model to Study Electricity Market Participants Behavior 9. A Stochastic Two Settlement Equilibrium Model for Electricity Markets With Wind Generation 10. Advanced Network Management Systems A Risk-Based AC OPF Approach 11. Aggregate Flexibility of Thermostatically Controlled Loads 12. An Adaptive Power Oscillation Damping Controller by STATCOM With Energy Storage 13. An Interaction Model for Simulation and Mitigation of Cascading Failures 14. An Isolated Industrial Power System Driven by Wind-Coal Power for Aluminum Productions A Case Study of Frequency Control 15. An Online Measurement Approach of Generators’ Torsional Mechanical Damping Coefficients for Subsynchronous Oscillation Analysis 16. Analysis and Impacts of Implementing Droop Control in DFIG-Based Wind Turbines on MicrogridWeak-Grid Stability 17. Analysis of Hydro-Coupled Power Plants and Design of Robust Control to Damp Oscillatory Modes
  • 16.
    18. Application ofa Real-Time Data Compression and Adapted Protocol Technique for WAMS 19. Application of the Moment-SOS Approach to Global Optimization of the OPF Problem 20. Arbitraging Intraday Wholesale Energy Market Prices With Aggregations of Thermostatic Loads 21. Artificial Immune Systems Optimization Approach for Multiobjective Distribution System Reconfiguration 22. Artificial-Intelligence-Based Methodology for Load Disaggregation at Bulk Supply Point 23. Assessing the Potential of Network Reconfiguration to Improve Distributed Generation Hosting Capacity in Active Distribution Systems 24. ATC-Based System Reduction for Planning Power Systems With Correlated Wind and Loads 25. Business Process Model for Deriving CIM Profile A Case Study for Indian Utility 26. Capacity of Low-Voltage Grids for Distributed Generation Classification by Means of Stochastic Simulations 27. Cascading Failure Analysis With DC Power Flow Model and Transient Stability Analysis 28. Computational Study of Security Constrained Economic Dispatch With Multi-Stage Rescheduling 29. Convex Relaxation for Optimal Power Flow Problem Mesh Networks 30. Coordination Strategy for Decentralized Reactive Power Optimization Based on a Probing Mechanism 31. Demand-Side Management Evaluation Tool 32. Development of Performance-Based Two-Part Regulating Reserve Compensation on MISO Energy and Ancillary Service Market 33. Dynamic Reserve Zones for Day-Ahead Unit Commitment With Renewable Resources 34. Economic Allocation for Energy Storage System Considering Wind Power Distribution 35. Economic Dispatch With Non-Smooth Objectives—Part II Dimensional Steepest Decline Method
  • 17.
    36. Enhanced Security-ConstrainedOPF With Distributed Battery Energy Storage 37. Estimating Dynamic Model Parameters for Adaptive Protection and Control in Power System 38. Estimating System-Wide Impacts of Smart Grid Demonstration 39. Evaluation of Wind Power Curtailment in Active Network Management Schemes 40. Exploring the Modeling Capacity of Two-Stage Robust Optimization Variants of Robust Unit Commitment Model 41. Extracting Rare Failure Events in Composite System Reliability Evaluation Via Subset Simulation 42. Extreme Value Analysis of Wet Snow Loads on Power Lines 43. Gas–Electricity Coordination in Competitive Markets Under Renewable Energy Uncertainty 44. Hierarchical Decentralized Network Reconfiguration for Smart Distribution Systems— Part I Problem Formulation and Algorithm Development 45. Hierarchical Decentralized Network Reconfiguration for Smart Distribution Systems— Part II Applications to Test Systems 46. Hierarchical Risk Assessment of Transmission System Considering the Influence of Active Distribution Network 47. Home Appliance Load Modeling From Aggregated Smart Meter Data 48. Impedance and Damping Characteristics of Grid-Connected VSCs With Power Synchronization Control Strategy 49. Improved Recursive Electromechanical Oscillations Monitoring Scheme A Novel Distributed Approach 50. Improving the Small Signal Stability of a PV-DE-Dynamic Load-Based Microgrid Using an Auxiliary Signal in the PV Control Loop 51. Inertia Estimation of the GB Power System Using Synchrophasor Measurements 52. Initial Results in Using a Self-Coherence Method for Detecting Sustained Oscillations
  • 18.
    53. Interval PowerFlow Analysis Using Linear Relaxation and Optimality-Based Bounds Tightening (OBBT) Method 54. Locational Reserve Disqualification for Distinct Scenarios 55. Long-Term Voltage Stability Analysis of Variable Speed Wind Generators 56. Low Carbon Oriented Expansion Planning of Integrated Gas and Power Systems 57. Managing Hydroelectric Reservoirs Over an Extended Horizon Using Benders Decomposition With a Memory Loss Assumption 58. Marginal Pricing of Transmission Services Using Min-Max Fairness Policy 59. Modeling and Analysis of a Variable Speed Heat Pump for Frequency Regulation Through Direct Load Control 60. Model-Predictive Cascade Mitigation in Electric Power Systems With Storage and Renewables—Part I Theory and Implementation 61. Model-Predictive Cascade Mitigation in Electric Power Systems With Storage and Renewables—Part II Case-Study 62. Multi-Agent System for Distributed Management of Microgrids 63. Multi-Objective Optimal Power Flow Considering Transient Stability Based on Parallel NSGA-II 64. On the Use of Pumped Storage for Wind Energy Maximization in Transmission- Constrained Power Systems 65. Online Adaptive Real-Time Optimal Dispatch of Privately Owned Energy Storage Systems Using Public-Domain Electricity Market Prices 66. Online Optimal Generation Control Based on Constrained Distributed Gradient Algorithm 67. Operational Adequacy Studies of a PV-Based and Energy Storage Stand-Alone Microgrid 68. Optimal Charging of Electric Vehicles Taking Distribution Network Constraints Into Account
  • 19.
    69. Optimal ESSAllocation for Load Management Application 70. Optimal Operation and Services Scheduling for an Electric Vehicle Battery Swapping Station 71. Optimal Placement and Sizing of Distributed Generators in Unbalanced Distribution Systems Using Supervised Big Bang-Big Crunch Method 72. Optimized Offers for Cascaded Hydroelectric Generators in a Market With Centralized Dispatch 73. Optimizing Spinning Reserve Requirement of Power System With Carbon Capture Plants 74. Power Quality Assessment in Distribution Systems Embedded With Plug-In Hybrid and Battery Electric Vehicles 75. Power System Voltage Stability Assessment Based on Branch Active Powers 76. Regional Carbon Emission Management Based on Probabilistic Power Flow With Correlated Stochastic Variables 77. Reliability Analysis of Substation Monitoring Systems Based on Branch PMUs 78. Renewable Energies in Medium-Term Power Planning 79. Resistive Network Optimal Power Flow Uniqueness and Algorithms 80. Risk-Constrained Strategic Bidding of GenCos Considering Demand Response 81. Robust Optimization of Storage Investment on Transmission Networks 82. Security Enhancement With Nodal Criticality-Based Integration of Strategic Micro Grids 83. Security Games for Risk Minimization in Automatic Generation Control 84. Single-Phase Generation Headroom in Low-Voltage Distribution Networks Under Reduced Circuit Characterization 85. Small Signal Analysis of Power Systems With Wind and Energy Storage Units 86. Statistical Analysis and Forecasting of Damping in the Nordic Power System 87. Stochastic Generation Capacity Expansion Planning Reducing Greenhouse Gas Emissions 88. Stochastically Optimized, Carbon-Reducing Dispatch of Storage, Generation, and Loads
  • 20.
    89. Strategic Biddingfor a Large Consumer 90. Sub-Synchronous Interaction Damping Control for DFIG Wind Turbines 91. Switch Allocation Problems in Power Distribution Systems 92. The Influence of Modeling Transformer Age Related Failures on System Reliability 93. Thermal Profiling of Residential Energy Use 94. Tight Relaxation Method for Unit Commitment Problem Using Reformulation and Lift- and-Project 95. Toward Fully Renewable Electric Energy Systems 96. Transmission, Variable Generation, and Power System Flexibility 97. Unifying Data Types of IEC 61850 and CIM 98. Valuation of Flexible Transmission Investment Options Under Uncertainty 99. Variable Resource Dispatch Through Do-Not-Exceed Limit 100. Zonal Reduction of Large Power Systems Assessment of an Optimal Grid Model Accounting for Loop Flows
  • 21.
    IEEE TRANSACTIONS ONENERGY CONVERSION 1. 3-D FEM Calculation of Electromagnetic Properties of Single-Phase Induction Machines 2. A Differential Algebraic Estimator for Sensorless Permanent-Magnet Synchronous Machine Drive 3. A Fault-Location Algorithm for Series-Compensated Double-Circuit Transmission Lines Using the Distributed Parameter Line Model 4. A Hierarchical Control Strategy With Fault Ride-Through Capability for Variable Frequency Transformer 5. A Low Component Count Series Voltage Compensation Scheme for DFIG WTs to Enhance Fault Ride-Through Capability 6. A Lumped-Parameter Off-Axis-Capable Dynamic Switched Reluctance Machine Model Including Unbalanced Radial Forces 7. A Model Predictive Direct Current Control Strategy With Predictive References for MV Grid-Connected Converters With LCL –Filters 8. A New Solar Module Modeling for PV Applications Based on a Symmetrized and Shifted Gompertz Model 9. A New Tool for Calculation of Lightning-Induced Voltages in Power Systems—Part I Development of Circuit Model 10. A New Tool for Calculation of Lightning-Induced Voltages in Power Systems—Part II Validation Study 11. A Prediction Error Method-Based Self-Commissioning Scheme for Parameter Identification of Induction Motors in Sensorless Drives 12. A Straightforward Method for Wide-Area Fault Location on Transmission Networks
  • 22.
    13. A Switched-ReluctanceGenerator With Interleaved Interface DC–DC Converter 14. A Temperature-Dependent Study of Sealed Lead-Acid Batteries Using Physical Equivalent Circuit Modeling With Impedance Spectra Derived High CurrentPower Correction 15. A Two-Level Framework to Fault Diagnosis and Decision Making for Power Transformers 16. Adaptive Droop for Control of Multiterminal DC Bus Integrating Energy Storage 17. Advances in High-Precision Amplifiers—The Extra L Opposed Current Converter 18. Air-Flow Investigation for a Medium-Voltage Load Break Switch 19. Air-Gap Power-Based Sensorless Control in a DFIG Connected to a DC Link 20. An Analytical Procedure for Calculating Harmonics of Three-Phase Uncontrolled Rectifiers Under Nonideal Conditions 21. An Experimental Design for Static Eccentricity Detection in Synchronous Machines Using a Cramér–Rao Lower Bound Technique 22. An Improved Circuit-Based Model of a Grounding Electrode by Considering the Current Rate of Rise and Soil Ionization Factors 23. An Online Early-Warning Method for Wind Swing Discharge of the Conductor Toward the Tangent Tower and Jumper Toward the Strain Tower 24. An Updated Model to Determine the Life Remaining of Transformer Insulation 25. Analysis and Mitigation of Resonance Propagation in Grid-Connected and Islanding Microgrids 26. Analysis of Switching Effects of Vacuum Circuit Breaker on Dry-Type Foil-Winding Transformers Validated by Experiments 27. Analysis of Temporary Overvoltages During Open-Phase Faults in Distribution Networks With Resonant Grounding
  • 23.
    28. Analytic Approximationof Fault Current Contributions From Capacitive Components in HVDC Cable Networks 29. Application of Frequency-Partitioning Fitting to the Phase-Domain Frequency- Dependent Modeling of Overhead Transmission Lines 30. Calculating the Surface Potential Gradient of Overhead Line Conductors 31. Calculation of the Phase-Angle-Jump for Voltage Dips in Three-Phase Systems 32. Cold Start of a 240-MVA Generator Step-Up Transformer Filled With Natural Ester Fluid 33. Con-Resistant Trust for Improved Reliability in a Smart-Grid Special Protection System 34. Constant-Parameter Voltage-Behind-Reactance Induction Machine Model Including Main Flux Saturation 35. Contributions to Differences Between On-Site and Factory-Measured Noise Levels of Power Transformers 36. Damaging Open-Phase Overvoltage Disturbance on a Shunt-Compensated 500-kV Line Initiated by Unintended Trip 37. DC Current Limitation Principle Using a Helical Arc Arrangement 38. Decomposition of the Hot-Spot Factor 39. Decreasing Electric Field in Soil Near Grounding Device by Building an Underground Insulating Wall 40. Design Methodology for High-Performance Segmented Rotor Switched Reluctance Motors 41. Design of Variable-Speed Dish-Stirling Solar–Thermal Power Plant for Maximum Energy Harness 42. Development and Implementation of a Supervisor Strategy and Sliding Mode Control Setup for Fuel-Cell-Based Hybrid Generation Systems
  • 24.
    43. Development ofa Low-Cost Self-Diagnostic Module for Oil-Immerse Forced-Air Cooling Transformers 44. Development of a Rare-Earth-Free SR Motor With High Torque Density for Hybrid Vehicles 45. Development of Dynamic Estimators for Islanding Detection of Inverter-Based DG 46. Development of Power Interface With FPGA-Based Adaptive Control for PEM-FC System 47. Diagnosis of Rotor Winding Interturn Short-Circuit in Turbine Generators Using Virtual Power 48. Direct MPP Calculation in Terms of the Single-Diode PV Model Parameters 49. Distribution System Optimization Based on a Linear Power-Flow Formulation 50. Dynamic Energy Management of Hybrid Energy Storage System With High-Gain PV Converter 51. Enhanced Transformer Model for Low- and Mid-Frequency Transients Part I 52. Enhanced Transformer Model for Low- and Mid-Frequency Transients—Part II Validation and Simulation Results 53. Estimation of Fault Resistance Using Fault Record Data 54. Estimation of Single-Phase and Three-Phase Power-Quality Indices Using Empirical Wavelet Transform 55. Experiment on Grid-Connection Process of Wind Turbines in Fractional Frequency Wind Power System 56. Experimental Design of Booster-Shed Parameters for Post Insulators under Heavy Icing Conditions 57. Experimentally Validated Reversible Single-Phase Multiwinding Transformer Model for the Accurate Calculation of Low-Frequency Transients
  • 25.
    58. Fast Voltage-BalancingControl and Fast Numerical Simulation Model for the Modular Multilevel Converter 59. Fractional Slot Concentrated Winding PMSM With Consequent Pole Rotor for a Low- Speed Direct Drive Reduction of Rare Earth Permanent Magnet 60. Harmony Search Algorithm-Based Controller Parameters Optimization for a Distributed- Generation System 61. High-Frequency Model of the Power Transformer Based on Frequency-Response Measurements 62. Hybrid Design of Modular Multilevel Converters for HVDC Systems Based on Various Submodule Circuits 63. Hybrid Electromagnetic Brakes Design and Performance Evaluation 64. Hybrid Microgrid Model Based on Solar Photovoltaic Battery Fuel Cell System for Intermittent Load Applications 65. Impact of Electrode Shape on the Performance of a Gas Discharge Arrester 66. Improved Fault Diagnosis of Ball Bearings Based on the Global Spectrum of Vibration Signals 67. Interruption in Air for Different Medium-Voltage Switching Duties 68. Investigating Operating Modes and Converter Options of Dual Winding Permanent Magnet Synchronous Machines for Hybrid Electric Vehicles 69. Investigations on Requirements for UHVEHV AC Switchgear by CIGRE Study Committee A3 70. Large Signal Stability Analysis at the Common Coupling Point of a DC Microgrid A Grid Impedance Estimation Approach Based on a Recursive Method 71. Lightning Electromagnetic Fields and Their Induced Voltages on Overhead Lines The Effect of a Horizontally Stratified Ground
  • 26.
    72. Lightning Performanceof Transmission Lines Methodology to Design Grounding Electrodes to Ensure an Expected Outage Rate 73. Localization Algorithm for the PD Source in Substation Based on L-Shaped Antenna Array Signal Processing 74. Magnetic Design Aspects of the Trans-Rotary Magnetic Gear 75. Measurement of Magnet Losses in a Surface Mounted Permanent Magnet Synchronous Machine 76. Modeling and Simulations of Ferroresonance by Using BDFNDF Numerical Methods 77. Monte Carlo Simulation by Using a Systematic Approach to Assess Distribution System Reliability Considering Intentional Islanding 78. New Rules Generation From Measurement Data Using an Expert System in a Power Station 79. Nonlinear abc-Model for Electrical Machines Using N-D Lookup Tables 80. On Control Actions Effects by Using {rm QV} Curves 81. Operating Characteristics of the P&O Algorithm at High Perturbation Frequencies for Standalone PV Systems 82. Optimal Signaling Scheme and Capacity Limit of PLC Under Bernoulli-Gaussian Impulsive Noise 83. Optimal Sizing of Energy Storage for Regenerative Braking in Electric Railway Systems 84. Passive Filter Design for China High-Speed Railway With Considering Harmonic Resonance and Characteristic Harmonics 85. Performance Evaluation of Radial- and Axial-Flux PM Wind Power Generators With Mechanical Energy Storage System 86. PMSM Drive Position Estimation Contribution to the High-Frequency Injection Voltage Selection Issue
  • 27.
    87. Power ManagementSystem With Integrated Maximum Power Extraction Algorithm for Microbial Fuel Cells 88. Power-Swing Detection Using Moving Window Averaging of Current Signals 89. Primary and Secondary Frequency Support by a Multi-Agent Demand Control System 90. Procedure for Determining Induction Motor Efficiency Working Under Distorted Grid Voltages 91. Realistic Approach for Phasor Measurement Unit Placement Consideration of Practical Hidden Costs 92. Secured Zone 3 Protection During Stressed Condition 93. Sensorless Direct Torque Control for Electrically Excited Synchronous Motor Based on Injecting High-Frequency Ripple Current Into Rotor Winding 94. Study on the Influence of Space Charge on the Upward Leader Emerging From the Conductors of UHVDC Transmission Lines 95. Subdomain Reduction by Dirichlet-to-Neumann Mappings in Time-Domain Electrical Machine Modeling 96. Subspace-Based Identification of Acoustic Noise Spectra in Induction Motors 97. The Effect of an Ocean-Land Mixed Propagation Path on the Lightning Electromagnetic Fields and Their Induced Voltages on Overhead Lines 98. Theoretical Analysis and Calculation Model of the Electromagnetic Torque of Nonsalient-Pole Synchronous Machines With Interturn Short Circuit in Field Windings 99. Thermal-Electric Rating Method for Mass-Impregnated Paper-Insulated HVDC Cable Circuits 100. Three-Dimensional Field Reconstruction Method for Modeling Axial Flux Permanent Magnet Machines
  • 28.
    101. Unbalanced Powerin Four-Wire Systems and Its Reactive compensation 102. Utilization Improvement of Transformers Using Demand Response IEEE TRANSACTIONS ON SMART GRID 1. A Multifunction Control Strategy for the Stable Operation of DG Units in Smart Grids 2. A Novel Flow Invariants-Based Approach to Microgrid Management 3. A Novel Method for Fault Location of Transmission Lines by Wide-Area Voltage Measurements Considering Measurement Errors 4. A Two-Stage Margin-Based Algorithm for Optimal Plug-in Electric Vehicles Scheduling 5. Availability and Flexibility of Loads for the Provision of Reserve 6. Balancing Energy in the Smart Grid Using Distributed Value Function (DVF) 7. Control of Island AC Microgrids Using a Fully Distributed Approach 8. CPIndex Cyber-Physical Vulnerability Assessment for Power-Grid Infrastructures 9. Decentralized Communication and Control Systems for Power System Operation 10. Decentralized Optimal Demand-Side Management for PHEV Charging in a Smart Grid 11. Detection and Location of High Impedance Faults in Multiconductor Overhead Distribution Lines Using Power Line Communication Devices 12. Distribution Network Verification for Secure Restoration by Enumerating All Critical Failures 13. Electric Vehicle Charging Stations With Renewable Power Generators A Game Theoretical Analysis 14. Electric Vehicle Route Optimization Considering Time-of-Use Electricity Price by Learnable Partheno-Genetic Algorithm
  • 29.
    15. Experimental Evaluationof Frequency Regulation From Commercial Building HVAC Systems 16. Feature Extraction for Load Identification Using Long-Term Operating Waveforms 17. Flexible Demand Control to Enhance the Dynamic Operation of Low Voltage Networks 18. Flexible Synchronized Measurement Technology-Based Fault Locator 19. Fuzzy Prediction Interval Models for Forecasting Renewable Resources and Loads in Microgrids 20. Game-Theoretic Frameworks for Demand Response in Electricity Markets 21. Improving the Centralized Control of Thermostatically Controlled Appliances by Obtaining the Right Information 22. Influence of Data Granularity on Smart Meter Privacy 23. Integrated Demand Side Management Game in Smart Energy Hubs 24. Integration of Distributed Generation in the VoltVAR Management System for Active Distribution Networks 25. Microgrids Frequency Control Considerations Within the Framework of the Optimal Generation Scheduling Problem 26. Mitigating Voltage and Frequency Fluctuation in Microgrids Using Electric Springs 27. Modeling Demand Response Capability by Internet Data Centers Processing Batch Computing Jobs 28. Nonparametric Demand Forecasting and Detection of Energy Aware Consumers 29. Offshore DC Grids as an Interconnection of Radial Systems Protection and Control Aspects 30. Optimal Charging of Electric Vehicles With Uncertain Departure Times A Closed-Form Solution
  • 30.
    31. Optimal EnergyManagement of Greenhouses in Smart Grids 32. Optimal Operation of Industrial Energy Hubs in Smart Grids 33. Optimizing Electric Vehicle Coordination Over a Heterogeneous Mesh Network in a Scaled-Down Smart Grid Testbed 34. PEV Charging Control Considering Transformer Life and Experimental Validation of a 25 kVA Distribution Transformer 35. Resumable Load Data Compression in Smart Grids 36. Robust Control for Microgrid Frequency Deviation Reduction With Attached Storage System 37. Robust Distribution Network Reconfiguration 38. Robust Restoration Decision-Making Model for Distribution Networks Based on Information Gap Decision Theory 39. Router for Power Packet Distribution Network Design and Experimental Verification 40. Single-Phase On-Board Bidirectional PEV Charger for V2G Reactive Power Operation 41. Smart Distribution System Operations With Price-Responsive and Controllable Loads 42. Spatiotemporally Multiresolutional Optimization Toward Supply-Demand-Storage Balancing Under PV Prediction Uncertainty 43. Toward Optimal Day-Ahead Scheduling and Operation Control of Microgrids Under Uncertainty 44. User-Aware Game Theoretic Approach for Demand Management 45. Using Smart Meter Data to Improve the Accuracy of Intraday Load Forecasting Considering Customer Behavior Similarities 46. Utilization of Flexible Demand in a Virtual Power Plant Set-Up
  • 31.
    IEEE TRANSACTIONS ONSUSTAINABLE ENERGY 1. 2-D-CFD Analysis of the Effect of Trailing Edge Shape on the Performance of a Straight- Blade Vertical Axis Wind Turbine 2. A Balance-of-Plant Vanadium Redox Battery System Model 3. A Brushless Wound Rotor Induction Generator for Variable Speed Microhydel Plants Without Ballast Load 4. A Comparative Study of Empirical Mode Decomposition-Based Short-Term Wind Speed Forecasting Methods 5. A Grid-Connected Dual Voltage Source Inverter With Power Quality Improvement Features 6. A Novel Multiagent Control Scheme for Voltage Regulation in DC Distribution Systems 7. A Parallel Capacitor Control Strategy for Enhanced FRT Capability of DFIG 8. A Semi-Markov Model for Control of Energy Storage in Utility Grids and Microgrids With PV Generation 9. A Supervisory Load-Leveling Approach to Improve the Voltage Profile in Distribution Network 10. A Temperature-Dependent Study of Sealed Lead-Acid Batteries Using Physical Equivalent Circuit Modeling With Impedance Spectra Derived High CurrentPower Correction 11. Active Rectifier With Integrated System Control for Microwind Power Systems 12. Adaptive Droop Control Strategy for Load Sharing and Circulating Current Minimization in Low-Voltage Standalone DC Microgrid 13. Adjustable Robust Real-Time Power Dispatch With Large-Scale Wind Power Integration. 14. Aggregation and Bidirectional Charging Power Control of Plug-in Hybrid Electric Vehicles Generation System Adequacy Analysis
  • 32.
    15. An Evaluationof Intraday Trading and Demand Response for a Predominantly Hydro- Wind System Under Nordic Market Rules 16. An Improved Current Controller for Grid Connected Voltage Source Converter in Microgrid Applications 17. An Improved Photovoltaic Power Forecasting Model With the Assistance of Aerosol Index Data 18. An Optimal Maximum Power Point Tracking Algorithm for PV Systems With Climatic Parameters Estimation 19. Automatic Contour-Based Road Network Design for Optimized Wind Farm Micrositing 20. Closed-Form Solution of Time-Varying Model and Its Applications for Output Current Harmonics in Two-Stage PV Inverter 21. Comparative Study of Advanced Signal Processing Techniques for Islanding Detection in a Hybrid Distributed Generation System 22. Conditional Range Metric for Determining Wind Power Variability of Scarce or Noisy Data 23. Control and Size Energy Storage Systems for Managing Energy Imbalance of Variable Generation Resources 24. Control of PMSG-Based Wind Turbines for System Inertial Response and Power Oscillation Damping 25. Control-Informed Optimal Array Layout for Wave Farms 26. Coordinated Operational Planning for Wind Farm With Battery Energy Storage System 27. Coordination of Hydro Units With Wind Power Generation Using Interval Optimization 28. Coordination of Interdependent Natural Gas and Electricity Infrastructures for Firming the Variability of Wind Energy in Stochastic Day-Ahead Scheduling
  • 33.
    29. Data ConstrainedAdequacy Assessment for Wind Resource Planning 30. Demand Response Management for Smart Grids With Wind Power 31. Demand Side Storage to Increase Hydroelectric Generation Efficiency 32. Effect of the Electrical Energy Conversion on Optimal Cycles for Pumping Airborne Wind Energy 33. Enhanced Energy Output From a PV System Under Partial Shaded Conditions Through Artificial Bee Colony 34. Game-Theoretic Formulation of Power Dispatch With Guaranteed Convergence and Prioritized BestResponse 35. Grid Harmonics Suppression Scheme for LCL-Type Grid-Connected Inverters Based on Output Admittance Revision 36. Grid Impact Indicators for Active Building Simulations 37. High-Precision Forecasting Model of Solar Irradiance Based on Grid Point Value Data Analysis for an Efficient Photovoltaic System 38. Impact of Wind-Based Distributed Generation on Electric Energy in Distribution Systems Embedded With Electric Vehicles 39. Impedance Model-Based SSR Analysis for TCSC Compensated Type-3 Wind Energy Delivery Systems 40. Integrated Photovoltaic and Dynamic Voltage Restorer System Configuration 41. Load Balancing With EV Chargers and PV Inverters in Unbalanced Distribution Grids 42. Methods for Assessing Available Wind Primary Power Reserve 43. Microinverter Curtailment Strategy for Increasing Photovoltaic Penetration in Low- Voltage Networks 44. Model Predictive Control of a Nonlinear 2-Body Point Absorber Wave Energy Converter With Estimated State Feedback 45. Multiple Lightning Discharges in Wind Turbines Associated With Nearby Cloud- to- Ground Lightning 46. Multitime-Scale Data-Driven Spatio-Temporal Forecast of Photovoltaic Generation
  • 34.
    47. Numerical OptimalControl of Wave Energy Converters 48. Optimal Superconducting Coil Integrated Into DFIG Wind Turbine for Fault Ride Through Capability Enhancement and Output Power Fluctuation Suppression 49. Partial Shading Analysis of Multistring PV Arrays and Derivation of Simplified MPP Expressions 50. Performance of Medium-Voltage DC-Bus PV System Architecture Utilizing High-Gain DC–DC Converter 51. Potential Harmonic Resonance Impacts of PV Inverter Filters on Distribution Systems 52. Preemptive Demand Response Management for Buildings 53. Qualification and Quantification of Reserves in Power Systems Under High Wind Generation Penetration Considering Demand Response 54. Raw Wind Data Preprocessing A Data-Mining Approach 55. Reducing Generation Uncertainty by Integrating CSP With Wind Power An Adaptive Robust Optimization-Based Analysis 56. Second-Order Cone Programming-Based Optimal Control Strategy for Wind Energy Conversion Systems Over Complete Operating Regions 57. Simultaneous Reconfiguration, Optimal Placement of DSTATCOM, and Photovoltaic Array in a Distribution System Based on Fuzzy-ACO Approach 58. Solar Power Shaping An Analytical Approach 59. Spatiotemporal Modeling of Wind Generation for Optimal Energy Storage Sizing 60. SSR Damping Controller Design and Optimal Placement in Rotor-Side and Grid-Side Converters of Series-Compensated DFIG-Based Wind Farm 61. Stochastic Capacity Expansion Planning of Remote Microgrids With Wind Farms and Energy Storage 62. Up-Wave and Autoregressive Methods for Short-Term Wave Forecasting for an Oscillating Water Column 63. Wind Power Ramp Event Forecasting Using a Stochastic Scenario Generation Method