SlideShare a Scribd company logo
®®
REŠENJA ZA HIDROIZOLACIJEREŠENJA ZA HIDROIZOLACIJE
Melanija Pavlović,dipl.ing.arh.
Vladimir Dimitrijević, dipl.ing.građ.
23.12.2014.
SVET MAPEIJA
U SRBIJI
PORTFOLIO
REFERENCI
Melanija Pavlović,d.i.a.
Mapei
- Građevinski lepkovi
- Hidroizolacioni sistemi
- Hemijski proizvodi za
građevinarstvo
Mapei je osnovao
Rodolfo Squinzi 1937.
godine u Milanu
Kompanija je pre dve
godine proslavila 75
godina postojanja
Istorija
Mapei SRB d.o.o. 2013.godina
Mapei SRB d.o.o.
Grupa Mapei
Sertifikacija i briga o
zaštiti životne sredine
Mapei investira 5% od godišnjeg profita u R&D
®®
REŠENJA ZA HIDROIZOLACIJEREŠENJA ZA HIDROIZOLACIJE
Melanija Pavlović,dipl.ing.arh.
Vladimir Dimitrijević, dipl.ing.građ.
SVET MAPEIJA
U SRBIJI
PORTFOLIO
REFERENCI
Hotel Splendid, Bečići
•Vreme izvođenja radova: 2002. 2006. godine̶
•Investitor: Montenegro Stars Hotel Group
•Projektant: Zoran Đorđević
•Izvođač radova: Tradeunique SC, d.o.o.
•Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša
Janić
Delta City
•Vreme izvođenja radova: 2007. godina
•Investitor: Delta City d.o.o. Beograd
•Izvođač radova: Gradina d.o.o. Beograd, Deneza M
d.o.o. Beograd
•Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša
Janić
•Distibuter: Botomex, BWC
Airport City Belgrade
•Vreme izvođenja radova: 2007. 2008. godine̶
•Investitor: Airport City Belgrade (ACB)
•Površina: 185.000 m²
•Glavni izvođač: Mercury Engineering d.o.o.
•Podizvođači: Mir inženjering d.o.o., Tik karpet, Demex-St d.o.o.
(za opisane radove)
•Mapei koordinatori: Nenad Cvetković, d.i.g., Vladimir
Dimitrijević, d.i.g., Nebojša Janić
• Distibuter: BWC, UC Partizan
Hotel Excelzior
•Vreme izvođenja radova: 2009. 2013. godine̶
•Investitor: Hotel Excelzior
•Izvođač radova rekonstrukcije: Permont d.o.o.
•Direktor projekta rekonstrukcije: Nenad Zoranović,
dipl.ing.maš.
•Izvođač radova nadogradnje: Global Kod d.o.o.
•Direktor projekta nadogradnje: Nenad Gavrilović,
d.i.g.
•Mapei koordinatori: Vladimir Dimitrijević, d.i.g.,
Nebojša Janić
•Distibuter: UC Partizan
Merkator Centar
•Vreme izvođenja radova: maj septembar 2012.̶
godine
•Investitor: Mercator – S d.o.o. Novi Sad
•Projekat rekonstrukcije: Mercator – Optima
inženjering, Nives Dobrojević, univ.dipl.inž.arh.
•Direktor projekta: Mateja Špan, u.d.i.a.
•Izvođač radova: Energogroup d.o.o., Beograd
•Mapei kooridinatori: Vladimir Dimitrijević, d.i.g.,
Nebojša Janić
•Distributer: UC Partizan
Hotel Crowne Plaza
•Vreme izvođenja radova: 2013. godina
•Investitor: Delta Holding, Hotel Crowne Plaza,
Beograd
•Autor projekta, dizajn enterijera: Imagination studio,
London U.K. Carlos Virgile, Ewald Damen
•Projektant: Mašinoprojekt Kopring AD Beograd
•Odgovorni projektant: Nataša Milojević, d.i.a.
•Generalni izvođač radova: Exing d.o.o., Beograd
•Izvođač radova sanacije betonskih površina
fasade: Sigma projekt d.o.o.
•Rukovodioci radova sanacije betonskih površina
fasade: Zoran Filipović, d.i.g. i Jugoslav Kecman, i.g.
Izvođač radova na hidroizolaciji bazena: Lever
inženjering d.o.o.
•Rukovodioci radova na hidroizolaciji bazena:
Nataša Stepanović, d.i.g. i Krsto Medigović, d.i.g.
Izvođač radova na izravnjavanju podova: Beton
Com d.o.o.
•Rukovodioci radova na izravnavanju podova:
Slobodan Šošic, i.g. i Andrija Andrić, i.g.
Mapei koordinatori: Vladimir Dimitrijević, d.i.g.,
Melanija Pavlović, d.i.a., Nebojša Janić
•Distibuter: UC Partizan
Hotel Falkensteiner, Stara Planina
•Vreme izvođenja radova: 2010-2011. godine
•Investitor: Javno preduzeće Stara Planina
•Autor projekta: Miroslav Stefanović, d.i.a.
•Projekat: Mašinoprojekt Kopring AD
•Izvođač radova: Deneza M Inženjering
•Mapei koordinatori: Melanija Pavlović, d.i.a., Nebojša
Janić
•Distibuter: UC Partizan
Pravni fakultet
•Vreme izvođenja radova: 2008.
godina
•Investitor: Univerzitet u Beogradu
•Projektant: Mega Plus, Beograd
•Izvođač radova: Alping d.o.o.,
Beograd
•Mapei koordinator: Nebojša Janić
Vrhovni kasacioni sud
•Vreme izvođenja radova: 2006. 2009. godine̶
•Investitor: Uprava za zajedničke poslove Republike
Srbije
•Projekat rekonstrukcije: Mašinoprojekt Kopring AD
•Odgovorni projektant: Marija Gec, d.i.a.
•Glavni izvođač: Ratko Mitrović Dedinje d.o.o.
•Odgovorni izvođač: Goran Mitić, d.i.a.
•Mapei kordinatori: Nenad Cvetković, d.i.g., Nebojša
Janić
•Distibuter: BWC
Avalski toranj
•Investitor: Republička direkcija za imovinu Republike
Srbije, Radio Televizija Srbije
•Vreme izgradnje: 2008. 2009. godine̶
•Projekat: Saobraćajni institut CIP, Beograd
•Prethodne probe betona: dr Ksenija Janković, d.i.g.,
Dragan Bojović, d.i.g. (Institut IMS)
•Izvođač radova: Ratko Mitrović Dedinje d.o.o.̶
Beograd
•Odgovorni izvođač radova: Goran Milovanović, d.i.g
•Rukovodilac gradilišta: Mirko Popović, d.i.g.
•Rukovodilac Laboratorije za beton: Dušanka
Tanasković, dipl.ing.tehnologije
•Mapei koordinatori: Nenad Cvetković, d.i.g, Vladimir
Dimitrijević, d.i.g., Nebojša Janić
•Distibuter: BWC
Fontana ispred Palate Srbija
•Vreme izvođenja radova: 2011. godina
•Investitor: Uprava za zajedničke poslove
•Rukovodilac projekta: Hranislav Milosavljević
•Izvođač radova: GP Morava In d.o.o.
•Nadzor: Saobraćajni institut CIP
•Mapei koordinatori: Vladimir Dimitrijević, d.i.g.,
Nebojša Janić
•Distibuter: BWC
Legat Petra Lubarde
•Vreme izvođenja radova: 2012. godina
•Investitor-korisnik: Kuća Legata
•Izvođač radova: Izolinvest d.o.o.
•Odgovorni projektant: Mirjana Gruber, d.i.a.
•Nadzor: Aleksandra Naumović, d.i.g.
•Odgovorni izvođač: Momčilo Cicvarić, d.i.g.
•Rukovodilac gradilišta: Verica Paraušić, arh.teh.
•Mapei koordinator: Vladimir Dimitrijević, d.i.g.
•Distributer: UC Partizan
Manastir Visoki Dečani
•Vreme izvođenja radova: 2010. 2013. godine̶
•Investitor: Manastir Visoki Dečani
•Površina: 3.200 m2
•Autor projekta: Petar Vidov Đurašković, d.i.a. i VMS
d.o.o. Beograd
•Projekat enterijera: Pavle Vasev, d.i.a.
•Izvođač radova: Permont d.o.o. Beograd
•Mapei koordinator: Nebojša Janić
Manastir Hilandar
•Vreme izvođenja radova: 2005. 2014. godina (radovi na̶
obnovi još traju)
•Investitor: Zadužbina manastira Hilandara, Beograd,
Srbija
•Koordinator: Milivoj Ranđić, direktor Zadužbine manastira
Hilandara
•Konzervatorski nadzor: Kedak Centar za zaštitu̶
svetogorskog nasleđa, Solun, Grčka
•Mapei koordinatori: Vladimir Dimitrijević, d.i.g., Melanija
Pavlović, d.i.a. i Nebojša Janić
•Distibuter: UC Partizan
•Informatičko tehnološki park „IT Park“ – InđijaVreme izvođenja radova: 2012. – 2013. godine
•Faza: I.1 poslovni objekat tipa B
•Investitor: Embassy Technozones d.o.o., Beograd
•Projektant: Arhi.pro d.o.o., Beograd
•Autori projekta: Ivana Anja Milić, d.i.a., Dejan Sokolov, d.i.a., Miloš Petrović, d.i.a.
•Generalni izvođač radova: Gemax d.o.o., Beograd
•Izvođač radova sistema hidroizolacije slaganog ravnog krova: Tim Sistem Plus d.o.o., Beograd
•Mapei koordinator: Melanija Pavlović, d.i.a.
IT Park Inđija
Most na Adi
•Vreme izvođenje radova: 2008. 2011. godine̶
•Investitor: Direkcija za građevinsko zemljište i izgradnju
Beograda
•Projekat: Pointing (Viktor Markelj, d.i.g, Marjan
Pipenbaher, d.i.g, prof. dr Peter Gabrijelčič, d.i.a.)
Nadzor: Lois Berger Group
•Izvođač: konzorcijum Porr-SCT DSD̶
•Izvođač opisanih radova: Slovenija Ceste Tehnika d.d.
•Prethodne probe betona:
•Predstavnici IMS-a: mr Dragan Bojović, d.i.g, mr Dragan
Nikolić, d.i.g.
•Ruk. laboratorije za beton Ici kom-a: Lazar Janković,
d.i.g.
•Predstavnici nadzora: Ljiljana Ćalić, d.i.g.
•Predstavnici izvođača: Andrija Čamber, d.i.g., Miha
Schiro
•Mapei koordinator: Vladimir Dimitrijević, d.i.g.
•Distributer: UC Partizan
Most kod Beške
•Vreme izvođenja radova: 2012. 2014. godine̶
•Investitor: JP Putevi Srbije
•Izvođač opsanih radova rekonstrukcije:
Mostogradnja a.d.
•Odgovorni izvođač radova: Predrag Živković, d.i.g.
•Rukovodilac Laboratorije za nemetale: Dragan
Radisavljević, građ.teh.
•Mapei koordinator: Vladimir Dimitrijević, d.i.g.,
Nebojša Janić
•Distibuter: UC Partizan
Zlatiborac
•Vreme izvođenja radova: 2007. 2014. godine̶
•Investitor: Zlatiborac d.o.o.
•Glavni izvođač: Zlatiborac d.o.o.
•Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša
Janić
Postojenje za preradu vode za piće
Makiš 2 •Vreme izvođenja radova: 2011. godina
•Investitor: JKP Beogradski vodovod i kanalizacija
•Izvođač opisanih radova: Kamenolomi d.o.o.
•Odgovorni izvođač: Bojan Radojković, d.i.g.
•Rukovodilac opisanih radova: Vlado Ilić
•Rukovodilac nadzora: Nenad Jokić, d.i.g.
•Mapei koordinatori: Vladimir Dimitrijević, d.i.g.,
Nebojša Janić
• Distributer: UC Partizan
Belville, stambeno poslovni kompleks
•Vreme izvođenja radova: 2007. 2009. godine̶
•Investitor: Delta Real Estate Beograd i Hypo Alpe
Adria Group Beograd
•Autor projekta: Milutin Gec, d.i.a.
•Projekat: Mašinoprojekt Kopring AD Beograd
•Izvođač radova: Delta Invest d.o.o.
•Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša
Janić
•Distibuter: UC Partizan, BWC
Naselje „Stepa Stepanović“
•Vreme izvođenja radova: 2010. 2013. godine̶
•Investitor: Građevinska direkcija Srbije
•Projekat: Saobraćajni institut CIP i arhitektonski biro
ZAP
•Izvođači opisanih radova: Grating BK, Novi
Hidrobeton, PMC Inženjering, KOTO, Izolacija AD
•Mapei koordinatori: Melanija Pavlović, d.i.a., Vladimir
Dimitrijević, d.i.g., Nebojša Janić
•Distibuter: UC Partizan
Sportsko rekreativni poslovni centar –
Milan Gale Muškatirović
•Investitor: Gradska opština Stari Grad
•Vreme izgradnje: 2011. godina
•Projekat: Mašinoprojekt Kopring Ad
•Autor projekta: akademik prof. Ivan Antić, d.i.a.
•Izvođač radova: Ratko Mitrović, Dedinje
•Mapei koordinatori: Nenad Cvetković, d.i.g., Vladimir Dimitrijević,
d.i.g., Nebojša Janić
•Distibuter: Botomex
®®
REŠENJA ZA HIDROIZOLACIJEREŠENJA ZA HIDROIZOLACIJE
Melanija Pavlović,dipl.ing.arh.
Vladimir Dimitrijević, dipl.ing.građ.
HVALA NA PAŽNJI!
Melanija Pavlović,d.i.a.
SVET MAPEIJA
U SRBIJI
PORTFOLIO
REFERENCI
Vinarija Cilić
23.12.2014.

More Related Content

Featured

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
SpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Lily Ray
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
Rajiv Jayarajah, MAppComm, ACC
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
Christy Abraham Joy
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
Vit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
MindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
GetSmarter
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
Alireza Esmikhani
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
Project for Public Spaces & National Center for Biking and Walking
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
Erica Santiago
 

Featured (20)

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 

Mapei portfolio referenci 23.12.2014.

  • 1. ®® REŠENJA ZA HIDROIZOLACIJEREŠENJA ZA HIDROIZOLACIJE Melanija Pavlović,dipl.ing.arh. Vladimir Dimitrijević, dipl.ing.građ. 23.12.2014. SVET MAPEIJA U SRBIJI PORTFOLIO REFERENCI Melanija Pavlović,d.i.a.
  • 2. Mapei - Građevinski lepkovi - Hidroizolacioni sistemi - Hemijski proizvodi za građevinarstvo
  • 3.
  • 4. Mapei je osnovao Rodolfo Squinzi 1937. godine u Milanu Kompanija je pre dve godine proslavila 75 godina postojanja Istorija
  • 5. Mapei SRB d.o.o. 2013.godina
  • 8. Sertifikacija i briga o zaštiti životne sredine Mapei investira 5% od godišnjeg profita u R&D
  • 9. ®® REŠENJA ZA HIDROIZOLACIJEREŠENJA ZA HIDROIZOLACIJE Melanija Pavlović,dipl.ing.arh. Vladimir Dimitrijević, dipl.ing.građ. SVET MAPEIJA U SRBIJI PORTFOLIO REFERENCI
  • 10. Hotel Splendid, Bečići •Vreme izvođenja radova: 2002. 2006. godine̶ •Investitor: Montenegro Stars Hotel Group •Projektant: Zoran Đorđević •Izvođač radova: Tradeunique SC, d.o.o. •Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša Janić
  • 11. Delta City •Vreme izvođenja radova: 2007. godina •Investitor: Delta City d.o.o. Beograd •Izvođač radova: Gradina d.o.o. Beograd, Deneza M d.o.o. Beograd •Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša Janić •Distibuter: Botomex, BWC
  • 12. Airport City Belgrade •Vreme izvođenja radova: 2007. 2008. godine̶ •Investitor: Airport City Belgrade (ACB) •Površina: 185.000 m² •Glavni izvođač: Mercury Engineering d.o.o. •Podizvođači: Mir inženjering d.o.o., Tik karpet, Demex-St d.o.o. (za opisane radove) •Mapei koordinatori: Nenad Cvetković, d.i.g., Vladimir Dimitrijević, d.i.g., Nebojša Janić • Distibuter: BWC, UC Partizan
  • 13. Hotel Excelzior •Vreme izvođenja radova: 2009. 2013. godine̶ •Investitor: Hotel Excelzior •Izvođač radova rekonstrukcije: Permont d.o.o. •Direktor projekta rekonstrukcije: Nenad Zoranović, dipl.ing.maš. •Izvođač radova nadogradnje: Global Kod d.o.o. •Direktor projekta nadogradnje: Nenad Gavrilović, d.i.g. •Mapei koordinatori: Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distibuter: UC Partizan
  • 14. Merkator Centar •Vreme izvođenja radova: maj septembar 2012.̶ godine •Investitor: Mercator – S d.o.o. Novi Sad •Projekat rekonstrukcije: Mercator – Optima inženjering, Nives Dobrojević, univ.dipl.inž.arh. •Direktor projekta: Mateja Špan, u.d.i.a. •Izvođač radova: Energogroup d.o.o., Beograd •Mapei kooridinatori: Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distributer: UC Partizan
  • 15. Hotel Crowne Plaza •Vreme izvođenja radova: 2013. godina •Investitor: Delta Holding, Hotel Crowne Plaza, Beograd •Autor projekta, dizajn enterijera: Imagination studio, London U.K. Carlos Virgile, Ewald Damen •Projektant: Mašinoprojekt Kopring AD Beograd •Odgovorni projektant: Nataša Milojević, d.i.a. •Generalni izvođač radova: Exing d.o.o., Beograd •Izvođač radova sanacije betonskih površina fasade: Sigma projekt d.o.o. •Rukovodioci radova sanacije betonskih površina fasade: Zoran Filipović, d.i.g. i Jugoslav Kecman, i.g. Izvođač radova na hidroizolaciji bazena: Lever inženjering d.o.o. •Rukovodioci radova na hidroizolaciji bazena: Nataša Stepanović, d.i.g. i Krsto Medigović, d.i.g. Izvođač radova na izravnjavanju podova: Beton Com d.o.o. •Rukovodioci radova na izravnavanju podova: Slobodan Šošic, i.g. i Andrija Andrić, i.g. Mapei koordinatori: Vladimir Dimitrijević, d.i.g., Melanija Pavlović, d.i.a., Nebojša Janić •Distibuter: UC Partizan
  • 16. Hotel Falkensteiner, Stara Planina •Vreme izvođenja radova: 2010-2011. godine •Investitor: Javno preduzeće Stara Planina •Autor projekta: Miroslav Stefanović, d.i.a. •Projekat: Mašinoprojekt Kopring AD •Izvođač radova: Deneza M Inženjering •Mapei koordinatori: Melanija Pavlović, d.i.a., Nebojša Janić •Distibuter: UC Partizan
  • 17. Pravni fakultet •Vreme izvođenja radova: 2008. godina •Investitor: Univerzitet u Beogradu •Projektant: Mega Plus, Beograd •Izvođač radova: Alping d.o.o., Beograd •Mapei koordinator: Nebojša Janić
  • 18. Vrhovni kasacioni sud •Vreme izvođenja radova: 2006. 2009. godine̶ •Investitor: Uprava za zajedničke poslove Republike Srbije •Projekat rekonstrukcije: Mašinoprojekt Kopring AD •Odgovorni projektant: Marija Gec, d.i.a. •Glavni izvođač: Ratko Mitrović Dedinje d.o.o. •Odgovorni izvođač: Goran Mitić, d.i.a. •Mapei kordinatori: Nenad Cvetković, d.i.g., Nebojša Janić •Distibuter: BWC
  • 19. Avalski toranj •Investitor: Republička direkcija za imovinu Republike Srbije, Radio Televizija Srbije •Vreme izgradnje: 2008. 2009. godine̶ •Projekat: Saobraćajni institut CIP, Beograd •Prethodne probe betona: dr Ksenija Janković, d.i.g., Dragan Bojović, d.i.g. (Institut IMS) •Izvođač radova: Ratko Mitrović Dedinje d.o.o.̶ Beograd •Odgovorni izvođač radova: Goran Milovanović, d.i.g •Rukovodilac gradilišta: Mirko Popović, d.i.g. •Rukovodilac Laboratorije za beton: Dušanka Tanasković, dipl.ing.tehnologije •Mapei koordinatori: Nenad Cvetković, d.i.g, Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distibuter: BWC
  • 20. Fontana ispred Palate Srbija •Vreme izvođenja radova: 2011. godina •Investitor: Uprava za zajedničke poslove •Rukovodilac projekta: Hranislav Milosavljević •Izvođač radova: GP Morava In d.o.o. •Nadzor: Saobraćajni institut CIP •Mapei koordinatori: Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distibuter: BWC
  • 21. Legat Petra Lubarde •Vreme izvođenja radova: 2012. godina •Investitor-korisnik: Kuća Legata •Izvođač radova: Izolinvest d.o.o. •Odgovorni projektant: Mirjana Gruber, d.i.a. •Nadzor: Aleksandra Naumović, d.i.g. •Odgovorni izvođač: Momčilo Cicvarić, d.i.g. •Rukovodilac gradilišta: Verica Paraušić, arh.teh. •Mapei koordinator: Vladimir Dimitrijević, d.i.g. •Distributer: UC Partizan
  • 22. Manastir Visoki Dečani •Vreme izvođenja radova: 2010. 2013. godine̶ •Investitor: Manastir Visoki Dečani •Površina: 3.200 m2 •Autor projekta: Petar Vidov Đurašković, d.i.a. i VMS d.o.o. Beograd •Projekat enterijera: Pavle Vasev, d.i.a. •Izvođač radova: Permont d.o.o. Beograd •Mapei koordinator: Nebojša Janić
  • 23. Manastir Hilandar •Vreme izvođenja radova: 2005. 2014. godina (radovi na̶ obnovi još traju) •Investitor: Zadužbina manastira Hilandara, Beograd, Srbija •Koordinator: Milivoj Ranđić, direktor Zadužbine manastira Hilandara •Konzervatorski nadzor: Kedak Centar za zaštitu̶ svetogorskog nasleđa, Solun, Grčka •Mapei koordinatori: Vladimir Dimitrijević, d.i.g., Melanija Pavlović, d.i.a. i Nebojša Janić •Distibuter: UC Partizan
  • 24. •Informatičko tehnološki park „IT Park“ – InđijaVreme izvođenja radova: 2012. – 2013. godine •Faza: I.1 poslovni objekat tipa B •Investitor: Embassy Technozones d.o.o., Beograd •Projektant: Arhi.pro d.o.o., Beograd •Autori projekta: Ivana Anja Milić, d.i.a., Dejan Sokolov, d.i.a., Miloš Petrović, d.i.a. •Generalni izvođač radova: Gemax d.o.o., Beograd •Izvođač radova sistema hidroizolacije slaganog ravnog krova: Tim Sistem Plus d.o.o., Beograd •Mapei koordinator: Melanija Pavlović, d.i.a. IT Park Inđija
  • 25. Most na Adi •Vreme izvođenje radova: 2008. 2011. godine̶ •Investitor: Direkcija za građevinsko zemljište i izgradnju Beograda •Projekat: Pointing (Viktor Markelj, d.i.g, Marjan Pipenbaher, d.i.g, prof. dr Peter Gabrijelčič, d.i.a.) Nadzor: Lois Berger Group •Izvođač: konzorcijum Porr-SCT DSD̶ •Izvođač opisanih radova: Slovenija Ceste Tehnika d.d. •Prethodne probe betona: •Predstavnici IMS-a: mr Dragan Bojović, d.i.g, mr Dragan Nikolić, d.i.g. •Ruk. laboratorije za beton Ici kom-a: Lazar Janković, d.i.g. •Predstavnici nadzora: Ljiljana Ćalić, d.i.g. •Predstavnici izvođača: Andrija Čamber, d.i.g., Miha Schiro •Mapei koordinator: Vladimir Dimitrijević, d.i.g. •Distributer: UC Partizan
  • 26. Most kod Beške •Vreme izvođenja radova: 2012. 2014. godine̶ •Investitor: JP Putevi Srbije •Izvođač opsanih radova rekonstrukcije: Mostogradnja a.d. •Odgovorni izvođač radova: Predrag Živković, d.i.g. •Rukovodilac Laboratorije za nemetale: Dragan Radisavljević, građ.teh. •Mapei koordinator: Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distibuter: UC Partizan
  • 27. Zlatiborac •Vreme izvođenja radova: 2007. 2014. godine̶ •Investitor: Zlatiborac d.o.o. •Glavni izvođač: Zlatiborac d.o.o. •Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša Janić
  • 28. Postojenje za preradu vode za piće Makiš 2 •Vreme izvođenja radova: 2011. godina •Investitor: JKP Beogradski vodovod i kanalizacija •Izvođač opisanih radova: Kamenolomi d.o.o. •Odgovorni izvođač: Bojan Radojković, d.i.g. •Rukovodilac opisanih radova: Vlado Ilić •Rukovodilac nadzora: Nenad Jokić, d.i.g. •Mapei koordinatori: Vladimir Dimitrijević, d.i.g., Nebojša Janić • Distributer: UC Partizan
  • 29. Belville, stambeno poslovni kompleks •Vreme izvođenja radova: 2007. 2009. godine̶ •Investitor: Delta Real Estate Beograd i Hypo Alpe Adria Group Beograd •Autor projekta: Milutin Gec, d.i.a. •Projekat: Mašinoprojekt Kopring AD Beograd •Izvođač radova: Delta Invest d.o.o. •Mapei koordinatori: Nenad Cvetković, d.i.g., Nebojša Janić •Distibuter: UC Partizan, BWC
  • 30. Naselje „Stepa Stepanović“ •Vreme izvođenja radova: 2010. 2013. godine̶ •Investitor: Građevinska direkcija Srbije •Projekat: Saobraćajni institut CIP i arhitektonski biro ZAP •Izvođači opisanih radova: Grating BK, Novi Hidrobeton, PMC Inženjering, KOTO, Izolacija AD •Mapei koordinatori: Melanija Pavlović, d.i.a., Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distibuter: UC Partizan
  • 31. Sportsko rekreativni poslovni centar – Milan Gale Muškatirović •Investitor: Gradska opština Stari Grad •Vreme izgradnje: 2011. godina •Projekat: Mašinoprojekt Kopring Ad •Autor projekta: akademik prof. Ivan Antić, d.i.a. •Izvođač radova: Ratko Mitrović, Dedinje •Mapei koordinatori: Nenad Cvetković, d.i.g., Vladimir Dimitrijević, d.i.g., Nebojša Janić •Distibuter: Botomex
  • 32. ®® REŠENJA ZA HIDROIZOLACIJEREŠENJA ZA HIDROIZOLACIJE Melanija Pavlović,dipl.ing.arh. Vladimir Dimitrijević, dipl.ing.građ. HVALA NA PAŽNJI! Melanija Pavlović,d.i.a. SVET MAPEIJA U SRBIJI PORTFOLIO REFERENCI Vinarija Cilić 23.12.2014.