BAPETCO Fields HSE Manager
Mahmoud Fathy EL Bahnsy
B.Sc.& M.Sc. in Elec. Engineering
NEBOSH Certified, Master log Certificate No. I01147
OHSAS 18001, ISO14001 Lead Auditor
Date of Birth: 22-4-1973
Mobile: +20121038948
Tel. +2 050-2325570, 2313494
Email : mbahnsy@gmail.com
15 Ahmed Khalifa St., El Derasat street, Mansoura, Egypt
Objective
Seeking an opportunity to explore my career paths develops, applies my engineering and management
skills.
Experience 2013 – Now Badr Petroleum Co. (BAPETCO), Joint Venture between EGPC and Shell.
BAPETCO Fields HSE Manager
Working as BAPETCO Fields HSE Manager (Bed-1, Bed-3, Obaiyed , ASEW, & NEAG1). As well as, BAPETCO
New Project (Assil & Karam Carbon Dioxide Removal Plant) HSE Manager. The Project completed with 5 million
Hours without LTI , the project costs $ 900 million. Workings with BAPETCO Management to achieve GOAL
ZERO "Safety is the highest priority" and aspire to safely produce 120,000 boepd in 2014 and sustain into 2015-
2016, with the following responsibilities:
 Ensure adherence to company HSE Policies, rules, regulations and procedures. As well as, enforce the
implementation of the BAPETCO HSE-MS and also promote awareness of its use among all divisions and
departments personnel in all fields.
 Ensure continuous improvement of Road Safety through the Road safety campaign, establish Road Safety
Monitoring team at other locations after the successful pilot at BED-3, posters , videos, In Vehicle Monitoring
System " IVMS" spot check and rewarding system (driver merit system)
 Implement on-line tracking system for more control on the road transportation and driver behavior as a pilot for
10 vehicles “cover all sites and main office”.
 Participate in preparation of corporate HSE plan, Millstone and scorecard
 Team leader deputy for Lean Project applied on the BAPETCO Consequence Management System. This project
received immediate and unquestionable approval for this Lean CI project. The project team was recognized
immediately as both a strong contribution to BAPETCO and a shining example of universal Lean rigor. As
such, this project is being shared among the Shell Upstream CI leadership.
 Ensure company staff and contractor compliance with Life Saving Rules "LSR" and Journey Management five
keys control through clear HSE clause in the contract, training, and coaching. For noncompliance ensure strictly
application of consequence management to enforce the compliance.
 Establish, implement and maintain a new project called HSE Competence Framework " competency ladder" for
all HSE engineers (as a pilot) to support career Development and for being a qualified professional HSE
Advisor.
 Establish, implement and maintain a new process called Safe Work Place Process "SWPP" and Safe System Of
Work "SSOW" to ensure that all activities will be safely and efficient execution.
 Establish, implement and maintain a new auditing program to confirm the proper implementation of SWPP
called Safety Leadership Visit "SLV". Joint the Top management (MD's) to carry out SLV to set an example for
the other management, senior supervisors and supervisor.
 Follow up with all fields the progress of the HSE plan and other tasks and targets.
 Establish, implement and maintain a new HSE position (Well service HSE Eng.) to follow up and control all
well service activities. Ensure implement of SWPP, SSOW, Permit To Work "PTW", Task Risk Assessment
"TRA", Toll Box Talk "TBT" and compliance with LSR and Five Keys control.
 Ensure the execution of the training plan for each field and this plan is cover the critical subject in the current
year (e.g. Line of fire, SWPP, SSOW, TRA, TBT, ..etc)
 Participate in establishment, implement maintain BAPETCO operation HSE Case. As well as, filed HSE case
(BED-3 & AESW)
 Ensure the readiness of emergency preparedness ( emergency and contingency plan " drills" , emergency
response team, firefighting facilities , fire and gas detection system, ESD system)
 BAPETCO internal auditing.
 Ensure all audit "internal / external" recommendations / actions are tracked and closed.
 Encourage Team Work spirit by setting an example.
2010 – 2013 Badr Petroleum Co. (BAPETCO), Joint Venture between EGPC and Shell.
BED-3 HSE Manager
 Ensure adherence to company HSE Policies, rules, regulations and procedures. As well as, enforce the
implementation of the BAPETCO HSE-MS and also promote awareness of its use among all divisions and
departments personnel in BED-3.
 Establish a new Road Safety Monitoring Team "RSMT" to control vehicle movements and improve road safety
in BED-3
 Install IVMS in all BED-3 vehicles.
 Participating in HAZID and HAZOP studies for ASW field and NEAG 1
 Review the weekly spot check of the IVMS and discuss with filed manager to improve our drivers behavior
 Ensure regular HSE campaigns (LSR, LOF, Road Safety, etc.) are successfully done and the key messages are
clear and easy to understand by the target audience.
 Ensure continuous rigorous improvement of the HSE culture of the company and contractor staff through a
comprehensive HSE training program (Hearts & Minds, contractor safety, work place safety, etc.)
 High Potential Incident Investigation
 Establish Learning form incident program to maximize the benefit from the incident leaning points.
 Ensure all incident recommendations/actions are tracked and closed to prevent reoccurrence.
 Ensure the implementation of HSE plan in BED-3
 Ensure the internal / external audit " ISO 18001, ISO 14001& Shell" recommendations / action are tracked and
closed
 HSE staff competency development program (engineers and technician)
 Ensure the emergency drills plan is executed as planed and their recommendations / actions are tracked and
closed
 Ensure the training plan for the emergency response team and back up team is successfully executed.
 Ensure the emergency container is full with the recommended list and the missing items ordered in SAP and
focal point to follow up was assigned.
 Review the budget to confirm the efficient utilization
 BAPETCO coach , Coaching the HSE staff " engineers and technicians"
 Participate in establishment, implement and maintain bed-3 technical staff (engineers& tech “ operation, lab,
maintenance, HSE & Technical Integrity” ) competency program. This program contains Process / operation,
maintenance and HSE topics.
 Participate in establishment, implement and maintain BAPETCO operation HSE BED-3 Case
2003 – 2010 Badr Petroleum Co. (BAPETCO), Joint Venture between EGPC and Shell.
BED-3 HSE Advisor
Working as HSE advisor in all company fields (Bed-1, Bed-3, Obaiyed , ASEW, & NEAG1) with the
following responsibilities:
 Actively encourage staff to report all Near Misses / Unsafe Acts/ Conditions.
 Participate in incidents investigation, analysis and track the recommendations and corrective actions
 Participate in implementing and documenting HSE cases.
 Participating in HAZID and HAZOP studies for BED-3 Pre-compression Phase I & II
 Providing HSE training (Theoretical fire fighting, Working at height, Scaffolding, Confined space, Hazardous
Area Classifications, HAZOP, HAZID, Crane Operation Safety, Elec. Safety, H2S Awareness, safe handling of
hazardous material, SSOW, SWPP, TRA, TBT, PTW, LOF,.., etc.) for company & Contractors staff.
 Providing Hearts and Minds training for company & Contractors staff
 Participating in Risk Assessment Studies.
 OHSAS 18001, ISO14001 Lead Auditor
 Track and issue Progress Reports of Corporate HSE plan & Statistical data.
 Audit Journey Management System and inspect vehicles in accordance with company specifications.
 Identify and communicate personal protective equipment (PPE) requirements and train the employees to ensure
that the PPE requirements are properly implemented and enforced.
 Conduct training courses in the use and operation of PPE.
 Carry out Unsafe Act/Condition Auditing (UAA) and PTW audit.
 Control the provision of a safe and hygienic work environment for all company and contractors’ employees.
 Ensure all relevant staff is competent to use PTW system and the supporting certificates
(Mechanical/process/electrical/safety system isolation certificates, confined space entry certificate, etc…)
 Carrying out regular facilities inspection, generate the deficiencies report and follow up the remedial work plan.
 Participate in HSE-MS self assessment.
 Ensure the implementation of Emergency Exercise program.
 Together with contract holders, audit the contractors HSE-MS and the effectiveness of the implementation of it.
 Organize HSE case training for senior staff.
 Together with Egyptian Atomic Energy Authority (EAEA) representative, carry out (NORM) surveys in
company assets.
 Ensure all firefighting equipment is maintained properly and ready for use.
 Internal and External Auditing (ISO14001 – OHSAS18001)
 Coordinate and assist HSE Self Audit assisting and reporting
 Follow up of audit reports – action plans etc
 Conduct site inspection and HSE audits on regular basis
 Follow up of environmental aspect programs and Waste Management
 Ensure the availability of firefighting equipment spare parts, tools and review stock levels to keep the
maintenance plan effective.
 CMMS (SAP) User.
 Preparing yearly pre-issued copy for staff's task and target.
 Following up, training new engineers and technicians to be assured that they cover their task& target plan on
planned time
 Participate in HSE meetings with relevant Contractors; track action items until completion.
 Contribute with the contract holders in conducting HSE capability assessment of contractors.
 Preparing the HSE. Dept. budget
2000- 2003 Badr Petroleum company
SeniorElec. Engineer
 In hand experience with repairing , maintenance, testing and overhauling Electrical motors , generators ( Solar
turbine generator 6.6KV type Kato ) & transformers
 In hand experience with repairing , maintenance and testing Protection system, using protective relays testing
equipment Type Megger , Model 8430
 In hand experience with repairing , maintenance and overhauling Diesel engine & gas engine generators ( CAT,
e.g. : 3304,3306, 3408 & 3412)
 In hand experience with Electrical installation in hazard area
 In hand experience with repairing and maintenance Variable Speed Drive
 In hand experience with repairing and maintenance Load Management Panel (PLC controller)
 In hand experience with repairing , maintenance and testing L. V. Switch gear ( AEG / ABB)
 In hand experience with repairing , maintenance and testing 6.6 KV Switch gear (SF6-Merlin Gerin)
 In hand experience with maintenance and repairing Bed-3 gas & oil plant electrical equipments (pipe line
compressor, Thomassen compressors, export pump, hot oil pump, glycol pumps, all other Elec. pumps,…etc. )
 In hand experience with maintenance and repairing Battery charger & U.P.S.
 In hand experience with maintenance and repairing Oil & gas wells control panel.
 CMMS (Immpower) user
1998 - 2000 Badr Petroleum company
Elec. Engineer
 Carried out all elec. routine maintenance activities ( weekly , monthly , 3 monthly , 6 monthly , yearly PM ‘s
and overhaul)
1997 - 1998 Faculty of Engineering , Mansoura University
SearcherAssistantinElectrical Dept.
 Teaching many subjects such as Elec. Circuits , Power System Protection, Network analysis and S.C
calculations
Education Highest University Degree
University
Faculty
Year
First University Degree
University
Faculty
Graduation Year
Major
Last year grade
Graduation project
Grade
M.Sc
Elec. Engineering
Mansoura University
Engineering
2003
B.Sc. Engineering
Mansoura University
Engineering
1996
Electrical Engineering
Excellent ( RANKED 3rd
)
Earthing systems at huge building ( Hospitals )
Excellent
Publication
s
- F.M. Youssef, S. A/Kader & M. EL Bahnsy " Application ANN to numerical field calculation
methods for an accurate simulation, as well as, field optimization of electrode systems." Middle East
Power system Conference " MEPCON" CAIRO University, Egypt, 2002
- M. EL Bahnsy " ANN approach to accurate elec. Field calculation and interactive electrode
optimization." M.Sc Thesis. Marsh, 2003
- F.M. Youssef , S. A/Kader & M. EL Bahnsy" Application ANN to numerical field calculation
methods for an accurate simulation, as well as, field optimization of electrode systems." The XIIIth
International Symposium on High Voltage Engineering, Delft, the Netherlands, August 25-29 ,
2003
Military
service Completed : 1996-1997
Training
Training
 Talkha elec. power station (1991-1995) during education
 PLC course (MERIT Center)
 Trubotronic 2.0 field maintenance course " PLC" ( solar international )
 Bearing technology ( SKF training center )
 S.C calculation course ( Cairo university training center )
 H.V course (Petromaint & Alex. University H.V training center)
 Elec. Installations in Hazard areas (STAHL)
 Power system protection (Electric Authority training center , Helwan)
 Variable Speed Drive course (ABB)
 U.P.S and Battery chargers ( Bapetco )
 Design and Sizing plant Elec. Equipments " Northern Alberta Institute of Technology (NAIT)
CANADA & International Education Center "
 Windows 98 - office 98 (ILC center)
 Safety courses (PTW, Safe Journey Plan, Incident reporting and investigation, HSE-MS
HEMP) , (Bapetco/ Shell)
 Root Causes Analysis (RCA) ( Shell)
 Defensive Driving Course (Petrosafe)
 HAZOP (Petrosafe / ENPPI)
 JHA work shop (Shell)
 Risk Assessment work Shop (Shell)
 Crude oil tanks Firefighting ( Oil & Gas Skills "OGS")
 Risk Analysis and Assessment (International Expertise Association "INTEX")
 OSHA Platinum
 OSHA Scaffold Competent Person
 OHSAS 18001, ISO14001 Lead Auditor (SGS)
 Attend & Participate in the XIIIth
International Symposium on High Voltage Engineering,
Delft, the Netherlands, August 25-29 ,2003
 Hearts and Minds train the trainer course (Shell – Dr. Robin),2007& 2008
 The National Examination Board in Occupational Safety and Health (NEBOSH):
International General Certificate in Occupational Safety and Health (awarded this
certificate on 15 Feb. 2007 with Credit). Master log Certificate No. I01147
 Emergency and Crises Management plan
 BAPETCO Top Management Development Program at American University in Cairo
Publication
s
- F.M. Youssef, S. A/Kader & M. EL Bahnsy " Application ANN to numerical field calculation
methods for an accurate simulation, as well as, field optimization of electrode systems." Middle East
Power system Conference " MEPCON" CAIRO University, Egypt, 2002
- M. EL Bahnsy " ANN approach to accurate elec. Field calculation and interactive electrode
optimization." M.Sc Thesis. Marsh, 2003
- F.M. Youssef , S. A/Kader & M. EL Bahnsy" Application ANN to numerical field calculation
methods for an accurate simulation, as well as, field optimization of electrode systems." The XIIIth
International Symposium on High Voltage Engineering, Delft, the Netherlands, August 25-29 ,
2003
Military
service Completed : 1996-1997
Training
Training
 Talkha elec. power station (1991-1995) during education
 PLC course (MERIT Center)
 Trubotronic 2.0 field maintenance course " PLC" ( solar international )
 Bearing technology ( SKF training center )
 S.C calculation course ( Cairo university training center )
 H.V course (Petromaint & Alex. University H.V training center)
 Elec. Installations in Hazard areas (STAHL)
 Power system protection (Electric Authority training center , Helwan)
 Variable Speed Drive course (ABB)
 U.P.S and Battery chargers ( Bapetco )
 Design and Sizing plant Elec. Equipments " Northern Alberta Institute of Technology (NAIT)
CANADA & International Education Center "
 Windows 98 - office 98 (ILC center)
 Safety courses (PTW, Safe Journey Plan, Incident reporting and investigation, HSE-MS
HEMP) , (Bapetco/ Shell)
 Root Causes Analysis (RCA) ( Shell)
 Defensive Driving Course (Petrosafe)
 HAZOP (Petrosafe / ENPPI)
 JHA work shop (Shell)
 Risk Assessment work Shop (Shell)
 Crude oil tanks Firefighting ( Oil & Gas Skills "OGS")
 Risk Analysis and Assessment (International Expertise Association "INTEX")
 OSHA Platinum
 OSHA Scaffold Competent Person
 OHSAS 18001, ISO14001 Lead Auditor (SGS)
 Attend & Participate in the XIIIth
International Symposium on High Voltage Engineering,
Delft, the Netherlands, August 25-29 ,2003
 Hearts and Minds train the trainer course (Shell – Dr. Robin),2007& 2008
 The National Examination Board in Occupational Safety and Health (NEBOSH):
International General Certificate in Occupational Safety and Health (awarded this
certificate on 15 Feb. 2007 with Credit). Master log Certificate No. I01147
 Emergency and Crises Management plan
 BAPETCO Top Management Development Program at American University in Cairo

Mahmoud El Bahnsy HSE Manager1

  • 1.
    BAPETCO Fields HSEManager Mahmoud Fathy EL Bahnsy B.Sc.& M.Sc. in Elec. Engineering NEBOSH Certified, Master log Certificate No. I01147 OHSAS 18001, ISO14001 Lead Auditor Date of Birth: 22-4-1973 Mobile: +20121038948 Tel. +2 050-2325570, 2313494 Email : mbahnsy@gmail.com 15 Ahmed Khalifa St., El Derasat street, Mansoura, Egypt Objective Seeking an opportunity to explore my career paths develops, applies my engineering and management skills. Experience 2013 – Now Badr Petroleum Co. (BAPETCO), Joint Venture between EGPC and Shell. BAPETCO Fields HSE Manager Working as BAPETCO Fields HSE Manager (Bed-1, Bed-3, Obaiyed , ASEW, & NEAG1). As well as, BAPETCO New Project (Assil & Karam Carbon Dioxide Removal Plant) HSE Manager. The Project completed with 5 million Hours without LTI , the project costs $ 900 million. Workings with BAPETCO Management to achieve GOAL ZERO "Safety is the highest priority" and aspire to safely produce 120,000 boepd in 2014 and sustain into 2015- 2016, with the following responsibilities:  Ensure adherence to company HSE Policies, rules, regulations and procedures. As well as, enforce the implementation of the BAPETCO HSE-MS and also promote awareness of its use among all divisions and departments personnel in all fields.  Ensure continuous improvement of Road Safety through the Road safety campaign, establish Road Safety Monitoring team at other locations after the successful pilot at BED-3, posters , videos, In Vehicle Monitoring System " IVMS" spot check and rewarding system (driver merit system)  Implement on-line tracking system for more control on the road transportation and driver behavior as a pilot for 10 vehicles “cover all sites and main office”.  Participate in preparation of corporate HSE plan, Millstone and scorecard  Team leader deputy for Lean Project applied on the BAPETCO Consequence Management System. This project received immediate and unquestionable approval for this Lean CI project. The project team was recognized immediately as both a strong contribution to BAPETCO and a shining example of universal Lean rigor. As such, this project is being shared among the Shell Upstream CI leadership.  Ensure company staff and contractor compliance with Life Saving Rules "LSR" and Journey Management five keys control through clear HSE clause in the contract, training, and coaching. For noncompliance ensure strictly application of consequence management to enforce the compliance.  Establish, implement and maintain a new project called HSE Competence Framework " competency ladder" for all HSE engineers (as a pilot) to support career Development and for being a qualified professional HSE Advisor.  Establish, implement and maintain a new process called Safe Work Place Process "SWPP" and Safe System Of Work "SSOW" to ensure that all activities will be safely and efficient execution.  Establish, implement and maintain a new auditing program to confirm the proper implementation of SWPP called Safety Leadership Visit "SLV". Joint the Top management (MD's) to carry out SLV to set an example for
  • 2.
    the other management,senior supervisors and supervisor.  Follow up with all fields the progress of the HSE plan and other tasks and targets.  Establish, implement and maintain a new HSE position (Well service HSE Eng.) to follow up and control all well service activities. Ensure implement of SWPP, SSOW, Permit To Work "PTW", Task Risk Assessment "TRA", Toll Box Talk "TBT" and compliance with LSR and Five Keys control.  Ensure the execution of the training plan for each field and this plan is cover the critical subject in the current year (e.g. Line of fire, SWPP, SSOW, TRA, TBT, ..etc)  Participate in establishment, implement maintain BAPETCO operation HSE Case. As well as, filed HSE case (BED-3 & AESW)  Ensure the readiness of emergency preparedness ( emergency and contingency plan " drills" , emergency response team, firefighting facilities , fire and gas detection system, ESD system)  BAPETCO internal auditing.  Ensure all audit "internal / external" recommendations / actions are tracked and closed.  Encourage Team Work spirit by setting an example. 2010 – 2013 Badr Petroleum Co. (BAPETCO), Joint Venture between EGPC and Shell. BED-3 HSE Manager  Ensure adherence to company HSE Policies, rules, regulations and procedures. As well as, enforce the implementation of the BAPETCO HSE-MS and also promote awareness of its use among all divisions and departments personnel in BED-3.  Establish a new Road Safety Monitoring Team "RSMT" to control vehicle movements and improve road safety in BED-3  Install IVMS in all BED-3 vehicles.  Participating in HAZID and HAZOP studies for ASW field and NEAG 1  Review the weekly spot check of the IVMS and discuss with filed manager to improve our drivers behavior  Ensure regular HSE campaigns (LSR, LOF, Road Safety, etc.) are successfully done and the key messages are clear and easy to understand by the target audience.  Ensure continuous rigorous improvement of the HSE culture of the company and contractor staff through a comprehensive HSE training program (Hearts & Minds, contractor safety, work place safety, etc.)  High Potential Incident Investigation  Establish Learning form incident program to maximize the benefit from the incident leaning points.  Ensure all incident recommendations/actions are tracked and closed to prevent reoccurrence.  Ensure the implementation of HSE plan in BED-3  Ensure the internal / external audit " ISO 18001, ISO 14001& Shell" recommendations / action are tracked and closed  HSE staff competency development program (engineers and technician)  Ensure the emergency drills plan is executed as planed and their recommendations / actions are tracked and closed  Ensure the training plan for the emergency response team and back up team is successfully executed.  Ensure the emergency container is full with the recommended list and the missing items ordered in SAP and focal point to follow up was assigned.  Review the budget to confirm the efficient utilization  BAPETCO coach , Coaching the HSE staff " engineers and technicians"  Participate in establishment, implement and maintain bed-3 technical staff (engineers& tech “ operation, lab,
  • 3.
    maintenance, HSE &Technical Integrity” ) competency program. This program contains Process / operation, maintenance and HSE topics.  Participate in establishment, implement and maintain BAPETCO operation HSE BED-3 Case 2003 – 2010 Badr Petroleum Co. (BAPETCO), Joint Venture between EGPC and Shell. BED-3 HSE Advisor Working as HSE advisor in all company fields (Bed-1, Bed-3, Obaiyed , ASEW, & NEAG1) with the following responsibilities:  Actively encourage staff to report all Near Misses / Unsafe Acts/ Conditions.  Participate in incidents investigation, analysis and track the recommendations and corrective actions  Participate in implementing and documenting HSE cases.  Participating in HAZID and HAZOP studies for BED-3 Pre-compression Phase I & II  Providing HSE training (Theoretical fire fighting, Working at height, Scaffolding, Confined space, Hazardous Area Classifications, HAZOP, HAZID, Crane Operation Safety, Elec. Safety, H2S Awareness, safe handling of hazardous material, SSOW, SWPP, TRA, TBT, PTW, LOF,.., etc.) for company & Contractors staff.  Providing Hearts and Minds training for company & Contractors staff  Participating in Risk Assessment Studies.  OHSAS 18001, ISO14001 Lead Auditor  Track and issue Progress Reports of Corporate HSE plan & Statistical data.  Audit Journey Management System and inspect vehicles in accordance with company specifications.  Identify and communicate personal protective equipment (PPE) requirements and train the employees to ensure that the PPE requirements are properly implemented and enforced.  Conduct training courses in the use and operation of PPE.  Carry out Unsafe Act/Condition Auditing (UAA) and PTW audit.  Control the provision of a safe and hygienic work environment for all company and contractors’ employees.  Ensure all relevant staff is competent to use PTW system and the supporting certificates (Mechanical/process/electrical/safety system isolation certificates, confined space entry certificate, etc…)  Carrying out regular facilities inspection, generate the deficiencies report and follow up the remedial work plan.  Participate in HSE-MS self assessment.  Ensure the implementation of Emergency Exercise program.  Together with contract holders, audit the contractors HSE-MS and the effectiveness of the implementation of it.  Organize HSE case training for senior staff.  Together with Egyptian Atomic Energy Authority (EAEA) representative, carry out (NORM) surveys in company assets.  Ensure all firefighting equipment is maintained properly and ready for use.  Internal and External Auditing (ISO14001 – OHSAS18001)  Coordinate and assist HSE Self Audit assisting and reporting  Follow up of audit reports – action plans etc  Conduct site inspection and HSE audits on regular basis  Follow up of environmental aspect programs and Waste Management  Ensure the availability of firefighting equipment spare parts, tools and review stock levels to keep the maintenance plan effective.  CMMS (SAP) User.  Preparing yearly pre-issued copy for staff's task and target.
  • 4.
     Following up,training new engineers and technicians to be assured that they cover their task& target plan on planned time  Participate in HSE meetings with relevant Contractors; track action items until completion.  Contribute with the contract holders in conducting HSE capability assessment of contractors.  Preparing the HSE. Dept. budget 2000- 2003 Badr Petroleum company SeniorElec. Engineer  In hand experience with repairing , maintenance, testing and overhauling Electrical motors , generators ( Solar turbine generator 6.6KV type Kato ) & transformers  In hand experience with repairing , maintenance and testing Protection system, using protective relays testing equipment Type Megger , Model 8430  In hand experience with repairing , maintenance and overhauling Diesel engine & gas engine generators ( CAT, e.g. : 3304,3306, 3408 & 3412)  In hand experience with Electrical installation in hazard area  In hand experience with repairing and maintenance Variable Speed Drive  In hand experience with repairing and maintenance Load Management Panel (PLC controller)  In hand experience with repairing , maintenance and testing L. V. Switch gear ( AEG / ABB)  In hand experience with repairing , maintenance and testing 6.6 KV Switch gear (SF6-Merlin Gerin)  In hand experience with maintenance and repairing Bed-3 gas & oil plant electrical equipments (pipe line compressor, Thomassen compressors, export pump, hot oil pump, glycol pumps, all other Elec. pumps,…etc. )  In hand experience with maintenance and repairing Battery charger & U.P.S.  In hand experience with maintenance and repairing Oil & gas wells control panel.  CMMS (Immpower) user 1998 - 2000 Badr Petroleum company Elec. Engineer  Carried out all elec. routine maintenance activities ( weekly , monthly , 3 monthly , 6 monthly , yearly PM ‘s and overhaul) 1997 - 1998 Faculty of Engineering , Mansoura University SearcherAssistantinElectrical Dept.  Teaching many subjects such as Elec. Circuits , Power System Protection, Network analysis and S.C calculations Education Highest University Degree University Faculty Year First University Degree University Faculty Graduation Year Major Last year grade Graduation project Grade M.Sc Elec. Engineering Mansoura University Engineering 2003 B.Sc. Engineering Mansoura University Engineering 1996 Electrical Engineering Excellent ( RANKED 3rd ) Earthing systems at huge building ( Hospitals ) Excellent
  • 5.
    Publication s - F.M. Youssef,S. A/Kader & M. EL Bahnsy " Application ANN to numerical field calculation methods for an accurate simulation, as well as, field optimization of electrode systems." Middle East Power system Conference " MEPCON" CAIRO University, Egypt, 2002 - M. EL Bahnsy " ANN approach to accurate elec. Field calculation and interactive electrode optimization." M.Sc Thesis. Marsh, 2003 - F.M. Youssef , S. A/Kader & M. EL Bahnsy" Application ANN to numerical field calculation methods for an accurate simulation, as well as, field optimization of electrode systems." The XIIIth International Symposium on High Voltage Engineering, Delft, the Netherlands, August 25-29 , 2003 Military service Completed : 1996-1997 Training Training  Talkha elec. power station (1991-1995) during education  PLC course (MERIT Center)  Trubotronic 2.0 field maintenance course " PLC" ( solar international )  Bearing technology ( SKF training center )  S.C calculation course ( Cairo university training center )  H.V course (Petromaint & Alex. University H.V training center)  Elec. Installations in Hazard areas (STAHL)  Power system protection (Electric Authority training center , Helwan)  Variable Speed Drive course (ABB)  U.P.S and Battery chargers ( Bapetco )  Design and Sizing plant Elec. Equipments " Northern Alberta Institute of Technology (NAIT) CANADA & International Education Center "  Windows 98 - office 98 (ILC center)  Safety courses (PTW, Safe Journey Plan, Incident reporting and investigation, HSE-MS HEMP) , (Bapetco/ Shell)  Root Causes Analysis (RCA) ( Shell)  Defensive Driving Course (Petrosafe)  HAZOP (Petrosafe / ENPPI)  JHA work shop (Shell)  Risk Assessment work Shop (Shell)  Crude oil tanks Firefighting ( Oil & Gas Skills "OGS")  Risk Analysis and Assessment (International Expertise Association "INTEX")  OSHA Platinum  OSHA Scaffold Competent Person  OHSAS 18001, ISO14001 Lead Auditor (SGS)  Attend & Participate in the XIIIth International Symposium on High Voltage Engineering, Delft, the Netherlands, August 25-29 ,2003  Hearts and Minds train the trainer course (Shell – Dr. Robin),2007& 2008  The National Examination Board in Occupational Safety and Health (NEBOSH): International General Certificate in Occupational Safety and Health (awarded this certificate on 15 Feb. 2007 with Credit). Master log Certificate No. I01147  Emergency and Crises Management plan  BAPETCO Top Management Development Program at American University in Cairo
  • 6.
    Publication s - F.M. Youssef,S. A/Kader & M. EL Bahnsy " Application ANN to numerical field calculation methods for an accurate simulation, as well as, field optimization of electrode systems." Middle East Power system Conference " MEPCON" CAIRO University, Egypt, 2002 - M. EL Bahnsy " ANN approach to accurate elec. Field calculation and interactive electrode optimization." M.Sc Thesis. Marsh, 2003 - F.M. Youssef , S. A/Kader & M. EL Bahnsy" Application ANN to numerical field calculation methods for an accurate simulation, as well as, field optimization of electrode systems." The XIIIth International Symposium on High Voltage Engineering, Delft, the Netherlands, August 25-29 , 2003 Military service Completed : 1996-1997 Training Training  Talkha elec. power station (1991-1995) during education  PLC course (MERIT Center)  Trubotronic 2.0 field maintenance course " PLC" ( solar international )  Bearing technology ( SKF training center )  S.C calculation course ( Cairo university training center )  H.V course (Petromaint & Alex. University H.V training center)  Elec. Installations in Hazard areas (STAHL)  Power system protection (Electric Authority training center , Helwan)  Variable Speed Drive course (ABB)  U.P.S and Battery chargers ( Bapetco )  Design and Sizing plant Elec. Equipments " Northern Alberta Institute of Technology (NAIT) CANADA & International Education Center "  Windows 98 - office 98 (ILC center)  Safety courses (PTW, Safe Journey Plan, Incident reporting and investigation, HSE-MS HEMP) , (Bapetco/ Shell)  Root Causes Analysis (RCA) ( Shell)  Defensive Driving Course (Petrosafe)  HAZOP (Petrosafe / ENPPI)  JHA work shop (Shell)  Risk Assessment work Shop (Shell)  Crude oil tanks Firefighting ( Oil & Gas Skills "OGS")  Risk Analysis and Assessment (International Expertise Association "INTEX")  OSHA Platinum  OSHA Scaffold Competent Person  OHSAS 18001, ISO14001 Lead Auditor (SGS)  Attend & Participate in the XIIIth International Symposium on High Voltage Engineering, Delft, the Netherlands, August 25-29 ,2003  Hearts and Minds train the trainer course (Shell – Dr. Robin),2007& 2008  The National Examination Board in Occupational Safety and Health (NEBOSH): International General Certificate in Occupational Safety and Health (awarded this certificate on 15 Feb. 2007 with Credit). Master log Certificate No. I01147  Emergency and Crises Management plan  BAPETCO Top Management Development Program at American University in Cairo