SlideShare a Scribd company logo
1 of 6
Download to read offline
MCC Technique
M&EENGINEERING LOGO
MCC Technique Sdn. Bhd. is
committed to providing complete customer
satisfaction, accompanying its
clients through every stage of
the M&E project covering HT,
MV and LV engineering works,
from planning,
installation and
commissioning through to op-
eration and continuous mainte-
nance.
MCC TECHNIQUE SDN.BHD
Tel. No.: +603 8076 811
Fax. No.: +603 8076 5268
MCC Technique Sdn. Bhd.
C-01-16, Jalan PPK 1
Pusat Perniagaan
Kinrara
Persiaran Kinrara Sek 3
Taman Kinrara
47100 PUCHONG
Selangor Darul Ehsan
Malaysia .
“ Keep asking stupid questions so
that you will learn… “
Philip Yong is the Executive Director of MCC
Technique Sdn Bhd . He have almost 17 years of
“ I just fired my barber for cutting my hair so short , I
missed my long hair , and now I look like a pure China man …” ,
this is the first sentences from Mr Yong when he first meet us in
the meeting room . This shows that Mr Yong was a very friendly
man and also like to make jokes…..For instance, “do you have a boy-
friend …”….
“Your capital lay-
out is high , in long
run you will gain , but ,
it must be a long term
thing…”
Longest duration to finish a project is around three years , but aver-
age normally is around six months . The biggest project he com-
Bandar Utama Office
Building 1
(8 First Avenue, Ban-
dar Utama)
Electrical HT & LV
Services,
Power Cabling Instal-
lation
& Earthing Installation.
2008-ongoing:
RM18,000,000.00
What services MCC Technique have ???
Electrical Power Installation :
 Electrical Power Switchgears Installation.
 Power/MICC/FR Cabling Works.
 Installation of Building/Compound/Street Lighting/
Power/Lighting Points Fixtures, Earthing and Light-
ning Protection Systems.
 Installation of Power Busbar Ducts.
Air conditioning— Mechanical Ventilation :
 Installation of Air Conditioning and Ducting System,
 Air Handling Units and Chilled Water Systems and
 Air Conditioning Starter Control Wiring Works.
Fire Protection System Installation :
 Installation of Hose Reel/Hydrant/Sprinkler/
Halogen Systems and Fire Alarm Activation System.
Uninterruptable Able Power
Supply & Power Engineering Solu-
tions :
 Installation of UPS, Surge Sup-
pressors, Voltage Stabilizers and
Power Line Conditioner
Get to know the work of M&E Engineering
M&E Engineering stands for Mechanical and Electric
Engineering. According to Mr Yong , mechanical is the
project of work that involved air conditional such as
installing air conditional , Air Handling Units , etc , and also
fire protection system , for instance , installing Hose Reel ,
Halogen System , etc. In addition , electrical have different
types which are high tension side , medium voltage , low
voltage and extra low voltage . Example of Switchboards
and Panels that used electrical low voltage are AMF
standby Generator Switchboard , air compressor panel ,
etc .
“ Electrical is very basic , doesn’t have extra innovation in it , no matter how you
innovated in , electrical is still electrical , can’t add anything else ….”
Projects that are successfully done
Casa Suria Condominium, Cheras, Kuala Lumpur
M&E Installations, Electrical Switchgears, Submains,
Power & Light points, MATV Cabling,
PA System & Telephone Cabling.
2007-ongoing: RM2,221,026.00
Kotra Pharma Malaysia Factory
Cheng Industrial Estate, Malacca
HT & LV, Telephone, LAN Infrastructure,
PA System, CCTV, E-Surveillance Security System,
Card Access System, Intercom
& Door Interlocking System.
Oct 08–ongoing : RM10,300,000.00
What is the biggest project you have ?
Did any accidents happen before during
working time ?
What is your hiring philosophy?
What is your strategy for your company ?
Well , is the Bandar Utama Office Building 1
(8 First Avenue, Bandar Utama) in 2008 , cost
RM18,000,000.00
A person that have certificate of degree or
above , professional and also is a project
management
No , we will always check the condition or
do safety precautions before working to
make sure the worker is in the safe .
Our strategy is , we make sure we devel-
op loyalty and we want the customer to
consider us when doing their next job .
“ Compete in every business is a must …”
Who is the main inspector of all the pro-
ject that you have?
The inspector of the work done is the
project manager .
During the interview day , unfortunately , I was absent due to personal problem . My group member have
recorded the interview in video . So , I get the information from the video that they had record .
Firstly , I would like to thank my lecture who was always a understanding . Then , I would like to
thanks my group member because they helped me a lot in my individual work .
Group member : Cassandra Wong ( leader )
Ronn Chua
Annisa
Alisha
Eelyn Cheong
In this interview , my group member interview our key person - Mr Yong , the Executive Director of
MCC Technique Sdn Bhd . During the interview he gave us a lot of extra knowledge , and all these in-
formation he gave is quite useful for us , as a Architecture student. Besides that , he told us the im-
portance of the ability to managing works .
In addition to that , studying M&E Engineering needs a lot of physics and also mathematics . Since
1996 ,Mr Yong involved in this field , so , we can saiy that Mr Yong was a very experience man .
In nut shell , what I learned from Mr Yong are the responsibilities of being an M&E Engineer to guide
and control the workers . Besides , we must able to face challenging in the work and also not to es-
cape from problems . Besides , we must placed the customer needs in first place before the profits when
gain , so that we can get the trust from customers and also to continued the good relationship between
the customer and the business man .
“Compete in business is a must…”, said Mr Yong .

More Related Content

Viewers also liked

Psychology Journal 2
Psychology Journal 2Psychology Journal 2
Psychology Journal 2Haziq1511
 
Economics assignment (Analysis of Two business)
Economics assignment (Analysis of Two business)Economics assignment (Analysis of Two business)
Economics assignment (Analysis of Two business)Haziq1511
 
Psychology Journal 1
Psychology Journal 1Psychology Journal 1
Psychology Journal 1Haziq1511
 
IBS - Business Plan
IBS - Business PlanIBS - Business Plan
IBS - Business PlanHaziq1511
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report AssignmentHaziq1511
 
Management Science Assignment
Management Science AssignmentManagement Science Assignment
Management Science AssignmentHaziq1511
 
Psychology Research Proposal
Psychology Research ProposalPsychology Research Proposal
Psychology Research ProposalHaziq1511
 
Ct 1 assignment
Ct 1 assignmentCt 1 assignment
Ct 1 assignmentJamesMoy7
 
English 2 Compare/Contrast Essay Assignment
English 2 Compare/Contrast Essay AssignmentEnglish 2 Compare/Contrast Essay Assignment
English 2 Compare/Contrast Essay AssignmentHaziq1511
 
Building Services
Building ServicesBuilding Services
Building ServicesTeck Wei
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2Haziq1511
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentHaziq1511
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...Haziq1511
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]Jannah Jailani
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group AssignmentHaziq1511
 
Building services-report
Building services-reportBuilding services-report
Building services-reportZIyeeTan
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Haziq1511
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)Chee Lee
 
Building services report
Building services report Building services report
Building services report Soh Shing
 

Viewers also liked (20)

Psychology Journal 2
Psychology Journal 2Psychology Journal 2
Psychology Journal 2
 
Economics assignment (Analysis of Two business)
Economics assignment (Analysis of Two business)Economics assignment (Analysis of Two business)
Economics assignment (Analysis of Two business)
 
Psychology Journal 1
Psychology Journal 1Psychology Journal 1
Psychology Journal 1
 
IBS - Business Plan
IBS - Business PlanIBS - Business Plan
IBS - Business Plan
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 
Management Science Assignment
Management Science AssignmentManagement Science Assignment
Management Science Assignment
 
Psychology Research Proposal
Psychology Research ProposalPsychology Research Proposal
Psychology Research Proposal
 
Ct 1 assignment
Ct 1 assignmentCt 1 assignment
Ct 1 assignment
 
BS2 REPORT
BS2 REPORTBS2 REPORT
BS2 REPORT
 
English 2 Compare/Contrast Essay Assignment
English 2 Compare/Contrast Essay AssignmentEnglish 2 Compare/Contrast Essay Assignment
English 2 Compare/Contrast Essay Assignment
 
Building Services
Building ServicesBuilding Services
Building Services
 
Building Material Assignment 2
Building Material Assignment 2Building Material Assignment 2
Building Material Assignment 2
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Building services-report
Building services-reportBuilding services-report
Building services-report
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
 
Building services report
Building services report Building services report
Building services report
 

Similar to Magazine complete to print

Similar to Magazine complete to print (20)

Profile MTE_(ThiLawar)
Profile MTE_(ThiLawar)Profile MTE_(ThiLawar)
Profile MTE_(ThiLawar)
 
Company profile
Company profileCompany profile
Company profile
 
Resume2016 rev_02
Resume2016 rev_02Resume2016 rev_02
Resume2016 rev_02
 
Projecxt guru 2017 mba final
Projecxt guru 2017 mba finalProjecxt guru 2017 mba final
Projecxt guru 2017 mba final
 
Umair-Electrical Engineer's Resume-2015
Umair-Electrical Engineer's Resume-2015Umair-Electrical Engineer's Resume-2015
Umair-Electrical Engineer's Resume-2015
 
MEP Service profile
MEP Service profileMEP Service profile
MEP Service profile
 
companyprofile-PEEC -02
companyprofile-PEEC -02companyprofile-PEEC -02
companyprofile-PEEC -02
 
compony profile 2015
compony profile 2015compony profile 2015
compony profile 2015
 
Company Presentation
Company PresentationCompany Presentation
Company Presentation
 
latihan industri
latihan industrilatihan industri
latihan industri
 
CS Tan Detail Resume (28032016)
CS Tan Detail Resume (28032016)CS Tan Detail Resume (28032016)
CS Tan Detail Resume (28032016)
 
KKEK3192 Industrial Training Report
KKEK3192 Industrial Training ReportKKEK3192 Industrial Training Report
KKEK3192 Industrial Training Report
 
Resume0516
Resume0516Resume0516
Resume0516
 
Resume0516
Resume0516Resume0516
Resume0516
 
Resume_LIM JOON CHIAN
Resume_LIM JOON CHIANResume_LIM JOON CHIAN
Resume_LIM JOON CHIAN
 
My Resume
My Resume My Resume
My Resume
 
NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815NTEL_Profile_ Projects_120815
NTEL_Profile_ Projects_120815
 
Sinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd ProfileSinbery Corporation Sdn Bhd Profile
Sinbery Corporation Sdn Bhd Profile
 
Govindaraj. K (1)
Govindaraj. K (1)Govindaraj. K (1)
Govindaraj. K (1)
 
RESUME
RESUMERESUME
RESUME
 

More from Eelyn Cheong

Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Eelyn Cheong
 
Psy journal 02 complete print
Psy journal 02 complete printPsy journal 02 complete print
Psy journal 02 complete printEelyn Cheong
 
Psy ready to print
Psy ready to printPsy ready to print
Psy ready to printEelyn Cheong
 
Psy research proposal
Psy research proposalPsy research proposal
Psy research proposalEelyn Cheong
 
Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Eelyn Cheong
 
Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Eelyn Cheong
 
A comparative analysis of businesses
A comparative analysis of businessesA comparative analysis of businesses
A comparative analysis of businessesEelyn Cheong
 
Animated films done888888888
Animated films done888888888Animated films done888888888
Animated films done888888888Eelyn Cheong
 
The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888Eelyn Cheong
 
20 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation88888888888820 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation888888888888Eelyn Cheong
 
The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888Eelyn Cheong
 

More from Eelyn Cheong (20)

Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01
 
Psy final report
Psy final reportPsy final report
Psy final report
 
Psy journal 02 complete print
Psy journal 02 complete printPsy journal 02 complete print
Psy journal 02 complete print
 
Psy ready to print
Psy ready to printPsy ready to print
Psy ready to print
 
Psy research proposal
Psy research proposalPsy research proposal
Psy research proposal
 
Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02
 
Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02
 
A comparative analysis of businesses
A comparative analysis of businessesA comparative analysis of businesses
A comparative analysis of businesses
 
Animated films done888888888
Animated films done888888888Animated films done888888888
Animated films done888888888
 
The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888
 
20 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation88888888888820 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation888888888888
 
The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888
 
Cnc p2 meeting
Cnc p2 meetingCnc p2 meeting
Cnc p2 meeting
 
Ici
IciIci
Ici
 
Ecsy card
Ecsy cardEcsy card
Ecsy card
 
Ecsy envelope
Ecsy envelopeEcsy envelope
Ecsy envelope
 
Ecs ycomprofile
Ecs ycomprofileEcs ycomprofile
Ecs ycomprofile
 
Tj0111111
Tj0111111Tj0111111
Tj0111111
 
Tj0111111
Tj0111111Tj0111111
Tj0111111
 
Ecsy envelope
Ecsy envelopeEcsy envelope
Ecsy envelope
 

Recently uploaded

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030tarushabhavsar
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Omaninstagramfab782445
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 

Recently uploaded (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 

Magazine complete to print

  • 1. MCC Technique M&EENGINEERING LOGO MCC Technique Sdn. Bhd. is committed to providing complete customer satisfaction, accompanying its clients through every stage of the M&E project covering HT, MV and LV engineering works, from planning, installation and commissioning through to op- eration and continuous mainte- nance. MCC TECHNIQUE SDN.BHD Tel. No.: +603 8076 811 Fax. No.: +603 8076 5268 MCC Technique Sdn. Bhd. C-01-16, Jalan PPK 1 Pusat Perniagaan Kinrara Persiaran Kinrara Sek 3 Taman Kinrara 47100 PUCHONG Selangor Darul Ehsan Malaysia .
  • 2. “ Keep asking stupid questions so that you will learn… “ Philip Yong is the Executive Director of MCC Technique Sdn Bhd . He have almost 17 years of “ I just fired my barber for cutting my hair so short , I missed my long hair , and now I look like a pure China man …” , this is the first sentences from Mr Yong when he first meet us in the meeting room . This shows that Mr Yong was a very friendly man and also like to make jokes…..For instance, “do you have a boy- friend …”…. “Your capital lay- out is high , in long run you will gain , but , it must be a long term thing…” Longest duration to finish a project is around three years , but aver- age normally is around six months . The biggest project he com- Bandar Utama Office Building 1 (8 First Avenue, Ban- dar Utama) Electrical HT & LV Services, Power Cabling Instal- lation & Earthing Installation. 2008-ongoing: RM18,000,000.00
  • 3. What services MCC Technique have ??? Electrical Power Installation :  Electrical Power Switchgears Installation.  Power/MICC/FR Cabling Works.  Installation of Building/Compound/Street Lighting/ Power/Lighting Points Fixtures, Earthing and Light- ning Protection Systems.  Installation of Power Busbar Ducts. Air conditioning— Mechanical Ventilation :  Installation of Air Conditioning and Ducting System,  Air Handling Units and Chilled Water Systems and  Air Conditioning Starter Control Wiring Works. Fire Protection System Installation :  Installation of Hose Reel/Hydrant/Sprinkler/ Halogen Systems and Fire Alarm Activation System. Uninterruptable Able Power Supply & Power Engineering Solu- tions :  Installation of UPS, Surge Sup- pressors, Voltage Stabilizers and Power Line Conditioner
  • 4. Get to know the work of M&E Engineering M&E Engineering stands for Mechanical and Electric Engineering. According to Mr Yong , mechanical is the project of work that involved air conditional such as installing air conditional , Air Handling Units , etc , and also fire protection system , for instance , installing Hose Reel , Halogen System , etc. In addition , electrical have different types which are high tension side , medium voltage , low voltage and extra low voltage . Example of Switchboards and Panels that used electrical low voltage are AMF standby Generator Switchboard , air compressor panel , etc . “ Electrical is very basic , doesn’t have extra innovation in it , no matter how you innovated in , electrical is still electrical , can’t add anything else ….” Projects that are successfully done Casa Suria Condominium, Cheras, Kuala Lumpur M&E Installations, Electrical Switchgears, Submains, Power & Light points, MATV Cabling, PA System & Telephone Cabling. 2007-ongoing: RM2,221,026.00 Kotra Pharma Malaysia Factory Cheng Industrial Estate, Malacca HT & LV, Telephone, LAN Infrastructure, PA System, CCTV, E-Surveillance Security System, Card Access System, Intercom & Door Interlocking System. Oct 08–ongoing : RM10,300,000.00
  • 5. What is the biggest project you have ? Did any accidents happen before during working time ? What is your hiring philosophy? What is your strategy for your company ? Well , is the Bandar Utama Office Building 1 (8 First Avenue, Bandar Utama) in 2008 , cost RM18,000,000.00 A person that have certificate of degree or above , professional and also is a project management No , we will always check the condition or do safety precautions before working to make sure the worker is in the safe . Our strategy is , we make sure we devel- op loyalty and we want the customer to consider us when doing their next job . “ Compete in every business is a must …” Who is the main inspector of all the pro- ject that you have? The inspector of the work done is the project manager .
  • 6. During the interview day , unfortunately , I was absent due to personal problem . My group member have recorded the interview in video . So , I get the information from the video that they had record . Firstly , I would like to thank my lecture who was always a understanding . Then , I would like to thanks my group member because they helped me a lot in my individual work . Group member : Cassandra Wong ( leader ) Ronn Chua Annisa Alisha Eelyn Cheong In this interview , my group member interview our key person - Mr Yong , the Executive Director of MCC Technique Sdn Bhd . During the interview he gave us a lot of extra knowledge , and all these in- formation he gave is quite useful for us , as a Architecture student. Besides that , he told us the im- portance of the ability to managing works . In addition to that , studying M&E Engineering needs a lot of physics and also mathematics . Since 1996 ,Mr Yong involved in this field , so , we can saiy that Mr Yong was a very experience man . In nut shell , what I learned from Mr Yong are the responsibilities of being an M&E Engineer to guide and control the workers . Besides , we must able to face challenging in the work and also not to es- cape from problems . Besides , we must placed the customer needs in first place before the profits when gain , so that we can get the trust from customers and also to continued the good relationship between the customer and the business man . “Compete in business is a must…”, said Mr Yong .