SlideShare a Scribd company logo
1 of 33
Download to read offline
Enabling Low Risk and Cost Effective
Fiber Deployment
In-Building Solutions & FTTH Installation
Introducing M2FX
 1997 Products approved at BT in first production
 2002 Licensed production in Europe
 2007 Pioneer in commercialisation of Splice-less FTTx Products
 2011 Rebrand of Miniflex to M2FX
 In-house UK based technical design team
 UK based 30,000ft manufacturing plant
 Sales offices in UK and USA
 60,000+ FTTx installations to date
 45,000km of cable and duct installed
 20,000+ Datacoms/Patch cords connections
 52 countries serviced
 Product approved by leading Tier 1 operators
Positioning M2FX USP
 Miniflex : Best-in-class robust, light weight, fibre protection
 3mm diameter up to 12 fibers // 4mm up to 24 fibers
 Hard plastic and UV resistant
 Flexible due to the live hinges
 Kink resistant
 Quikpush : Pushable Connectorisation
 Deployable through ducting
 Elimination of splicing
 Elimination of blowing
 Simple to use
 High Quality Fiber Protection : End to End Solution provider
 Indoor, Outdoor and Buried microduct
 Patented DVC lining for increasing performance
 Industry leading crush, flexibility & durability
 Unrivalled fiber protection
Miniflex Unique Properties
 Loose Tube Design
 More resilient to temperature fluctuations & better tensile strength
 Easier to handle individual fibers when field splicing
 High Crush Resistance
 Crush resistance up to 1,400N
 Equivalent to 140kg per square inch
 Macro Bending & Anti Kink
 5x time Outside Diameter of the Miniflex cable
 Miniflex generates torsional helix recoil to resist super-tight bends
 Tensile Strength
 Developed to meet ‘Pushable fiber’ installation techniques
 >200N per 2km self support
Miniflex Unique Properties
 High Temperature Flexibility
 Outdoor/Indoor/FR Miniflex operating temperature -40°C to +85°C
 Indoor/LSZH Miniflex operating temperature -20°C to +85°C
 Environmental Conditions
 Outdoor/Indoor Miniflex UL94: V0 / Full UV resistance
 Indoor/LSZH Miniflex UL94: V2
 Lightweight and Durable
 Less than 13kg per 2km reel
 OEM labelling and specific print options available
 High Crush Resistance
 Designed & produced to the highest standards in United Kingdom
 ISO 9001 & 14001 certified, REACH, ROHS compliant
Miniflex Specific Applications
 Fiber to the Home/Premises (FTTH/P)
 Most flexible, lightweight and robust cable on the market
 Removing the need for skilled field engineers and installation equipment
 Creating a ‘Copy & Paste’ model for >75% of FTTH deployment
 Proven track record with leading Tier 1 operators around the world
 In-Building / MDU Tailored Solution
 Eliminates the need for installation equipment and trained technicians
 Miniflex designed specifically for ‘Pushable’ application
 Proven to dramatically increase the ROI for In-Building projects
 Real Life performance with QNBN in Qatar, AT&T in US, plus others
 Telecoms / DAS
 Fiber to the antenna for both indoor and outdoor environments
 High quality materials gives UV resistance and LSZH performance
 Removes the requirements for Outdoor and Indoor micro ducting
 Increases installation efficiency and reduces Capex cost
Three Stage In-Building
Design Concept
Challenges facing In-Building installation
 How to cost effectively bring the fibre
from the ODB into the building and into
the apartment
 Considerations for ensuring:
 Professional cable management
 Reduced equipment footprint
 Timely installation
 There is not always 100% customer
uptake, so further consideration for
managing:
 Meet short term demand (PtP) OR
 Provide for future customers (Splice)
 Finding the optimum solution when
planning for a variety of In-Building
designs is the challenge
Stage 1 : Fibre to the Premises
 Existing installation methods require microduct & cable
 Traditional deployed in PtP format with single cable from the ODB
 Time consuming to install the microduct and then pull/blow the fibre cable
 Potential life cycle issues when deploying outdoor microduct
 Flexible microduct life span is less than 2 years
 Not scalable in medium to high end MDU environments
 ODB cable management becoming un-managable
Stage 1 : Fibre to the Premises
 Miniflex enables low risk and cost effective fibre connection
 UV resistant in the most demanding situations (+85°C)
 Miniflex can be deployed outdoors without the need for microduct
 Lightweight and compact for durable installation using only wall clips
 Aesthetically pleasing installation that reduces the visual footprint
 Reduces the installation time which vastly increases the ROI
Stage 1 : Fibre to the Premises
1. The fiber breaks out from the curb to the premises and into an ODB
 This is generally preformed by the Service Deployment team
2. Existing ODB has grown organically and will cause issues in the future
 Harsh Saudi environment will lead to early end of life if remaining outdoors
3. Revised ODB installation method could bring all wiring indoors
 Single connection from the Outside ODB to the Indoor IDB
1. FTTP ODB Location 2. Existing PtP Install 3. Moving the ODB Indoors
Stage 1: Fibre inside the Premises
1. Connecting the ODB into the IDB/IDF located in the building
2. Breaking out with a Pre-Terminated Miniflex Lead
3. Removing need to splice in the field with ‘plug & play’ solution
4. Brings the Point of Failure inside the building and away from damage
 Now fully protected from harsh weather and extends the life
2. Miniflex Pre-Terminated Break Out Lead1. FTTP ODB Location
Stage 1 : Fibre inside the Premises
ODB/IDB Solution : Scalable to suit building requirements
 Unit can be preconfigured for quicker installation with SC or LC plugs
IDF Solution : 19” Rack mounted units designed to suit
 Plug and play options to quickly add new customers when signed to operator
Stage 2 : Fibre to the floor
 Rather than using traditional PtP
connection from the ODB to apartment
 Introduce Floor Level Box
1. Take the IDB to Floor Level box
2. ‘Pushable’ pre-connectorised Miniflex
from the IDB to the Floor Splice box
3. LSZH Risser Rated solution
 Providing Plug & Play solution
 Future Proof and Scalable
 Speeds future connections by 5x
 De-skills installation requirement
Stage 2 : Fibre to the floor
Miniflex Risser Solution : Pre-connectorised and Pluggable
 Support for pre-terminated Miniflex to speed installation times
 Miniflex can be pushed through the existing conduit
 OR LSZH conduit can be installed using M2FX solutions
 One cable per floor and thus reducing cable management concerns
 Future proofing the building for simple and fast additional connections
M2FX LSZH DVC Lined Microduct Miniflex Patch Cord termination options
Stage 2 : Fibre to the floor
ODB/IDB Solution : Scalable to suit building requirements
 Unit can be preconfigured for quicker installation with SC or LC plugs
 Common unit in the network
 And can be used in the basement, outdoors and/or floor level
Stage 3 : Fibre to the apartment
 Pre-connectorised Miniflex reel for 5x
faster installation and removing all
engineer skills during the installation
process
1. Hand-push through existing conduits
2. Or install directly onto building without
the need for additional conduits
3. Quikpush used inside apartment
 Providing Plug & Play solution
 Fast and unobtrusive inside apartment
 Speeds future connections by 5x
 Deskills installation requirement
Stage 2 : Fibre to the apartment
 Miniflex innovative ‘Pushable’ fibre installation cable
 Miniflex cable offers strength, flexibility and compact size
 Can be pushed by hand through existing pre-populated conduits/ducts
 Lightweight and compact form factor allows for discreet installation
 Ability to remove additional ducting inside the apartment
200
METRES PULL
+300
METRESBLOW
100*
METRESPUSH
Stage 3 : Fibre to the apartment
 Pre-terminated Miniflex further reduces the installation cost
 Patented ‘QuikPush’ solution delivers unrivalled installation speeds
 Available in a range of lengths to support all installations (10 -250m)
 De-skills the installation team while increasing installation speeds
 Supports a variety of installations with a ‘tool-box’ of solutions
 Step 1 : Miniflex cable cutter
 The m2fx cable and Microduct cutter performs perfect neat cuts to
the end of the cable and/or microduct.
 Step 2 : Miniflex cable rotary cutter
 The cable rotary cutters are ideal for removing the outset sheath
without cutting or damaging the optical fibres and/or microduct.
 Step 3 : Hot glue gun install
 Hot-melt glue guns are available and allow fast fixing of Miniflex
optical fibre cable to a range of building materials.
 Step 4 : Cable wall clips
 Cable clips are available in a range of different types, suitable for
various types of materials including timber, masonry, plastic, metal
and render.
Stage 3 : Installation Guidelines
Stage 3 : Fibre to the apartment
Customer Unit Solution : Compact and easy to install
 Can hold 2 SC simplex adaptors or 2 LC duplex adaptors
 Easily re-enter with minimum tools, saving time and cost
 Can be pre-terminated onto Miniflex reels for Plug & Play connections
 Dramatically de-skilling the installation process as no splicing required
End to End solution deskilling the
installation process by u to 5x
Big Picture : Future proof today!
Phase 1
1st apartment on the
ground floor
installed
Ready for future
plug and play for
new customers
Phase 3
2nd floor has a new
customer and floor
is ready for future
plug & play new
customers
Phase 2
2nd customer on the
existing 1st floor now
connected
New customer on
ground floor installed
and future proofed
Phase 4
Finally 3rd floor has
new a customer and
additional
customers on the
other floors and
installed faster than
STC!
QNBN Proven Success
Doha, Qatar : April 2014
QNBN Case Study
 QNBN have a nationwide project to retro-fit fiber
optic cable into existing infrastructure in
approximately 100 apartment blocks
 Ericsson has been selected as the integrator for
the project
 20mm electrical conduit in place
 Cat-6 cable already in the existing conduits
 Floor level runs on average <25m
 Blown fiber killing the business case
 Ericsson used Miniflex LSZH 4-core fiber cable
 1st Pushable fiber demonstration by Ericsson
 Supported locally by two M2fx engineers
QNBN Scope
 Miniflex LSZH 3mm cable complete with 2 pushable clip on brass dongle
 Hand pushed into existing 20mm electrical conduits, which are
populated with existing Cat-6 cable
 The typical route was estimated at 15-25 metres with 2 or 3 x 90° bends
and at least 1 conduit join
QNBN Performance
 Miniflex was pushed by hand into 15 apartments up to a distance of 25m
 No air blown installation equipment was used
 No physical installation equipment was used
 No technical skill level was required
 Less than 5 minutes training from the M2FX engineers was needed
 Ericsson installation teams performed the demonstration
 25 QNBN technicians present and were involved in the pilot
 Senior management handled the cable and undertook pushable demo
 Splicing performed in each apartment with 0.05dB loss
 100% connectivity and no faults detected after connection test
 QNBN 100% happy and positive towards M2FX/Ericsson Pushable fiber
QNBN Conclusion
 Miniflex was pushed by hand at a speed of 15m per minute
 On average, saved 45 minutes installation per apartment
 Over 10 buildings, this will save >2,200 hours (93 days!)
 QNBN have stated that future air blown fiber installations will not be
acceptable and requesting only hand pushable fiber in the future
 QNBN senior management see the huge advantages of pushable fiber
 QNBN have issued Material Approval for M2FX cable
But what about the FTTH
SDU Solution
Same same but Different
 Essentially SDU installation is the same principal as In-Building
 Taking FTTC inside the premises via a PtP connection
 Ideally suited to QuikPush and pre-termination
SDU Overview
 Push or Pull installation reduces install time and cost:
 Hand pushed up to 100m in new ducts / up to 25m in occupied microducts
 Miniflex can be pulled up to 300m using traditional methods
 Less damage to Miniflex than standard cable when pulled
 No need for expensive blowing and/or compressor equipment
 Pre-terminated QuikPush technology:
 Ruggedised Pre-termination (one or both ends) fibre cable
 Remove the need for splicing and extensive time on site
 Deskill the installation teams while increasing efficiency
 Proven to reduce the installation time & increase the quality
 Product approval by Mobily and already used in the network
 Proven business case with existing installers throughout Africa
Mobily / Detasad Case Example
Miniflex from the ODB
into the customers villa
boundary.
Note that external
microduct is no longer
required due to the UV
performance of Miniflex
Miniflex runs into the
premises connected
directly to the wall
without microduct
protection.
Miniflex enters the
premises and still
does not require
microduct.
Ultimately into the
customer wall box
with QuikPush
connection.
M2FX End-2-End Toolbox Summary
 Removal of external microduct
 Miniflex clipped directly to the outside wall
 Flexible, strong and lightweight cable management and reduced footprint
 Hand push Miniflex through existing conduit/duct
 Reduces cable damage and down time (pull/push rod not required)
 Removal of expensive installation blowing equipment
 QuikPush and Pre-terminated solutions drive down installation times
 Reduces the number of field splices
 Deskills the installation team(s) and reduces the installation time
 Plug and Play network designed for tomorrows requirements
 Splice provisioned network designed to support todays customers
 100% removal of requirement of training installation teams
 High quality manufacturing and 20+ years of fiber innovation
 Miniflex produced only in the United Kingdom
 All components produced or sourced from within the EU
Here to help:
Mr Simon Roberts
Sales Director Middle East & Africa
s.roberts@m2fx.com
Mob: +44 7787 298350

More Related Content

What's hot

2012 Introduction wire bonding
2012 Introduction wire bonding2012 Introduction wire bonding
2012 Introduction wire bondingJan Eite Bullema
 
Introduction to Fiber Breakout Cable
Introduction to Fiber Breakout CableIntroduction to Fiber Breakout Cable
Introduction to Fiber Breakout CableJo Wang
 
250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiber250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiberAngelina Li
 
High voltage cable insulation systems
High voltage cable insulation systemsHigh voltage cable insulation systems
High voltage cable insulation systemsSanket Tambakhe
 
Fiber optic patch cord knowledge
Fiber optic patch cord knowledgeFiber optic patch cord knowledge
Fiber optic patch cord knowledgeFern Xu
 
2017 Electrical interconnects in miro fluidics
2017 Electrical interconnects in miro fluidics  2017 Electrical interconnects in miro fluidics
2017 Electrical interconnects in miro fluidics Jan Eite Bullema
 
Wire Manufacturer In Pune - Elcab Conductors
Wire Manufacturer In Pune - Elcab ConductorsWire Manufacturer In Pune - Elcab Conductors
Wire Manufacturer In Pune - Elcab Conductorsbizporto.com
 
Gbic shop superior fiber supply
Gbic shop superior fiber supplyGbic shop superior fiber supply
Gbic shop superior fiber supplyGbic-shop.de
 
Electrical wiring system - and estimation
Electrical wiring system -  and estimation Electrical wiring system -  and estimation
Electrical wiring system - and estimation Mahfuz Sikder
 
network cabling
network cablingnetwork cabling
network cablingemad94
 
Xiamen Winlink Cable Factory Coaxial cable catalogue
Xiamen Winlink Cable Factory Coaxial cable catalogueXiamen Winlink Cable Factory Coaxial cable catalogue
Xiamen Winlink Cable Factory Coaxial cable catalogueXiamen Winlink Cable Factory
 

What's hot (20)

2012 Introduction wire bonding
2012 Introduction wire bonding2012 Introduction wire bonding
2012 Introduction wire bonding
 
Outdoor Joint enclosure | Unisol
Outdoor Joint enclosure | UnisolOutdoor Joint enclosure | Unisol
Outdoor Joint enclosure | Unisol
 
Types of cables
Types of cablesTypes of cables
Types of cables
 
Introduction to Fiber Breakout Cable
Introduction to Fiber Breakout CableIntroduction to Fiber Breakout Cable
Introduction to Fiber Breakout Cable
 
Tempsens- cable and wires
Tempsens- cable and wiresTempsens- cable and wires
Tempsens- cable and wires
 
Network cables
Network cablesNetwork cables
Network cables
 
Cable
CableCable
Cable
 
250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiber250um loose tube vs. 900um tight buffered fiber
250um loose tube vs. 900um tight buffered fiber
 
High voltage cable insulation systems
High voltage cable insulation systemsHigh voltage cable insulation systems
High voltage cable insulation systems
 
Cable Installation 2013
Cable Installation 2013Cable Installation 2013
Cable Installation 2013
 
Fiber optic patch cord knowledge
Fiber optic patch cord knowledgeFiber optic patch cord knowledge
Fiber optic patch cord knowledge
 
Network Cabling Guide | Cat5, Cat6, Cat7
Network Cabling Guide | Cat5, Cat6, Cat7  Network Cabling Guide | Cat5, Cat6, Cat7
Network Cabling Guide | Cat5, Cat6, Cat7
 
2017 Electrical interconnects in miro fluidics
2017 Electrical interconnects in miro fluidics  2017 Electrical interconnects in miro fluidics
2017 Electrical interconnects in miro fluidics
 
Wire Manufacturer In Pune - Elcab Conductors
Wire Manufacturer In Pune - Elcab ConductorsWire Manufacturer In Pune - Elcab Conductors
Wire Manufacturer In Pune - Elcab Conductors
 
Gbic shop superior fiber supply
Gbic shop superior fiber supplyGbic shop superior fiber supply
Gbic shop superior fiber supply
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Electrical wiring system - and estimation
Electrical wiring system -  and estimation Electrical wiring system -  and estimation
Electrical wiring system - and estimation
 
network cabling
network cablingnetwork cabling
network cabling
 
Wire bonding
Wire bondingWire bonding
Wire bonding
 
Xiamen Winlink Cable Factory Coaxial cable catalogue
Xiamen Winlink Cable Factory Coaxial cable catalogueXiamen Winlink Cable Factory Coaxial cable catalogue
Xiamen Winlink Cable Factory Coaxial cable catalogue
 

Viewers also liked

Challenges Future Fiber Project
Challenges Future Fiber ProjectChallenges Future Fiber Project
Challenges Future Fiber Projecthamid_buet
 
In-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder SystemsIn-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder Systemstelecom-wiring
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutionstelecom-wiring
 
Presentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIMPresentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIMSujeeva Ranasinghe, MBA
 
iBwave: Streamlining the planning & design of small cells
iBwave: Streamlining the planning & design of small cellsiBwave: Streamlining the planning & design of small cells
iBwave: Streamlining the planning & design of small cellsSmall Cell Forum
 
Distributed Antenna Systems and Compact Base Stations: When to Use Which?
Distributed Antenna Systems and Compact Base Stations: When to Use Which?Distributed Antenna Systems and Compact Base Stations: When to Use Which?
Distributed Antenna Systems and Compact Base Stations: When to Use Which?Frank Rayal
 
Ibs antenna teardown v1.0
Ibs antenna teardown v1.0Ibs antenna teardown v1.0
Ibs antenna teardown v1.0Vitor Torres
 
Ssv template
Ssv templateSsv template
Ssv templateVirak Sou
 
Oss vs drive test pdcp throughput
Oss vs drive test pdcp throughputOss vs drive test pdcp throughput
Oss vs drive test pdcp throughputSubhash Kumar
 
Zero Site Outdoor Small Cell Solution
Zero Site Outdoor Small Cell Solution Zero Site Outdoor Small Cell Solution
Zero Site Outdoor Small Cell Solution Ericsson
 
3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal AbadenMd Joynal Abaden
 
Solution for code congestion
Solution for code congestionSolution for code congestion
Solution for code congestionGrace Harefa
 
Rbs 6401 datasheet
Rbs 6401 datasheetRbs 6401 datasheet
Rbs 6401 datasheetSS Saravanan
 
Gren tech indoor coverage solutions
Gren tech indoor coverage solutions Gren tech indoor coverage solutions
Gren tech indoor coverage solutions bappyni
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_temsIshaque uddin
 
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOSNEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOSIlissa Miller
 

Viewers also liked (20)

Challenges Future Fiber Project
Challenges Future Fiber ProjectChallenges Future Fiber Project
Challenges Future Fiber Project
 
In-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder SystemsIn-Building Wireless, DAS and First Responder Systems
In-Building Wireless, DAS and First Responder Systems
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutions
 
Presentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIMPresentation to CCNC Summit on PS DAS Design and PIM
Presentation to CCNC Summit on PS DAS Design and PIM
 
5 major milestones in fiber osp project
5 major milestones in fiber osp project5 major milestones in fiber osp project
5 major milestones in fiber osp project
 
BICSI Wireless DAS Update
BICSI Wireless DAS UpdateBICSI Wireless DAS Update
BICSI Wireless DAS Update
 
iBwave: Streamlining the planning & design of small cells
iBwave: Streamlining the planning & design of small cellsiBwave: Streamlining the planning & design of small cells
iBwave: Streamlining the planning & design of small cells
 
Distributed Antenna Systems and Compact Base Stations: When to Use Which?
Distributed Antenna Systems and Compact Base Stations: When to Use Which?Distributed Antenna Systems and Compact Base Stations: When to Use Which?
Distributed Antenna Systems and Compact Base Stations: When to Use Which?
 
Ibs antenna teardown v1.0
Ibs antenna teardown v1.0Ibs antenna teardown v1.0
Ibs antenna teardown v1.0
 
Ssv template
Ssv templateSsv template
Ssv template
 
2 g vs-3g dt-
2 g vs-3g dt-2 g vs-3g dt-
2 g vs-3g dt-
 
Oss vs drive test pdcp throughput
Oss vs drive test pdcp throughputOss vs drive test pdcp throughput
Oss vs drive test pdcp throughput
 
Zero Site Outdoor Small Cell Solution
Zero Site Outdoor Small Cell Solution Zero Site Outdoor Small Cell Solution
Zero Site Outdoor Small Cell Solution
 
3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal Abaden
 
Fiber Network Deployment
Fiber Network DeploymentFiber Network Deployment
Fiber Network Deployment
 
Solution for code congestion
Solution for code congestionSolution for code congestion
Solution for code congestion
 
Rbs 6401 datasheet
Rbs 6401 datasheetRbs 6401 datasheet
Rbs 6401 datasheet
 
Gren tech indoor coverage solutions
Gren tech indoor coverage solutions Gren tech indoor coverage solutions
Gren tech indoor coverage solutions
 
3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems3 g ibs walk test report dhk_v1415_tems
3 g ibs walk test report dhk_v1415_tems
 
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOSNEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
NEDAS Fall In-Building Wireless Summit - October 2014 in PHOTOS
 

Similar to M2FX In Building Solution February 2015

m2fx : How Pushable fiber is transforming Africa
m2fx : How Pushable fiber is transforming Africam2fx : How Pushable fiber is transforming Africa
m2fx : How Pushable fiber is transforming AfricaSimon Roberts
 
M2FX FTTH Africa: Alternative FTTH Techniques
M2FX FTTH Africa: Alternative FTTH TechniquesM2FX FTTH Africa: Alternative FTTH Techniques
M2FX FTTH Africa: Alternative FTTH TechniquesSimon Roberts
 
Gm Brand Rex Greek 2009 Optical
Gm Brand Rex Greek  2009 OpticalGm Brand Rex Greek  2009 Optical
Gm Brand Rex Greek 2009 OpticalGianluca Musetti
 
Nestor Cables Solutions
Nestor Cables SolutionsNestor Cables Solutions
Nestor Cables SolutionsNestorExports
 
Miniflex FTTH Cabling System
Miniflex FTTH Cabling SystemMiniflex FTTH Cabling System
Miniflex FTTH Cabling SystemMarc Duchesne
 
OFS FTTx Webinar July 2017 at CABA
  OFS FTTx Webinar July 2017 at CABA  OFS FTTx Webinar July 2017 at CABA
OFS FTTx Webinar July 2017 at CABAOFS
 
Introducing the next generation industrial switch platform
Introducing the next generation industrial switch platformIntroducing the next generation industrial switch platform
Introducing the next generation industrial switch platformWestermo Network Technologies
 
Tongding Group Presentationv
Tongding Group PresentationvTongding Group Presentationv
Tongding Group PresentationvJulia Chen
 
3m-clear-solutions-for-ftth-white-paper
3m-clear-solutions-for-ftth-white-paper3m-clear-solutions-for-ftth-white-paper
3m-clear-solutions-for-ftth-white-paperJohn Sherard
 
Antenna Solutions from Laird Connectivity
Antenna Solutions from Laird Connectivity Antenna Solutions from Laird Connectivity
Antenna Solutions from Laird Connectivity Laird Connectivity
 
Industria case study by mesfin
Industria case study by mesfinIndustria case study by mesfin
Industria case study by mesfinmesfin kebede
 
Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...
Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...
Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...Sckipio
 
Fiber optics in-buildings infrastructure paper - OEA- Lebanon
Fiber optics in-buildings infrastructure paper - OEA- LebanonFiber optics in-buildings infrastructure paper - OEA- Lebanon
Fiber optics in-buildings infrastructure paper - OEA- LebanonKSU
 
OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017
OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017
OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017Anurag Jain
 
Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012Phil Heft
 
Roxtec telecom
Roxtec telecomRoxtec telecom
Roxtec telecomRADOME-IT
 
MTP Fibre connectivity range - Flux IT
MTP Fibre connectivity range - Flux ITMTP Fibre connectivity range - Flux IT
MTP Fibre connectivity range - Flux ITPritesh Patel
 

Similar to M2FX In Building Solution February 2015 (20)

m2fx : How Pushable fiber is transforming Africa
m2fx : How Pushable fiber is transforming Africam2fx : How Pushable fiber is transforming Africa
m2fx : How Pushable fiber is transforming Africa
 
M2FX FTTH Africa: Alternative FTTH Techniques
M2FX FTTH Africa: Alternative FTTH TechniquesM2FX FTTH Africa: Alternative FTTH Techniques
M2FX FTTH Africa: Alternative FTTH Techniques
 
Gm Brand Rex Greek 2009 Optical
Gm Brand Rex Greek  2009 OpticalGm Brand Rex Greek  2009 Optical
Gm Brand Rex Greek 2009 Optical
 
Nestor Cables Solutions
Nestor Cables SolutionsNestor Cables Solutions
Nestor Cables Solutions
 
Miniflex FTTH Cabling System
Miniflex FTTH Cabling SystemMiniflex FTTH Cabling System
Miniflex FTTH Cabling System
 
Fibre Innovation
Fibre InnovationFibre Innovation
Fibre Innovation
 
Roxtec Cable & Pipe Transits - Telecoms
Roxtec Cable & Pipe Transits - TelecomsRoxtec Cable & Pipe Transits - Telecoms
Roxtec Cable & Pipe Transits - Telecoms
 
OFS FTTx Webinar July 2017 at CABA
  OFS FTTx Webinar July 2017 at CABA  OFS FTTx Webinar July 2017 at CABA
OFS FTTx Webinar July 2017 at CABA
 
Introducing the next generation industrial switch platform
Introducing the next generation industrial switch platformIntroducing the next generation industrial switch platform
Introducing the next generation industrial switch platform
 
Tongding Group Presentationv
Tongding Group PresentationvTongding Group Presentationv
Tongding Group Presentationv
 
3m-clear-solutions-for-ftth-white-paper
3m-clear-solutions-for-ftth-white-paper3m-clear-solutions-for-ftth-white-paper
3m-clear-solutions-for-ftth-white-paper
 
Antenna Solutions from Laird Connectivity
Antenna Solutions from Laird Connectivity Antenna Solutions from Laird Connectivity
Antenna Solutions from Laird Connectivity
 
Industria case study by mesfin
Industria case study by mesfinIndustria case study by mesfin
Industria case study by mesfin
 
Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...
Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...
Sckipio and Actiontec Present at Broadband Multimedia Marketers Association o...
 
Fiber optics in-buildings infrastructure paper - OEA- Lebanon
Fiber optics in-buildings infrastructure paper - OEA- LebanonFiber optics in-buildings infrastructure paper - OEA- Lebanon
Fiber optics in-buildings infrastructure paper - OEA- Lebanon
 
OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017
OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017
OFS Indoor Fiber Solutions Buildings and Homes Adtran 2017
 
Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012
 
Roxtec telecom
Roxtec telecomRoxtec telecom
Roxtec telecom
 
Ip68
Ip68Ip68
Ip68
 
MTP Fibre connectivity range - Flux IT
MTP Fibre connectivity range - Flux ITMTP Fibre connectivity range - Flux IT
MTP Fibre connectivity range - Flux IT
 

Recently uploaded

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 

Recently uploaded (20)

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 

M2FX In Building Solution February 2015

  • 1. Enabling Low Risk and Cost Effective Fiber Deployment In-Building Solutions & FTTH Installation
  • 2. Introducing M2FX  1997 Products approved at BT in first production  2002 Licensed production in Europe  2007 Pioneer in commercialisation of Splice-less FTTx Products  2011 Rebrand of Miniflex to M2FX  In-house UK based technical design team  UK based 30,000ft manufacturing plant  Sales offices in UK and USA  60,000+ FTTx installations to date  45,000km of cable and duct installed  20,000+ Datacoms/Patch cords connections  52 countries serviced  Product approved by leading Tier 1 operators
  • 3. Positioning M2FX USP  Miniflex : Best-in-class robust, light weight, fibre protection  3mm diameter up to 12 fibers // 4mm up to 24 fibers  Hard plastic and UV resistant  Flexible due to the live hinges  Kink resistant  Quikpush : Pushable Connectorisation  Deployable through ducting  Elimination of splicing  Elimination of blowing  Simple to use  High Quality Fiber Protection : End to End Solution provider  Indoor, Outdoor and Buried microduct  Patented DVC lining for increasing performance  Industry leading crush, flexibility & durability  Unrivalled fiber protection
  • 4. Miniflex Unique Properties  Loose Tube Design  More resilient to temperature fluctuations & better tensile strength  Easier to handle individual fibers when field splicing  High Crush Resistance  Crush resistance up to 1,400N  Equivalent to 140kg per square inch  Macro Bending & Anti Kink  5x time Outside Diameter of the Miniflex cable  Miniflex generates torsional helix recoil to resist super-tight bends  Tensile Strength  Developed to meet ‘Pushable fiber’ installation techniques  >200N per 2km self support
  • 5. Miniflex Unique Properties  High Temperature Flexibility  Outdoor/Indoor/FR Miniflex operating temperature -40°C to +85°C  Indoor/LSZH Miniflex operating temperature -20°C to +85°C  Environmental Conditions  Outdoor/Indoor Miniflex UL94: V0 / Full UV resistance  Indoor/LSZH Miniflex UL94: V2  Lightweight and Durable  Less than 13kg per 2km reel  OEM labelling and specific print options available  High Crush Resistance  Designed & produced to the highest standards in United Kingdom  ISO 9001 & 14001 certified, REACH, ROHS compliant
  • 6. Miniflex Specific Applications  Fiber to the Home/Premises (FTTH/P)  Most flexible, lightweight and robust cable on the market  Removing the need for skilled field engineers and installation equipment  Creating a ‘Copy & Paste’ model for >75% of FTTH deployment  Proven track record with leading Tier 1 operators around the world  In-Building / MDU Tailored Solution  Eliminates the need for installation equipment and trained technicians  Miniflex designed specifically for ‘Pushable’ application  Proven to dramatically increase the ROI for In-Building projects  Real Life performance with QNBN in Qatar, AT&T in US, plus others  Telecoms / DAS  Fiber to the antenna for both indoor and outdoor environments  High quality materials gives UV resistance and LSZH performance  Removes the requirements for Outdoor and Indoor micro ducting  Increases installation efficiency and reduces Capex cost
  • 8. Challenges facing In-Building installation  How to cost effectively bring the fibre from the ODB into the building and into the apartment  Considerations for ensuring:  Professional cable management  Reduced equipment footprint  Timely installation  There is not always 100% customer uptake, so further consideration for managing:  Meet short term demand (PtP) OR  Provide for future customers (Splice)  Finding the optimum solution when planning for a variety of In-Building designs is the challenge
  • 9. Stage 1 : Fibre to the Premises  Existing installation methods require microduct & cable  Traditional deployed in PtP format with single cable from the ODB  Time consuming to install the microduct and then pull/blow the fibre cable  Potential life cycle issues when deploying outdoor microduct  Flexible microduct life span is less than 2 years  Not scalable in medium to high end MDU environments  ODB cable management becoming un-managable
  • 10. Stage 1 : Fibre to the Premises  Miniflex enables low risk and cost effective fibre connection  UV resistant in the most demanding situations (+85°C)  Miniflex can be deployed outdoors without the need for microduct  Lightweight and compact for durable installation using only wall clips  Aesthetically pleasing installation that reduces the visual footprint  Reduces the installation time which vastly increases the ROI
  • 11. Stage 1 : Fibre to the Premises 1. The fiber breaks out from the curb to the premises and into an ODB  This is generally preformed by the Service Deployment team 2. Existing ODB has grown organically and will cause issues in the future  Harsh Saudi environment will lead to early end of life if remaining outdoors 3. Revised ODB installation method could bring all wiring indoors  Single connection from the Outside ODB to the Indoor IDB 1. FTTP ODB Location 2. Existing PtP Install 3. Moving the ODB Indoors
  • 12. Stage 1: Fibre inside the Premises 1. Connecting the ODB into the IDB/IDF located in the building 2. Breaking out with a Pre-Terminated Miniflex Lead 3. Removing need to splice in the field with ‘plug & play’ solution 4. Brings the Point of Failure inside the building and away from damage  Now fully protected from harsh weather and extends the life 2. Miniflex Pre-Terminated Break Out Lead1. FTTP ODB Location
  • 13. Stage 1 : Fibre inside the Premises ODB/IDB Solution : Scalable to suit building requirements  Unit can be preconfigured for quicker installation with SC or LC plugs IDF Solution : 19” Rack mounted units designed to suit  Plug and play options to quickly add new customers when signed to operator
  • 14. Stage 2 : Fibre to the floor  Rather than using traditional PtP connection from the ODB to apartment  Introduce Floor Level Box 1. Take the IDB to Floor Level box 2. ‘Pushable’ pre-connectorised Miniflex from the IDB to the Floor Splice box 3. LSZH Risser Rated solution  Providing Plug & Play solution  Future Proof and Scalable  Speeds future connections by 5x  De-skills installation requirement
  • 15. Stage 2 : Fibre to the floor Miniflex Risser Solution : Pre-connectorised and Pluggable  Support for pre-terminated Miniflex to speed installation times  Miniflex can be pushed through the existing conduit  OR LSZH conduit can be installed using M2FX solutions  One cable per floor and thus reducing cable management concerns  Future proofing the building for simple and fast additional connections M2FX LSZH DVC Lined Microduct Miniflex Patch Cord termination options
  • 16. Stage 2 : Fibre to the floor ODB/IDB Solution : Scalable to suit building requirements  Unit can be preconfigured for quicker installation with SC or LC plugs  Common unit in the network  And can be used in the basement, outdoors and/or floor level
  • 17. Stage 3 : Fibre to the apartment  Pre-connectorised Miniflex reel for 5x faster installation and removing all engineer skills during the installation process 1. Hand-push through existing conduits 2. Or install directly onto building without the need for additional conduits 3. Quikpush used inside apartment  Providing Plug & Play solution  Fast and unobtrusive inside apartment  Speeds future connections by 5x  Deskills installation requirement
  • 18. Stage 2 : Fibre to the apartment  Miniflex innovative ‘Pushable’ fibre installation cable  Miniflex cable offers strength, flexibility and compact size  Can be pushed by hand through existing pre-populated conduits/ducts  Lightweight and compact form factor allows for discreet installation  Ability to remove additional ducting inside the apartment 200 METRES PULL +300 METRESBLOW 100* METRESPUSH
  • 19. Stage 3 : Fibre to the apartment  Pre-terminated Miniflex further reduces the installation cost  Patented ‘QuikPush’ solution delivers unrivalled installation speeds  Available in a range of lengths to support all installations (10 -250m)  De-skills the installation team while increasing installation speeds  Supports a variety of installations with a ‘tool-box’ of solutions
  • 20.  Step 1 : Miniflex cable cutter  The m2fx cable and Microduct cutter performs perfect neat cuts to the end of the cable and/or microduct.  Step 2 : Miniflex cable rotary cutter  The cable rotary cutters are ideal for removing the outset sheath without cutting or damaging the optical fibres and/or microduct.  Step 3 : Hot glue gun install  Hot-melt glue guns are available and allow fast fixing of Miniflex optical fibre cable to a range of building materials.  Step 4 : Cable wall clips  Cable clips are available in a range of different types, suitable for various types of materials including timber, masonry, plastic, metal and render. Stage 3 : Installation Guidelines
  • 21. Stage 3 : Fibre to the apartment Customer Unit Solution : Compact and easy to install  Can hold 2 SC simplex adaptors or 2 LC duplex adaptors  Easily re-enter with minimum tools, saving time and cost  Can be pre-terminated onto Miniflex reels for Plug & Play connections  Dramatically de-skilling the installation process as no splicing required End to End solution deskilling the installation process by u to 5x
  • 22. Big Picture : Future proof today! Phase 1 1st apartment on the ground floor installed Ready for future plug and play for new customers Phase 3 2nd floor has a new customer and floor is ready for future plug & play new customers Phase 2 2nd customer on the existing 1st floor now connected New customer on ground floor installed and future proofed Phase 4 Finally 3rd floor has new a customer and additional customers on the other floors and installed faster than STC!
  • 23. QNBN Proven Success Doha, Qatar : April 2014
  • 24. QNBN Case Study  QNBN have a nationwide project to retro-fit fiber optic cable into existing infrastructure in approximately 100 apartment blocks  Ericsson has been selected as the integrator for the project  20mm electrical conduit in place  Cat-6 cable already in the existing conduits  Floor level runs on average <25m  Blown fiber killing the business case  Ericsson used Miniflex LSZH 4-core fiber cable  1st Pushable fiber demonstration by Ericsson  Supported locally by two M2fx engineers
  • 25. QNBN Scope  Miniflex LSZH 3mm cable complete with 2 pushable clip on brass dongle  Hand pushed into existing 20mm electrical conduits, which are populated with existing Cat-6 cable  The typical route was estimated at 15-25 metres with 2 or 3 x 90° bends and at least 1 conduit join
  • 26. QNBN Performance  Miniflex was pushed by hand into 15 apartments up to a distance of 25m  No air blown installation equipment was used  No physical installation equipment was used  No technical skill level was required  Less than 5 minutes training from the M2FX engineers was needed  Ericsson installation teams performed the demonstration  25 QNBN technicians present and were involved in the pilot  Senior management handled the cable and undertook pushable demo  Splicing performed in each apartment with 0.05dB loss  100% connectivity and no faults detected after connection test  QNBN 100% happy and positive towards M2FX/Ericsson Pushable fiber
  • 27. QNBN Conclusion  Miniflex was pushed by hand at a speed of 15m per minute  On average, saved 45 minutes installation per apartment  Over 10 buildings, this will save >2,200 hours (93 days!)  QNBN have stated that future air blown fiber installations will not be acceptable and requesting only hand pushable fiber in the future  QNBN senior management see the huge advantages of pushable fiber  QNBN have issued Material Approval for M2FX cable
  • 28. But what about the FTTH SDU Solution
  • 29. Same same but Different  Essentially SDU installation is the same principal as In-Building  Taking FTTC inside the premises via a PtP connection  Ideally suited to QuikPush and pre-termination
  • 30. SDU Overview  Push or Pull installation reduces install time and cost:  Hand pushed up to 100m in new ducts / up to 25m in occupied microducts  Miniflex can be pulled up to 300m using traditional methods  Less damage to Miniflex than standard cable when pulled  No need for expensive blowing and/or compressor equipment  Pre-terminated QuikPush technology:  Ruggedised Pre-termination (one or both ends) fibre cable  Remove the need for splicing and extensive time on site  Deskill the installation teams while increasing efficiency  Proven to reduce the installation time & increase the quality  Product approval by Mobily and already used in the network  Proven business case with existing installers throughout Africa
  • 31. Mobily / Detasad Case Example Miniflex from the ODB into the customers villa boundary. Note that external microduct is no longer required due to the UV performance of Miniflex Miniflex runs into the premises connected directly to the wall without microduct protection. Miniflex enters the premises and still does not require microduct. Ultimately into the customer wall box with QuikPush connection.
  • 32. M2FX End-2-End Toolbox Summary  Removal of external microduct  Miniflex clipped directly to the outside wall  Flexible, strong and lightweight cable management and reduced footprint  Hand push Miniflex through existing conduit/duct  Reduces cable damage and down time (pull/push rod not required)  Removal of expensive installation blowing equipment  QuikPush and Pre-terminated solutions drive down installation times  Reduces the number of field splices  Deskills the installation team(s) and reduces the installation time  Plug and Play network designed for tomorrows requirements  Splice provisioned network designed to support todays customers  100% removal of requirement of training installation teams  High quality manufacturing and 20+ years of fiber innovation  Miniflex produced only in the United Kingdom  All components produced or sourced from within the EU
  • 33. Here to help: Mr Simon Roberts Sales Director Middle East & Africa s.roberts@m2fx.com Mob: +44 7787 298350