1
L EED v4.
1 (BD+C)
Soil Erosion and Sedimentation
Control
2
Intent:
To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne
dust that disproportionately impact frontline communities.
IMPLEMENTATION MEASURES
1. Water bodies within 50ft from construction
site
2. Stormwater infiltration
3. Sediment controls
4. Sediment track-out
5. Stockpile management
6. Dust suppression measures
7. Top soil preservation
8. Minimise soil compaction
9. Protect storm drain inlet
10. Sedimentation basin
W
a
t
e
r bodies within 50ft fr
o
m
construction site
3
Implementation Measure:
Provide and maintain natural buffers and/or equivalent erosion and sediment controls when a water body is located within 50
feet of the construction site.
.
Vegetation as
buffer
Soil Erosion and Sedimentation
Control
Stormwater
infiltration
4
Implementation Measure:
Direct stormwater to vegetated areas and maximize stormwater infiltration and filtering to reduce pollutant
discharge.
Storm water directed to
Vegetation
Storm water
Infiltration
Soil Erosion and Sedimentation
Control
Sediment
controls
5
Implementation Measure:
Install sediment controls along any perimeter areas of the site that will receive pollutant
discharges.
Site
barricading
Soil Erosion and Sedimentation
Control
Sediment track-
out
6
Implementation Measure:
• Restrict vehicle use to properly designated exit points.
• Where sediment has been tracked-out from your site onto paved roads, sidewalk, or other paved areas outside of your site,
remove (sweeping, shoveling or vacuuming) the deposited sediment by the end of the same business day in which the track-
out occurs or by the end of the next business day if track-out occurs on a non-business day.
Stabilized construction
exits
Soil Erosion and Sedimentation
Control
Stockpile
ma
na
geme
nt
7
Implementation Measure:
• Locate the piles outside of any natural buffers and away from stormwater conveyances, drain inlets, and areas where
stormwater flow is concentrated.
• Cover stockpiles that are unused for 14 days or more.
Store stockpile away from Vegetation & Storm
drain
Soil Erosion and Sedimentation
Control
Dust suppression
measures
8
Implementation Measure:
On areas of exposed soil, minimize the generation of dust through the appropriate application of water or other dust suppression
techniques.
Dust
suppression
Soil Erosion and Sedimentation
Control
T
o
p soil
preservation
9
Implementation Measure:
• Preserve native top soil by stockpiling away from water drain area and provide signage to protect the
top soil.
• Maintain the fertility of the soil by mulching.
Top soil stock
pile
Soil Erosion and Sedimentation
Control
Mulchin
g
Minimise soil
compaction
10
Implementation Measure:
In areas of site where final vegetative stabilization will occur or where infiltration practices will be installed,
• Restrict vehicle and equipment use in these locations to avoid soil compaction.
• Before seeding or planting areas of exposed soil that have been compacted, use techniques that rehabilitate and condition
the soils as necessary to support.
Avoiding soil compaction at areas dedicated for
vegetation
Soil Erosion and Sedimentation
Control
Protect storm drain
inlet
11
Implementation Measure:
• Install inlet protection measures that remove sediment from discharges prior to entry into any storm drain inlet that carries
stormwater
flow from your site to a water body.
• Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or
performance is compromised.
.
Storm water inlet
protection
Soil Erosion and Sedimentation
Control
Sedimentation
basin
12
Implementation Measure:
• Provide temporary sedimentation basin to divert & capture the rain water generated during construction.
• Design the basin or impoundment to provide storage for calculated volume of runoff from a 2-year, 24-hour
storm.
Temporary sedimentation
basin
Soil Erosion and Sedimentation
Control
W
aste Management- Construction and
demolition
13
Intent:
To reduce construction and demolition waste disposed of in landfills and incineration facilities through waste prevention and
by reusing, recovering, and recycling materials, and conserving resources for future generations.
IMPLEMENTATION MEASURES
1. Reusing construction waste on-site.
2. Store and segregate construction waste on-site with permanent
signage.
Reuse of broken
bricks
Construction waste
yard
14
Intent:
To promote the well-being of construction workers and building occupants by minimizing indoor air quality problems
associated with construction and renovation.
Air Quality Management – During
construction
IMPLEMENTATION MEASURES
1. Training and Communication
2. HVAC Protection
3. Source control
4. Protection of absorptive
materials
5. Pathway interruption
6. Housekeeping
7. Low VOC materials
8. Prohibition of smoking
T
r
aining and
Communication
15
Workers
training
Implementation Measure:
• Train construction workers and site managers on IAQ (Indoor air quality) control measures, including the importance of
minimizing dust, proper use of chemicals, and maintaining ventilation.
• Post signs and provide communication to reinforce IAQ (Indoor air quality) practices and remind workers of their
responsibilities.
Signage-
IAQ
Air Quality Management – During
construction
H
V
A
C
Protection
16
HVAC
protection
Implementation Measure:
Major HVAC equipment and ductwork should be sealed at the factory and wrapped completely in a non-porous covering.
Prior to operation, all installed duct openings shall be covered with a non-porous material to prevent airborne contaminants,
debris and moisture from entering the duct.
Air Quality Management – During
construction
Source
Control
17
DG on Raised
platform
Implementation Measure:
• DG set used in the project should be placed away (more than 8m) from the construction area and the exhaust is placed
facing away from the site.
• All the paints, coatings, adhesives and sealants used in the project should be stored in a raised platform with vent to
minimize the
indoor air pollution during construction.
Air Quality Management – During
construction
Paint
storage
Protection of absorptive
materials.
18
Material
storage
Implementation Measure:
• All absorbent materials shall be covered on all six sides and elevated to prevent absorption, preferably stored in a
container or inside the building.
• In the event an absorbent material gets moist, it shall be replaced, even if already installed.
• Unless required, installed drywall shall not touch the floor. This will limit absorption of liquids.
Air Quality Management – During
construction
P
athway
Interruption
19
Pathway
measures
Implementation Measure:
• Ensure that all the finished construction zone are provided with mats such that dirt from boots and tires are removed before
entering the construction zone.
• Ensure a pressure differential between completed or existing areas and work areas, sufficient to prevent airborne
contaminates from spreading to finished spaces.
Air Quality Management – During
construction
Housekeepin
g
20
Housekeepin
g
Implementation Measure:
• All trash, debris and dust shall be cleaned up from the construction area and all floors swept at each close of business or
24 hour period.
• No waste or construction materials shall be stored in the AHU. If not in use, access doors of AHU room shall be locked.
• Petroleum based products shall not be used when sweeping floors.
• All spills and accumulated water shall be cleaned as soon as possible.
Air Quality Management – During
construction
During
Construction
L
o
w V
O
C
materials
21
Material
storage
Implementation Measure:
• Store chemicals, paints, and solvents in sealed containers and in well-ventilated areas away from occupied spaces.
• Ensure adequate ventilation in areas where VOCs and chemicals are used. Use exhaust fans or temporary ventilation
systems to remove fumes.
Air Quality Management – During
construction
Prohibition of
smoking
22
Implementation Measure:
Prohibit the use of smoking inside the building and within 25 feet (7.5 meters) of the building openings during
construction
No smoking
signage

L E E D ppppppppppppt dhd v 4.pptx

  • 1.
  • 2.
    Soil Erosion andSedimentation Control 2 Intent: To reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust that disproportionately impact frontline communities. IMPLEMENTATION MEASURES 1. Water bodies within 50ft from construction site 2. Stormwater infiltration 3. Sediment controls 4. Sediment track-out 5. Stockpile management 6. Dust suppression measures 7. Top soil preservation 8. Minimise soil compaction 9. Protect storm drain inlet 10. Sedimentation basin
  • 3.
    W a t e r bodies within50ft fr o m construction site 3 Implementation Measure: Provide and maintain natural buffers and/or equivalent erosion and sediment controls when a water body is located within 50 feet of the construction site. . Vegetation as buffer Soil Erosion and Sedimentation Control
  • 4.
    Stormwater infiltration 4 Implementation Measure: Direct stormwaterto vegetated areas and maximize stormwater infiltration and filtering to reduce pollutant discharge. Storm water directed to Vegetation Storm water Infiltration Soil Erosion and Sedimentation Control
  • 5.
    Sediment controls 5 Implementation Measure: Install sedimentcontrols along any perimeter areas of the site that will receive pollutant discharges. Site barricading Soil Erosion and Sedimentation Control
  • 6.
    Sediment track- out 6 Implementation Measure: •Restrict vehicle use to properly designated exit points. • Where sediment has been tracked-out from your site onto paved roads, sidewalk, or other paved areas outside of your site, remove (sweeping, shoveling or vacuuming) the deposited sediment by the end of the same business day in which the track- out occurs or by the end of the next business day if track-out occurs on a non-business day. Stabilized construction exits Soil Erosion and Sedimentation Control
  • 7.
    Stockpile ma na geme nt 7 Implementation Measure: • Locatethe piles outside of any natural buffers and away from stormwater conveyances, drain inlets, and areas where stormwater flow is concentrated. • Cover stockpiles that are unused for 14 days or more. Store stockpile away from Vegetation & Storm drain Soil Erosion and Sedimentation Control
  • 8.
    Dust suppression measures 8 Implementation Measure: Onareas of exposed soil, minimize the generation of dust through the appropriate application of water or other dust suppression techniques. Dust suppression Soil Erosion and Sedimentation Control
  • 9.
    T o p soil preservation 9 Implementation Measure: •Preserve native top soil by stockpiling away from water drain area and provide signage to protect the top soil. • Maintain the fertility of the soil by mulching. Top soil stock pile Soil Erosion and Sedimentation Control Mulchin g
  • 10.
    Minimise soil compaction 10 Implementation Measure: Inareas of site where final vegetative stabilization will occur or where infiltration practices will be installed, • Restrict vehicle and equipment use in these locations to avoid soil compaction. • Before seeding or planting areas of exposed soil that have been compacted, use techniques that rehabilitate and condition the soils as necessary to support. Avoiding soil compaction at areas dedicated for vegetation Soil Erosion and Sedimentation Control
  • 11.
    Protect storm drain inlet 11 ImplementationMeasure: • Install inlet protection measures that remove sediment from discharges prior to entry into any storm drain inlet that carries stormwater flow from your site to a water body. • Clean, or remove and replace, the protection measures as sediment accumulates, the filter becomes clogged, and/or performance is compromised. . Storm water inlet protection Soil Erosion and Sedimentation Control
  • 12.
    Sedimentation basin 12 Implementation Measure: • Providetemporary sedimentation basin to divert & capture the rain water generated during construction. • Design the basin or impoundment to provide storage for calculated volume of runoff from a 2-year, 24-hour storm. Temporary sedimentation basin Soil Erosion and Sedimentation Control
  • 13.
    W aste Management- Constructionand demolition 13 Intent: To reduce construction and demolition waste disposed of in landfills and incineration facilities through waste prevention and by reusing, recovering, and recycling materials, and conserving resources for future generations. IMPLEMENTATION MEASURES 1. Reusing construction waste on-site. 2. Store and segregate construction waste on-site with permanent signage. Reuse of broken bricks Construction waste yard
  • 14.
    14 Intent: To promote thewell-being of construction workers and building occupants by minimizing indoor air quality problems associated with construction and renovation. Air Quality Management – During construction IMPLEMENTATION MEASURES 1. Training and Communication 2. HVAC Protection 3. Source control 4. Protection of absorptive materials 5. Pathway interruption 6. Housekeeping 7. Low VOC materials 8. Prohibition of smoking
  • 15.
    T r aining and Communication 15 Workers training Implementation Measure: •Train construction workers and site managers on IAQ (Indoor air quality) control measures, including the importance of minimizing dust, proper use of chemicals, and maintaining ventilation. • Post signs and provide communication to reinforce IAQ (Indoor air quality) practices and remind workers of their responsibilities. Signage- IAQ Air Quality Management – During construction
  • 16.
    H V A C Protection 16 HVAC protection Implementation Measure: Major HVACequipment and ductwork should be sealed at the factory and wrapped completely in a non-porous covering. Prior to operation, all installed duct openings shall be covered with a non-porous material to prevent airborne contaminants, debris and moisture from entering the duct. Air Quality Management – During construction
  • 17.
    Source Control 17 DG on Raised platform ImplementationMeasure: • DG set used in the project should be placed away (more than 8m) from the construction area and the exhaust is placed facing away from the site. • All the paints, coatings, adhesives and sealants used in the project should be stored in a raised platform with vent to minimize the indoor air pollution during construction. Air Quality Management – During construction Paint storage
  • 18.
    Protection of absorptive materials. 18 Material storage ImplementationMeasure: • All absorbent materials shall be covered on all six sides and elevated to prevent absorption, preferably stored in a container or inside the building. • In the event an absorbent material gets moist, it shall be replaced, even if already installed. • Unless required, installed drywall shall not touch the floor. This will limit absorption of liquids. Air Quality Management – During construction
  • 19.
    P athway Interruption 19 Pathway measures Implementation Measure: • Ensurethat all the finished construction zone are provided with mats such that dirt from boots and tires are removed before entering the construction zone. • Ensure a pressure differential between completed or existing areas and work areas, sufficient to prevent airborne contaminates from spreading to finished spaces. Air Quality Management – During construction
  • 20.
    Housekeepin g 20 Housekeepin g Implementation Measure: • Alltrash, debris and dust shall be cleaned up from the construction area and all floors swept at each close of business or 24 hour period. • No waste or construction materials shall be stored in the AHU. If not in use, access doors of AHU room shall be locked. • Petroleum based products shall not be used when sweeping floors. • All spills and accumulated water shall be cleaned as soon as possible. Air Quality Management – During construction During Construction
  • 21.
    L o w V O C materials 21 Material storage Implementation Measure: •Store chemicals, paints, and solvents in sealed containers and in well-ventilated areas away from occupied spaces. • Ensure adequate ventilation in areas where VOCs and chemicals are used. Use exhaust fans or temporary ventilation systems to remove fumes. Air Quality Management – During construction
  • 22.
    Prohibition of smoking 22 Implementation Measure: Prohibitthe use of smoking inside the building and within 25 feet (7.5 meters) of the building openings during construction No smoking signage