SlideShare a Scribd company logo
2
3













4
5
6
#1 Shaft
#1A shaft
7
#3 shaft
Glory Hole
8
Hole #
From
(m)
To (m)
Length
(m)
Est.
True
Width
Cu% Pb% Ag g/t
K15-001 8.27 37.92 29.65 18.5 1.24 0.0053 19.18
Incl. 14.76 32.27 17.51 10.9 1.86 0.0044 29.34
K15-002 13.47 24.58 11.11 6.8 0.75 0.14 6.68
K15-003 NSV
K15-004 32 51 19 9.3 0.97 2.24 11.58
incl. 38.64 43 4.36 2.70 3.49 9.65 37.06
K15-005 19.34 46.65 27.31 13.4 0.61 1.95 5.68
incl. 19.34 34.37 15.03 7.4 0.17 3.53 2.15
incl. 33.68 46.65 12.97 6.4 1.23 0.23 11.54
K15-006 1.5 10.2 8.7 5.39 0.57 NSV 4.32
K15-007 15.1 23.57 8.47 5.25 0.69 NSV 6.39
K15-008 32.21 34 1.79 1.11 2.74 NSV 19.36
K15-009 17.15 18.85 1.7 1.05 0.54 NSV 2.07
K15-010 0 19.25 19.25 11.94 1.16 NSV 11.04
K15-011 0 13.76 13.76 8.53 0.16 NSV 1.64
K15-012 3.55 11.88 8.33 5.16 1.37 NSV 14.77
K15-012 40.05 50.11 10.06 6.24 0.1 NSV 1.52
K15-013 5.4 24.52 19.11 11.85 0.76 NSV 9.12
K15-014 46.25 61.59 15.34 9.51 0.47 NSV 1.89
K15-015 9.66 23.6 13.94 8.64 2.86 0.00 9.66
incl. 9.66 12 2.34 1.45 16.31 0.07 75.34
K15-016 NSV
K15-017 53.7 79.12 25.42 15.76 0.29 0.51 1.61
K15-018 41.4 52.95 11.55 7.16 0.48 0.004 4.73
K15-019 NSV
Hole #
From
(m)
To (m)
Length
(m)
Est.
True
Width
Cu% Pb% Ag g/t
K15-020 21.1 44.45 23.25 14.42 0.56 0.01 1.98
K15-021 7.44 46.33 38.89 24.11 0.66 2.29 8.67
incl. 32.03 46.33 14.3 8.87 1.38 2.32 17.84
K15-022 34.07 42.3 8.23 5.1 2.01 0.39 7.9
K15-023 6.82 11.26 4.44 2.75 0.63 0.08 1.42
K15-024 NSV
K15-025 NSV
K15-026 40.13 43.38 3.25 2.02 0.84 4.46 8.9
K15-027 NSV
K15-028 29.2 30.4 1.2 0.74 10.95 0.16 142
K15-029 43.84 54 10.16 6.3 1.05 0.003 15.36
K15-030 29.47 45.00 15.53 9.63 1.35 0.8 15.36
incl. 29.47 32.86 3.39 2.10 4.57 3.59 53.44
incl 43.02 45.00 1.98 1.23 2.53 0.015 24.53
K15-031 2.60 7.94 5.34 3.31 0.48 0.007 4.89
and 50.36 52.00 1.64 1.02 0.54 0.0006 4.56
K15-032 15.36 15.96 0.6 0.37 0.95 0 21.7
and 34.90 41.55 6.65 4.12 0.04 1.06 0.85
and 52.00 53.53 1.53 0.95 0.47 0.02 2.75
K15-033 1.53 23.60 22.07 13.68 0.64 1.1 4.95
incl. 1.53 13.83 12.3 7.63 1.04 1.62 8.16
and 28.24 31.00 2.76 1.71 1.12 0.04 2.46
and 50.80 61.00 10.2 6.32 0.78 1.48 4.89
incl. 50.80 57.00 6.2 3.84 1.13 2.43 6.72
K15-034 NSV
K15-035 NSV
NSV=No Significant Values
9
10
11








12
Rod and Ball Mills Flotation Circuits AFW Shaft Hoist



13
14



 .
2015 Drilling
Area









17
Angola
Botswana
South Africa
Zambia
Kombat Mine
18
19
52 Week Price Performance
$-
$0.02
$0.04
$0.06
$0.08
$0.10
$0.12
20





21




22

More Related Content

What's hot

cable dimensions AWG and MM sizes
cable dimensions AWG and MM sizescable dimensions AWG and MM sizes
cable dimensions AWG and MM sizesJoe Khan
 
Navy Cycle 225 active e9 mcpo quotas
Navy Cycle 225 active e9 mcpo quotasNavy Cycle 225 active e9 mcpo quotas
Navy Cycle 225 active e9 mcpo quotas
NavyMentor.org
 
Wire Strand Chart
Wire Strand ChartWire Strand Chart
Wire Strand Chart
MaryArmenta
 
Ejemplos de formulas
Ejemplos de formulasEjemplos de formulas
Ejemplos de formulasDiana Ramirez
 
Campo magnetiiicoommb
Campo magnetiiicoommbCampo magnetiiicoommb
Campo magnetiiicoommbmaripepa1993
 
Sisat turno vespertino EST 6 Querétaro
Sisat turno vespertino EST 6 QuerétaroSisat turno vespertino EST 6 Querétaro
Sisat turno vespertino EST 6 Querétaro
Usebeq
 
Besavne cevi din_2448
Besavne cevi din_2448Besavne cevi din_2448
Besavne cevi din_2448
mariomocic1989
 
Pipe nb
Pipe nbPipe nb
Produção Nacional
Produção NacionalProdução Nacional
Produção Nacional
Eduardo Abbas
 
Notas Primera Parcial Quimica I 2009
Notas Primera Parcial   Quimica I 2009Notas Primera Parcial   Quimica I 2009
Notas Primera Parcial Quimica I 2009guest75b82c8c
 
Conversão de polegadas para mm.
Conversão de polegadas para mm.Conversão de polegadas para mm.
Conversão de polegadas para mm.
Luiz Avelar
 
Polegada milimetro
Polegada milimetroPolegada milimetro
Polegada milimetrocletospotto
 
Sample Pricing sheet
Sample Pricing sheetSample Pricing sheet
Sample Pricing sheet
Tina Thomas
 

What's hot (20)

cable dimensions AWG and MM sizes
cable dimensions AWG and MM sizescable dimensions AWG and MM sizes
cable dimensions AWG and MM sizes
 
Ttablosu
TtablosuTtablosu
Ttablosu
 
Navy Cycle 225 active e9 mcpo quotas
Navy Cycle 225 active e9 mcpo quotasNavy Cycle 225 active e9 mcpo quotas
Navy Cycle 225 active e9 mcpo quotas
 
Wire Strand Chart
Wire Strand ChartWire Strand Chart
Wire Strand Chart
 
Ejemplos de formulas
Ejemplos de formulasEjemplos de formulas
Ejemplos de formulas
 
Campo magnetiiicoommb
Campo magnetiiicoommbCampo magnetiiicoommb
Campo magnetiiicoommb
 
GC-MC Report NAS DIV 2016
GC-MC Report NAS DIV 2016GC-MC Report NAS DIV 2016
GC-MC Report NAS DIV 2016
 
Sisat turno vespertino EST 6 Querétaro
Sisat turno vespertino EST 6 QuerétaroSisat turno vespertino EST 6 Querétaro
Sisat turno vespertino EST 6 Querétaro
 
Besavne cevi din_2448
Besavne cevi din_2448Besavne cevi din_2448
Besavne cevi din_2448
 
Pipe nb
Pipe nbPipe nb
Pipe nb
 
Produção Nacional
Produção NacionalProdução Nacional
Produção Nacional
 
Lev curva
Lev curvaLev curva
Lev curva
 
Catlog
CatlogCatlog
Catlog
 
Notas Primera Parcial Quimica I 2009
Notas Primera Parcial   Quimica I 2009Notas Primera Parcial   Quimica I 2009
Notas Primera Parcial Quimica I 2009
 
Conversão de polegadas para mm.
Conversão de polegadas para mm.Conversão de polegadas para mm.
Conversão de polegadas para mm.
 
HH2 Duong Noi Xuan Mai
HH2 Duong Noi Xuan Mai HH2 Duong Noi Xuan Mai
HH2 Duong Noi Xuan Mai
 
Rigo quimcaexpo
Rigo quimcaexpoRigo quimcaexpo
Rigo quimcaexpo
 
Polegada milimetro
Polegada milimetroPolegada milimetro
Polegada milimetro
 
Sample Pricing sheet
Sample Pricing sheetSample Pricing sheet
Sample Pricing sheet
 
Escala de notas
Escala de notasEscala de notas
Escala de notas
 

Viewers also liked

Pppm bahasa inggeris ting 1
Pppm bahasa inggeris ting 1Pppm bahasa inggeris ting 1
Pppm bahasa inggeris ting 1
Amilinda Amsar
 
Pppm khb pertanian_ting 1_kemaskini 29.4.14
Pppm khb pertanian_ting 1_kemaskini 29.4.14Pppm khb pertanian_ting 1_kemaskini 29.4.14
Pppm khb pertanian_ting 1_kemaskini 29.4.14
Amilinda Amsar
 
Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...
Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...
Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...
Glassdoor
 
Chuong6 4237
Chuong6 4237Chuong6 4237
Chuong6 4237
Hảo Hiểm
 
Tckh tinh khoahoc
Tckh tinh khoahocTckh tinh khoahoc
Tckh tinh khoahoc
Ngoc Anh Nguyen
 
109258193 case-ckd
109258193 case-ckd109258193 case-ckd
109258193 case-ckd
homeworkping7
 
What is causing my database to grow?
What is causing my database to grow?What is causing my database to grow?
What is causing my database to grow?
Jared Karney
 
კურორტ სქურის ბუკლეტი ტურისტებისათვის
კურორტ სქურის ბუკლეტი ტურისტებისათვისკურორტ სქურის ბუკლეტი ტურისტებისათვის
კურორტ სქურის ბუკლეტი ტურისტებისათვის
nonajgali77
 
Borrower Guide: Stock Options
Borrower Guide: Stock OptionsBorrower Guide: Stock Options
Borrower Guide: Stock Options
WeFinance
 
Traduccion a ensamblador
Traduccion a ensambladorTraduccion a ensamblador
Traduccion a ensamblador
tre_na_gil
 
UN Secretary-General's Visit to Nigeria
UN Secretary-General's Visit to Nigeria UN Secretary-General's Visit to Nigeria
UN Secretary-General's Visit to Nigeria
JSI
 
Global consulting attijariwafaa bank m2 di
Global consulting attijariwafaa bank m2 diGlobal consulting attijariwafaa bank m2 di
Global consulting attijariwafaa bank m2 di
Jijifou
 
Effectivenotemaking (2)
Effectivenotemaking (2)Effectivenotemaking (2)
Effectivenotemaking (2)
Vishal N. Lokhande
 
Testomials en productbeschrijvingen20140311105315917
Testomials en productbeschrijvingen20140311105315917Testomials en productbeschrijvingen20140311105315917
Testomials en productbeschrijvingen20140311105315917
Theo Theo Herbots the voice from #Tienen
 
Write down the rational of followings
Write down the rational of  followingsWrite down the rational of  followings
Write down the rational of followings
Shyam Mandal
 
Audience Research Survey
Audience Research SurveyAudience Research Survey
Audience Research SurveyAntoniaG98
 
02基本功能鍵介紹
02基本功能鍵介紹02基本功能鍵介紹
02基本功能鍵介紹
lavias
 
IQSellers - узкотаргетированная баннерная реклама в b2b сегменте
IQSellers - узкотаргетированная баннерная реклама в b2b сегментеIQSellers - узкотаргетированная баннерная реклама в b2b сегменте
IQSellers - узкотаргетированная баннерная реклама в b2b сегменте
Татьяна Примак !
 

Viewers also liked (19)

Pppm bahasa inggeris ting 1
Pppm bahasa inggeris ting 1Pppm bahasa inggeris ting 1
Pppm bahasa inggeris ting 1
 
Pppm khb pertanian_ting 1_kemaskini 29.4.14
Pppm khb pertanian_ting 1_kemaskini 29.4.14Pppm khb pertanian_ting 1_kemaskini 29.4.14
Pppm khb pertanian_ting 1_kemaskini 29.4.14
 
Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...
Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...
Vancouver Rebels of Recruiting Roadshow | John Trenholme from Canadian Tire C...
 
Chuong6 4237
Chuong6 4237Chuong6 4237
Chuong6 4237
 
Tckh tinh khoahoc
Tckh tinh khoahocTckh tinh khoahoc
Tckh tinh khoahoc
 
109258193 case-ckd
109258193 case-ckd109258193 case-ckd
109258193 case-ckd
 
What is causing my database to grow?
What is causing my database to grow?What is causing my database to grow?
What is causing my database to grow?
 
კურორტ სქურის ბუკლეტი ტურისტებისათვის
კურორტ სქურის ბუკლეტი ტურისტებისათვისკურორტ სქურის ბუკლეტი ტურისტებისათვის
კურორტ სქურის ბუკლეტი ტურისტებისათვის
 
Borrower Guide: Stock Options
Borrower Guide: Stock OptionsBorrower Guide: Stock Options
Borrower Guide: Stock Options
 
Traduccion a ensamblador
Traduccion a ensambladorTraduccion a ensamblador
Traduccion a ensamblador
 
UN Secretary-General's Visit to Nigeria
UN Secretary-General's Visit to Nigeria UN Secretary-General's Visit to Nigeria
UN Secretary-General's Visit to Nigeria
 
Global consulting attijariwafaa bank m2 di
Global consulting attijariwafaa bank m2 diGlobal consulting attijariwafaa bank m2 di
Global consulting attijariwafaa bank m2 di
 
Effectivenotemaking (2)
Effectivenotemaking (2)Effectivenotemaking (2)
Effectivenotemaking (2)
 
Testomials en productbeschrijvingen20140311105315917
Testomials en productbeschrijvingen20140311105315917Testomials en productbeschrijvingen20140311105315917
Testomials en productbeschrijvingen20140311105315917
 
Write down the rational of followings
Write down the rational of  followingsWrite down the rational of  followings
Write down the rational of followings
 
Audience Research Survey
Audience Research SurveyAudience Research Survey
Audience Research Survey
 
02基本功能鍵介紹
02基本功能鍵介紹02基本功能鍵介紹
02基本功能鍵介紹
 
MP.Marincik.2015Q3
MP.Marincik.2015Q3MP.Marincik.2015Q3
MP.Marincik.2015Q3
 
IQSellers - узкотаргетированная баннерная реклама в b2b сегменте
IQSellers - узкотаргетированная баннерная реклама в b2b сегментеIQSellers - узкотаргетированная баннерная реклама в b2b сегменте
IQSellers - узкотаргетированная баннерная реклама в b2b сегменте
 

Similar to Kombat Copper September 2015 Corporate Presentation

Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units Tables
Kum Visal
 
Fittings acero forjado
Fittings acero forjadoFittings acero forjado
Fittings acero forjado
Eduardo Adana
 
Share
ShareShare
186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap
NitaMewaKameliaSiman
 
186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap
NitaMewaKameliaSiman
 
Metode nakayasu
Metode nakayasuMetode nakayasu
Metode nakayasu
Arista Aulia
 
DataUp for the IALE 2013 Meeting
DataUp for the IALE 2013 MeetingDataUp for the IALE 2013 Meeting
DataUp for the IALE 2013 Meeting
Carly Strasser
 
Hasil perhitungan Orifice Gas
Hasil perhitungan Orifice GasHasil perhitungan Orifice Gas
Hasil perhitungan Orifice Gas
GGM Spektafest
 
Steam tables
Steam tablesSteam tables
Steam tables
Shiva Nasiri
 
DataUp Presentation at Cal Poly
DataUp Presentation at Cal PolyDataUp Presentation at Cal Poly
DataUp Presentation at Cal Poly
Carly Strasser
 
Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2
NelsonBort
 
Anexo tablas2. q terzaghi.
Anexo tablas2. q terzaghi.Anexo tablas2. q terzaghi.
Anexo tablas2. q terzaghi.
Sacsavilca Ramos
 
Aisc tablas catalogos
Aisc tablas catalogosAisc tablas catalogos
Aisc tablas catalogos
hbyron
 
Construction Cost management System
Construction Cost management SystemConstruction Cost management System
Construction Cost management System
Utkarsh mittal
 
Periodic Table Graphs
Periodic Table GraphsPeriodic Table Graphs
Periodic Table Graphs
Mohammad Hefny
 
Volvo EC55B Compact Excavator Service Repair Manual.pdf
Volvo EC55B Compact Excavator Service Repair Manual.pdfVolvo EC55B Compact Excavator Service Repair Manual.pdf
Volvo EC55B Compact Excavator Service Repair Manual.pdf
bin971209zhou
 
Volvo EC55B Compact Excavator Service Repair Manual
Volvo EC55B Compact Excavator Service Repair ManualVolvo EC55B Compact Excavator Service Repair Manual
Volvo EC55B Compact Excavator Service Repair Manual
fujdfjjskrtekme
 

Similar to Kombat Copper September 2015 Corporate Presentation (20)

Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units Tables
 
Fittings acero forjado
Fittings acero forjadoFittings acero forjado
Fittings acero forjado
 
Share
ShareShare
Share
 
186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap
 
186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap186024212 tabel-baja-lengkap
186024212 tabel-baja-lengkap
 
Metode nakayasu
Metode nakayasuMetode nakayasu
Metode nakayasu
 
DataUp for the IALE 2013 Meeting
DataUp for the IALE 2013 MeetingDataUp for the IALE 2013 Meeting
DataUp for the IALE 2013 Meeting
 
Hasil perhitungan Orifice Gas
Hasil perhitungan Orifice GasHasil perhitungan Orifice Gas
Hasil perhitungan Orifice Gas
 
CBG_BSc Grad
CBG_BSc GradCBG_BSc Grad
CBG_BSc Grad
 
Steam tables
Steam tablesSteam tables
Steam tables
 
DataUp Presentation at Cal Poly
DataUp Presentation at Cal PolyDataUp Presentation at Cal Poly
DataUp Presentation at Cal Poly
 
Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2Moyno pump 2000 dimensions g2
Moyno pump 2000 dimensions g2
 
GC-MC Report NN 2016
GC-MC Report NN 2016GC-MC Report NN 2016
GC-MC Report NN 2016
 
Anexo tablas2. q terzaghi.
Anexo tablas2. q terzaghi.Anexo tablas2. q terzaghi.
Anexo tablas2. q terzaghi.
 
Aisc tablas catalogos
Aisc tablas catalogosAisc tablas catalogos
Aisc tablas catalogos
 
Construction Cost management System
Construction Cost management SystemConstruction Cost management System
Construction Cost management System
 
Periodic Table Graphs
Periodic Table GraphsPeriodic Table Graphs
Periodic Table Graphs
 
IBO2014_FINAL_scores
IBO2014_FINAL_scoresIBO2014_FINAL_scores
IBO2014_FINAL_scores
 
Volvo EC55B Compact Excavator Service Repair Manual.pdf
Volvo EC55B Compact Excavator Service Repair Manual.pdfVolvo EC55B Compact Excavator Service Repair Manual.pdf
Volvo EC55B Compact Excavator Service Repair Manual.pdf
 
Volvo EC55B Compact Excavator Service Repair Manual
Volvo EC55B Compact Excavator Service Repair ManualVolvo EC55B Compact Excavator Service Repair Manual
Volvo EC55B Compact Excavator Service Repair Manual
 

More from Kombat_Copper

Kombat Copper July 2016 Corporate Presentation
Kombat Copper July 2016 Corporate PresentationKombat Copper July 2016 Corporate Presentation
Kombat Copper July 2016 Corporate Presentation
Kombat_Copper
 
June 2016 Kombat Corporate Presentation
June 2016 Kombat Corporate PresentationJune 2016 Kombat Corporate Presentation
June 2016 Kombat Corporate Presentation
Kombat_Copper
 
Kombat Copper Corporate Presentation April 2016
Kombat Copper Corporate Presentation April 2016 Kombat Copper Corporate Presentation April 2016
Kombat Copper Corporate Presentation April 2016
Kombat_Copper
 
March 2016 kbt presentation public online
March 2016 kbt presentation public onlineMarch 2016 kbt presentation public online
March 2016 kbt presentation public online
Kombat_Copper
 
February 2016 Corporate Presentation (Updated Feb 16th)
February 2016 Corporate Presentation (Updated Feb 16th)February 2016 Corporate Presentation (Updated Feb 16th)
February 2016 Corporate Presentation (Updated Feb 16th)
Kombat_Copper
 
Updated February 2016 Presentation
Updated February 2016 Presentation Updated February 2016 Presentation
Updated February 2016 Presentation
Kombat_Copper
 
Kombat Copper Corporate Presentation February 2016
Kombat Copper Corporate Presentation February 2016 Kombat Copper Corporate Presentation February 2016
Kombat Copper Corporate Presentation February 2016
Kombat_Copper
 
Kombat Corporate Presentation January 2016
Kombat Corporate Presentation January 2016Kombat Corporate Presentation January 2016
Kombat Corporate Presentation January 2016
Kombat_Copper
 
Kombat Copper AGM 2015 Presentation
Kombat Copper AGM 2015 PresentationKombat Copper AGM 2015 Presentation
Kombat Copper AGM 2015 Presentation
Kombat_Copper
 
Kombat Copper Corporate Presentation January 2015
Kombat Copper Corporate Presentation January 2015Kombat Copper Corporate Presentation January 2015
Kombat Copper Corporate Presentation January 2015
Kombat_Copper
 

More from Kombat_Copper (10)

Kombat Copper July 2016 Corporate Presentation
Kombat Copper July 2016 Corporate PresentationKombat Copper July 2016 Corporate Presentation
Kombat Copper July 2016 Corporate Presentation
 
June 2016 Kombat Corporate Presentation
June 2016 Kombat Corporate PresentationJune 2016 Kombat Corporate Presentation
June 2016 Kombat Corporate Presentation
 
Kombat Copper Corporate Presentation April 2016
Kombat Copper Corporate Presentation April 2016 Kombat Copper Corporate Presentation April 2016
Kombat Copper Corporate Presentation April 2016
 
March 2016 kbt presentation public online
March 2016 kbt presentation public onlineMarch 2016 kbt presentation public online
March 2016 kbt presentation public online
 
February 2016 Corporate Presentation (Updated Feb 16th)
February 2016 Corporate Presentation (Updated Feb 16th)February 2016 Corporate Presentation (Updated Feb 16th)
February 2016 Corporate Presentation (Updated Feb 16th)
 
Updated February 2016 Presentation
Updated February 2016 Presentation Updated February 2016 Presentation
Updated February 2016 Presentation
 
Kombat Copper Corporate Presentation February 2016
Kombat Copper Corporate Presentation February 2016 Kombat Copper Corporate Presentation February 2016
Kombat Copper Corporate Presentation February 2016
 
Kombat Corporate Presentation January 2016
Kombat Corporate Presentation January 2016Kombat Corporate Presentation January 2016
Kombat Corporate Presentation January 2016
 
Kombat Copper AGM 2015 Presentation
Kombat Copper AGM 2015 PresentationKombat Copper AGM 2015 Presentation
Kombat Copper AGM 2015 Presentation
 
Kombat Copper Corporate Presentation January 2015
Kombat Copper Corporate Presentation January 2015Kombat Copper Corporate Presentation January 2015
Kombat Copper Corporate Presentation January 2015
 

Recently uploaded

Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
ybout
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
Sysco_Investors
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 

Recently uploaded (7)

Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
一比一原版(UW毕业证)华盛顿大学毕业证成绩单专业办理
 
2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf2024-deutsche-bank-global-consumer-conference.pdf
2024-deutsche-bank-global-consumer-conference.pdf
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 2024
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 

Kombat Copper September 2015 Corporate Presentation

  • 1.
  • 2. 2
  • 5. 5
  • 8. 8 Hole # From (m) To (m) Length (m) Est. True Width Cu% Pb% Ag g/t K15-001 8.27 37.92 29.65 18.5 1.24 0.0053 19.18 Incl. 14.76 32.27 17.51 10.9 1.86 0.0044 29.34 K15-002 13.47 24.58 11.11 6.8 0.75 0.14 6.68 K15-003 NSV K15-004 32 51 19 9.3 0.97 2.24 11.58 incl. 38.64 43 4.36 2.70 3.49 9.65 37.06 K15-005 19.34 46.65 27.31 13.4 0.61 1.95 5.68 incl. 19.34 34.37 15.03 7.4 0.17 3.53 2.15 incl. 33.68 46.65 12.97 6.4 1.23 0.23 11.54 K15-006 1.5 10.2 8.7 5.39 0.57 NSV 4.32 K15-007 15.1 23.57 8.47 5.25 0.69 NSV 6.39 K15-008 32.21 34 1.79 1.11 2.74 NSV 19.36 K15-009 17.15 18.85 1.7 1.05 0.54 NSV 2.07 K15-010 0 19.25 19.25 11.94 1.16 NSV 11.04 K15-011 0 13.76 13.76 8.53 0.16 NSV 1.64 K15-012 3.55 11.88 8.33 5.16 1.37 NSV 14.77 K15-012 40.05 50.11 10.06 6.24 0.1 NSV 1.52 K15-013 5.4 24.52 19.11 11.85 0.76 NSV 9.12 K15-014 46.25 61.59 15.34 9.51 0.47 NSV 1.89 K15-015 9.66 23.6 13.94 8.64 2.86 0.00 9.66 incl. 9.66 12 2.34 1.45 16.31 0.07 75.34 K15-016 NSV K15-017 53.7 79.12 25.42 15.76 0.29 0.51 1.61 K15-018 41.4 52.95 11.55 7.16 0.48 0.004 4.73 K15-019 NSV Hole # From (m) To (m) Length (m) Est. True Width Cu% Pb% Ag g/t K15-020 21.1 44.45 23.25 14.42 0.56 0.01 1.98 K15-021 7.44 46.33 38.89 24.11 0.66 2.29 8.67 incl. 32.03 46.33 14.3 8.87 1.38 2.32 17.84 K15-022 34.07 42.3 8.23 5.1 2.01 0.39 7.9 K15-023 6.82 11.26 4.44 2.75 0.63 0.08 1.42 K15-024 NSV K15-025 NSV K15-026 40.13 43.38 3.25 2.02 0.84 4.46 8.9 K15-027 NSV K15-028 29.2 30.4 1.2 0.74 10.95 0.16 142 K15-029 43.84 54 10.16 6.3 1.05 0.003 15.36 K15-030 29.47 45.00 15.53 9.63 1.35 0.8 15.36 incl. 29.47 32.86 3.39 2.10 4.57 3.59 53.44 incl 43.02 45.00 1.98 1.23 2.53 0.015 24.53 K15-031 2.60 7.94 5.34 3.31 0.48 0.007 4.89 and 50.36 52.00 1.64 1.02 0.54 0.0006 4.56 K15-032 15.36 15.96 0.6 0.37 0.95 0 21.7 and 34.90 41.55 6.65 4.12 0.04 1.06 0.85 and 52.00 53.53 1.53 0.95 0.47 0.02 2.75 K15-033 1.53 23.60 22.07 13.68 0.64 1.1 4.95 incl. 1.53 13.83 12.3 7.63 1.04 1.62 8.16 and 28.24 31.00 2.76 1.71 1.12 0.04 2.46 and 50.80 61.00 10.2 6.32 0.78 1.48 4.89 incl. 50.80 57.00 6.2 3.84 1.13 2.43 6.72 K15-034 NSV K15-035 NSV NSV=No Significant Values
  • 9. 9
  • 10. 10
  • 12.     12 Rod and Ball Mills Flotation Circuits AFW Shaft Hoist
  • 15.
  • 16.
  • 18. 18
  • 19. 19 52 Week Price Performance $- $0.02 $0.04 $0.06 $0.08 $0.10 $0.12
  • 22. 22