Design Mix
Sr.
No.
Grade Total
Cement
Qty
M3
cement FlyAsh Microsilica 20m
m
10mm River
Sand
Crusher
Sand
Kg Kg Kg Kg Kg Kg Kg
1 M80 680 1 480 140 60 552 563 0 740
2 M 70 614 1 455 108 51 535 536 0 728
3 M60 570 1 450 80 40 537 520 0 718
4 M50 560 1 450 110 0 535 512 0 716
5 M40 480 1 400 80 0 530 484 0 846
6 M30 420 1 350 70 0 548 500 0 886
7 M20 320 1 260 60 0 552 502 0 946
8 M15 280 1 224 56 0 556 520 703 306
9 M10 220 1 176 44 0 588 478 568 358
In the Further Pages Calculation of Concrete is shown fromthe given drawings. TheGradeof
Concrete is assumed to be of M-60. Consisting of Following Components.
1. Cement
2. Aggregates 10mmand 20mm
3. Micro Silica
4. Fly Ash
5. Crushed Sand
Structure Details
S.no Details Remarks
1.1 Concrete Calculation for Beams
1.2 Concrete Calculation for Coloumn
1.3 Concrete Calculation for Slab
Calculationof Beams Wing-1Wing-2Wing-3
S.No DESCRIPTION NOS L B H Area Quantity Shuttering
1 B48 2 0.501 0.23 0.575 0.576 0.132515 0.98196
2 B49 2 0.9 0.23 0.575 1.035 0.23805 1.764
6 B3 4 4.95 0.23 0.35 6.93 1.5939 10.494
7 B5 4 2.85 0.23 0.775 8.835 2.03205 15.732
8 B5A 4 3.02 0.23 0.35 4.228 0.97244 6.4024
10 B1 4 6.5 0.04 0.35 9.1 0.364 8.84
11 B2 2 4.95 0.23 0.35 3.465 0.79695 5.247
14 B8 2 2.415 0.2 0.35 1.691 0.3381 2.415
17 LB3 2 3.77 0.3 0.525 3.959 1.18755 7.163
18 B28 2 2.5 0.2 0.575 2.875 0.575 4.75
19 B28 2 1.9 0.2 0.35 1.33 0.266 1.9
20 B17 2 1.75 0.3 0.5 1.75 0.525 3.15
25 B5 4 3.2 0.23 0.775 9.92 2.2816 17.664
26 B5A 4 3.2 0.23 0.35 4.48 1.0304 6.784
27 B16 4 1.5 0.23 0.5 3 0.69 4.98
28 B10 4 4.07 0.2 0.5 8.14 1.628 13.024
32 LB2 2 1.25 0.3 1 2.5 0.75 4.75
35 LB2 2 1.25 0.3 1 2.5 0.75 4.75
38 B15 2 1.125 0.23 0.35 0.788 0.181125 1.1925
39 B2A 2 5.955 0.23 0.3 3.573 0.82179 5.1213
40 B1 2 5.955 0.04 0.35 4.169 0.16674 4.0494
42 B5A 2 2.8 0.23 0.35 1.96 0.4508 2.968
44 B14 2 0.875 0.3 0.775 1.356 0.406875 2.5375
46 B12 2 1.4 0.3 0.5 1.4 0.42 2.52
49 B5 2 3.35 0.23 0.775 5.193 1.194275 9.246
51 B9 2 1.6 0.2 0.35 1.12 0.224 1.6
53 B54 2 1.275 0.15 0.3 0.765 0.11475 0.8925
54 B8A 2 2.475 0.2 0.35 1.733 0.3465 2.475
S.No DESCRIPTION NOS L B H Area Quantity Shuttering
55 B17 2 1.675 0.2
3
0.5 1.675 0.38525 2.7805
62 B45 1 0.73 0.2 0.525 0.383 0.07665 0.6205
64 B26 1 1.21 0.1
5
0.2 0.242 0.0363 0.1815
65 B21 1 1.21 0.2 0.525 0.635 0.12705 1.0285
66 B25 1 4.47 0.2 0.525 2.347 0.46935 3.7995
67 B13A 1 1.31 0.2 0.525 0.688 0.13755 1.1135
72 B32 1 1.793 0.2
3
0.575 1.031 0.237124 1.75714
73 B51 1 1.198 0.1
5
0.3 0.359 0.05391 0.4193
75 B33(inc) 1 2.511 0.2 0.575 1.444 0.288765 2.38545
77 B38 1 1.397 0.1
5
0.35 0.489 0.073343 0.62865
78 B22M 1 4.15 0.2 0.525 2.179 0.43575 3.5275
79 LB5 1 2.59 0.2 0.525 1.36 0.27195 2.2015
80 B6 1 8.27 0.2 0.525 4.342 0.86835 7.0295
82 B6B 1 1.2 0.2 0.525 0.63 0.126 1.02
83 BK2 1 1.6 0.2 0.5 0.8 0.16 1.28
84 BK2 1 0.85 0.2 0.5 0.425 0.085 0.68
86 B50 1 0.9 0.3 0.9 0.81 0.243 1.53
87 B31 1 1.689 0.2 0.525 0.887 0.177345 1.43565
89 B51 1 1.198 0.1
5
0.3 0.359 0.05391 0.4193
90 B52 1 0.41 0.1
5
0.3 0.123 0.01845 0.1435
92 B20 1 4.15 0.2 0.725 3.009 0.60175 5.1875
93 B18 2 2.8 0.2
3
0.575 3.22 0.7406 5.488
94 B27 2 3.2 0.1
5
0.575 3.68 0.552 5.76
95 B47 2 0.47 0.2
3
0.575 0.541 0.124315 0.9212
3 B19 1 3.5 0.2
3
0.575 2.013 0.462875 3.43
4 B43 1 3.8 0.1
5
0.575 2.185 0.32775 3.42
5 B2 2 5.18 0.2
3
0.35 3.626 0.83398 5.4908
9 B2A 4 6.8 0.2
3
0.3 8.16 1.8768 11.696
12 B12 4 1.4 0.3 0.5 2.8 0.84 5.04
13 B14 2 1.5 0.3 0.775 2.325 0.6975 4.35
S.No DESCRIPTION NOS L B H Area Quantity Shuttering
15 B8A 3 2.375 0.2 0.35 2.494 0.49875 3.5625
16 B17 2 1.75 0.3 0.5 1.75 0.525 3.15
21 LB1 2 0.94 0.3 1.325 2.491 0.7473 4.794
22 B54 2 0.94 0.1
5
0.3 0.564 0.0846 0.658
23 B8 2 2.55 0.2 0.35 1.785 0.357 2.55
24 B14 2 1.169 0.3 0.775 1.812 0.543585 3.3901
29 B9 4 1.6 0.2 0.35 2.24 0.448 3.2
30 B15 2 0.54 0.2
3
0.35 0.378 0.08694 0.5724
31 B7 4 1.25 0.1
5
0.5 2.5 0.375 3.75
33 B4A 4 2.92 0.2
3
0.5 5.84 1.3432 9.6944
34 B37 2 2.125 0.2
3
0.35 1.488 0.342125 2.2525
36 LB4 4 6.742 0.8 1.5 40.45 32.3616 91.6912
37 B2 2 4.875 0.2
3
0.35 3.413 0.784875 5.1675
41 B5 2 2.8 0.2
3
0.775 4.34 0.9982 7.728
43 B3 2 5.8 0.2
3
0.35 4.06 0.9338 6.148
45 B16 2 1.145 0.2
3
0.5 1.145 0.26335 1.9007
47 B10 2 2.775 0.2 0.5 2.775 0.555 4.44
48 B10 2 1.295 0.2 0.3 0.777 0.1554 1.036
50 B5A 2 3.35 0.2
3
0.35 2.345 0.53935 3.551
52 B7 2 1.25 0.1
5
0.5 1.25 0.1875 1.875
56 B4A 2 2.92 0.2
3
0.5 2.92 0.6716 4.8472
57 LB3 1 3.85 0.3 0.525 2.021 0.606375 3.6575
58 LB1 2 1.275 0.3 1.325 3.379 1.013625 6.5025
59 LB2 2 1.25 0.3 1 2.5 0.75 4.75
60 B6A 1 2.6 0.2 0.525 1.365 0.273 2.21
61 B44 1 2.6 0.2 0.525 1.365 0.273 2.21
63 B13 1 1.11 0.2 0.525 0.583 0.11655 0.9435
68 B39 1 2 0.3 0.5 1 0.3 1.8
69 B41 1 0.9 0.3 0.5 0.45 0.135 0.81
70 B40 1 2.66 0.3 0.5 1.33 0.399 2.394
S.No DESCRIPTION NOS L B H Area Quantity Shuttering
71 B46 1 0.9 0.3 0.9 0.81 0.243 1.53
74 B34 1 1.548 0.2 0.3 0.464 0.09288 0.6192
76 B52 1 0.41 0.1
5
0.3 0.123 0.01845 0.1435
81 B6 1 7.96 0.2 0.525 4.179 0.8358 6.766
85 B24 1 1.784 0.3 0.5 0.892 0.2676 1.6056
88 B35 1 3.45 0.2 0.525 1.811 0.36225 2.9325
91 B38 1 1.111 0.1
5
0.35 0.389 0.058328 0.49995
Total 260.6 80.41 443.49
S.No DESCRIPTION
OF WORK
No's Area Perimete
r
Depth Volume of
concrete
Area of
shuttering
1 C2-05 1 0.695 3.780 3.000 2.085 11.34
2 C3-05 1 0.81 3.9 3.000 2.427 11.7
3 C2-06 1 0.69 3.78 3.000 2.082 11.34
4 C1-A-05 1 0.45 3.3 3.000 1.35 9.9
5 C1-06 1 0.45 3.3 3.000 1.35 9.9
6 C4-A-05 1 0.27 2.4 3.000 0.81 7.2
7 C4-05 1 0.71 5.4 3.000 2.13 16.2
8 C4-06 1 0.72 5.4 3.000 2.16 16.2
9 C4-A-06 1 0.27 2.4 3.000 0.81 7.2
10 C5-06 1 0.55 3.85 3.000 1.65 11.55
11 C5-05 1 0.55 3.85 3.000 1.65 11.55
12 C4-a-04 1 0.270 2.405 3.000 0.8112 7.215
13 C4-04 1 0.72 5.4 3.000 2.16 16.2
14 c1-04 1 0.41 2.7 3.000 1.23 8.1
15 c5-04 1 0.43 3.18 3.000 1.29 9.54
16 C2-04 1 0.69 4.4 3.000 2.07 13.2
17 C3-02 1 0.8 3.9 3.000 2.4 11.7
18 C2-02 1 0.69 4.45 3.000 2.079 13.35
19 C5-02 1 0.43 3.1 3.000 1.29 9.3
20 C1-02 1 0.4 2.7 3.000 1.2 8.1
21 C4-A-02 1 0.27 2.41 3.000 0.81 7.23
22 C4-02 1 0.72 5.414 3.000 2.16 16.242
23 C4-a-01 1 0.27 2.41 3.000 0.81 7.23
24 C4-01 1 0.71 5.4 3.000 2.13 16.2
25 C1-01 1 0.4 2.7 3.000 1.2 8.1
26 C5-01 1 0.43 3.18 3.000 1.29 9.54
27 C2-01 1 0.69 4.4 3.000 2.07 13.2
S.No DESCRIPTION
OF WORK
No's Area Perimete
r
Depth Volume of
concrete
Area of
shuttering
28 C3-01 1 0.81 3.9 3.000 2.43 11.7
29 C2-03 1 0.69 4.45 3.000 2.079 13.35
30 C1-03 1 0.4 2.7 3.000 1.2 8.1
31 C5-03 1 0.43 3.18 3.000 1.29 9.54
32 C4-03 1 0.54 5.4 3.000 1.62 16.2
33 C4-a-03 1 0.27 2.4 3.000 0.81 7.2
34 C5-03 1 0.43 3.8 3.000 1.302 11.4
35 C6-01 1 0.42 2.7 3.000 1.26 8.1
36 C6-02 1 0.42 2.7 3.000 1.26 8.1
37 (C9-01B)+(C9-
01C)+(C9-
01D)
1 3.8 28 3.000 11.4 84
38 (C9-01A) +
(C9-01
B) + (C9-01
C)+ (C9-01
D) + (C9-01
E)
1 53.64 40 3.000 160.92 120
39 C7-01 1 0.88 6.5 3.000 2.64 19.5
40 C7-02 1 0.88 6.5 3.000 2.64 19.5
41 C7-03 1 0.32 2.8 3.000 0.96 8.4
Structure
has a plan of
G + 25
Floors.We
assumethat
every Floor
is Identical
and the
Total Qty is
Multiplied
by 26
Total 235.
3
Total
for
26
Floor
s
24472.8 Total
Shutterin
g
643.617
Slab Concreting
Total Quantities For Slab ( Horizontal Wing )
Slab No N
o
Area Perimete
r
Dept
h
Volum
e
shutterin
g
S 1 2 42.63 54.96 0.215 18.33 85.26
S4 2 2.47 7.24 0.125 0.62 4.94
S5 2 3.3 7.5 0.15 0.99 6.6
S25 2 0.65 3.2 0.125 0.16 1.3
S5 2 3.38 7.63 0.15 1.01 6.76
S2a 2 12.42 14.1 0.15 3.73 24.84
S16 2 1.47 7.5 0.15 0.44 2.94
S16 2 4.3 11.53 0.15 1.29 8.6
S5 2 3.06 7.18 0.15 0.92 6.12
S2 2 24.14 21.5 0.15 7.24 48.28
Total Quantities For Slab ( Wing 2 Right )
Slab No No Area Perimeter Depth Volume shuttering
S16 4 1.407 7.2 0.15 0.84 5.628
S2a 4 13.66 14.93 0.15 8.20 54.64
S5 4 3.85 8.3 0.15 2.31 15.4
S16 4 4.4 11.6 0.15 2.64 17.6
S2a 4 33.798 39.04 0.15 20.28 135.192
S16 4 1.256 16.58 0.15 0.75 5.024
S9 4 4.2 13.51 0.125 2.10 16.8
S16 4 40.04 38.44 0.15 24.02 160.16
S5 4 3.3 7.5 0.15 1.98 13.2
S4 4 2.4 7.24 0.125 1.20 9.6
Slab No No Area Perimeter Depth Volume shuttering
s8 4 4.06 12.45 0.125 2.03 16.24
s5 4 3.2 7.5 0.15 1.92 12.8
Total 68.28 462.284
Total QuantitiesForSlab( Centre)
Slab No No Area Perimeter Depth Volume shuttering
S14 2 0.64 4.85 0.125 0.16 1.28
S3 2 17.14 19.09 0.215 7.37 34.28
S3 2 12.19 19.98 0.2215 5.40 24.38
S15 2 9.79 13.01 0.25 4.90 19.58
S5 2 8.3 17.3 0.15 2.49 16.6
S19 2 0.7 3.6 0.125 0.18 1.4
S11 2 1.72 5.32 0.125 0.43 3.44
S13 2 0.537 3.19 0.125 0.13 1.074
S19 2 0.7 3.7 0.125 0.18 1.4
S17 2 0.9 4.86 0.125 0.23 1.8
S12 2 8.01 11.78 0.215 3.44 16.02
S14 2 1.2 6.15 0.125 0.30 2.4
S3a 2 5.17 9.17 0.215 2.22 10.34
S22 2 1.17 4.78 0.125 0.29 2.34
S23 2 0.54 3.01 0.125 0.14 1.08
Total 27.85 137.414
Total Quantity
Concreting
27.85 68.28 35.10 = 131.23
Total Quantity
Shuttering
137.41 462.28 198.12 = 797.82
Reinforcement Calculations
Structure Details
S.no Details Remarks
1.1 Reinforcement Calculation for Beams
1.2 Reinforcement Calculation for Coloumn
1.3 Reinforcement Calculation for Slab
Calculation of Reinforcement in Beams
Calculation for lobby
Assume that 1m3 includes 200kg of Reinforcement
Beam Nos L B D Q Reinforcement
B6 57.49 0.2 0.525 6.04 1.207
B6A 2.6 0.2 0.525 0.27 0.055
B6B 1.2 0.2 0.525 0.13 0.025
B13 1.1 0.2 0.525 0.12 0.023
B13A 1.3 0.2 0.525 0.14 0.027
B20 4.14 0.2 0.725 0.60 0.120
B22 4.14 0.2 0.525 0.43 0.087
B25 3.8 0.2 0.525 0.40 0.080
B26 1.1 0.15 0.3 0.05 0.010
B28 7.2 0.2 0.575 0.83 0.166
B31 3.36 0.2 5.225 3.51 0.702
B32 1.69 0.23 0.575 0.22 0.045
B33 2.2 0.2 0.575 0.25 0.051
B34 1.54 0.2 0.3 0.09 0.018
B37 2.12 0.23 0.35 0.17 0.034
B38 1.1 0.15 0.35 0.06 0.012
B39 2 0.3 0.5 0.30 0.060
B40- 2.65 0.3 0.5 0.40 0.080
B44 3.9 0.2 0.525 0.41 0.082
B45 0.63 0.2 0.525 0.07 0.013
B46,B50 1.8 0.3 0.9 0.49 0.097
B51,B52 1.51 0.15 0.3 0.07 0.014
HB1 1.95 0.5 0.3 0.29 0.059
LB5 2.58 0.2 0.725 0.37 0.075
Calculation of Reinforcement in Beams
Calculation for Wing 1
Beam Nos L B D Q Reinforcement
B1 12.4 0.35 0.4 1.74 0.347
B2 22.3 0.35 0.23 1.80 0.359
B3 9.9 0.35 0.23 0.80 0.159
B4A 5.84 0.5 0.23 0.67 0.134
B5 12.1 0.775 0.23 2.16 0.431
B5A 12.1 0.35 0.23 0.97 0.195
B7 6.23 0.5 0.15 0.47 0.093
B8 2.415 0.35 0.2 0.17 0.034
B8A 4.75 0.35 0.2 0.33 0.067
B9 3.2 0.35 0.2 0.22 0.045
B10 8.14 0.45 0.2 0.73 0.147
B12 2.79 0.45 0.15 0.19 0.038
B14 2.29 0.775 0.3 0.53 0.106
B15 1.53 0.35 0.23 0.12 0.025
B16 2.285 0.5 0.23 0.26 0.053
B17 1.57 0.5 0.23 0.18 0.036
HB2 3.01 0.507 0.507 0.77 0.155
B54 0.93 0.3 0.15 0.04 0.008
LB2 1.25 0.575 0.23 0.17 0.033
LB1 1.88 0.575 0.23 0.25 0.050
Calculation of Reinforcement in Beams
Calculation for Wing 2
Beam Nos L B D Q Reinforcement
B1 12.4 0.4 0.35 1.74 0.347
B2 11.15 0.23 0.35 0.90 0.180
B2A 6.2 0.23 0.3 0.43 0.086
B3 9.9 0.23 0.35 0.80 0.159
B4A 5.84 0.23 0.5 0.67 0.134
B5 9.25 0.23 0.775 1.65 0.330
B5A 12.089 0.23 0.35 0.97 0.195
B7 2.5 0.15 0.5 0.19 0.038
B8 4.828 0.2 0.35 0.34 0.068
B8A 4.75 0.2 0.35 0.33 0.067
B9 3.2 0.2 0.35 0.22 0.045
B10 8.14 0.2 0.5 0.81 0.163
B12 5.53 0.15 0.5 0.41 0.083
B14 1.1 0.3 0.775 0.26 0.051
B15 0.76 0.23 0.35 0.06 0.012
B16 1.14 0.23 0.5 0.13 0.026
B17 5.875 0.23 0.5 0.68 0.135
B28 3.8 0.2 0.575 0.44 0.087
B32 1.692 0.23 0.575 0.22 0.045
B34 1.547 0.2 0.3 0.09 0.019
B51,B52 2.767 0.15 0.3 0.12 0.025
HB2 1.5 0.507 0.3 0.23 0.046
LB2 2.5 0.2 0.725 0.36 0.073
LB3 3.84 0.2 0.725 0.56 0.111
LB1 1.88 0.2 0.725 0.27 0.055
Calculation of Reinforcement in Beams
Calculation for Wing 3
Beam Nos L B D Q Reinforcement
B1 11.91 0.4 0.35 1.67 0.333
B2 9.75 0.23 0.35 0.78 0.157
B2A 11.91 0.23 0.3 0.82 0.164
B3 9.65 0.23 0.35 0.78 0.155
B4A 5.84 0.23 0.5 0.67 0.134
B5 8.95 0.23 0.775 1.60 0.319
B5A 12.3 0.23 0.35 0.99 0.198
B7 5 0.15 0.5 0.38 0.075
B8 4.83 0.2 0.35 0.34 0.068
B8A 4.702 0.2 0.35 0.33 0.066
B9 3.2 0.2 0.35 0.22 0.045
B10 4.07 0.2 0.35 0.28 0.057
4.07 0.2 0.5 0.41 0.081
B12 2.798 0.15 0.5 0.21 0.042
B14 1.75 0.3 0.775 0.41 0.081
B15 1.125 0.23 0.35 0.09 0.018
B16 2.29 0.23 0.5 0.26 0.053
B17 3.15 0.23 0.5 0.36 0.072
B22 2.321 0.2 0.525 0.24 0.049
B23M 4.5 0.3 0.5 0.68 0.135
B24 6.3 0.3 0.5 0.95 0.189
B26 2.3 0.15 0.3 0.10 0.021
B28 3.51 0.2 0.575 0.40 0.081
B31 5.2 0.2 0.525 0.55 0.109
B332 3.51 0.2 0.575 0.40 0.081
B35 1.2 0.2 0.525 0.13 0.025
B38 1.3 0.15 0.35 0.07 0.014
Beam Nos L B D Q Reinforcement
B45 3.51 0.2 0.525 0.37 0.074
HB2 3.018 0.507 0.3 0.46 0.092
B54 3.51 0.15 0.3 0.16 0.032
LB2 1.25 0.2 0.725 0.18 0.036
LB3 3.849 0.2 0.725 0.56 0.112
LB1 2.548 0.2 0.725 0.37 0.074
Total 70.15 11.516
Calculation of Coloumn Reinforcement
S.No DESCRIPTION OF
WORK
No'
s
Area Perimet
er
Dept
h
Volume of
concrete
Rebar
1 C2-05 1 0.695 3.780 3.000 2.085 0.177
2 C3-05 1 0.809 3.9 3.000 2.427 0.206
3 C2-06 1 0.694 3.78 3.000 2.082 0.177
4 C1-A-05 1 0.45 3.3 3.000 1.35 0.115
5 C1-06 1 0.45 3.3 3.000 1.35 0.115
6 C4-A-05 1 0.27 2.4 3.000 0.81 0.069
7 C4-05 1 0.71 5.4 3.000 2.13 0.181
8 C4-06 1 0.72 5.4 3.000 2.16 0.184
9 C4-A-06 1 0.27 2.4 3.000 0.81 0.069
10 C5-06 1 0.55 3.85 3.000 1.65 0.140
11 C5-05 1 0.55 3.85 3.000 1.65 0.140
12 C4-a-04 1 0.270 2.405 3.000 0.8112 0.069
13 C4-04 1 0.72 5.4 3.000 2.16 0.184
14 c1-04 1 0.41 2.7 3.000 1.23 0.105
15 c5-04 1 0.43 3.18 3.000 1.29 0.110
16 C2-04 1 0.69 4.4 3.000 2.07 0.176
17 C3-02 1 0.8 3.9 3.000 2.4 0.204
18 C2-02 1 0.693 4.45 3.000 2.079 0.177
19 C5-02 1 0.43 3.1 3.000 1.29 0.110
20 C1-02 1 0.4 2.7 3.000 1.2 0.102
21 C4-A-02 1 0.27 2.41 3.000 0.81 0.069
22 C4-02 1 0.72 5.414 3.000 2.16 0.184
23 C4-a-01 1 0.27 2.41 3.000 0.81 0.069
S.No DESCRIPTION OF
WORK
No'
s
Area Perimet
er
Dept
h
Volume of
concrete
Rebar
24 C4-01 1 0.71 5.4 3.000 2.13 0.181
25 C1-01 1 0.4 2.7 3.000 1.2 0.102
26 C5-01 1 0.43 3.18 3.000 1.29 0.110
27 C2-01 1 0.69 4.4 3.000 2.07 0.176
28 C3-01 1 0.81 3.9 3.000 2.43 0.207
29 C2-03 1 0.693 4.45 3.000 2.079 0.177
30 C1-03 1 0.4 2.7 3.000 1.2 0.102
31 C5-03 1 0.43 3.18 3.000 1.29 0.110
32 C4-03 1 0.54 5.4 3.000 1.62 0.138
33 C4-a-03 1 0.27 2.4 3.000 0.81 0.069
34 C5-03 1 0.434 3.8 3.000 1.302 0.111
35 C6-01 1 0.42 2.7 3.000 1.26 0.107
36 C6-02 1 0.42 2.7 3.000 1.26 0.107
37 (C9-01B)+(C9-
01C)+(C9-01D)
1 3.8 28 3.000 11.4 0.969
38 (C9-01A) + (C9-01
B) + (C9-01
C)+ (C9-01
D) + (C9-01
E)
1 53.64 40 3.000 160.92 13.678
39 C7-01 1 0.88 6.5 3.000 2.64 0.224
40 C7-02 1 0.88 6.5 3.000 2.64 0.224
41 C7-03 1 0.32 2.8 3.000 0.96 0.082
Total 235.3152 20.00
Calculation for Slab Reinforcement
S.No Descriptio
n
No'
s
Area Depth Volume of
concrete
Reinforcement
(Ton)
1 S1 3 83.070 0.215 53.580 10.72
2 S11 1 1.720 0.125 0.215 0.04
3 S12 1 8.008 0.215 1.722 0.34
4 S12 1 8.001 0.215 1.720 0.34
5 S14 1 1.329 0.125 0.166 0.03
6 S14 1 1.632 0.125 0.204 0.04
7 S14 1 1.330 0.125 0.166 0.03
8 S15 1 8.330 0.250 2.083 0.42
9 S15 1 9.790 0.250 2.448 0.49
10 S16 3 4.405 0.150 1.982 0.40
11 S16 3 1.250 0.150 0.563 0.11
12 S16 3 1.253 0.150 0.564 0.11
13 S16 3 4.400 0.150 1.980 0.40
14 S16 3 1.407 0.150 0.633 0.13
15 S17 1 6.710 0.125 0.839 0.17
16 S17 1 0.770 0.125 0.096 0.02
17 S18 1 1.727 0.125 0.216 0.04
18 S19 1 0.625 0.125 0.078 0.02
19 S19 1 0.690 0.125 0.086 0.02
20 S2 3 33.770 0.150 15.197 3.04
21 S2 3 33.770 0.150 15.197 3.04
22 S20 1 0.061 0.125 0.008 0.01
23 S20 1 0.061 0.125 0.008 0.00
24 S22 1 1.208 0.125 0.151 0.03
25 S23 1 0.569 0.125 0.071 0.01
S.No Descriptio
n
No'
s
Area Depth Volume of
concrete
Reinforcement
(Ton)
26 S24 1 0.190 0.125 0.024 0.00
27 S24 1 0.190 0.125 0.024 0.00
28 S24 1 0.190 0.125 0.024 0.00
29 S25 3 0.328 0.125 0.123 0.02
30 S25 3 0.338 0.125 0.127 0.03
31 S26 3 1.120 0.125 0.420 0.08
32 S26 3 1.119 0.125 0.420 0.08
1 S2A 3 13.660 0.150 6.147 1.23
2 S2A 3 13.600 0.150 6.120 1.22
3 S3 1 33.040 0.215 7.104 1.42
4 S3 1 22.180 0.215 4.769 0.95
5 S3 1 0.537 0.215 0.115 0.02
6 S3A 1 10.070 0.215 2.165 0.43
7 S4 3 3.740 0.125 1.403 0.28
8 S4 3 3.743 0.125 1.404 0.28
9 S5 3 3.885 0.150 1.748 0.35
10 S5 3 3.389 0.150 1.525 0.31
11 S5 3 3.325 0.150 1.496 0.30
12 S5 3 3.324 0.150 1.496 0.30
13 S5 3 3.380 0.150 1.521 0.30
14 S5 3 3.885 0.150 1.748 0.35
15 S6 1 3.060 0.125 0.383 0.08
16 S8 3 4.109 0.125 1.541 0.31
S.No Descriptio
n
No'
s
Area Depth Volume of
concrete
Reinforcement
(Ton)
17 S8 3 4.109 0.125 1.541 0.31
18 S9 3 4.248 0.125 1.593 0.32
19 S9 3 4.248 0.125 1.593 0.32
As per ther
question we
assume that
200Kg per m3
Total 18.60
Total Steel 483.493413
We have Assumed that the Building
is G.F + 25 Floors
Structure Details
S.no Details Remarks
1.1
Calculation for Masonary Works 200
mm
1.2
Calculation for Masonary Works 150
mm
1.3
Calculation for Masonary Works 100
mm
Calculation of Paraphet wall
Thickness of the wall is 200 mm
Name Length
(mm)
Total Length
(mm)
Breadth
(mm)
Height
(mm)
Volume
parapet
wall 1
3200mmx2 6400 200 900 1.152
parapet
wall 2
1140mmx2 2280 200 900 0.4104
parapet
wall 3
5180mmx2 10360 200 900 1.8648
parapet
wall 4
770mmx2 1540 200 900 0.2772
parapet
wall 5
2850mmx2 5700 200 900 1.026
parapet
wall 6
6200mmx2 12400 200 900 2.232
parapet
wall 7
6200mmx2 12400 200 900 2.232
parapet
wall 8
2850mm
x2
5740 200 900 1.0332
parapet
wall 9
770mmx2 1540 200 900 0.2772
parapet
wall 10
5180mmx2 10360 200 900 1.8648
parapet
wall 11
3200mmx2 6400 200 900 1.152
parapet
wall 12
1250mmx2 2500 200 900 0.45
parapet
wall 13
1250mmx2 2500 200 900 0.45
Name Length (mm) Total Length
(mm)
Breadth
(mm)
Height
(mm)
Volume
parapet
wall 14
2529mmx2 5058 200 900 0.91044
parapet
wall 15
2136.58mmx
2
4273.16 200 900 0.7691688
parapet
wall 16
725mmx2 1450 200 900 0.261
parapet
wall 17
588.46mmx2 1176.92 200 900 0.2118456
parapet
wall 18
2414.32mmx
2
4828.64 200 900 0.8691552
parapet
wall 19
2300mm 2300 200 900 0.414
parapet
wall 20
1783.60mm 3567.2 200 900 0.642096
parapet
wall 21
2300mm 2300 200 900 0.414
parapet
wall 22
2660mm 2660 200 900 0.4788
parapet
wall 23
2600mmx2 5200 200 900 0.936
parapet
wall 24
1250mmx2 2500 200 900 0.45
parapet
wall 25
3350mmx2 6700 200 900 1.206
parapet
wall 26
1145mmx2 2290 200 900 0.4122
Name Length (mm) Total Length
(mm)
Breadth
(mm)
Height
(mm)
Volume
parapet
wall 27
6225mmx2 12450 200 900 2.241
parapet
wall 28
2800mmx2 5600 200 900 1.008
parapet
wall 29
5955mmx2 11910 200 900 2.1438
Total Length (in m) 154.38392 Total Volume 27.789105
6
Height (in m) 0.9 Assume 9 nos. per sqm
Total Area (in m2) 138.945528
Toatl no. of blocks for one floor 1251
Qty of 10mm gypsum plaster
Gypsum in 1 sqm (in kg) 8.97
Gysum in 139 sqm (kg) on internal face 1246.83
Fixoblock 4.5kg/sqm
for 139 sqm (in Kg) 625.5
Qty of Putty
Coarse Putty in 1 sqm (Kg) 3.22
Coarse Putty in 139sqm (Kg) on internal
and external
895.16
Fine Putty in 1 sqm (Kg) 1.43
Fine Putty in 139sqm (Kg) on internal and
external
198.77
Calculation of Partition Wall (150mm)
S.no Name Length Total Length
(mm)
Breadth
(mm)
Height
(mm)
Volume
(m3)
1 wall 1 755 1510 150 3000 0.6795
2 wall 2 300 600 150 3000 0.27
3 wall 3 755 1510 150 3000 0.6795
4 wall 4 300 600 150 3000 0.27
5 wall 5 350 700 150 3000 0.315
6 wall 6 600 1200 150 3000 0.54
7 wall 7 350 700 150 3000 0.315
8 wall 8 600 1200 150 3000 0.54
9 wall 9 350 700 150 3000 0.315
10 wall 10 600 1200 150 3000 0.54
11 wall 11 630 1260 150 3000 0.567
12 wall 12 330 660 150 3000 0.297
13 wall 13 350 700 150 3000 0.315
14 wall 14 630 1260 150 3000 0.567
15 wall 15 330 660 150 3000 0.297
16 wall 16 500 1000 150 3000 0.45
17 wall 17 700 1400 150 3000 0.63
18 wall 18 1350 2700 150 3000 1.215
19 wall 19 325 650 150 3000 0.2925
20 wall 20 755 1510 150 3000 0.6795
21 wall 21 300 600 150 3000 0.27
22 wall 22 600 1200 150 3000 0.54
23 wall 23 350 700 150 3000 0.315
24 wall 24 600 1200 150 3000 0.54
25 wall 25 350 700 150 3000 0.315
26 wall 26 630 1260 150 3000 0.567
27 wall 27 330 660 150 3000 0.297
28 wall 28 350 350 150 3000 0.1575
29 wall 29 2410.33 2410.33 150 3000 1.0846485
30 wall 30 1600 1600 150 3000 0.72
S.no Name Length Total Length
(mm)
Breadth
(mm)
Height
(mm)
Volume
(m3)
31 wall 31 1150 1150 150 3000 0.5175
32 wall 32 4470 4470 150 3000 2.0115
33 wall 33 1110 1110 150 3000 0.4995
34 wall 34 1050 1050 150 3000 0.4725
35 wall 35 250 250 150 3000 0.1125
36 wall 36 240 240 150 3000 0.108
37 wall 37 1585 1585 150 3000 0.71325
Total 42255.33 Total 19.01
Calculation of Partition Wall (150mm)
Calculation of volume
Total Length (in m) 42.25533
Total Area (in m2) 126.77
Total Volume 19.01
Calculation of Gypsum
Height (in m) 3
Qty of 10mm Gypsum Plaster per Sq.m (kg) 8.97
Total Quantity for Gypsum 2278.38
Calculation of Fixo-block
Total No. of Blocks on each Floor 1143
Fixoblock 3.2kg/sqm
Total Qty of Fixoblock 406.4
Calculation of Putty
S.no Item Qty
1 Coarse Putty in 1 sqm (Kg) 3.22
2 Coarse Putty in 127sqm (Kg) on internal and external 817.88
3 Fine Putty in 1 sqm (Kg) 1.43
4 Fine Putty in 127sqm (Kg) on internal and external 363.22
Calculation of Partition Wall (100mm)
S.no Name Length Total Length Width Height Volume
(m3
)
1 Iwall 1 3200 6400 100 3000 1.92
2 Iwall 2 1600 3200 100 3000 0.96
3 Iwall 3 2515 5030 100 3000 1.51
4 Iwall 4 2125 4250 100 3000 1.28
5 Iwall 5 1295 2590 100 3000 0.78
6 Iwall 6 3350 6700 100 3000 2.01
7 Iwall 7 4050 8100 100 3000 2.43
8 Iwall 8 3300 6600 100 3000 1.98
9 Iwall 9 3000 6000 100 3000 1.80
10 Iwall 10 2850 5700 100 3000 1.71
11 Iwall 11 2385 4770 100 3000 1.43
12 Iwall 12 4300 8600 100 3000 2.58
13 Iwall 13 600 1200 100 3000 0.36
14 Iwall 14 3050 6100 100 3000 1.83
15 Iwall 15 1550 3100 100 3000 0.93
16 Iwall 16 300 600 100 3000 0.18
17 Iwall 17 7500 15000 100 3000 4.50
18 Iwall 18 1550 3100 100 3000 0.93
19 Iwall 19 300 600 100 3000 0.18
20 Iwall 20 4300 8600 100 3000 2.58
21 Iwall 21 1500 3000 100 3000 0.90
22 Iwall 22 3050 6100 100 3000 1.83
23 Iwall 23 2370 4740 100 3000 1.42
24 Iwall 24 3100 6200 100 3000 1.86
25 Iwall 25 3200 6400 100 3000 1.92
26 Iwall 26 2850 5700 100 3000 1.71
27 Iwall 27 4050 8100 100 3000 2.43
28 Iwall 28 1600 3200 100 3000 0.96
29 Iwall 29 1715 3430 100 3000 1.03
30 Iwall 30 2450 4900 100 3000 1.47
S.no Name Length Total Length Width Height Volume
(m3
)
31 Iwall 31 4220 8440 100 3000 2.53
32 Iwall 32 3200 6400 100 3000 1.92
33 Iwall 33 1780 3560 100 3000 1.07
34 Iwall 34 1515 3030 100 3000 0.91
35 Iwall 35 150 300 100 3000 0.09
36 Iwall 36 700 1400 100 3000 0.42
37 Iwall 37 1230 2460 100 3000 0.74
38 Iwall 38 800 1600 100 3000 0.48
39 Iwall 39 323 646 100 3000 0.19
40 Iwall 40 1075 2150 100 3000 0.65
41 Iwall 41 725 1450 100 3000 0.44
42 Iwall 42 1311 2622 100 3000 0.79
43 Iwall 43 800 1600 100 3000 0.48
44 Iwall 44 3350 6700 100 3000 2.01
45 Iwall 45 4170 8340 100 3000 2.50
46 Iwall 46 2375 4750 100 3000 1.43
47 Iwall 47 1565 3130 100 3000 0.94
48 Iwall 48 2700 5400 100 3000 1.62
49 Iwall 49 900 1800 100 3000 0.54
50 Iwall 50 3300 6600 100 3000 1.98
51 Iwall 51 2800 5600 100 3000 1.68
52 Iwall 52 2810 5620 100 3000 1.69
53 Iwall 53 3050 6100 100 3000 1.83
54 Iwall 54 2390 4780 100 3000 1.43
55 Iwall 55 3965 7930 100 3000 2.38
56 Iwall 56 450 900 100 3000 0.27
57 Iwall 57 3050 6100 100 3000 1.83
58 Iwall 58 1700 3400 100 3000 1.02
59 Iwall 59 1600 3200 100 3000 0.96
60 Iwall 60 300 600 100 3000 0.18
61 Iwall 61 450 900 100 3000 0.27
62 Iwall 62 7210 7210 100 3000 2.16
63 Iwall 63 1710 1710 100 3000 0.51
S.no Name Length Total Length Width Height Volume
(m3
)
64 Iwall 64 775 775 100 3000 0.23
65 Iwall 65 1710 1710 100 3000 0.51
66 Iwall 66 775 775 100 3000 0.23
67 Iwall 67 775 775 100 3000 0.23
68 Iwall 68 1710 1710 100 3000 0.51
69 Iwall 69 775 775 100 3000 0.23
70 Iwall 70 1310 1310 100 3000 0.39
71 Iwall 71 430 430 100 3000 0.13
72 Iwall 72 400 400 100 3000 0.12
73 Iwall 73 900 900 100 3000 0.27
74 Iwall 74 750 750 100 3000 0.23
75 Iwall 75 1950 1950 100 3000 0.59
76 Iwall 76 510 1530 100 3000 0.46
77 Iwall 77 450 1350 100 3000 0.41
78 Iwall 78 510 1530 100 3000 0.46
Total 90.33
Total
Length (in
m)
301.10
8
Total Area (in
m2)
903.3
Total
Volume
90.332
4
Total area after
deduction
858.8
Height (in
m)
3 Total No. of
Blocks on each
Floor
7729
Quantity of 10mm Plaster
Gypsum in 1sqm (in
kg)
8.97 Gypsum in 858.8sqm (kg ) both
internal and external
15406.872
Quantity of Fixo-block
Fixoblock Per Sq
Meter
2.5 Fixoblock for Total Area 2147
Page left for extra data
Plant and Machinery
Calculation Of Materials
Final BOQ
Calculation of the Quantities
Item
Concreting Quantities For
1 Floor Beam 80.41
Coloumn 235.32
Slab 131.23
Total Concreting 446.95
Calculation of the Quantities 4 Towers and 26 Floors each
Item
Concreting Quantities
For 4 Tower Beam 8040.81
Coloumn 29414.4
Slab 13123.062
Total Concreting 50578.27
Calculation of the Reinforcement Cost
Reinforcemen
t for 4 Towers
and 26 Floors
each
Item Qty Uni
t
Unit
Cost( Rs)
Amount
Beam 804.08 Ton 46150 37108319.11
Coloumn 2500.22 Ton 46150 115385337.6
Slab 1312.31 Ton 46150 60562931.13
Total
Rebar
4616.61 Ton 46150 ₹
213,056,587.8
4
Calculation of the Formwork Cost
Shutter
ing for
1 Floor
Beam 443.4
9
Sq
Met
er
Shutter
ing for
4
Towers
and 25
floors
Beam 44349.
13
Sq
Mete
r
Coloum
n
643.6
2
Sq
Met
er
Coloum
n
64361.
70
Sq
Mete
r
Slab 797.8
2
Sq
Met
er
Slab 79782.
20
Sq
Mete
r
Total
Shutteri
ng
1884.
93
Sq
Met
er
Total
Shutteri
ng
188493
.03
Sq
Mete
r
Cost of
Alumini
um
Formw
ork
250.0
0
Per
Sq
Met
er
Cost of
Alumini
um
Formw
ork
250.00 Per
Sq
Mete
r
Total
Cost
₹
471,232.58
Total Cost ₹
47,123,25
7.50
Calculation of the Material Cost
S.No Materials Kg
per
m3
Unit Unit
Cost
Unit Cost / cum Remark
s
1 Cement-
Opc
450 Kg/
cum
267 per Bag 2403
2 Coarse
Aggregate
20mm
537 Kg/
cum
604 per MT 324.348
3 Coarse
Aggregate
10mm
520 Kg/
cum
604 per MT 314.08
4 Crushed
sand
718 Kg/
cum
2968 per m3 1420.68266
7
5 Microsilica 40 Kg/
cum
29 per Kg 1160
6 Flyash 80 Kg/
cum
2.2 per Kg 176
Total Cost of 1 m3 (M-60)
₹ 5,798.11
Total Cost of Concrete for 4
towers and 26 Floors each
₹ 293,258,394.47
Calculation Of Materials
Calculation of Block-work Cost
S.No Materials L B D No of
Block
(per
Floor)
No of
Block
(Project)
Unit
Rate
Total
Amount
1 wall 150
mm
600 200 150 1143 114300 75 ₹ 8572500
2 Wall 100
mm
600 200 100 7729.2 772920 65 ₹
50239800
3 Wall 200
mm
600 200 200 1251 125100 87.6 ₹
10958760
Total ₹
69,771,06
Plastering AndPutty Work (Whole Project)
Particu
lars
Inter
nal
Exter
nal
Sla
b
Total
(Sqm)
Wast
age
@ 5
%
Total
(Sqm)
includi
ng
wastag
e
Unit
Quan
tity
(Kg/S
qm)
Total
(Kg)
Rate Total
Cost
Gypsu
m
1205
07.3
1066
07.3
116
05
2387
19.6
1193
5.98
250655
.58
8.97 224838
0.553
8.6 ₹
19,336,0
72.75
CalculationFor Putty
Coarse 1205
07.3
1066
07.3
116
05
2387
19.6
9548.
784
248268
.384
3.22 799424.
1965
13.3 ₹
10,632,3
41.81
Fine 1205
07.3
1066
07.3
116
05
2387
19.6
9548.
784
248268
.384
1.43 355023.
7891
17.9 ₹
6,354,92
5.83
Total (In Rs.) ₹
36,323,3
40.39
Total Cost
Reinforcement ₹ 213,056,587.84
Shuttering ₹ 47,123,257.50
Concreting ₹ 293,258,394.47
Blockwork ₹ 69,771,060.00
Fixoblock ₹ 4,766,859.07
Gypsum + putty ₹ 36,323,340.39
Total ₹ 664,299,499
Plant and Machinery Cost Allocation
Labour Cost
S.n
o
Item Unit Quanti
ty
Productiv
ity
P5
UNIT
Avg
Cos
t
per
MH
Total Cost Labour
Cost/U
nit
1 Concreting Cu
m.
50578 18 MH/cu
m
38.
8
35278341.
84
697.5
2 Aluminium
Formwork
Sq
m.
18849
3
1.5 MH/sq
m
38.
8
10956157.
37
58.125
3 Reinforcem
ent
Sq
m.
6314 60 MH/To
n
38.
8
14680050 2325
4 Blockwork Sq
m.
10123
20
2 MH/sq
m
38.
8
78454800 77.5
5 Gypsum
Plastering
Sq
m.
25065
5
1 MH/sq
m
38.
8
9712903.7
25
38.75
6 Putty
Internal
Sq
m.
12050
7
0.75 MH/sq
m
38.
8
3502243.4
06
29.062
5
7 Putty
External
Sq
m.
10660
7
0.75 MH/sq
m
38.
8
3098274.6
56
29.062
5
TOTAL LABOUR COST ₹ 155,682,771
Estimation of Tax
PAT/ Markup/ Profit Margin
ESTIMATION OF PROFIT AFTER TAX
S.N
o
Description Cost in Rs Column1
X Project Duration in Months 26
A Plant & Machinery Cost 278796180 A
B Material Cost 664299499.3 B
C Labour Cost 187038883.5
D Direct Cost 1130134563 D=A+B+C
E Project Overheads @10% of Direct Cost 113013456.3 E=(10% x D)
F TOTAL COST 1243148019 F=D+E
G Risk @ 2% of Total Cost 24862960.38 G= 2% of F
H Contingency @ 2 % of Total Cost 24862960.38 H= 2% of F
I TOTAL PROJECT COST 1292873940 I = F+G+H
J CONTRACT VALUE 2100000000
K GROSS MARGIN 807126060.2 K= J-I
L % Margin 38.4345743 (K/J)*100
M H.O over heads @ 2% on Total Cost 24862960.38 M = 2% of F
N PBIT (GM-HO OH) 782263099.8 N = K - M
O TAX @38% (PBIT X38%) 297259977.9 O = 38% of N
P PAT or NE (PBIT - Tax) 485003121.9 N - O
Q % Markup ( Off Top ) 62.42882893 (J/I-1)*100
R Cover 1.858185803 R = (J/D)
XYZ Infra Private Limited
Project Name: Commercial Tower
No of Floors: Basement + 25 Typical Floors
No of Buildings: 4
Location: Noida, UP
Contract Value: 210 Cr
Project Duration: 26 Months
BUDGET/COST CONTROL SHEET
S/
No
DESCRIPT
ION
U
NI
T
Labor
Cost per
Package
Materi
al Cost
P&M
Cost per
Unit
10%
Overhe
ad
Total
Cost
Rem
arks
1 Reinforce
ment
cu
m
1468005
0
351368
137.8
18386642.8
6
183866
.43
3846186
97.13
2 Shutterin
g
Mt 2140819
4.87
920782
57.5
18639102.8
6
186391
.03
1323119
46.25
4 Concretin
g
Sq
m
5618241
6.84
467027
771.1
142134942.
9
142134
9.43
6667664
80.28
5 Blockwor
k
Sq
m
7845480
0
697710
60
39576382.8
6
395763
.83
1881980
06.69
9 Gypsum +
putty
Sq
m
1631342
1.79
363233
40.39
39622885.7
1
396228
.86
9265587
6.75
11 Total Sq
m
102133
5426
102133
5426
1021335
426
Total Direct Cost = Rs. 1130134563
Project Monitoring
For Month 10 Calculated in Excel and is submitted in Hard Copy for further details
kindly refer to the hard copy submitted in personal
Labour Schedule
Details Total Qty M 1 M 2 M 3 M 4 M 5 M 6 M 7 M 8 M 9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 M 19 M 20 M 21 M 22 M 23 M 24 M 25 M 26
Concreting 80548.27
805.483
6443.86
3221.93
4027.41
7249.34
3221.93
5638.38
4832.9
6443.86
4832.9
3221.93
6443.86
7249.34
4027.41
3221.93
4832.9
4832.9
0.01
0.08
0.04
0.05
0.09
0.04
0.07
0.06
0.08
0.06
0.04
0.08
0.09
0.05
0.04
0.06
0.06
AluminiumFormwork 36813 SqM
2576.91
2208.78
3313.17
2945.04
2576.91
3313.17
2945.04
2576.91
1840.65
2945.04
2208.78
1840.65
2208.78
1104.39
1472.52
736.26
0.07
0.06
0.09
0.08
0.07
0.09
0.08
0.07
0.05
0.08
0.06
0.05
0.06
0.03
0.04
0.02
Reinforcement 7613
533
457
685
609
533
685
609
533
381
609
457
381
457
228
305
152
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Blockwork 1012320
70862.4
60739.2
91108.8
80985.6
70862.4
91108.8
80985.6
70862.4
50616
80985.6
60739.2
50616
60739.2
30369.6
40492.8
20246.4
0.07
0.06
0.09
0.08
0.07
0.09
0.08
0.07
0.05
0.08
0.06
0.05
0.06
0.03
0.04
0.02
GypsumPlastering 250655.6
17545.9
22559
62663.9
22559
12532.8
22559
22559
20052.4
20052.4
27572.1
0.07
0.09
0.25
0.09
0.05
0.09
0.09
0.08
0.08
0.11
PuttyInternal 241014.6
2410.15
48202.9
24101.5
120507
0
21691.3
24101.5
0.01
0.2
0.1
0.5
0
0.09
0.1
PuttyExternal 213214.6
2132.15
42642.9
21321.5
115136
2132.15
2132.15
10660.7
17057.2
0.01 0.2 0.1 0.54 0.01 0.01 0.05 0.08

More Related Content

What's hot

Massey ferguson mf 274 cf crawler parts catalogue manual
Massey ferguson mf 274 cf crawler parts catalogue manualMassey ferguson mf 274 cf crawler parts catalogue manual
Massey ferguson mf 274 cf crawler parts catalogue manual
fjjskedmme
 
Massey ferguson mf 274 c crawler parts catalogue manual
Massey ferguson mf 274 c crawler parts catalogue manualMassey ferguson mf 274 c crawler parts catalogue manual
Massey ferguson mf 274 c crawler parts catalogue manual
fudjjjskeskmmd
 
T distribution table
T distribution tableT distribution table
T distribution table
Raja Rosenani
 
Como se utiliza la tabla t de student (formulas)
Como se utiliza la tabla t de student (formulas)Como se utiliza la tabla t de student (formulas)
Como se utiliza la tabla t de student (formulas)Zully HR
 
Massey ferguson mf 294 c crawler parts catalogue manual
Massey ferguson mf 294 c crawler parts catalogue manualMassey ferguson mf 294 c crawler parts catalogue manual
Massey ferguson mf 294 c crawler parts catalogue manual
dujjsjekkkdmm
 
Massey ferguson mf 410 combines parts catalogue manual
Massey ferguson mf 410 combines parts catalogue manualMassey ferguson mf 410 combines parts catalogue manual
Massey ferguson mf 410 combines parts catalogue manual
fjskekdmjekm
 
Massey ferguson mf 400 combine (gb) parts catalogue manual
Massey ferguson mf 400 combine (gb) parts catalogue manualMassey ferguson mf 400 combine (gb) parts catalogue manual
Massey ferguson mf 400 combine (gb) parts catalogue manual
fjskekdmjekm
 
Massey ferguson mf 788 combine parts catalogue manual
Massey ferguson mf 788 combine parts catalogue manualMassey ferguson mf 788 combine parts catalogue manual
Massey ferguson mf 788 combine parts catalogue manual
fjskekdmjekm
 
Massey ferguson mf2620 tractor ( 271212) parts catalogue manual
Massey ferguson mf2620 tractor (  271212) parts catalogue manualMassey ferguson mf2620 tractor (  271212) parts catalogue manual
Massey ferguson mf2620 tractor ( 271212) parts catalogue manual
udfjjdjkskkemmd
 
Massey ferguson mf 560 combines parts catalogue manual
Massey ferguson mf 560 combines parts catalogue manualMassey ferguson mf 560 combines parts catalogue manual
Massey ferguson mf 560 combines parts catalogue manual
fjskemdme
 
Modelo de Tornillos de Bolas de DRE de China.
Modelo de Tornillos de Bolas de DRE de China.Modelo de Tornillos de Bolas de DRE de China.
Modelo de Tornillos de Bolas de DRE de China.Evelyn Zhang
 

What's hot (11)

Massey ferguson mf 274 cf crawler parts catalogue manual
Massey ferguson mf 274 cf crawler parts catalogue manualMassey ferguson mf 274 cf crawler parts catalogue manual
Massey ferguson mf 274 cf crawler parts catalogue manual
 
Massey ferguson mf 274 c crawler parts catalogue manual
Massey ferguson mf 274 c crawler parts catalogue manualMassey ferguson mf 274 c crawler parts catalogue manual
Massey ferguson mf 274 c crawler parts catalogue manual
 
T distribution table
T distribution tableT distribution table
T distribution table
 
Como se utiliza la tabla t de student (formulas)
Como se utiliza la tabla t de student (formulas)Como se utiliza la tabla t de student (formulas)
Como se utiliza la tabla t de student (formulas)
 
Massey ferguson mf 294 c crawler parts catalogue manual
Massey ferguson mf 294 c crawler parts catalogue manualMassey ferguson mf 294 c crawler parts catalogue manual
Massey ferguson mf 294 c crawler parts catalogue manual
 
Massey ferguson mf 410 combines parts catalogue manual
Massey ferguson mf 410 combines parts catalogue manualMassey ferguson mf 410 combines parts catalogue manual
Massey ferguson mf 410 combines parts catalogue manual
 
Massey ferguson mf 400 combine (gb) parts catalogue manual
Massey ferguson mf 400 combine (gb) parts catalogue manualMassey ferguson mf 400 combine (gb) parts catalogue manual
Massey ferguson mf 400 combine (gb) parts catalogue manual
 
Massey ferguson mf 788 combine parts catalogue manual
Massey ferguson mf 788 combine parts catalogue manualMassey ferguson mf 788 combine parts catalogue manual
Massey ferguson mf 788 combine parts catalogue manual
 
Massey ferguson mf2620 tractor ( 271212) parts catalogue manual
Massey ferguson mf2620 tractor (  271212) parts catalogue manualMassey ferguson mf2620 tractor (  271212) parts catalogue manual
Massey ferguson mf2620 tractor ( 271212) parts catalogue manual
 
Massey ferguson mf 560 combines parts catalogue manual
Massey ferguson mf 560 combines parts catalogue manualMassey ferguson mf 560 combines parts catalogue manual
Massey ferguson mf 560 combines parts catalogue manual
 
Modelo de Tornillos de Bolas de DRE de China.
Modelo de Tornillos de Bolas de DRE de China.Modelo de Tornillos de Bolas de DRE de China.
Modelo de Tornillos de Bolas de DRE de China.
 

Similar to Construction Cost management System

Steam tables
Steam tablesSteam tables
Steam tables
Shiva Nasiri
 
FLT catalog
FLT catalogFLT catalog
47643562 indian-rolled-sections-756
47643562 indian-rolled-sections-75647643562 indian-rolled-sections-756
47643562 indian-rolled-sections-756prathamesh p parkar
 
WCB thin section slewing ring bearing
WCB thin section slewing ring bearingWCB thin section slewing ring bearing
WCB thin section slewing ring bearing
Wen Chen
 
Tabel uap
Tabel uapTabel uap
Tabel uap
Muhammad Luthfan
 
1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mb1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mbPaul Dahlke
 
Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units Tables
Kum Visal
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueArnoud Sulkers
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CataloguePieter Blom
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueRobert van Dijk
 
Tabel baja standard
Tabel baja standardTabel baja standard
Tabel baja standard
Rudi Putra Reog
 
Burndy / Conector mecanico tipo GAR
Burndy / Conector mecanico tipo GARBurndy / Conector mecanico tipo GAR
Burndy / Conector mecanico tipo GAR
Ing. Jair Flores
 
OzLinc Industries Buttweld Catalogue
OzLinc Industries Buttweld CatalogueOzLinc Industries Buttweld Catalogue
OzLinc Industries Buttweld Catalogue
ozlincau
 
More than an advisory committee ingels
More than an advisory committee   ingelsMore than an advisory committee   ingels
More than an advisory committee ingels
Soil and Water Conservation Society
 
Gpz bearing catalogue
Gpz bearing catalogueGpz bearing catalogue
Gpz bearing catalogue
Bearings Gpz
 
Delta series 15
Delta series 15Delta series 15
Delta series 15
Julio Villagran
 
Wire Strand Chart
Wire Strand ChartWire Strand Chart
Wire Strand Chart
MaryArmenta
 

Similar to Construction Cost management System (20)

Steam tables
Steam tablesSteam tables
Steam tables
 
FLT catalog
FLT catalogFLT catalog
FLT catalog
 
47643562 indian-rolled-sections-756
47643562 indian-rolled-sections-75647643562 indian-rolled-sections-756
47643562 indian-rolled-sections-756
 
WCB thin section slewing ring bearing
WCB thin section slewing ring bearingWCB thin section slewing ring bearing
WCB thin section slewing ring bearing
 
Properties table
Properties tableProperties table
Properties table
 
Tabel uap
Tabel uapTabel uap
Tabel uap
 
1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mb1502015_hadley_ultrazed_4mb
1502015_hadley_ultrazed_4mb
 
Thermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units TablesThermo Property Tables in SI and Other Units Tables
Thermo Property Tables in SI and Other Units Tables
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - Catalogue
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - Catalogue
 
Ferrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - CatalogueFerrostaal Piping Supply - Catalogue
Ferrostaal Piping Supply - Catalogue
 
Tabel baja standard
Tabel baja standardTabel baja standard
Tabel baja standard
 
Burndy / Conector mecanico tipo GAR
Burndy / Conector mecanico tipo GARBurndy / Conector mecanico tipo GAR
Burndy / Conector mecanico tipo GAR
 
OzLinc Industries Buttweld Catalogue
OzLinc Industries Buttweld CatalogueOzLinc Industries Buttweld Catalogue
OzLinc Industries Buttweld Catalogue
 
Ttablosu
TtablosuTtablosu
Ttablosu
 
More than an advisory committee ingels
More than an advisory committee   ingelsMore than an advisory committee   ingels
More than an advisory committee ingels
 
Gpz bearing catalogue
Gpz bearing catalogueGpz bearing catalogue
Gpz bearing catalogue
 
Delta series 15
Delta series 15Delta series 15
Delta series 15
 
Wire Strand Chart
Wire Strand ChartWire Strand Chart
Wire Strand Chart
 
PIPE SIZES AMSE.pdf
PIPE SIZES AMSE.pdfPIPE SIZES AMSE.pdf
PIPE SIZES AMSE.pdf
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 

Construction Cost management System

  • 1. Design Mix Sr. No. Grade Total Cement Qty M3 cement FlyAsh Microsilica 20m m 10mm River Sand Crusher Sand Kg Kg Kg Kg Kg Kg Kg 1 M80 680 1 480 140 60 552 563 0 740 2 M 70 614 1 455 108 51 535 536 0 728 3 M60 570 1 450 80 40 537 520 0 718 4 M50 560 1 450 110 0 535 512 0 716 5 M40 480 1 400 80 0 530 484 0 846 6 M30 420 1 350 70 0 548 500 0 886 7 M20 320 1 260 60 0 552 502 0 946 8 M15 280 1 224 56 0 556 520 703 306 9 M10 220 1 176 44 0 588 478 568 358
  • 2. In the Further Pages Calculation of Concrete is shown fromthe given drawings. TheGradeof Concrete is assumed to be of M-60. Consisting of Following Components. 1. Cement 2. Aggregates 10mmand 20mm 3. Micro Silica 4. Fly Ash 5. Crushed Sand Structure Details S.no Details Remarks 1.1 Concrete Calculation for Beams 1.2 Concrete Calculation for Coloumn 1.3 Concrete Calculation for Slab
  • 3. Calculationof Beams Wing-1Wing-2Wing-3 S.No DESCRIPTION NOS L B H Area Quantity Shuttering 1 B48 2 0.501 0.23 0.575 0.576 0.132515 0.98196 2 B49 2 0.9 0.23 0.575 1.035 0.23805 1.764 6 B3 4 4.95 0.23 0.35 6.93 1.5939 10.494 7 B5 4 2.85 0.23 0.775 8.835 2.03205 15.732 8 B5A 4 3.02 0.23 0.35 4.228 0.97244 6.4024 10 B1 4 6.5 0.04 0.35 9.1 0.364 8.84 11 B2 2 4.95 0.23 0.35 3.465 0.79695 5.247 14 B8 2 2.415 0.2 0.35 1.691 0.3381 2.415 17 LB3 2 3.77 0.3 0.525 3.959 1.18755 7.163 18 B28 2 2.5 0.2 0.575 2.875 0.575 4.75 19 B28 2 1.9 0.2 0.35 1.33 0.266 1.9 20 B17 2 1.75 0.3 0.5 1.75 0.525 3.15 25 B5 4 3.2 0.23 0.775 9.92 2.2816 17.664 26 B5A 4 3.2 0.23 0.35 4.48 1.0304 6.784 27 B16 4 1.5 0.23 0.5 3 0.69 4.98 28 B10 4 4.07 0.2 0.5 8.14 1.628 13.024 32 LB2 2 1.25 0.3 1 2.5 0.75 4.75 35 LB2 2 1.25 0.3 1 2.5 0.75 4.75 38 B15 2 1.125 0.23 0.35 0.788 0.181125 1.1925 39 B2A 2 5.955 0.23 0.3 3.573 0.82179 5.1213 40 B1 2 5.955 0.04 0.35 4.169 0.16674 4.0494 42 B5A 2 2.8 0.23 0.35 1.96 0.4508 2.968 44 B14 2 0.875 0.3 0.775 1.356 0.406875 2.5375 46 B12 2 1.4 0.3 0.5 1.4 0.42 2.52 49 B5 2 3.35 0.23 0.775 5.193 1.194275 9.246 51 B9 2 1.6 0.2 0.35 1.12 0.224 1.6 53 B54 2 1.275 0.15 0.3 0.765 0.11475 0.8925 54 B8A 2 2.475 0.2 0.35 1.733 0.3465 2.475
  • 4. S.No DESCRIPTION NOS L B H Area Quantity Shuttering 55 B17 2 1.675 0.2 3 0.5 1.675 0.38525 2.7805 62 B45 1 0.73 0.2 0.525 0.383 0.07665 0.6205 64 B26 1 1.21 0.1 5 0.2 0.242 0.0363 0.1815 65 B21 1 1.21 0.2 0.525 0.635 0.12705 1.0285 66 B25 1 4.47 0.2 0.525 2.347 0.46935 3.7995 67 B13A 1 1.31 0.2 0.525 0.688 0.13755 1.1135 72 B32 1 1.793 0.2 3 0.575 1.031 0.237124 1.75714 73 B51 1 1.198 0.1 5 0.3 0.359 0.05391 0.4193 75 B33(inc) 1 2.511 0.2 0.575 1.444 0.288765 2.38545 77 B38 1 1.397 0.1 5 0.35 0.489 0.073343 0.62865 78 B22M 1 4.15 0.2 0.525 2.179 0.43575 3.5275 79 LB5 1 2.59 0.2 0.525 1.36 0.27195 2.2015 80 B6 1 8.27 0.2 0.525 4.342 0.86835 7.0295 82 B6B 1 1.2 0.2 0.525 0.63 0.126 1.02 83 BK2 1 1.6 0.2 0.5 0.8 0.16 1.28 84 BK2 1 0.85 0.2 0.5 0.425 0.085 0.68 86 B50 1 0.9 0.3 0.9 0.81 0.243 1.53 87 B31 1 1.689 0.2 0.525 0.887 0.177345 1.43565 89 B51 1 1.198 0.1 5 0.3 0.359 0.05391 0.4193 90 B52 1 0.41 0.1 5 0.3 0.123 0.01845 0.1435 92 B20 1 4.15 0.2 0.725 3.009 0.60175 5.1875 93 B18 2 2.8 0.2 3 0.575 3.22 0.7406 5.488 94 B27 2 3.2 0.1 5 0.575 3.68 0.552 5.76
  • 5. 95 B47 2 0.47 0.2 3 0.575 0.541 0.124315 0.9212 3 B19 1 3.5 0.2 3 0.575 2.013 0.462875 3.43 4 B43 1 3.8 0.1 5 0.575 2.185 0.32775 3.42 5 B2 2 5.18 0.2 3 0.35 3.626 0.83398 5.4908 9 B2A 4 6.8 0.2 3 0.3 8.16 1.8768 11.696 12 B12 4 1.4 0.3 0.5 2.8 0.84 5.04 13 B14 2 1.5 0.3 0.775 2.325 0.6975 4.35 S.No DESCRIPTION NOS L B H Area Quantity Shuttering 15 B8A 3 2.375 0.2 0.35 2.494 0.49875 3.5625 16 B17 2 1.75 0.3 0.5 1.75 0.525 3.15 21 LB1 2 0.94 0.3 1.325 2.491 0.7473 4.794 22 B54 2 0.94 0.1 5 0.3 0.564 0.0846 0.658 23 B8 2 2.55 0.2 0.35 1.785 0.357 2.55 24 B14 2 1.169 0.3 0.775 1.812 0.543585 3.3901 29 B9 4 1.6 0.2 0.35 2.24 0.448 3.2 30 B15 2 0.54 0.2 3 0.35 0.378 0.08694 0.5724 31 B7 4 1.25 0.1 5 0.5 2.5 0.375 3.75 33 B4A 4 2.92 0.2 3 0.5 5.84 1.3432 9.6944 34 B37 2 2.125 0.2 3 0.35 1.488 0.342125 2.2525 36 LB4 4 6.742 0.8 1.5 40.45 32.3616 91.6912 37 B2 2 4.875 0.2 3 0.35 3.413 0.784875 5.1675
  • 6. 41 B5 2 2.8 0.2 3 0.775 4.34 0.9982 7.728 43 B3 2 5.8 0.2 3 0.35 4.06 0.9338 6.148 45 B16 2 1.145 0.2 3 0.5 1.145 0.26335 1.9007 47 B10 2 2.775 0.2 0.5 2.775 0.555 4.44 48 B10 2 1.295 0.2 0.3 0.777 0.1554 1.036 50 B5A 2 3.35 0.2 3 0.35 2.345 0.53935 3.551 52 B7 2 1.25 0.1 5 0.5 1.25 0.1875 1.875 56 B4A 2 2.92 0.2 3 0.5 2.92 0.6716 4.8472 57 LB3 1 3.85 0.3 0.525 2.021 0.606375 3.6575 58 LB1 2 1.275 0.3 1.325 3.379 1.013625 6.5025 59 LB2 2 1.25 0.3 1 2.5 0.75 4.75 60 B6A 1 2.6 0.2 0.525 1.365 0.273 2.21 61 B44 1 2.6 0.2 0.525 1.365 0.273 2.21 63 B13 1 1.11 0.2 0.525 0.583 0.11655 0.9435 68 B39 1 2 0.3 0.5 1 0.3 1.8 69 B41 1 0.9 0.3 0.5 0.45 0.135 0.81 70 B40 1 2.66 0.3 0.5 1.33 0.399 2.394 S.No DESCRIPTION NOS L B H Area Quantity Shuttering 71 B46 1 0.9 0.3 0.9 0.81 0.243 1.53 74 B34 1 1.548 0.2 0.3 0.464 0.09288 0.6192 76 B52 1 0.41 0.1 5 0.3 0.123 0.01845 0.1435 81 B6 1 7.96 0.2 0.525 4.179 0.8358 6.766 85 B24 1 1.784 0.3 0.5 0.892 0.2676 1.6056 88 B35 1 3.45 0.2 0.525 1.811 0.36225 2.9325 91 B38 1 1.111 0.1 5 0.35 0.389 0.058328 0.49995 Total 260.6 80.41 443.49
  • 7. S.No DESCRIPTION OF WORK No's Area Perimete r Depth Volume of concrete Area of shuttering 1 C2-05 1 0.695 3.780 3.000 2.085 11.34 2 C3-05 1 0.81 3.9 3.000 2.427 11.7 3 C2-06 1 0.69 3.78 3.000 2.082 11.34 4 C1-A-05 1 0.45 3.3 3.000 1.35 9.9 5 C1-06 1 0.45 3.3 3.000 1.35 9.9 6 C4-A-05 1 0.27 2.4 3.000 0.81 7.2
  • 8. 7 C4-05 1 0.71 5.4 3.000 2.13 16.2 8 C4-06 1 0.72 5.4 3.000 2.16 16.2 9 C4-A-06 1 0.27 2.4 3.000 0.81 7.2 10 C5-06 1 0.55 3.85 3.000 1.65 11.55 11 C5-05 1 0.55 3.85 3.000 1.65 11.55 12 C4-a-04 1 0.270 2.405 3.000 0.8112 7.215 13 C4-04 1 0.72 5.4 3.000 2.16 16.2 14 c1-04 1 0.41 2.7 3.000 1.23 8.1 15 c5-04 1 0.43 3.18 3.000 1.29 9.54 16 C2-04 1 0.69 4.4 3.000 2.07 13.2 17 C3-02 1 0.8 3.9 3.000 2.4 11.7 18 C2-02 1 0.69 4.45 3.000 2.079 13.35 19 C5-02 1 0.43 3.1 3.000 1.29 9.3 20 C1-02 1 0.4 2.7 3.000 1.2 8.1 21 C4-A-02 1 0.27 2.41 3.000 0.81 7.23 22 C4-02 1 0.72 5.414 3.000 2.16 16.242 23 C4-a-01 1 0.27 2.41 3.000 0.81 7.23 24 C4-01 1 0.71 5.4 3.000 2.13 16.2 25 C1-01 1 0.4 2.7 3.000 1.2 8.1 26 C5-01 1 0.43 3.18 3.000 1.29 9.54 27 C2-01 1 0.69 4.4 3.000 2.07 13.2 S.No DESCRIPTION OF WORK No's Area Perimete r Depth Volume of concrete Area of shuttering 28 C3-01 1 0.81 3.9 3.000 2.43 11.7 29 C2-03 1 0.69 4.45 3.000 2.079 13.35 30 C1-03 1 0.4 2.7 3.000 1.2 8.1 31 C5-03 1 0.43 3.18 3.000 1.29 9.54 32 C4-03 1 0.54 5.4 3.000 1.62 16.2 33 C4-a-03 1 0.27 2.4 3.000 0.81 7.2 34 C5-03 1 0.43 3.8 3.000 1.302 11.4
  • 9. 35 C6-01 1 0.42 2.7 3.000 1.26 8.1 36 C6-02 1 0.42 2.7 3.000 1.26 8.1 37 (C9-01B)+(C9- 01C)+(C9- 01D) 1 3.8 28 3.000 11.4 84 38 (C9-01A) + (C9-01 B) + (C9-01 C)+ (C9-01 D) + (C9-01 E) 1 53.64 40 3.000 160.92 120 39 C7-01 1 0.88 6.5 3.000 2.64 19.5 40 C7-02 1 0.88 6.5 3.000 2.64 19.5 41 C7-03 1 0.32 2.8 3.000 0.96 8.4 Structure has a plan of G + 25 Floors.We assumethat every Floor is Identical and the Total Qty is Multiplied by 26 Total 235. 3 Total for 26 Floor s 24472.8 Total Shutterin g 643.617 Slab Concreting Total Quantities For Slab ( Horizontal Wing ) Slab No N o Area Perimete r Dept h Volum e shutterin g S 1 2 42.63 54.96 0.215 18.33 85.26 S4 2 2.47 7.24 0.125 0.62 4.94 S5 2 3.3 7.5 0.15 0.99 6.6
  • 10. S25 2 0.65 3.2 0.125 0.16 1.3 S5 2 3.38 7.63 0.15 1.01 6.76 S2a 2 12.42 14.1 0.15 3.73 24.84 S16 2 1.47 7.5 0.15 0.44 2.94 S16 2 4.3 11.53 0.15 1.29 8.6 S5 2 3.06 7.18 0.15 0.92 6.12 S2 2 24.14 21.5 0.15 7.24 48.28 Total Quantities For Slab ( Wing 2 Right ) Slab No No Area Perimeter Depth Volume shuttering S16 4 1.407 7.2 0.15 0.84 5.628 S2a 4 13.66 14.93 0.15 8.20 54.64 S5 4 3.85 8.3 0.15 2.31 15.4 S16 4 4.4 11.6 0.15 2.64 17.6 S2a 4 33.798 39.04 0.15 20.28 135.192 S16 4 1.256 16.58 0.15 0.75 5.024 S9 4 4.2 13.51 0.125 2.10 16.8 S16 4 40.04 38.44 0.15 24.02 160.16 S5 4 3.3 7.5 0.15 1.98 13.2 S4 4 2.4 7.24 0.125 1.20 9.6 Slab No No Area Perimeter Depth Volume shuttering s8 4 4.06 12.45 0.125 2.03 16.24 s5 4 3.2 7.5 0.15 1.92 12.8 Total 68.28 462.284
  • 11. Total QuantitiesForSlab( Centre) Slab No No Area Perimeter Depth Volume shuttering S14 2 0.64 4.85 0.125 0.16 1.28 S3 2 17.14 19.09 0.215 7.37 34.28 S3 2 12.19 19.98 0.2215 5.40 24.38 S15 2 9.79 13.01 0.25 4.90 19.58 S5 2 8.3 17.3 0.15 2.49 16.6 S19 2 0.7 3.6 0.125 0.18 1.4 S11 2 1.72 5.32 0.125 0.43 3.44 S13 2 0.537 3.19 0.125 0.13 1.074 S19 2 0.7 3.7 0.125 0.18 1.4 S17 2 0.9 4.86 0.125 0.23 1.8 S12 2 8.01 11.78 0.215 3.44 16.02 S14 2 1.2 6.15 0.125 0.30 2.4 S3a 2 5.17 9.17 0.215 2.22 10.34 S22 2 1.17 4.78 0.125 0.29 2.34 S23 2 0.54 3.01 0.125 0.14 1.08 Total 27.85 137.414 Total Quantity Concreting 27.85 68.28 35.10 = 131.23 Total Quantity Shuttering 137.41 462.28 198.12 = 797.82 Reinforcement Calculations
  • 12. Structure Details S.no Details Remarks 1.1 Reinforcement Calculation for Beams 1.2 Reinforcement Calculation for Coloumn 1.3 Reinforcement Calculation for Slab Calculation of Reinforcement in Beams Calculation for lobby Assume that 1m3 includes 200kg of Reinforcement Beam Nos L B D Q Reinforcement B6 57.49 0.2 0.525 6.04 1.207 B6A 2.6 0.2 0.525 0.27 0.055 B6B 1.2 0.2 0.525 0.13 0.025 B13 1.1 0.2 0.525 0.12 0.023
  • 13. B13A 1.3 0.2 0.525 0.14 0.027 B20 4.14 0.2 0.725 0.60 0.120 B22 4.14 0.2 0.525 0.43 0.087 B25 3.8 0.2 0.525 0.40 0.080 B26 1.1 0.15 0.3 0.05 0.010 B28 7.2 0.2 0.575 0.83 0.166 B31 3.36 0.2 5.225 3.51 0.702 B32 1.69 0.23 0.575 0.22 0.045 B33 2.2 0.2 0.575 0.25 0.051 B34 1.54 0.2 0.3 0.09 0.018 B37 2.12 0.23 0.35 0.17 0.034 B38 1.1 0.15 0.35 0.06 0.012 B39 2 0.3 0.5 0.30 0.060 B40- 2.65 0.3 0.5 0.40 0.080 B44 3.9 0.2 0.525 0.41 0.082 B45 0.63 0.2 0.525 0.07 0.013 B46,B50 1.8 0.3 0.9 0.49 0.097 B51,B52 1.51 0.15 0.3 0.07 0.014 HB1 1.95 0.5 0.3 0.29 0.059 LB5 2.58 0.2 0.725 0.37 0.075 Calculation of Reinforcement in Beams Calculation for Wing 1 Beam Nos L B D Q Reinforcement B1 12.4 0.35 0.4 1.74 0.347 B2 22.3 0.35 0.23 1.80 0.359 B3 9.9 0.35 0.23 0.80 0.159
  • 14. B4A 5.84 0.5 0.23 0.67 0.134 B5 12.1 0.775 0.23 2.16 0.431 B5A 12.1 0.35 0.23 0.97 0.195 B7 6.23 0.5 0.15 0.47 0.093 B8 2.415 0.35 0.2 0.17 0.034 B8A 4.75 0.35 0.2 0.33 0.067 B9 3.2 0.35 0.2 0.22 0.045 B10 8.14 0.45 0.2 0.73 0.147 B12 2.79 0.45 0.15 0.19 0.038 B14 2.29 0.775 0.3 0.53 0.106 B15 1.53 0.35 0.23 0.12 0.025 B16 2.285 0.5 0.23 0.26 0.053 B17 1.57 0.5 0.23 0.18 0.036 HB2 3.01 0.507 0.507 0.77 0.155 B54 0.93 0.3 0.15 0.04 0.008 LB2 1.25 0.575 0.23 0.17 0.033 LB1 1.88 0.575 0.23 0.25 0.050 Calculation of Reinforcement in Beams Calculation for Wing 2 Beam Nos L B D Q Reinforcement B1 12.4 0.4 0.35 1.74 0.347 B2 11.15 0.23 0.35 0.90 0.180 B2A 6.2 0.23 0.3 0.43 0.086
  • 15. B3 9.9 0.23 0.35 0.80 0.159 B4A 5.84 0.23 0.5 0.67 0.134 B5 9.25 0.23 0.775 1.65 0.330 B5A 12.089 0.23 0.35 0.97 0.195 B7 2.5 0.15 0.5 0.19 0.038 B8 4.828 0.2 0.35 0.34 0.068 B8A 4.75 0.2 0.35 0.33 0.067 B9 3.2 0.2 0.35 0.22 0.045 B10 8.14 0.2 0.5 0.81 0.163 B12 5.53 0.15 0.5 0.41 0.083 B14 1.1 0.3 0.775 0.26 0.051 B15 0.76 0.23 0.35 0.06 0.012 B16 1.14 0.23 0.5 0.13 0.026 B17 5.875 0.23 0.5 0.68 0.135 B28 3.8 0.2 0.575 0.44 0.087 B32 1.692 0.23 0.575 0.22 0.045 B34 1.547 0.2 0.3 0.09 0.019 B51,B52 2.767 0.15 0.3 0.12 0.025 HB2 1.5 0.507 0.3 0.23 0.046 LB2 2.5 0.2 0.725 0.36 0.073 LB3 3.84 0.2 0.725 0.56 0.111 LB1 1.88 0.2 0.725 0.27 0.055 Calculation of Reinforcement in Beams Calculation for Wing 3 Beam Nos L B D Q Reinforcement B1 11.91 0.4 0.35 1.67 0.333 B2 9.75 0.23 0.35 0.78 0.157
  • 16. B2A 11.91 0.23 0.3 0.82 0.164 B3 9.65 0.23 0.35 0.78 0.155 B4A 5.84 0.23 0.5 0.67 0.134 B5 8.95 0.23 0.775 1.60 0.319 B5A 12.3 0.23 0.35 0.99 0.198 B7 5 0.15 0.5 0.38 0.075 B8 4.83 0.2 0.35 0.34 0.068 B8A 4.702 0.2 0.35 0.33 0.066 B9 3.2 0.2 0.35 0.22 0.045 B10 4.07 0.2 0.35 0.28 0.057 4.07 0.2 0.5 0.41 0.081 B12 2.798 0.15 0.5 0.21 0.042 B14 1.75 0.3 0.775 0.41 0.081 B15 1.125 0.23 0.35 0.09 0.018 B16 2.29 0.23 0.5 0.26 0.053 B17 3.15 0.23 0.5 0.36 0.072 B22 2.321 0.2 0.525 0.24 0.049 B23M 4.5 0.3 0.5 0.68 0.135 B24 6.3 0.3 0.5 0.95 0.189 B26 2.3 0.15 0.3 0.10 0.021 B28 3.51 0.2 0.575 0.40 0.081 B31 5.2 0.2 0.525 0.55 0.109 B332 3.51 0.2 0.575 0.40 0.081 B35 1.2 0.2 0.525 0.13 0.025 B38 1.3 0.15 0.35 0.07 0.014 Beam Nos L B D Q Reinforcement B45 3.51 0.2 0.525 0.37 0.074 HB2 3.018 0.507 0.3 0.46 0.092 B54 3.51 0.15 0.3 0.16 0.032 LB2 1.25 0.2 0.725 0.18 0.036 LB3 3.849 0.2 0.725 0.56 0.112 LB1 2.548 0.2 0.725 0.37 0.074 Total 70.15 11.516
  • 17. Calculation of Coloumn Reinforcement S.No DESCRIPTION OF WORK No' s Area Perimet er Dept h Volume of concrete Rebar 1 C2-05 1 0.695 3.780 3.000 2.085 0.177 2 C3-05 1 0.809 3.9 3.000 2.427 0.206
  • 18. 3 C2-06 1 0.694 3.78 3.000 2.082 0.177 4 C1-A-05 1 0.45 3.3 3.000 1.35 0.115 5 C1-06 1 0.45 3.3 3.000 1.35 0.115 6 C4-A-05 1 0.27 2.4 3.000 0.81 0.069 7 C4-05 1 0.71 5.4 3.000 2.13 0.181 8 C4-06 1 0.72 5.4 3.000 2.16 0.184 9 C4-A-06 1 0.27 2.4 3.000 0.81 0.069 10 C5-06 1 0.55 3.85 3.000 1.65 0.140 11 C5-05 1 0.55 3.85 3.000 1.65 0.140 12 C4-a-04 1 0.270 2.405 3.000 0.8112 0.069 13 C4-04 1 0.72 5.4 3.000 2.16 0.184 14 c1-04 1 0.41 2.7 3.000 1.23 0.105 15 c5-04 1 0.43 3.18 3.000 1.29 0.110 16 C2-04 1 0.69 4.4 3.000 2.07 0.176 17 C3-02 1 0.8 3.9 3.000 2.4 0.204 18 C2-02 1 0.693 4.45 3.000 2.079 0.177 19 C5-02 1 0.43 3.1 3.000 1.29 0.110 20 C1-02 1 0.4 2.7 3.000 1.2 0.102 21 C4-A-02 1 0.27 2.41 3.000 0.81 0.069 22 C4-02 1 0.72 5.414 3.000 2.16 0.184 23 C4-a-01 1 0.27 2.41 3.000 0.81 0.069 S.No DESCRIPTION OF WORK No' s Area Perimet er Dept h Volume of concrete Rebar 24 C4-01 1 0.71 5.4 3.000 2.13 0.181 25 C1-01 1 0.4 2.7 3.000 1.2 0.102 26 C5-01 1 0.43 3.18 3.000 1.29 0.110 27 C2-01 1 0.69 4.4 3.000 2.07 0.176 28 C3-01 1 0.81 3.9 3.000 2.43 0.207
  • 19. 29 C2-03 1 0.693 4.45 3.000 2.079 0.177 30 C1-03 1 0.4 2.7 3.000 1.2 0.102 31 C5-03 1 0.43 3.18 3.000 1.29 0.110 32 C4-03 1 0.54 5.4 3.000 1.62 0.138 33 C4-a-03 1 0.27 2.4 3.000 0.81 0.069 34 C5-03 1 0.434 3.8 3.000 1.302 0.111 35 C6-01 1 0.42 2.7 3.000 1.26 0.107 36 C6-02 1 0.42 2.7 3.000 1.26 0.107 37 (C9-01B)+(C9- 01C)+(C9-01D) 1 3.8 28 3.000 11.4 0.969 38 (C9-01A) + (C9-01 B) + (C9-01 C)+ (C9-01 D) + (C9-01 E) 1 53.64 40 3.000 160.92 13.678 39 C7-01 1 0.88 6.5 3.000 2.64 0.224 40 C7-02 1 0.88 6.5 3.000 2.64 0.224 41 C7-03 1 0.32 2.8 3.000 0.96 0.082 Total 235.3152 20.00 Calculation for Slab Reinforcement S.No Descriptio n No' s Area Depth Volume of concrete Reinforcement (Ton) 1 S1 3 83.070 0.215 53.580 10.72 2 S11 1 1.720 0.125 0.215 0.04
  • 20. 3 S12 1 8.008 0.215 1.722 0.34 4 S12 1 8.001 0.215 1.720 0.34 5 S14 1 1.329 0.125 0.166 0.03 6 S14 1 1.632 0.125 0.204 0.04 7 S14 1 1.330 0.125 0.166 0.03 8 S15 1 8.330 0.250 2.083 0.42 9 S15 1 9.790 0.250 2.448 0.49 10 S16 3 4.405 0.150 1.982 0.40 11 S16 3 1.250 0.150 0.563 0.11 12 S16 3 1.253 0.150 0.564 0.11 13 S16 3 4.400 0.150 1.980 0.40 14 S16 3 1.407 0.150 0.633 0.13 15 S17 1 6.710 0.125 0.839 0.17 16 S17 1 0.770 0.125 0.096 0.02 17 S18 1 1.727 0.125 0.216 0.04 18 S19 1 0.625 0.125 0.078 0.02 19 S19 1 0.690 0.125 0.086 0.02 20 S2 3 33.770 0.150 15.197 3.04 21 S2 3 33.770 0.150 15.197 3.04 22 S20 1 0.061 0.125 0.008 0.01 23 S20 1 0.061 0.125 0.008 0.00 24 S22 1 1.208 0.125 0.151 0.03 25 S23 1 0.569 0.125 0.071 0.01 S.No Descriptio n No' s Area Depth Volume of concrete Reinforcement (Ton) 26 S24 1 0.190 0.125 0.024 0.00 27 S24 1 0.190 0.125 0.024 0.00 28 S24 1 0.190 0.125 0.024 0.00 29 S25 3 0.328 0.125 0.123 0.02 30 S25 3 0.338 0.125 0.127 0.03
  • 21. 31 S26 3 1.120 0.125 0.420 0.08 32 S26 3 1.119 0.125 0.420 0.08 1 S2A 3 13.660 0.150 6.147 1.23 2 S2A 3 13.600 0.150 6.120 1.22 3 S3 1 33.040 0.215 7.104 1.42 4 S3 1 22.180 0.215 4.769 0.95 5 S3 1 0.537 0.215 0.115 0.02 6 S3A 1 10.070 0.215 2.165 0.43 7 S4 3 3.740 0.125 1.403 0.28 8 S4 3 3.743 0.125 1.404 0.28 9 S5 3 3.885 0.150 1.748 0.35 10 S5 3 3.389 0.150 1.525 0.31 11 S5 3 3.325 0.150 1.496 0.30 12 S5 3 3.324 0.150 1.496 0.30 13 S5 3 3.380 0.150 1.521 0.30 14 S5 3 3.885 0.150 1.748 0.35 15 S6 1 3.060 0.125 0.383 0.08 16 S8 3 4.109 0.125 1.541 0.31 S.No Descriptio n No' s Area Depth Volume of concrete Reinforcement (Ton) 17 S8 3 4.109 0.125 1.541 0.31 18 S9 3 4.248 0.125 1.593 0.32 19 S9 3 4.248 0.125 1.593 0.32
  • 22. As per ther question we assume that 200Kg per m3 Total 18.60 Total Steel 483.493413 We have Assumed that the Building is G.F + 25 Floors
  • 23. Structure Details S.no Details Remarks 1.1 Calculation for Masonary Works 200 mm 1.2 Calculation for Masonary Works 150 mm 1.3 Calculation for Masonary Works 100 mm
  • 24. Calculation of Paraphet wall Thickness of the wall is 200 mm Name Length (mm) Total Length (mm) Breadth (mm) Height (mm) Volume parapet wall 1 3200mmx2 6400 200 900 1.152 parapet wall 2 1140mmx2 2280 200 900 0.4104 parapet wall 3 5180mmx2 10360 200 900 1.8648 parapet wall 4 770mmx2 1540 200 900 0.2772 parapet wall 5 2850mmx2 5700 200 900 1.026 parapet wall 6 6200mmx2 12400 200 900 2.232 parapet wall 7 6200mmx2 12400 200 900 2.232 parapet wall 8 2850mm x2 5740 200 900 1.0332 parapet wall 9 770mmx2 1540 200 900 0.2772 parapet wall 10 5180mmx2 10360 200 900 1.8648 parapet wall 11 3200mmx2 6400 200 900 1.152 parapet wall 12 1250mmx2 2500 200 900 0.45 parapet wall 13 1250mmx2 2500 200 900 0.45
  • 25. Name Length (mm) Total Length (mm) Breadth (mm) Height (mm) Volume parapet wall 14 2529mmx2 5058 200 900 0.91044 parapet wall 15 2136.58mmx 2 4273.16 200 900 0.7691688 parapet wall 16 725mmx2 1450 200 900 0.261 parapet wall 17 588.46mmx2 1176.92 200 900 0.2118456 parapet wall 18 2414.32mmx 2 4828.64 200 900 0.8691552 parapet wall 19 2300mm 2300 200 900 0.414 parapet wall 20 1783.60mm 3567.2 200 900 0.642096 parapet wall 21 2300mm 2300 200 900 0.414 parapet wall 22 2660mm 2660 200 900 0.4788 parapet wall 23 2600mmx2 5200 200 900 0.936 parapet wall 24 1250mmx2 2500 200 900 0.45 parapet wall 25 3350mmx2 6700 200 900 1.206 parapet wall 26 1145mmx2 2290 200 900 0.4122
  • 26. Name Length (mm) Total Length (mm) Breadth (mm) Height (mm) Volume parapet wall 27 6225mmx2 12450 200 900 2.241 parapet wall 28 2800mmx2 5600 200 900 1.008 parapet wall 29 5955mmx2 11910 200 900 2.1438 Total Length (in m) 154.38392 Total Volume 27.789105 6 Height (in m) 0.9 Assume 9 nos. per sqm Total Area (in m2) 138.945528 Toatl no. of blocks for one floor 1251 Qty of 10mm gypsum plaster Gypsum in 1 sqm (in kg) 8.97 Gysum in 139 sqm (kg) on internal face 1246.83 Fixoblock 4.5kg/sqm for 139 sqm (in Kg) 625.5 Qty of Putty Coarse Putty in 1 sqm (Kg) 3.22 Coarse Putty in 139sqm (Kg) on internal and external 895.16 Fine Putty in 1 sqm (Kg) 1.43 Fine Putty in 139sqm (Kg) on internal and external 198.77
  • 27. Calculation of Partition Wall (150mm) S.no Name Length Total Length (mm) Breadth (mm) Height (mm) Volume (m3) 1 wall 1 755 1510 150 3000 0.6795 2 wall 2 300 600 150 3000 0.27 3 wall 3 755 1510 150 3000 0.6795 4 wall 4 300 600 150 3000 0.27 5 wall 5 350 700 150 3000 0.315 6 wall 6 600 1200 150 3000 0.54 7 wall 7 350 700 150 3000 0.315 8 wall 8 600 1200 150 3000 0.54 9 wall 9 350 700 150 3000 0.315 10 wall 10 600 1200 150 3000 0.54 11 wall 11 630 1260 150 3000 0.567 12 wall 12 330 660 150 3000 0.297 13 wall 13 350 700 150 3000 0.315 14 wall 14 630 1260 150 3000 0.567 15 wall 15 330 660 150 3000 0.297 16 wall 16 500 1000 150 3000 0.45 17 wall 17 700 1400 150 3000 0.63 18 wall 18 1350 2700 150 3000 1.215 19 wall 19 325 650 150 3000 0.2925 20 wall 20 755 1510 150 3000 0.6795 21 wall 21 300 600 150 3000 0.27 22 wall 22 600 1200 150 3000 0.54 23 wall 23 350 700 150 3000 0.315 24 wall 24 600 1200 150 3000 0.54 25 wall 25 350 700 150 3000 0.315 26 wall 26 630 1260 150 3000 0.567 27 wall 27 330 660 150 3000 0.297 28 wall 28 350 350 150 3000 0.1575 29 wall 29 2410.33 2410.33 150 3000 1.0846485 30 wall 30 1600 1600 150 3000 0.72
  • 28. S.no Name Length Total Length (mm) Breadth (mm) Height (mm) Volume (m3) 31 wall 31 1150 1150 150 3000 0.5175 32 wall 32 4470 4470 150 3000 2.0115 33 wall 33 1110 1110 150 3000 0.4995 34 wall 34 1050 1050 150 3000 0.4725 35 wall 35 250 250 150 3000 0.1125 36 wall 36 240 240 150 3000 0.108 37 wall 37 1585 1585 150 3000 0.71325 Total 42255.33 Total 19.01 Calculation of Partition Wall (150mm) Calculation of volume Total Length (in m) 42.25533 Total Area (in m2) 126.77 Total Volume 19.01 Calculation of Gypsum Height (in m) 3 Qty of 10mm Gypsum Plaster per Sq.m (kg) 8.97 Total Quantity for Gypsum 2278.38 Calculation of Fixo-block Total No. of Blocks on each Floor 1143 Fixoblock 3.2kg/sqm Total Qty of Fixoblock 406.4 Calculation of Putty S.no Item Qty 1 Coarse Putty in 1 sqm (Kg) 3.22 2 Coarse Putty in 127sqm (Kg) on internal and external 817.88 3 Fine Putty in 1 sqm (Kg) 1.43 4 Fine Putty in 127sqm (Kg) on internal and external 363.22
  • 29. Calculation of Partition Wall (100mm) S.no Name Length Total Length Width Height Volume (m3 ) 1 Iwall 1 3200 6400 100 3000 1.92 2 Iwall 2 1600 3200 100 3000 0.96 3 Iwall 3 2515 5030 100 3000 1.51 4 Iwall 4 2125 4250 100 3000 1.28 5 Iwall 5 1295 2590 100 3000 0.78 6 Iwall 6 3350 6700 100 3000 2.01 7 Iwall 7 4050 8100 100 3000 2.43 8 Iwall 8 3300 6600 100 3000 1.98 9 Iwall 9 3000 6000 100 3000 1.80 10 Iwall 10 2850 5700 100 3000 1.71 11 Iwall 11 2385 4770 100 3000 1.43 12 Iwall 12 4300 8600 100 3000 2.58 13 Iwall 13 600 1200 100 3000 0.36 14 Iwall 14 3050 6100 100 3000 1.83 15 Iwall 15 1550 3100 100 3000 0.93 16 Iwall 16 300 600 100 3000 0.18 17 Iwall 17 7500 15000 100 3000 4.50 18 Iwall 18 1550 3100 100 3000 0.93 19 Iwall 19 300 600 100 3000 0.18 20 Iwall 20 4300 8600 100 3000 2.58 21 Iwall 21 1500 3000 100 3000 0.90 22 Iwall 22 3050 6100 100 3000 1.83 23 Iwall 23 2370 4740 100 3000 1.42 24 Iwall 24 3100 6200 100 3000 1.86 25 Iwall 25 3200 6400 100 3000 1.92 26 Iwall 26 2850 5700 100 3000 1.71 27 Iwall 27 4050 8100 100 3000 2.43 28 Iwall 28 1600 3200 100 3000 0.96 29 Iwall 29 1715 3430 100 3000 1.03 30 Iwall 30 2450 4900 100 3000 1.47
  • 30. S.no Name Length Total Length Width Height Volume (m3 ) 31 Iwall 31 4220 8440 100 3000 2.53 32 Iwall 32 3200 6400 100 3000 1.92 33 Iwall 33 1780 3560 100 3000 1.07 34 Iwall 34 1515 3030 100 3000 0.91 35 Iwall 35 150 300 100 3000 0.09 36 Iwall 36 700 1400 100 3000 0.42 37 Iwall 37 1230 2460 100 3000 0.74 38 Iwall 38 800 1600 100 3000 0.48 39 Iwall 39 323 646 100 3000 0.19 40 Iwall 40 1075 2150 100 3000 0.65 41 Iwall 41 725 1450 100 3000 0.44 42 Iwall 42 1311 2622 100 3000 0.79 43 Iwall 43 800 1600 100 3000 0.48 44 Iwall 44 3350 6700 100 3000 2.01 45 Iwall 45 4170 8340 100 3000 2.50 46 Iwall 46 2375 4750 100 3000 1.43 47 Iwall 47 1565 3130 100 3000 0.94 48 Iwall 48 2700 5400 100 3000 1.62 49 Iwall 49 900 1800 100 3000 0.54 50 Iwall 50 3300 6600 100 3000 1.98 51 Iwall 51 2800 5600 100 3000 1.68 52 Iwall 52 2810 5620 100 3000 1.69 53 Iwall 53 3050 6100 100 3000 1.83 54 Iwall 54 2390 4780 100 3000 1.43 55 Iwall 55 3965 7930 100 3000 2.38 56 Iwall 56 450 900 100 3000 0.27 57 Iwall 57 3050 6100 100 3000 1.83 58 Iwall 58 1700 3400 100 3000 1.02 59 Iwall 59 1600 3200 100 3000 0.96 60 Iwall 60 300 600 100 3000 0.18 61 Iwall 61 450 900 100 3000 0.27 62 Iwall 62 7210 7210 100 3000 2.16 63 Iwall 63 1710 1710 100 3000 0.51
  • 31. S.no Name Length Total Length Width Height Volume (m3 ) 64 Iwall 64 775 775 100 3000 0.23 65 Iwall 65 1710 1710 100 3000 0.51 66 Iwall 66 775 775 100 3000 0.23 67 Iwall 67 775 775 100 3000 0.23 68 Iwall 68 1710 1710 100 3000 0.51 69 Iwall 69 775 775 100 3000 0.23 70 Iwall 70 1310 1310 100 3000 0.39 71 Iwall 71 430 430 100 3000 0.13 72 Iwall 72 400 400 100 3000 0.12 73 Iwall 73 900 900 100 3000 0.27 74 Iwall 74 750 750 100 3000 0.23 75 Iwall 75 1950 1950 100 3000 0.59 76 Iwall 76 510 1530 100 3000 0.46 77 Iwall 77 450 1350 100 3000 0.41 78 Iwall 78 510 1530 100 3000 0.46 Total 90.33 Total Length (in m) 301.10 8 Total Area (in m2) 903.3 Total Volume 90.332 4 Total area after deduction 858.8 Height (in m) 3 Total No. of Blocks on each Floor 7729 Quantity of 10mm Plaster Gypsum in 1sqm (in kg) 8.97 Gypsum in 858.8sqm (kg ) both internal and external 15406.872 Quantity of Fixo-block Fixoblock Per Sq Meter 2.5 Fixoblock for Total Area 2147
  • 32. Page left for extra data
  • 34. Calculation Of Materials Final BOQ Calculation of the Quantities Item Concreting Quantities For 1 Floor Beam 80.41 Coloumn 235.32 Slab 131.23 Total Concreting 446.95 Calculation of the Quantities 4 Towers and 26 Floors each Item Concreting Quantities For 4 Tower Beam 8040.81 Coloumn 29414.4 Slab 13123.062 Total Concreting 50578.27 Calculation of the Reinforcement Cost Reinforcemen t for 4 Towers and 26 Floors each Item Qty Uni t Unit Cost( Rs) Amount Beam 804.08 Ton 46150 37108319.11 Coloumn 2500.22 Ton 46150 115385337.6 Slab 1312.31 Ton 46150 60562931.13 Total Rebar 4616.61 Ton 46150 ₹ 213,056,587.8 4
  • 35. Calculation of the Formwork Cost Shutter ing for 1 Floor Beam 443.4 9 Sq Met er Shutter ing for 4 Towers and 25 floors Beam 44349. 13 Sq Mete r Coloum n 643.6 2 Sq Met er Coloum n 64361. 70 Sq Mete r Slab 797.8 2 Sq Met er Slab 79782. 20 Sq Mete r Total Shutteri ng 1884. 93 Sq Met er Total Shutteri ng 188493 .03 Sq Mete r Cost of Alumini um Formw ork 250.0 0 Per Sq Met er Cost of Alumini um Formw ork 250.00 Per Sq Mete r Total Cost ₹ 471,232.58 Total Cost ₹ 47,123,25 7.50
  • 36. Calculation of the Material Cost S.No Materials Kg per m3 Unit Unit Cost Unit Cost / cum Remark s 1 Cement- Opc 450 Kg/ cum 267 per Bag 2403 2 Coarse Aggregate 20mm 537 Kg/ cum 604 per MT 324.348 3 Coarse Aggregate 10mm 520 Kg/ cum 604 per MT 314.08 4 Crushed sand 718 Kg/ cum 2968 per m3 1420.68266 7 5 Microsilica 40 Kg/ cum 29 per Kg 1160 6 Flyash 80 Kg/ cum 2.2 per Kg 176 Total Cost of 1 m3 (M-60) ₹ 5,798.11 Total Cost of Concrete for 4 towers and 26 Floors each ₹ 293,258,394.47
  • 37. Calculation Of Materials Calculation of Block-work Cost S.No Materials L B D No of Block (per Floor) No of Block (Project) Unit Rate Total Amount 1 wall 150 mm 600 200 150 1143 114300 75 ₹ 8572500 2 Wall 100 mm 600 200 100 7729.2 772920 65 ₹ 50239800 3 Wall 200 mm 600 200 200 1251 125100 87.6 ₹ 10958760 Total ₹ 69,771,06
  • 38. Plastering AndPutty Work (Whole Project) Particu lars Inter nal Exter nal Sla b Total (Sqm) Wast age @ 5 % Total (Sqm) includi ng wastag e Unit Quan tity (Kg/S qm) Total (Kg) Rate Total Cost Gypsu m 1205 07.3 1066 07.3 116 05 2387 19.6 1193 5.98 250655 .58 8.97 224838 0.553 8.6 ₹ 19,336,0 72.75 CalculationFor Putty Coarse 1205 07.3 1066 07.3 116 05 2387 19.6 9548. 784 248268 .384 3.22 799424. 1965 13.3 ₹ 10,632,3 41.81 Fine 1205 07.3 1066 07.3 116 05 2387 19.6 9548. 784 248268 .384 1.43 355023. 7891 17.9 ₹ 6,354,92 5.83 Total (In Rs.) ₹ 36,323,3 40.39 Total Cost Reinforcement ₹ 213,056,587.84 Shuttering ₹ 47,123,257.50 Concreting ₹ 293,258,394.47 Blockwork ₹ 69,771,060.00 Fixoblock ₹ 4,766,859.07 Gypsum + putty ₹ 36,323,340.39 Total ₹ 664,299,499
  • 39. Plant and Machinery Cost Allocation
  • 40. Labour Cost S.n o Item Unit Quanti ty Productiv ity P5 UNIT Avg Cos t per MH Total Cost Labour Cost/U nit 1 Concreting Cu m. 50578 18 MH/cu m 38. 8 35278341. 84 697.5 2 Aluminium Formwork Sq m. 18849 3 1.5 MH/sq m 38. 8 10956157. 37 58.125 3 Reinforcem ent Sq m. 6314 60 MH/To n 38. 8 14680050 2325 4 Blockwork Sq m. 10123 20 2 MH/sq m 38. 8 78454800 77.5 5 Gypsum Plastering Sq m. 25065 5 1 MH/sq m 38. 8 9712903.7 25 38.75 6 Putty Internal Sq m. 12050 7 0.75 MH/sq m 38. 8 3502243.4 06 29.062 5 7 Putty External Sq m. 10660 7 0.75 MH/sq m 38. 8 3098274.6 56 29.062 5 TOTAL LABOUR COST ₹ 155,682,771
  • 41. Estimation of Tax PAT/ Markup/ Profit Margin ESTIMATION OF PROFIT AFTER TAX S.N o Description Cost in Rs Column1 X Project Duration in Months 26 A Plant & Machinery Cost 278796180 A B Material Cost 664299499.3 B C Labour Cost 187038883.5 D Direct Cost 1130134563 D=A+B+C E Project Overheads @10% of Direct Cost 113013456.3 E=(10% x D) F TOTAL COST 1243148019 F=D+E G Risk @ 2% of Total Cost 24862960.38 G= 2% of F H Contingency @ 2 % of Total Cost 24862960.38 H= 2% of F I TOTAL PROJECT COST 1292873940 I = F+G+H J CONTRACT VALUE 2100000000 K GROSS MARGIN 807126060.2 K= J-I L % Margin 38.4345743 (K/J)*100 M H.O over heads @ 2% on Total Cost 24862960.38 M = 2% of F N PBIT (GM-HO OH) 782263099.8 N = K - M O TAX @38% (PBIT X38%) 297259977.9 O = 38% of N P PAT or NE (PBIT - Tax) 485003121.9 N - O Q % Markup ( Off Top ) 62.42882893 (J/I-1)*100 R Cover 1.858185803 R = (J/D)
  • 42. XYZ Infra Private Limited Project Name: Commercial Tower No of Floors: Basement + 25 Typical Floors No of Buildings: 4 Location: Noida, UP Contract Value: 210 Cr Project Duration: 26 Months BUDGET/COST CONTROL SHEET S/ No DESCRIPT ION U NI T Labor Cost per Package Materi al Cost P&M Cost per Unit 10% Overhe ad Total Cost Rem arks 1 Reinforce ment cu m 1468005 0 351368 137.8 18386642.8 6 183866 .43 3846186 97.13 2 Shutterin g Mt 2140819 4.87 920782 57.5 18639102.8 6 186391 .03 1323119 46.25 4 Concretin g Sq m 5618241 6.84 467027 771.1 142134942. 9 142134 9.43 6667664 80.28 5 Blockwor k Sq m 7845480 0 697710 60 39576382.8 6 395763 .83 1881980 06.69 9 Gypsum + putty Sq m 1631342 1.79 363233 40.39 39622885.7 1 396228 .86 9265587 6.75 11 Total Sq m 102133 5426 102133 5426 1021335 426 Total Direct Cost = Rs. 1130134563
  • 43. Project Monitoring For Month 10 Calculated in Excel and is submitted in Hard Copy for further details kindly refer to the hard copy submitted in personal Labour Schedule Details Total Qty M 1 M 2 M 3 M 4 M 5 M 6 M 7 M 8 M 9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 M 19 M 20 M 21 M 22 M 23 M 24 M 25 M 26 Concreting 80548.27 805.483 6443.86 3221.93 4027.41 7249.34 3221.93 5638.38 4832.9 6443.86 4832.9 3221.93 6443.86 7249.34 4027.41 3221.93 4832.9 4832.9 0.01 0.08 0.04 0.05 0.09 0.04 0.07 0.06 0.08 0.06 0.04 0.08 0.09 0.05 0.04 0.06 0.06 AluminiumFormwork 36813 SqM 2576.91 2208.78 3313.17 2945.04 2576.91 3313.17 2945.04 2576.91 1840.65 2945.04 2208.78 1840.65 2208.78 1104.39 1472.52 736.26 0.07 0.06 0.09 0.08 0.07 0.09 0.08 0.07 0.05 0.08 0.06 0.05 0.06 0.03 0.04 0.02 Reinforcement 7613 533 457 685 609 533 685 609 533 381 609 457 381 457 228 305 152 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Blockwork 1012320 70862.4 60739.2 91108.8 80985.6 70862.4 91108.8 80985.6 70862.4 50616 80985.6 60739.2 50616 60739.2 30369.6 40492.8 20246.4 0.07 0.06 0.09 0.08 0.07 0.09 0.08 0.07 0.05 0.08 0.06 0.05 0.06 0.03 0.04 0.02 GypsumPlastering 250655.6 17545.9 22559 62663.9 22559 12532.8 22559 22559 20052.4 20052.4 27572.1 0.07 0.09 0.25 0.09 0.05 0.09 0.09 0.08 0.08 0.11 PuttyInternal 241014.6 2410.15 48202.9 24101.5 120507 0 21691.3 24101.5 0.01 0.2 0.1 0.5 0 0.09 0.1 PuttyExternal 213214.6 2132.15 42642.9 21321.5 115136 2132.15 2132.15 10660.7 17057.2 0.01 0.2 0.1 0.54 0.01 0.01 0.05 0.08