Page 1 of 2  References available upon request 
Career History
Current position (Since January / 2015)
Job Title: QA/QC Engineer
Department: Quality Department
Employer: Saudi Metal Art Work Co.
Arabian Roots Group – Jeddah KSA
Job Responsibilities:
 Prepare inspection and test plans (ITP), QC inspection reports, and acceptance criteria
according to project specifications with respect to International standards such as AWS,
ASME, ASTM, and ISO.
 Check approved shop drawing received from consultant or client repetitive.
 Prepare welding book (WPS, PQR, and Welders prequalification) to be submitted to
consultant with Material submittals (MTS) and Document submittals (DCS).
 Hold receiving inspections activities for fabrication raw materials (Material grades sorting
using Portable Spectrometer and Mechanical tests such as hardness and tension test).
 Inspection of Steel Structure Fabrications for Dimensional and Fit-up check.
 Checking painted / coated steel surfaces (coating thickness, zinc content and surface finish).
 Inspection of welding joints and connections as per AWS (Visual check, NDT such as Die
penetration test, Ultrasonic and X-rays radiography).
 Perform tests and inspections to be witnessed by third parties as per customer requirement.
 Responsible for submitting MIR to consultant and get product release to be sent to site.
 Inspection of Decorative items such as Gold Plated items and Stainless steel Handrails.
 Responsible for calibrating devices which could be internally calibrated and holding calibration
plan for which are externally calibrated.
 Responsible for holding ISO 9001 documents and preparing internal audit.
January / 2013 – December / 2014
Job Title: Quality Control Shift Engineer
Department: Quality Department
Employer: Alexandria Automotive Casting Co. – Alexandria Egypt
Automotive and parts manufacturing industry
Job Responsibilities:
 Responsible for doing in process control activities to assure that manufacturing process is
done according to quality specifications and control plans.
 Apply variable metal tests such as Microstructure check, Hardness and Tension test,
porosity check by X-rays and Die penetration test, analysing material composition by
Spectrometer, checking material grade using Ultrasound test…etc.
 Monitoring cast full dimensions by CMM machine.
 Perform receiving inspections for metal and sand raw materials.
 Follow up customer complaints and take the necessary corrective actions.
 Take charge of product audit activities and product sorting actions including inspecting
products for casting defects as requested by customer.
 Develop statistics by calculating the percentage of defected products record inspection data.
 Develop a quality control plan based on ISO 9001 and ISO/TS 16949
Khaled Mahmoud Shehata
E-mail: khaledshehata_eng@hotmail.com
Mobile: KSA +966540416199 / +966580622971
Egypt +201014281475
Objective
Seeking a challenging engineering position in a leading organization where all my knowledge and
skills are best utilized and developed.
Page 2 of 2  References available upon request 
 
 
                
Personal Details
 Name: Khaled Mohamed Mahmoud Mohamed Shehata
 Location: Jeddah, KSA
 Date of birth: 08/01/1990
 Marital status: Single
 Nationality: Egyptian
Training and Certificates
 Currently Certified Welding Inspector preparation course and practical training
 September / 2015 Practical Training on XRF Spectrometer Application
 February / 2015 ISO 9001:2008 Internal Audit training course
 December / 2014 Lean Six Sigma Black Belt 120 hours training course
 September / 2011 Management of Mini-projects course certified from Shell education center
October / 2012 – January / 2013
Job Title: Mechanical Design Engineer
Department: Lean Manufacturing Engineering Department
Employer: Alexandria Automotive Casting Company
Job Responsibilities:
 Responsible for performing technical studies for new projects and preparing project status
reports, cost benefit analysis and recommended actions.
 Develops manufacturing processes by designing and modifying equipment for fabricating,
building, assembling and installing components.
 Responsible for creating 3D CAD models of parts and assemblies then creating dimensional
drawings and complete bill of materials.
 Prepare design calculations and CAD drawings for steel structure projects.
Personal Skills
Languages
 Arabic: Mother tongue
 English: Excellent
 French: Fair
 German: Fair
Computer skills
 Proficient in Computer Aided Design applications (Solid Works and AutoCAD)
 Familiar with Finite element analysis software (Cosmos and Mat Lab)
 Microsoft Office
Sports and hobbies
 Judo: 3rd place in Alexandria championship and 1st place in championship for schools
 Basketball: Worked as a mini-basket referee
 Fishing
Education
2008 - 2012
Graduated from: Faculty of Engineering – Alexandria University
Degree: B.Sc. in Engineering – Mechanical Department
Grade: Good (70%)
Graduation project: Energy recovery for cars through small scale wind turbine
Graduation project grade: Excellent
1995 - 2007
Graduated from: Sidigaber language school
Degree: High School Certificate
Grade: Excellent (97.6%)
khaled Updated Resume
khaled Updated Resume
khaled Updated Resume
khaled Updated Resume

khaled Updated Resume

  • 1.
    Page 1 of 2  References available uponrequest  Career History Current position (Since January / 2015) Job Title: QA/QC Engineer Department: Quality Department Employer: Saudi Metal Art Work Co. Arabian Roots Group – Jeddah KSA Job Responsibilities:  Prepare inspection and test plans (ITP), QC inspection reports, and acceptance criteria according to project specifications with respect to International standards such as AWS, ASME, ASTM, and ISO.  Check approved shop drawing received from consultant or client repetitive.  Prepare welding book (WPS, PQR, and Welders prequalification) to be submitted to consultant with Material submittals (MTS) and Document submittals (DCS).  Hold receiving inspections activities for fabrication raw materials (Material grades sorting using Portable Spectrometer and Mechanical tests such as hardness and tension test).  Inspection of Steel Structure Fabrications for Dimensional and Fit-up check.  Checking painted / coated steel surfaces (coating thickness, zinc content and surface finish).  Inspection of welding joints and connections as per AWS (Visual check, NDT such as Die penetration test, Ultrasonic and X-rays radiography).  Perform tests and inspections to be witnessed by third parties as per customer requirement.  Responsible for submitting MIR to consultant and get product release to be sent to site.  Inspection of Decorative items such as Gold Plated items and Stainless steel Handrails.  Responsible for calibrating devices which could be internally calibrated and holding calibration plan for which are externally calibrated.  Responsible for holding ISO 9001 documents and preparing internal audit. January / 2013 – December / 2014 Job Title: Quality Control Shift Engineer Department: Quality Department Employer: Alexandria Automotive Casting Co. – Alexandria Egypt Automotive and parts manufacturing industry Job Responsibilities:  Responsible for doing in process control activities to assure that manufacturing process is done according to quality specifications and control plans.  Apply variable metal tests such as Microstructure check, Hardness and Tension test, porosity check by X-rays and Die penetration test, analysing material composition by Spectrometer, checking material grade using Ultrasound test…etc.  Monitoring cast full dimensions by CMM machine.  Perform receiving inspections for metal and sand raw materials.  Follow up customer complaints and take the necessary corrective actions.  Take charge of product audit activities and product sorting actions including inspecting products for casting defects as requested by customer.  Develop statistics by calculating the percentage of defected products record inspection data.  Develop a quality control plan based on ISO 9001 and ISO/TS 16949 Khaled Mahmoud Shehata E-mail: khaledshehata_eng@hotmail.com Mobile: KSA +966540416199 / +966580622971 Egypt +201014281475 Objective Seeking a challenging engineering position in a leading organization where all my knowledge and skills are best utilized and developed.
  • 2.
    Page 2 of 2  References available uponrequest                       Personal Details  Name: Khaled Mohamed Mahmoud Mohamed Shehata  Location: Jeddah, KSA  Date of birth: 08/01/1990  Marital status: Single  Nationality: Egyptian Training and Certificates  Currently Certified Welding Inspector preparation course and practical training  September / 2015 Practical Training on XRF Spectrometer Application  February / 2015 ISO 9001:2008 Internal Audit training course  December / 2014 Lean Six Sigma Black Belt 120 hours training course  September / 2011 Management of Mini-projects course certified from Shell education center October / 2012 – January / 2013 Job Title: Mechanical Design Engineer Department: Lean Manufacturing Engineering Department Employer: Alexandria Automotive Casting Company Job Responsibilities:  Responsible for performing technical studies for new projects and preparing project status reports, cost benefit analysis and recommended actions.  Develops manufacturing processes by designing and modifying equipment for fabricating, building, assembling and installing components.  Responsible for creating 3D CAD models of parts and assemblies then creating dimensional drawings and complete bill of materials.  Prepare design calculations and CAD drawings for steel structure projects. Personal Skills Languages  Arabic: Mother tongue  English: Excellent  French: Fair  German: Fair Computer skills  Proficient in Computer Aided Design applications (Solid Works and AutoCAD)  Familiar with Finite element analysis software (Cosmos and Mat Lab)  Microsoft Office Sports and hobbies  Judo: 3rd place in Alexandria championship and 1st place in championship for schools  Basketball: Worked as a mini-basket referee  Fishing Education 2008 - 2012 Graduated from: Faculty of Engineering – Alexandria University Degree: B.Sc. in Engineering – Mechanical Department Grade: Good (70%) Graduation project: Energy recovery for cars through small scale wind turbine Graduation project grade: Excellent 1995 - 2007 Graduated from: Sidigaber language school Degree: High School Certificate Grade: Excellent (97.6%)