SlideShare a Scribd company logo
1 of 15
KSP
(KERB SIDE PUMP)
INTRODUCTION.
AIM.
PREVIEW : -
PART – I (a) ADVANTAGE OF KSP.
(b) USE OF TOK .
(c) CRITERIA FOR INSTLN.
(d) PROPOSAL CUM SITING BOARD
(e) RESPONSIBILITIES.
PART – II DEMAND AND RECEIPT OF FOL.
CONCLUSION
ADVANTAGE OF KSP
1. REDUCTION IN MAN POWER.
2. HANDLING IN BULK ECONOMICAL.
3. SAVINGS.
4. LESS LOSSES.
5. ECONOMY IN PM.
6. SAVES TIME.
7. LESS FIRE HAZARD.
8. MEASURE UPTO FRACTION.
CRITERIA FOR INSTLN
1. AVG CONSUMPTION MORE THAN 10 KL.
2. MONTHLY OFF TAKE 10 KL AT LEAST
FOR 5 YRS.
3. TOK LOC WITHIN KLP OF SUP DEPOT.
4. CENTRALLY LOC TO DEPENDENT UNITS.
5. TRAINED PERS.
6. WITHIN 50 M OF EXISTING 220V DOUBLE
POWER LINE.
7. WITHIN 10 M METALLED RD.
8. ADEQUATE SECURITY AND FIRE
PRECAUTIONS.
EST OF KSP
1. REQMTS FOR RECOMMENDATIONS - KSP
(a) AVG CONSUMPTION 10 KL / MONTH FOR EACH
KSP.
(b) SHOULD REMAIN SO FOR FIRST 5 YEARS.
(c) LOC WITHIN KLP OF UNIT / DEPOT.
(d) CENTRALLY LOC.
(e) REQD REPLENISHMENT AND TRANSPORTATION
AVAILABLE.
(f) SECURITY & FIRE PRECAUTIONS AS PER RULES.
(g) TRAINED MANPOWER FOR FUNC AND
ACCOUNTING.
(h) 50M DOUBLE POWER 220V POLE & 10M FROM RD.
INITIATION & PROCESSING OF PROPOSAL
(a) RESPONSIBILITY (OC SUP / FOL DEPOT).
(b) ASPECTS FOR PROPOSAL :-
(i) PROXIMITY TO MAIN INSTLN. FREE DEL
ZONE.
(ii) OIL COY HOLDING MSL STKS.
(iii) OIL COY WITH TPT AGREEMENT
(iv) STATE OF SERVICE ALREADY PROVIDED.
(c) DRAFT PROPOSAL 4 COPIES SENT BY OC
SUP/FOL DEPOT THROUGH ST CHANNELS.
(d) ON EXAMINATION & APPROVAL OF
PROPOSAL INFO MGASC AND OIL COY.
(e) AHQ NOMINATES OIL COY REQUESTS TO
DETAIL REP FOR SITING BOARD.
PROCESSING OF PROPOSAL
SITING BD MGASC/
DDST
ARMY HQ[ST-10]
OIL COY
OC SUP DEP
MES
FOUR COPIES OF
PROPOSAL
ISSUE
ORDER
LIASE FOR WKS
LIASE FOR
WKS
FINAL EXAM
AND APPROVAL
OF ADGST[FT]
INTIMATION
INTIMATION
DIVISION OF RESP OF KSP
ARMY
1. DETAIL SITING BD.
2. INITIATE PROPOSAL & FEASIBILITY REPORT.
3. EXECUTION OF WKS.
4. PROVIDE TRAINED PERS.
5. REPLENISHMENT OF STKS.
6. CLEARANCE OF BILLS.
7. OP AND SECURITY OF TOK.
8. PERIODICAL EXAM OF REQMTS.
TRADE
– ACCEPTS PROPOSAL.
– FINAL PLAN APPROVED
– ARRANGE LEVELLING.
– CONSTR OF KSP.
– PROCURE AND INSTALL PUMPS.
– TKS.
– PPLS.
– PROVIDE ELECTRIC CONNECTIONS (15 M).
– HAND OVER PUMP AND CALIBRATION CHART.
– ARRANGE CLEANING AND MAINT.
– CLAIM INCIDENTAL AND RENTAL CHARGES.
– PROVIDE CIV WKS.
OPERATION OF KSP
KSPs OF TWO TYPES :-
(a) UNIT RUN KSP.
(i) ADEQUATE OFF TAKE
(ii) ECONOMY FOR REPLENISHMENT ARNGS.
(b) KSPs AT SUP / FOL DEPOTS.
ISSUES TO VEHS
(a) JCO I/C KSP WILL ENDORSE ISSUE ON CAR
DIARY (IAFZ-2209).
(b) CENTRAL MANUSCRIPT MAINT WITH SIG OF
DVR.
(c) END OF DAY DAILY STATEMENT MADE.
(d) OTHER UNITS ISSUED ON BASIS OF DEMAND
SLIP. AUTH LETTER SIGNED BY MTO/QM.
(e) ONE COPY DEMAND RETAINED BY JCO.
(i) CAR DIARY FILLED.
(ii) SIGN UNIT COPY OF DEMAND SLIP, DVR SIG.
(iii) MAINT UNITWISE REGISTER FOR ACCT.
(iv) CVYS. BA NOS IF DIFFERENT UNIT VEHS.
(v) PREPARE DS.
(VI) END OF EACH MONTH CONSOLIDATED
ISSUE VOUCHERS ( IAFZ – 2255 )
DOCUS FOR ACCT OF FOL AT KSP
1. CAR DIARY IAFZ 2209.
2. DAILY STATEMENT IAFS 1531.
3. FOL LEDGER IAFZ 2109.
4. CONSOLIDATED ISSUE VOUCHER IAFZ 2255.
(a) OFFICE COPY - ONE.
(b) LAO - TWO COPIES.
(c) UNIT - TWO COPIES.
5. REGISTER PER UNIT NOT AUDITABLE.
DOCU FOR PAYMENT ISSUE
1. CASH MEMO – IAFZ 2282
(a) OFFICE COPY – ONE
(b) GATE PASS/ISSUE COPY – ONE
(c) CONSUMER COPY- ONE.
(d) LAO COPY – ONE.
2. DAILY STATEMENT – IAFS 1531.
3. FOL LEDGER - IAFZ 2109.
4. RECONCILIATION STATEMENT.
5. REGISTERS.
CLARIFICATION OF DOUBTS
CONCLUSION

More Related Content

What's hot

Guided reading look fors
Guided reading look forsGuided reading look fors
Guided reading look fors
Jennifer Evans
 
Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )
AmiRul AFiq
 

What's hot (20)

Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answers
 
Manpower planning for a construction company
Manpower planning for a construction companyManpower planning for a construction company
Manpower planning for a construction company
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
civil datas for estimate
civil datas for estimatecivil datas for estimate
civil datas for estimate
 
Doing the ap euro hist dbq
Doing the ap euro hist dbqDoing the ap euro hist dbq
Doing the ap euro hist dbq
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering field
 
Contract specifications
Contract specifications Contract specifications
Contract specifications
 
Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&b
 
Doka self climbing system
Doka self climbing systemDoka self climbing system
Doka self climbing system
 
RMC plant
RMC plantRMC plant
RMC plant
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 
Is 7272 1 (1)
Is 7272 1 (1)Is 7272 1 (1)
Is 7272 1 (1)
 
Guided reading look fors
Guided reading look forsGuided reading look fors
Guided reading look fors
 
Observation site report
Observation site report Observation site report
Observation site report
 
Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 

Similar to Kerb side Pump.ppt

Project-Coconut Dehusking Machine ppt
Project-Coconut Dehusking Machine pptProject-Coconut Dehusking Machine ppt
Project-Coconut Dehusking Machine ppt
Basil Varghese
 
STUDY ON INDIAN DEFENSE INDUSTRIES
STUDY ON INDIAN DEFENSE INDUSTRIESSTUDY ON INDIAN DEFENSE INDUSTRIES
STUDY ON INDIAN DEFENSE INDUSTRIES
monaps1
 
Clean air metals corporate presentation - full versio-dec-23-2021
Clean air metals   corporate presentation - full versio-dec-23-2021Clean air metals   corporate presentation - full versio-dec-23-2021
Clean air metals corporate presentation - full versio-dec-23-2021
AdnetNew
 
Clean air metals corporate presentation - full versio
Clean air metals   corporate presentation - full versioClean air metals   corporate presentation - full versio
Clean air metals corporate presentation - full versio
AdnetNew
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
Habib Ali Khan
 

Similar to Kerb side Pump.ppt (20)

Working Experience
Working ExperienceWorking Experience
Working Experience
 
Project-Coconut Dehusking Machine ppt
Project-Coconut Dehusking Machine pptProject-Coconut Dehusking Machine ppt
Project-Coconut Dehusking Machine ppt
 
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon CaptureBusiness case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
Business case of CCUS, Sasha Mackler, SUMMIT Carbon Capture
 
Clean Air Metals Presentation - January 2022
Clean Air Metals Presentation - January 2022Clean Air Metals Presentation - January 2022
Clean Air Metals Presentation - January 2022
 
Hcd2 pending works-jan 2017
Hcd2 pending works-jan 2017Hcd2 pending works-jan 2017
Hcd2 pending works-jan 2017
 
STUDY ON INDIAN DEFENSE INDUSTRIES
STUDY ON INDIAN DEFENSE INDUSTRIESSTUDY ON INDIAN DEFENSE INDUSTRIES
STUDY ON INDIAN DEFENSE INDUSTRIES
 
Rice husk power plant project for finance, subsidy & project related suppor...
Rice husk power plant project   for finance, subsidy & project related suppor...Rice husk power plant project   for finance, subsidy & project related suppor...
Rice husk power plant project for finance, subsidy & project related suppor...
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Clean air metals corporate presentation - full versio-dec-23-2021
Clean air metals   corporate presentation - full versio-dec-23-2021Clean air metals   corporate presentation - full versio-dec-23-2021
Clean air metals corporate presentation - full versio-dec-23-2021
 
Clean Air Metals - Corporate Presentation
Clean Air Metals - Corporate PresentationClean Air Metals - Corporate Presentation
Clean Air Metals - Corporate Presentation
 
Clean air metals corporate presentation - full versio
Clean air metals   corporate presentation - full versioClean air metals   corporate presentation - full versio
Clean air metals corporate presentation - full versio
 
Clean Air Metals - January 2022 Corporate Presentation
Clean Air Metals - January 2022 Corporate PresentationClean Air Metals - January 2022 Corporate Presentation
Clean Air Metals - January 2022 Corporate Presentation
 
12 02 lima - gccsi - why invest in ccs - final
12 02 lima - gccsi - why invest in ccs - final12 02 lima - gccsi - why invest in ccs - final
12 02 lima - gccsi - why invest in ccs - final
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
Benefits and Challenges of Implementing Carbon Capture and Sequestration Tech...
Benefits and Challenges of Implementing Carbon Capture and Sequestration Tech...Benefits and Challenges of Implementing Carbon Capture and Sequestration Tech...
Benefits and Challenges of Implementing Carbon Capture and Sequestration Tech...
 
Gulf war op art
Gulf war op artGulf war op art
Gulf war op art
 
Atlantic Council - Darren Mollot
Atlantic Council - Darren MollotAtlantic Council - Darren Mollot
Atlantic Council - Darren Mollot
 
Compliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or ReplaceCompliance with the Clean Air Act: Remove, Retrofit or Replace
Compliance with the Clean Air Act: Remove, Retrofit or Replace
 
Target committee review meeting
Target committee review meetingTarget committee review meeting
Target committee review meeting
 
IEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINALIEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINAL
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Kerb side Pump.ppt

  • 2. INTRODUCTION. AIM. PREVIEW : - PART – I (a) ADVANTAGE OF KSP. (b) USE OF TOK . (c) CRITERIA FOR INSTLN. (d) PROPOSAL CUM SITING BOARD (e) RESPONSIBILITIES. PART – II DEMAND AND RECEIPT OF FOL. CONCLUSION
  • 3. ADVANTAGE OF KSP 1. REDUCTION IN MAN POWER. 2. HANDLING IN BULK ECONOMICAL. 3. SAVINGS. 4. LESS LOSSES. 5. ECONOMY IN PM. 6. SAVES TIME. 7. LESS FIRE HAZARD. 8. MEASURE UPTO FRACTION.
  • 4. CRITERIA FOR INSTLN 1. AVG CONSUMPTION MORE THAN 10 KL. 2. MONTHLY OFF TAKE 10 KL AT LEAST FOR 5 YRS. 3. TOK LOC WITHIN KLP OF SUP DEPOT. 4. CENTRALLY LOC TO DEPENDENT UNITS. 5. TRAINED PERS. 6. WITHIN 50 M OF EXISTING 220V DOUBLE POWER LINE. 7. WITHIN 10 M METALLED RD. 8. ADEQUATE SECURITY AND FIRE PRECAUTIONS.
  • 5. EST OF KSP 1. REQMTS FOR RECOMMENDATIONS - KSP (a) AVG CONSUMPTION 10 KL / MONTH FOR EACH KSP. (b) SHOULD REMAIN SO FOR FIRST 5 YEARS. (c) LOC WITHIN KLP OF UNIT / DEPOT. (d) CENTRALLY LOC. (e) REQD REPLENISHMENT AND TRANSPORTATION AVAILABLE. (f) SECURITY & FIRE PRECAUTIONS AS PER RULES. (g) TRAINED MANPOWER FOR FUNC AND ACCOUNTING. (h) 50M DOUBLE POWER 220V POLE & 10M FROM RD.
  • 6. INITIATION & PROCESSING OF PROPOSAL (a) RESPONSIBILITY (OC SUP / FOL DEPOT). (b) ASPECTS FOR PROPOSAL :- (i) PROXIMITY TO MAIN INSTLN. FREE DEL ZONE. (ii) OIL COY HOLDING MSL STKS. (iii) OIL COY WITH TPT AGREEMENT (iv) STATE OF SERVICE ALREADY PROVIDED.
  • 7. (c) DRAFT PROPOSAL 4 COPIES SENT BY OC SUP/FOL DEPOT THROUGH ST CHANNELS. (d) ON EXAMINATION & APPROVAL OF PROPOSAL INFO MGASC AND OIL COY. (e) AHQ NOMINATES OIL COY REQUESTS TO DETAIL REP FOR SITING BOARD.
  • 8. PROCESSING OF PROPOSAL SITING BD MGASC/ DDST ARMY HQ[ST-10] OIL COY OC SUP DEP MES FOUR COPIES OF PROPOSAL ISSUE ORDER LIASE FOR WKS LIASE FOR WKS FINAL EXAM AND APPROVAL OF ADGST[FT] INTIMATION INTIMATION
  • 9. DIVISION OF RESP OF KSP ARMY 1. DETAIL SITING BD. 2. INITIATE PROPOSAL & FEASIBILITY REPORT. 3. EXECUTION OF WKS. 4. PROVIDE TRAINED PERS. 5. REPLENISHMENT OF STKS. 6. CLEARANCE OF BILLS. 7. OP AND SECURITY OF TOK. 8. PERIODICAL EXAM OF REQMTS.
  • 10. TRADE – ACCEPTS PROPOSAL. – FINAL PLAN APPROVED – ARRANGE LEVELLING. – CONSTR OF KSP. – PROCURE AND INSTALL PUMPS. – TKS. – PPLS. – PROVIDE ELECTRIC CONNECTIONS (15 M). – HAND OVER PUMP AND CALIBRATION CHART. – ARRANGE CLEANING AND MAINT. – CLAIM INCIDENTAL AND RENTAL CHARGES. – PROVIDE CIV WKS.
  • 11. OPERATION OF KSP KSPs OF TWO TYPES :- (a) UNIT RUN KSP. (i) ADEQUATE OFF TAKE (ii) ECONOMY FOR REPLENISHMENT ARNGS. (b) KSPs AT SUP / FOL DEPOTS.
  • 12. ISSUES TO VEHS (a) JCO I/C KSP WILL ENDORSE ISSUE ON CAR DIARY (IAFZ-2209). (b) CENTRAL MANUSCRIPT MAINT WITH SIG OF DVR. (c) END OF DAY DAILY STATEMENT MADE. (d) OTHER UNITS ISSUED ON BASIS OF DEMAND SLIP. AUTH LETTER SIGNED BY MTO/QM. (e) ONE COPY DEMAND RETAINED BY JCO. (i) CAR DIARY FILLED. (ii) SIGN UNIT COPY OF DEMAND SLIP, DVR SIG. (iii) MAINT UNITWISE REGISTER FOR ACCT. (iv) CVYS. BA NOS IF DIFFERENT UNIT VEHS. (v) PREPARE DS.
  • 13. (VI) END OF EACH MONTH CONSOLIDATED ISSUE VOUCHERS ( IAFZ – 2255 ) DOCUS FOR ACCT OF FOL AT KSP 1. CAR DIARY IAFZ 2209. 2. DAILY STATEMENT IAFS 1531. 3. FOL LEDGER IAFZ 2109. 4. CONSOLIDATED ISSUE VOUCHER IAFZ 2255. (a) OFFICE COPY - ONE. (b) LAO - TWO COPIES. (c) UNIT - TWO COPIES. 5. REGISTER PER UNIT NOT AUDITABLE.
  • 14. DOCU FOR PAYMENT ISSUE 1. CASH MEMO – IAFZ 2282 (a) OFFICE COPY – ONE (b) GATE PASS/ISSUE COPY – ONE (c) CONSUMER COPY- ONE. (d) LAO COPY – ONE. 2. DAILY STATEMENT – IAFS 1531. 3. FOL LEDGER - IAFZ 2109. 4. RECONCILIATION STATEMENT. 5. REGISTERS.