1. KARTHIK AVALUR Mobile: +974 66225684 ~ E-Mail: karthik.avalur84@gmail.com
I am seeking a competitive and challenging environment where I can serve the organization and
establish an enjoyable career for myself.
Academic Credentials
BE-Mechanical Engineering (2007), Sri Chandrashekarendra Saraswathi Viswa Maha Vidhyalaya,
Deemed University, Kanchipuram, Tamil Nadu.
Professional Profile
• 8 years of experience in Technical Sales & support and Design in KONE Corporation (India &
Qatar).
• Ability to collaborate within all levels of the organization with respect to Sales, Installation and
maintenance teams to achieve desired results in providing customer solution.
• Ability to work on the line of customer’s requirement strictly adhering to local regulation,
industrial standards & Codes.
• Capability to grasp new idea and integrate them into desired results with a broad understanding in
Technical functions.
• Organized and goal oriented in execution of operations with a team coordination and
management.
Organizational History
Apr ’2013 to Till Date – KONE Elevators L.L.C “Qatar” as “Technical Sales Support Engineer” Qatar &
Bahrain Operations
Roles & Responsibility
• Segregate documents (Specification, BOQ, Finishes ID, Drawings etc.,) received from customer to
prepare tender submittal.
• Understand project requirements through detail study on Specifications, Drawings (Architectural,
Structural & ID drawings).
• List out the requirements from the tender documents for the offer submittal and collaborate with
Sales, Field & Service teams to attain necessary documents for submission.
• Preparing detail compliance statement based on KONE offers and code standards.
• In case to obtain further details or details which are not clearly defined/ discrepancy in
specification raise RFI to client and Supply lines to reach common understanding.
• Converting customer specification into KONE language with respect to Floor levels, Options,
finishes etc., and fill ‘’Core specification’’ sheet for supply line understanding for tender letter
preparation.
• Obtain optimized result/solution to satisfy customer needs.
• Taking ownership of the content on the Engineering details filled on the CSP.
• Analyse tender letter obtained from supply line and note down all related deviations, if require
coordinate with supply line to minimize the deviation.
• Prepare deviation and clarification list for customer understanding.
• Prepare Pre-Calc based on supply line tender letter and local options to assist Sales team to
arrive BOQ.
• In charge for projects to obtain material, shop drawings and finishes approval from
consultant/client to commence manufacturing.
• Meeting with consultant/client to explain about the product and to respond their technical query.
• Preparing technical submittals with all relevant details with compliance statement, technical
data & finishes to obtain necessary approvals.
Page 1 of 4
2. • Coordinate with design team to prepare detail layout drawings based on approved building
drawings.
• Based on the approvals release the job for manufacturing through KTOC or non-standard process.
• Updating S-plan activities and in charge for Milestone 0b to 2z for each project.
• Handover all relevant details to Field team to commence installation activities.
Some of Key Projects Handled :
1. MALL OF QATAR :
• Consists of 62 Monospace Elevators, 58 Escalators & 2 travelators.
• Speed 1~1.75mps
• Total number of floors 6
2. NATIONAL PORT PROJECT :
• Consists of 22 Monospace Elevators
• Speed 1~2.5mps
• Total number of floors 12
3. VIVAH BHARIA :
• Consists of 21 Minispace Elevators.
• Speed 2.5mps
• Total number of floors 26.
• Travel 90 meters. 0
4. PANAROMA TOWER:
• Consists of 10 Minispace Elevators.
• Speed 2.5mps
• Total number of floors 39.
• Travel 131 meters.
Jan’2011 to Apr ‘2013 – KONE ELEVATORS INDIA (P) Ltd, DESIGN ENGINEER-GLOBAL ENGINEERING
CENTRE (GEC)
Roles & Responsibility
• Making General Arrangement Drawing with respect to customer approved shaft using AUTO CAD
2011 in accordance with customer’s requirements and country norms for elevators & Escalators.
• Making engineering calculations for non standard jobs.
• Making interface checks for tight shafts, low pit & headroom issues.
• Making car cabin drawings.
• Check drawings and documents at every stage in accordance with customer’s requirement and
their checking procedures.
June’2009 to Jan’2011 – KONE ELEVATORS INDIA (P) Ltd, DESIGN ENGINEER - CUSTOMER
ENGINEERING DEPARTMENT
Roles & Responsibility
• Making General Arrangement Drawing with respect to customer approved shaft using AUTO CAD
2011 in accordance with customer’s requirements and country norms for ESlevators & Escalators.
• Responsible for making component and assembly drawings needed for the project using
AutoCAD 2011.
• Preparing the bill of material for job.
Page 2 of 4
3. • Assist and support junior personnel, identify issues and communicate to develop appropriate
solutions.
KEY PROJECTS HANDLED IN INDIA:
• DMRC (Delhi Metro Railway Corporation)
• INDIA LAND TECH PARK
• DLF, JEWEL HOMES, INDIA BULL
Feb’2008 to June’2009 – KONE ELEVATORS INDIA (P) Ltd, “GRADUATE FIELD ENGINEER”
• Hands on experience on the Installation, Testing Commissioning of Elevators of various types like
Machine room less, Over head traction.
• Involved in manpower planning and project scheduling.
• Surveying of building construction site prior to the start of installation in related with shop
drawing.
• Undertaken stage wise quality checks and reports to identify installation/testing been done as per
company standards and codes of EN 81.
• Communicate directly with the Owner, Project Consultant, Contractors and Subcontractors
concerning Design, Project Cost, Staffing and Scheduling.
• Prepare project status reports and works to ensure plans adhere to contract specification and
project budget.
• Coordinated and supervised the overall projects related to Elevators, Escalators & Auto walks from
the development stage till handing over to Client.
• Optimizing the specs according to the requirement of the client/consultant.
• Raising Trouble reports to the factory in case of malfunction in the system.
• Involved in procurement of project tools and materials to carryout installation activities.
• Involved in overall project coordination from the start of the project till hand over to client.
KEY PROJECTS HANDLED:
• PURVANKARA CONSTRUCTIONS
• WILLINGTON HOMES
Activities, Interests AND Achievements
• Joined as a Graduate Engineer Trainee and gained experience in Field operations.
• Chosen to work as Listing engineer after completion of my training period in the company.
• Promoted as GAD design engineer from BOM listing engineer within the department.
• Chosen to work for Global Engineering Centre (Kone- Finland Operations) from Customer
Engineering Department( Kone- India operations)
• Moved to Kone Qatar from Global Engineering Centre (Kone- Finland Operations) as a job rotation
process.
• Best performer of the year award in the year 2010.
• Bravo appreciation award for Doha Metro Phase-1 in 2015.
SOFT SKILLS KNOWN:
• PRO-E WILD FIRE
• CATIA-V5
Personal Detail:
• Nationality: Indian
• Date of Birth: 9th June, 1984
• Marital Status: Single
Page 3 of 4
4. • Languages Known: English, Hindi, Telugu & Tamil
• Passport no: G4766994
Declaraion:
I hereby declare that the above information provided by me is correct up to my knowledge and I bear
responsibility for the correctness of the above said particulars.
Page 4 of 4