SlideShare a Scribd company logo
1 of 4
KARTHIK AVALUR Mobile: +974 66225684 ~ E-Mail: karthik.avalur84@gmail.com
I am seeking a competitive and challenging environment where I can serve the organization and
establish an enjoyable career for myself.
Academic Credentials
BE-Mechanical Engineering (2007), Sri Chandrashekarendra Saraswathi Viswa Maha Vidhyalaya,
Deemed University, Kanchipuram, Tamil Nadu.
Professional Profile
• 8 years of experience in Technical Sales & support and Design in KONE Corporation (India &
Qatar).
• Ability to collaborate within all levels of the organization with respect to Sales, Installation and
maintenance teams to achieve desired results in providing customer solution.
• Ability to work on the line of customer’s requirement strictly adhering to local regulation,
industrial standards & Codes.
• Capability to grasp new idea and integrate them into desired results with a broad understanding in
Technical functions.
• Organized and goal oriented in execution of operations with a team coordination and
management.
Organizational History
Apr ’2013 to Till Date – KONE Elevators L.L.C “Qatar” as “Technical Sales Support Engineer” Qatar &
Bahrain Operations
Roles & Responsibility
• Segregate documents (Specification, BOQ, Finishes ID, Drawings etc.,) received from customer to
prepare tender submittal.
• Understand project requirements through detail study on Specifications, Drawings (Architectural,
Structural & ID drawings).
• List out the requirements from the tender documents for the offer submittal and collaborate with
Sales, Field & Service teams to attain necessary documents for submission.
• Preparing detail compliance statement based on KONE offers and code standards.
• In case to obtain further details or details which are not clearly defined/ discrepancy in
specification raise RFI to client and Supply lines to reach common understanding.
• Converting customer specification into KONE language with respect to Floor levels, Options,
finishes etc., and fill ‘’Core specification’’ sheet for supply line understanding for tender letter
preparation.
• Obtain optimized result/solution to satisfy customer needs.
• Taking ownership of the content on the Engineering details filled on the CSP.
• Analyse tender letter obtained from supply line and note down all related deviations, if require
coordinate with supply line to minimize the deviation.
• Prepare deviation and clarification list for customer understanding.
• Prepare Pre-Calc based on supply line tender letter and local options to assist Sales team to
arrive BOQ.
• In charge for projects to obtain material, shop drawings and finishes approval from
consultant/client to commence manufacturing.
• Meeting with consultant/client to explain about the product and to respond their technical query.
• Preparing technical submittals with all relevant details with compliance statement, technical
data & finishes to obtain necessary approvals.
Page 1 of 4
• Coordinate with design team to prepare detail layout drawings based on approved building
drawings.
• Based on the approvals release the job for manufacturing through KTOC or non-standard process.
• Updating S-plan activities and in charge for Milestone 0b to 2z for each project.
• Handover all relevant details to Field team to commence installation activities.
Some of Key Projects Handled :
1. MALL OF QATAR :
• Consists of 62 Monospace Elevators, 58 Escalators & 2 travelators.
• Speed 1~1.75mps
• Total number of floors 6
2. NATIONAL PORT PROJECT :
• Consists of 22 Monospace Elevators
• Speed 1~2.5mps
• Total number of floors 12
3. VIVAH BHARIA :
• Consists of 21 Minispace Elevators.
• Speed 2.5mps
• Total number of floors 26.
• Travel 90 meters. 0
4. PANAROMA TOWER:
• Consists of 10 Minispace Elevators.
• Speed 2.5mps
• Total number of floors 39.
• Travel 131 meters.
Jan’2011 to Apr ‘2013 – KONE ELEVATORS INDIA (P) Ltd, DESIGN ENGINEER-GLOBAL ENGINEERING
CENTRE (GEC)
Roles & Responsibility
• Making General Arrangement Drawing with respect to customer approved shaft using AUTO CAD
2011 in accordance with customer’s requirements and country norms for elevators & Escalators.
• Making engineering calculations for non standard jobs.
• Making interface checks for tight shafts, low pit & headroom issues.
• Making car cabin drawings.
• Check drawings and documents at every stage in accordance with customer’s requirement and
their checking procedures.
June’2009 to Jan’2011 – KONE ELEVATORS INDIA (P) Ltd, DESIGN ENGINEER - CUSTOMER
ENGINEERING DEPARTMENT
Roles & Responsibility
• Making General Arrangement Drawing with respect to customer approved shaft using AUTO CAD
2011 in accordance with customer’s requirements and country norms for ESlevators & Escalators.
• Responsible for making component and assembly drawings needed for the project using
AutoCAD 2011.
• Preparing the bill of material for job.
Page 2 of 4
• Assist and support junior personnel, identify issues and communicate to develop appropriate
solutions.
KEY PROJECTS HANDLED IN INDIA:
• DMRC (Delhi Metro Railway Corporation)
• INDIA LAND TECH PARK
• DLF, JEWEL HOMES, INDIA BULL
Feb’2008 to June’2009 – KONE ELEVATORS INDIA (P) Ltd, “GRADUATE FIELD ENGINEER”
• Hands on experience on the Installation, Testing Commissioning of Elevators of various types like
Machine room less, Over head traction.
• Involved in manpower planning and project scheduling.
• Surveying of building construction site prior to the start of installation in related with shop
drawing.
• Undertaken stage wise quality checks and reports to identify installation/testing been done as per
company standards and codes of EN 81.
• Communicate directly with the Owner, Project Consultant, Contractors and Subcontractors
concerning Design, Project Cost, Staffing and Scheduling.
• Prepare project status reports and works to ensure plans adhere to contract specification and
project budget.
• Coordinated and supervised the overall projects related to Elevators, Escalators & Auto walks from
the development stage till handing over to Client.
• Optimizing the specs according to the requirement of the client/consultant.
• Raising Trouble reports to the factory in case of malfunction in the system.
• Involved in procurement of project tools and materials to carryout installation activities.
• Involved in overall project coordination from the start of the project till hand over to client.
KEY PROJECTS HANDLED:
• PURVANKARA CONSTRUCTIONS
• WILLINGTON HOMES
Activities, Interests AND Achievements
• Joined as a Graduate Engineer Trainee and gained experience in Field operations.
• Chosen to work as Listing engineer after completion of my training period in the company.
• Promoted as GAD design engineer from BOM listing engineer within the department.
• Chosen to work for Global Engineering Centre (Kone- Finland Operations) from Customer
Engineering Department( Kone- India operations)
• Moved to Kone Qatar from Global Engineering Centre (Kone- Finland Operations) as a job rotation
process.
• Best performer of the year award in the year 2010.
• Bravo appreciation award for Doha Metro Phase-1 in 2015.
SOFT SKILLS KNOWN:
• PRO-E WILD FIRE
• CATIA-V5
Personal Detail:
• Nationality: Indian
• Date of Birth: 9th June, 1984
• Marital Status: Single
Page 3 of 4
• Languages Known: English, Hindi, Telugu & Tamil
• Passport no: G4766994
Declaraion:
I hereby declare that the above information provided by me is correct up to my knowledge and I bear
responsibility for the correctness of the above said particulars.
Page 4 of 4

More Related Content

What's hot (19)

my resume sankar 3
my resume sankar 3my resume sankar 3
my resume sankar 3
 
Sandeep cv 21012016
Sandeep cv 21012016Sandeep cv 21012016
Sandeep cv 21012016
 
NEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENTNEW-PRODUCTDEVELOPMENT
NEW-PRODUCTDEVELOPMENT
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_Aerospace
 
Senthilraja.S_Resume
Senthilraja.S_ResumeSenthilraja.S_Resume
Senthilraja.S_Resume
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
Mechanical engineer 8 years projects
Mechanical engineer  8 years projectsMechanical engineer  8 years projects
Mechanical engineer 8 years projects
 
pappu choudhary new
pappu choudhary newpappu choudhary new
pappu choudhary new
 
Pratheesan
PratheesanPratheesan
Pratheesan
 
Process Designer
Process DesignerProcess Designer
Process Designer
 
kbs_resume
kbs_resumekbs_resume
kbs_resume
 
M.Manojkumar
M.ManojkumarM.Manojkumar
M.Manojkumar
 
SUNIL
SUNILSUNIL
SUNIL
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
 
Mohan-PPC
Mohan-PPCMohan-PPC
Mohan-PPC
 
CV_Rahul
CV_RahulCV_Rahul
CV_Rahul
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
PRR-RESUME-Project_New
PRR-RESUME-Project_NewPRR-RESUME-Project_New
PRR-RESUME-Project_New
 
JD-Estimation Engineer
JD-Estimation EngineerJD-Estimation Engineer
JD-Estimation Engineer
 

Viewers also liked

Jarrar: Architectural solutions in Data Integration
Jarrar: Architectural solutions in Data IntegrationJarrar: Architectural solutions in Data Integration
Jarrar: Architectural solutions in Data IntegrationMustafa Jarrar
 
Maqueta iglesia san antonio
Maqueta iglesia san antonioMaqueta iglesia san antonio
Maqueta iglesia san antonioAladier Ospina
 
Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...
Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...
Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...Nowgen
 
Grammatical terms1
Grammatical terms1Grammatical terms1
Grammatical terms1Mohammad Ali
 
The World’s First Membership Warehouse Club
The World’s First Membership Warehouse ClubThe World’s First Membership Warehouse Club
The World’s First Membership Warehouse ClubRuss Scaramella
 
Órganos Estatales
Órganos EstatalesÓrganos Estatales
Órganos Estatalesmariafelixcr
 
Patients at the core of medical research & development (Emma Law, Scottish De...
Patients at the core of medical research & development (Emma Law, Scottish De...Patients at the core of medical research & development (Emma Law, Scottish De...
Patients at the core of medical research & development (Emma Law, Scottish De...Nowgen
 
Creating and budgeting an effective dtc marketing plan wine entreneurship v2
Creating and budgeting an effective dtc marketing plan   wine entreneurship v2Creating and budgeting an effective dtc marketing plan   wine entreneurship v2
Creating and budgeting an effective dtc marketing plan wine entreneurship v2Ryan Neergaard
 
Andrew Powrie Smith Breakdowns V2
Andrew  Powrie  Smith  Breakdowns V2Andrew  Powrie  Smith  Breakdowns V2
Andrew Powrie Smith Breakdowns V2ABPI
 
Proudly Found Elsewhere: The Open Source Bonanza
Proudly Found Elsewhere: The Open Source BonanzaProudly Found Elsewhere: The Open Source Bonanza
Proudly Found Elsewhere: The Open Source BonanzaX.commerce
 
USA Pricing Model for Wine and Spirit Brands
USA Pricing Model for Wine and Spirit BrandsUSA Pricing Model for Wine and Spirit Brands
USA Pricing Model for Wine and Spirit BrandsBeverageTradeNetwork.com
 
Complications of local anesthesia
Complications of local anesthesiaComplications of local anesthesia
Complications of local anesthesiaSalabh Parihar
 
Robert Mondavi Marketing Plan
Robert Mondavi Marketing PlanRobert Mondavi Marketing Plan
Robert Mondavi Marketing Plandavehennessy
 
Corporate Social Responsability / RSE
Corporate Social Responsability / RSE Corporate Social Responsability / RSE
Corporate Social Responsability / RSE ADHERE RH
 
UGP Techincal Tips Field Guide English FINAL
UGP Techincal Tips Field Guide English FINALUGP Techincal Tips Field Guide English FINAL
UGP Techincal Tips Field Guide English FINALNicholas J Parkinson
 

Viewers also liked (18)

Jarrar: Architectural solutions in Data Integration
Jarrar: Architectural solutions in Data IntegrationJarrar: Architectural solutions in Data Integration
Jarrar: Architectural solutions in Data Integration
 
Maqueta iglesia san antonio
Maqueta iglesia san antonioMaqueta iglesia san antonio
Maqueta iglesia san antonio
 
Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...
Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...
Involving People: Patients, Participants & Consumers in U.K.Cancer Research (...
 
Grammatical terms1
Grammatical terms1Grammatical terms1
Grammatical terms1
 
The World’s First Membership Warehouse Club
The World’s First Membership Warehouse ClubThe World’s First Membership Warehouse Club
The World’s First Membership Warehouse Club
 
Órganos Estatales
Órganos EstatalesÓrganos Estatales
Órganos Estatales
 
Patients at the core of medical research & development (Emma Law, Scottish De...
Patients at the core of medical research & development (Emma Law, Scottish De...Patients at the core of medical research & development (Emma Law, Scottish De...
Patients at the core of medical research & development (Emma Law, Scottish De...
 
Food deserts icsc fl conf 8.31.15
Food deserts  icsc fl conf 8.31.15Food deserts  icsc fl conf 8.31.15
Food deserts icsc fl conf 8.31.15
 
Creating and budgeting an effective dtc marketing plan wine entreneurship v2
Creating and budgeting an effective dtc marketing plan   wine entreneurship v2Creating and budgeting an effective dtc marketing plan   wine entreneurship v2
Creating and budgeting an effective dtc marketing plan wine entreneurship v2
 
Andrew Powrie Smith Breakdowns V2
Andrew  Powrie  Smith  Breakdowns V2Andrew  Powrie  Smith  Breakdowns V2
Andrew Powrie Smith Breakdowns V2
 
Proudly Found Elsewhere: The Open Source Bonanza
Proudly Found Elsewhere: The Open Source BonanzaProudly Found Elsewhere: The Open Source Bonanza
Proudly Found Elsewhere: The Open Source Bonanza
 
USA Pricing Model for Wine and Spirit Brands
USA Pricing Model for Wine and Spirit BrandsUSA Pricing Model for Wine and Spirit Brands
USA Pricing Model for Wine and Spirit Brands
 
Complications of local anesthesia
Complications of local anesthesiaComplications of local anesthesia
Complications of local anesthesia
 
Paisaje y humanidad
Paisaje y humanidadPaisaje y humanidad
Paisaje y humanidad
 
Robert Mondavi Marketing Plan
Robert Mondavi Marketing PlanRobert Mondavi Marketing Plan
Robert Mondavi Marketing Plan
 
présentation du référentiel partagé pour la RSE en pays de la loire
présentation du référentiel partagé pour la RSE en pays de la loireprésentation du référentiel partagé pour la RSE en pays de la loire
présentation du référentiel partagé pour la RSE en pays de la loire
 
Corporate Social Responsability / RSE
Corporate Social Responsability / RSE Corporate Social Responsability / RSE
Corporate Social Responsability / RSE
 
UGP Techincal Tips Field Guide English FINAL
UGP Techincal Tips Field Guide English FINALUGP Techincal Tips Field Guide English FINAL
UGP Techincal Tips Field Guide English FINAL
 

Similar to Karthik RESUME FOR TSS

Similar to Karthik RESUME FOR TSS (20)

M.Ali CV
M.Ali  CVM.Ali  CV
M.Ali CV
 
Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)Shivaraj_Kumar_2016 (1)
Shivaraj_Kumar_2016 (1)
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
CV
CVCV
CV
 
KARTHIK CV - TSS
KARTHIK CV - TSSKARTHIK CV - TSS
KARTHIK CV - TSS
 
5yr_Tendering & Estimation Engineer
5yr_Tendering & Estimation Engineer5yr_Tendering & Estimation Engineer
5yr_Tendering & Estimation Engineer
 
Rahul
RahulRahul
Rahul
 
Resume
ResumeResume
Resume
 
Marimuthu Kumar S. Revised V2
Marimuthu Kumar S. Revised V2Marimuthu Kumar S. Revised V2
Marimuthu Kumar S. Revised V2
 
CV - Jahangeer Raza
CV - Jahangeer RazaCV - Jahangeer Raza
CV - Jahangeer Raza
 
JD_CV_15
JD_CV_15JD_CV_15
JD_CV_15
 
lee RESUME
lee RESUMElee RESUME
lee RESUME
 
Rehan Ahmed - Mechanical (Nov-2016)
Rehan Ahmed  - Mechanical (Nov-2016)Rehan Ahmed  - Mechanical (Nov-2016)
Rehan Ahmed - Mechanical (Nov-2016)
 
resume-.PDF (2)
resume-.PDF (2)resume-.PDF (2)
resume-.PDF (2)
 
Design Engineer (Mechanical) Valve Design, Manufacturing Industry
Design Engineer (Mechanical) Valve Design, Manufacturing IndustryDesign Engineer (Mechanical) Valve Design, Manufacturing Industry
Design Engineer (Mechanical) Valve Design, Manufacturing Industry
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
new sales eng
new sales engnew sales eng
new sales eng
 
Ronald Seguritan CV
Ronald Seguritan CVRonald Seguritan CV
Ronald Seguritan CV
 
Cv raviteja 6_years_exp_veh_integration
Cv raviteja 6_years_exp_veh_integrationCv raviteja 6_years_exp_veh_integration
Cv raviteja 6_years_exp_veh_integration
 
Vijin resume mechanical design
Vijin resume mechanical designVijin resume mechanical design
Vijin resume mechanical design
 

Karthik RESUME FOR TSS

  • 1. KARTHIK AVALUR Mobile: +974 66225684 ~ E-Mail: karthik.avalur84@gmail.com I am seeking a competitive and challenging environment where I can serve the organization and establish an enjoyable career for myself. Academic Credentials BE-Mechanical Engineering (2007), Sri Chandrashekarendra Saraswathi Viswa Maha Vidhyalaya, Deemed University, Kanchipuram, Tamil Nadu. Professional Profile • 8 years of experience in Technical Sales & support and Design in KONE Corporation (India & Qatar). • Ability to collaborate within all levels of the organization with respect to Sales, Installation and maintenance teams to achieve desired results in providing customer solution. • Ability to work on the line of customer’s requirement strictly adhering to local regulation, industrial standards & Codes. • Capability to grasp new idea and integrate them into desired results with a broad understanding in Technical functions. • Organized and goal oriented in execution of operations with a team coordination and management. Organizational History Apr ’2013 to Till Date – KONE Elevators L.L.C “Qatar” as “Technical Sales Support Engineer” Qatar & Bahrain Operations Roles & Responsibility • Segregate documents (Specification, BOQ, Finishes ID, Drawings etc.,) received from customer to prepare tender submittal. • Understand project requirements through detail study on Specifications, Drawings (Architectural, Structural & ID drawings). • List out the requirements from the tender documents for the offer submittal and collaborate with Sales, Field & Service teams to attain necessary documents for submission. • Preparing detail compliance statement based on KONE offers and code standards. • In case to obtain further details or details which are not clearly defined/ discrepancy in specification raise RFI to client and Supply lines to reach common understanding. • Converting customer specification into KONE language with respect to Floor levels, Options, finishes etc., and fill ‘’Core specification’’ sheet for supply line understanding for tender letter preparation. • Obtain optimized result/solution to satisfy customer needs. • Taking ownership of the content on the Engineering details filled on the CSP. • Analyse tender letter obtained from supply line and note down all related deviations, if require coordinate with supply line to minimize the deviation. • Prepare deviation and clarification list for customer understanding. • Prepare Pre-Calc based on supply line tender letter and local options to assist Sales team to arrive BOQ. • In charge for projects to obtain material, shop drawings and finishes approval from consultant/client to commence manufacturing. • Meeting with consultant/client to explain about the product and to respond their technical query. • Preparing technical submittals with all relevant details with compliance statement, technical data & finishes to obtain necessary approvals. Page 1 of 4
  • 2. • Coordinate with design team to prepare detail layout drawings based on approved building drawings. • Based on the approvals release the job for manufacturing through KTOC or non-standard process. • Updating S-plan activities and in charge for Milestone 0b to 2z for each project. • Handover all relevant details to Field team to commence installation activities. Some of Key Projects Handled : 1. MALL OF QATAR : • Consists of 62 Monospace Elevators, 58 Escalators & 2 travelators. • Speed 1~1.75mps • Total number of floors 6 2. NATIONAL PORT PROJECT : • Consists of 22 Monospace Elevators • Speed 1~2.5mps • Total number of floors 12 3. VIVAH BHARIA : • Consists of 21 Minispace Elevators. • Speed 2.5mps • Total number of floors 26. • Travel 90 meters. 0 4. PANAROMA TOWER: • Consists of 10 Minispace Elevators. • Speed 2.5mps • Total number of floors 39. • Travel 131 meters. Jan’2011 to Apr ‘2013 – KONE ELEVATORS INDIA (P) Ltd, DESIGN ENGINEER-GLOBAL ENGINEERING CENTRE (GEC) Roles & Responsibility • Making General Arrangement Drawing with respect to customer approved shaft using AUTO CAD 2011 in accordance with customer’s requirements and country norms for elevators & Escalators. • Making engineering calculations for non standard jobs. • Making interface checks for tight shafts, low pit & headroom issues. • Making car cabin drawings. • Check drawings and documents at every stage in accordance with customer’s requirement and their checking procedures. June’2009 to Jan’2011 – KONE ELEVATORS INDIA (P) Ltd, DESIGN ENGINEER - CUSTOMER ENGINEERING DEPARTMENT Roles & Responsibility • Making General Arrangement Drawing with respect to customer approved shaft using AUTO CAD 2011 in accordance with customer’s requirements and country norms for ESlevators & Escalators. • Responsible for making component and assembly drawings needed for the project using AutoCAD 2011. • Preparing the bill of material for job. Page 2 of 4
  • 3. • Assist and support junior personnel, identify issues and communicate to develop appropriate solutions. KEY PROJECTS HANDLED IN INDIA: • DMRC (Delhi Metro Railway Corporation) • INDIA LAND TECH PARK • DLF, JEWEL HOMES, INDIA BULL Feb’2008 to June’2009 – KONE ELEVATORS INDIA (P) Ltd, “GRADUATE FIELD ENGINEER” • Hands on experience on the Installation, Testing Commissioning of Elevators of various types like Machine room less, Over head traction. • Involved in manpower planning and project scheduling. • Surveying of building construction site prior to the start of installation in related with shop drawing. • Undertaken stage wise quality checks and reports to identify installation/testing been done as per company standards and codes of EN 81. • Communicate directly with the Owner, Project Consultant, Contractors and Subcontractors concerning Design, Project Cost, Staffing and Scheduling. • Prepare project status reports and works to ensure plans adhere to contract specification and project budget. • Coordinated and supervised the overall projects related to Elevators, Escalators & Auto walks from the development stage till handing over to Client. • Optimizing the specs according to the requirement of the client/consultant. • Raising Trouble reports to the factory in case of malfunction in the system. • Involved in procurement of project tools and materials to carryout installation activities. • Involved in overall project coordination from the start of the project till hand over to client. KEY PROJECTS HANDLED: • PURVANKARA CONSTRUCTIONS • WILLINGTON HOMES Activities, Interests AND Achievements • Joined as a Graduate Engineer Trainee and gained experience in Field operations. • Chosen to work as Listing engineer after completion of my training period in the company. • Promoted as GAD design engineer from BOM listing engineer within the department. • Chosen to work for Global Engineering Centre (Kone- Finland Operations) from Customer Engineering Department( Kone- India operations) • Moved to Kone Qatar from Global Engineering Centre (Kone- Finland Operations) as a job rotation process. • Best performer of the year award in the year 2010. • Bravo appreciation award for Doha Metro Phase-1 in 2015. SOFT SKILLS KNOWN: • PRO-E WILD FIRE • CATIA-V5 Personal Detail: • Nationality: Indian • Date of Birth: 9th June, 1984 • Marital Status: Single Page 3 of 4
  • 4. • Languages Known: English, Hindi, Telugu & Tamil • Passport no: G4766994 Declaraion: I hereby declare that the above information provided by me is correct up to my knowledge and I bear responsibility for the correctness of the above said particulars. Page 4 of 4