INSPECTION REPORT
LOCATION : KANGBOOK CO. (BD) LTD.
Sector # 1, Plot #21-23, CEPZ, Chittagong, Bangladesh
PREPARED BY
ENGR. MOSTAFA SAMEER
B.Sc. CIVIL (AUST), A.M.I.E.B,
ASSISTANT ENGINEER
LUMINARS ENGINEER’S ASSOCIATION
2ND
FLOOR JIBON BIMA BHABAN, AGRABAD C/A, CHITTAGONG,
BANGLADESH.
INTRODUCTION
KANGBOOK CO. BD. (LTD) is a well-known garments manufacturer of
Bangladesh located Sector #1, Plot # 21-23, CEPZ, Chittagong, Bangladesh. The factory is
pre-fabricated steel frame structure one storied building
KANGBOOK CO. BD. (LTD) is situated inside CEPZ. The building’s last level of
construction was done 1990. This building is used mainly for light RMG factory operations
including required offices, generator room, sewing, cutting, packing & finished goods
storage workers dining etc.
INVESTIGATION OF AS BUILT CONDITION
As-built drawing of the building available and test result of the construction
materials used during construction is not available. To carry out the detail engineering
assessment of the building in an effective way, a detail survey and is performed to
construct the as built drawing of the building. Confirmatory strength assessment
materials of concrete, re bar scanning and time of construction were also carried out.
The building is narrow-rectangular in character. Found layout drawings and present constructed floor
layout is almost similar. The physical parameter and use of floor described below.
Category/occupancy: Industrial (Readymade Garment manufacturing)
Number of level: One
No of basement: None
No of levels above grade: One
No of future level: None
Mezzanine floor: two
Width: The average width of the building found 76,248 mm.
Length: The approximate length of the building is 51,136mm.
Date construction started: 1990
Total built area: 55,000 sq.ft.
Total number of occupants: As per BNBC code
Lift: None
Generator: Generator is located at the ground level at separate place.
6
7
8

More Related Content

Viewers also liked

Act3 jmoy
Act3 jmoyAct3 jmoy
Act3 jmoy
Michell-21
 
Yellow Brick Road Holdings Investor Update
Yellow Brick Road Holdings Investor Update Yellow Brick Road Holdings Investor Update
Yellow Brick Road Holdings Investor Update
Michael Hovardas
 
Presentation25
Presentation25Presentation25
Presentation25
pooja deshmukh
 
Ahsan Ibrahim Chohan
Ahsan Ibrahim ChohanAhsan Ibrahim Chohan
Ahsan Ibrahim ChohanAhsan Chohan
 
Презент
ПрезентПрезент
Презент
daniil chilochi
 
estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...
estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...
estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...
Peertechz Publications
 
Introduction to Git
Introduction to GitIntroduction to Git
Introduction to Git
Yan Vugenfirer
 
Hometask-клиенты и ниша
Hometask-клиенты и нишаHometask-клиенты и ниша
Hometask-клиенты и ниша
Зарина Кульбаева
 
PRESENTACIÓN FINAL DE LA CARTILLA
PRESENTACIÓN FINAL DE LA CARTILLAPRESENTACIÓN FINAL DE LA CARTILLA
PRESENTACIÓN FINAL DE LA CARTILLAAlejita Sanchez
 
Autorealizacion
AutorealizacionAutorealizacion
Autorealizacion
Delfina Brazon de Cortez
 

Viewers also liked (12)

Act3 jmoy
Act3 jmoyAct3 jmoy
Act3 jmoy
 
Yellow Brick Road Holdings Investor Update
Yellow Brick Road Holdings Investor Update Yellow Brick Road Holdings Investor Update
Yellow Brick Road Holdings Investor Update
 
Rory CV 2016
Rory CV 2016Rory CV 2016
Rory CV 2016
 
Presentation25
Presentation25Presentation25
Presentation25
 
Ahsan Ibrahim Chohan
Ahsan Ibrahim ChohanAhsan Ibrahim Chohan
Ahsan Ibrahim Chohan
 
folio final print10
folio final print10folio final print10
folio final print10
 
Презент
ПрезентПрезент
Презент
 
estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...
estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...
estimated-rate-of-post-operative-anastomotic-leak-following-colorectal-resect...
 
Introduction to Git
Introduction to GitIntroduction to Git
Introduction to Git
 
Hometask-клиенты и ниша
Hometask-клиенты и нишаHometask-клиенты и ниша
Hometask-клиенты и ниша
 
PRESENTACIÓN FINAL DE LA CARTILLA
PRESENTACIÓN FINAL DE LA CARTILLAPRESENTACIÓN FINAL DE LA CARTILLA
PRESENTACIÓN FINAL DE LA CARTILLA
 
Autorealizacion
AutorealizacionAutorealizacion
Autorealizacion
 

kangbook_inspection

  • 1. INSPECTION REPORT LOCATION : KANGBOOK CO. (BD) LTD. Sector # 1, Plot #21-23, CEPZ, Chittagong, Bangladesh PREPARED BY ENGR. MOSTAFA SAMEER B.Sc. CIVIL (AUST), A.M.I.E.B, ASSISTANT ENGINEER LUMINARS ENGINEER’S ASSOCIATION 2ND FLOOR JIBON BIMA BHABAN, AGRABAD C/A, CHITTAGONG, BANGLADESH.
  • 2. INTRODUCTION KANGBOOK CO. BD. (LTD) is a well-known garments manufacturer of Bangladesh located Sector #1, Plot # 21-23, CEPZ, Chittagong, Bangladesh. The factory is pre-fabricated steel frame structure one storied building KANGBOOK CO. BD. (LTD) is situated inside CEPZ. The building’s last level of construction was done 1990. This building is used mainly for light RMG factory operations including required offices, generator room, sewing, cutting, packing & finished goods storage workers dining etc. INVESTIGATION OF AS BUILT CONDITION As-built drawing of the building available and test result of the construction materials used during construction is not available. To carry out the detail engineering assessment of the building in an effective way, a detail survey and is performed to construct the as built drawing of the building. Confirmatory strength assessment materials of concrete, re bar scanning and time of construction were also carried out. The building is narrow-rectangular in character. Found layout drawings and present constructed floor layout is almost similar. The physical parameter and use of floor described below. Category/occupancy: Industrial (Readymade Garment manufacturing) Number of level: One No of basement: None No of levels above grade: One No of future level: None Mezzanine floor: two Width: The average width of the building found 76,248 mm. Length: The approximate length of the building is 51,136mm. Date construction started: 1990 Total built area: 55,000 sq.ft. Total number of occupants: As per BNBC code Lift: None Generator: Generator is located at the ground level at separate place.
  • 3.
  • 4.
  • 5.
  • 6. 6
  • 7. 7
  • 8. 8