                                        MINUTES OF
                            MEETING OF THE BOARD OF DIRECTORS
                             Wednesday, June 15, 2011 at 5:30 p.m.

Call to Order

The Meeting of the Board of Directors was held on the date, time and at the place set forth in
the Notice of Meeting fixing such time and place, and attached to the Minutes of this Meeting.
Notice of the Meeting was posted 48 forty-eight hours prior to the Meeting. The President called
the meeting to order at 5:31 p.m.

Calling of the Roll
A quorum of Board of Directors was established.

There were present the following Board Members:

                 Magali Uribarri, President
                 Maria Victoria Rua, Secretary
                 Randall Gluss, Vice President

There were present the following Management Representatives:

                 Elaine Perez, LCAM
                 Gary Pyott, Continental President


Anago

Magali explains to all those present who Anago is and the issues with respect to this company
and the association. Anago was the janitorial company in place at the time of the Developer.
They remained servicing the association for a few months after turnover when the board
requested for the manager at the time Karen Castro to cancel the contract. Karen did so without
following the cancellation clause stipulated on the contract and Anago in turn filed a lawsuit
against the association. Magali then proceeds to read a letter she wrote out loud to all those
present and the board directed to Anago.

Gary Pyott then explains Continental’s position with respect to the contract cancellation and also
reminds the board that after turnover, the board had a certain amount of time to cancel all
contractors and vendors and this was not done. Gary proceeded to explain that he is not willing
                                                                                                 1
OPS/Minutes- BOD Meeting
Rev. 3/18/2010
to assume full responsibility for the mistake and believes association should partially assume
responsibility for fees, costs and settlement. Board decided they would discuss further and then
present response to Continental.


Engineer Report

Elaine provided an update on the Engineer’s Report. At the time the meeting was held, a final
version of the Engineer’s Report had not been provided to the association. Therefore, the
association is awaiting for this to be provided in order for the next update to be provided to all
owner’s.


Landscaping

Randall informed all those present that the association has decided to cancel contract with the
current landscaper and Lukes Landscaping was hired as the association’s new landscaper.
Improvements to the entire landscaping surrounding the building are almost done. Company
performing the work is Lukes.

DirecTV

Elaine and Randall gave an update on the DirecTV issue. It was explained to all those present
that at the present time there are many items that the association does not agree on with
respect to the contract terms that DirecTV is presenting and the association’s attorney is
working on going through all the items in order to reach a mutual agreement.

Minutes

Randall and Vicky wanted Elaine to change last meeting minutes to state that they both agree
with the discuss project at that meeting.

Gary and Elaine were then asked to leave the meeting by the board. Therefore, Elaine
explained that minutes would adjourn at the time of her leaving and that Vicky would be
responsible for completing the minutes to the remainder of the meeting discussion.

Adjournment

6:37 p.m.




                                                                                                 2
OPS/Minutes- BOD Meeting
Rev. 3/18/2010

More Related Content

More from VillaAlhambra

Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012
VillaAlhambra
 
Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012
VillaAlhambra
 
Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012
VillaAlhambra
 
Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012
VillaAlhambra
 
Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012
VillaAlhambra
 
Villa alhambra financials 2011
Villa alhambra financials 2011Villa alhambra financials 2011
Villa alhambra financials 2011
VillaAlhambra
 
Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012
VillaAlhambra
 
Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012VillaAlhambra
 
Villa Alhambra Financials 2011
Villa Alhambra Financials 2011Villa Alhambra Financials 2011
Villa Alhambra Financials 2011
VillaAlhambra
 
Carjacking Warning
Carjacking WarningCarjacking Warning
Carjacking Warning
VillaAlhambra
 
Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012
VillaAlhambra
 
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
VillaAlhambra
 
Florida Statute Chapter 718
Florida Statute Chapter 718Florida Statute Chapter 718
Florida Statute Chapter 718
VillaAlhambra
 
Waste Management Contract - Villa Alhambra
Waste Management Contract - Villa AlhambraWaste Management Contract - Villa Alhambra
Waste Management Contract - Villa AlhambraVillaAlhambra
 
The Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa AlhambraThe Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa Alhambra
VillaAlhambra
 
SIS Contract - Villa Alhambra
SIS Contract - Villa AlhambraSIS Contract - Villa Alhambra
SIS Contract - Villa AlhambraVillaAlhambra
 
Power Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa AlhambraPower Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa AlhambraVillaAlhambra
 
Otis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa AlhambraOtis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa AlhambraVillaAlhambra
 
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa AlhambraLukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa AlhambraVillaAlhambra
 
Hivac Contract - Villa Alhambra
Hivac Contract - Villa AlhambraHivac Contract - Villa Alhambra
Hivac Contract - Villa AlhambraVillaAlhambra
 

More from VillaAlhambra (20)

Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012Villa Alhambra Financials July 2012
Villa Alhambra Financials July 2012
 
Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012Villa Alhambra Financials May 2012
Villa Alhambra Financials May 2012
 
Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012Villa Alhambra Financials Apr. 2012
Villa Alhambra Financials Apr. 2012
 
Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012Villa Alhambra Financials Feb. 2012
Villa Alhambra Financials Feb. 2012
 
Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012Villa Alhambra Financials Jan. 2012
Villa Alhambra Financials Jan. 2012
 
Villa alhambra financials 2011
Villa alhambra financials 2011Villa alhambra financials 2011
Villa alhambra financials 2011
 
Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012Gerri Brod Written Request Response E-mail 3-5-2012
Gerri Brod Written Request Response E-mail 3-5-2012
 
Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012Dania Fernandez Cease and Desist Letter 2 2012
Dania Fernandez Cease and Desist Letter 2 2012
 
Villa Alhambra Financials 2011
Villa Alhambra Financials 2011Villa Alhambra Financials 2011
Villa Alhambra Financials 2011
 
Carjacking Warning
Carjacking WarningCarjacking Warning
Carjacking Warning
 
Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012Written Request E-mail 3-29-2012
Written Request E-mail 3-29-2012
 
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
Villa Alhambra Owners Meeting Presentation 3-19-2012 (meeting version)
 
Florida Statute Chapter 718
Florida Statute Chapter 718Florida Statute Chapter 718
Florida Statute Chapter 718
 
Waste Management Contract - Villa Alhambra
Waste Management Contract - Villa AlhambraWaste Management Contract - Villa Alhambra
Waste Management Contract - Villa Alhambra
 
The Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa AlhambraThe Continental Group Contract - Villa Alhambra
The Continental Group Contract - Villa Alhambra
 
SIS Contract - Villa Alhambra
SIS Contract - Villa AlhambraSIS Contract - Villa Alhambra
SIS Contract - Villa Alhambra
 
Power Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa AlhambraPower Exterminators Contract - Villa Alhambra
Power Exterminators Contract - Villa Alhambra
 
Otis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa AlhambraOtis Elevator Contract - Villa Alhambra
Otis Elevator Contract - Villa Alhambra
 
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa AlhambraLukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
Lukes Sawgrass Landscaping Maintenance Contract - Villa Alhambra
 
Hivac Contract - Villa Alhambra
Hivac Contract - Villa AlhambraHivac Contract - Villa Alhambra
Hivac Contract - Villa Alhambra
 

Recently uploaded

TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website
Pixlogix Infotech
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
mikeeftimakis1
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Zilliz
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 

Recently uploaded (20)

TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Introduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - CybersecurityIntroduction to CHERI technology - Cybersecurity
Introduction to CHERI technology - Cybersecurity
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...Building RAG with self-deployed Milvus vector database and Snowpark Container...
Building RAG with self-deployed Milvus vector database and Snowpark Container...
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 

June 2011 Villa Alhambra Board Minutes

  • 1. A Corporation Not-for Profit MINUTES OF MEETING OF THE BOARD OF DIRECTORS Wednesday, June 15, 2011 at 5:30 p.m. Call to Order The Meeting of the Board of Directors was held on the date, time and at the place set forth in the Notice of Meeting fixing such time and place, and attached to the Minutes of this Meeting. Notice of the Meeting was posted 48 forty-eight hours prior to the Meeting. The President called the meeting to order at 5:31 p.m. Calling of the Roll A quorum of Board of Directors was established. There were present the following Board Members: Magali Uribarri, President Maria Victoria Rua, Secretary Randall Gluss, Vice President There were present the following Management Representatives: Elaine Perez, LCAM Gary Pyott, Continental President Anago Magali explains to all those present who Anago is and the issues with respect to this company and the association. Anago was the janitorial company in place at the time of the Developer. They remained servicing the association for a few months after turnover when the board requested for the manager at the time Karen Castro to cancel the contract. Karen did so without following the cancellation clause stipulated on the contract and Anago in turn filed a lawsuit against the association. Magali then proceeds to read a letter she wrote out loud to all those present and the board directed to Anago. Gary Pyott then explains Continental’s position with respect to the contract cancellation and also reminds the board that after turnover, the board had a certain amount of time to cancel all contractors and vendors and this was not done. Gary proceeded to explain that he is not willing 1 OPS/Minutes- BOD Meeting Rev. 3/18/2010
  • 2. to assume full responsibility for the mistake and believes association should partially assume responsibility for fees, costs and settlement. Board decided they would discuss further and then present response to Continental. Engineer Report Elaine provided an update on the Engineer’s Report. At the time the meeting was held, a final version of the Engineer’s Report had not been provided to the association. Therefore, the association is awaiting for this to be provided in order for the next update to be provided to all owner’s. Landscaping Randall informed all those present that the association has decided to cancel contract with the current landscaper and Lukes Landscaping was hired as the association’s new landscaper. Improvements to the entire landscaping surrounding the building are almost done. Company performing the work is Lukes. DirecTV Elaine and Randall gave an update on the DirecTV issue. It was explained to all those present that at the present time there are many items that the association does not agree on with respect to the contract terms that DirecTV is presenting and the association’s attorney is working on going through all the items in order to reach a mutual agreement. Minutes Randall and Vicky wanted Elaine to change last meeting minutes to state that they both agree with the discuss project at that meeting. Gary and Elaine were then asked to leave the meeting by the board. Therefore, Elaine explained that minutes would adjourn at the time of her leaving and that Vicky would be responsible for completing the minutes to the remainder of the meeting discussion. Adjournment 6:37 p.m. 2 OPS/Minutes- BOD Meeting Rev. 3/18/2010