2. www.guygold.com 2
This presentation of Guyana Goldfields Inc. (the "Company") contains
statements that constitute "forward-looking statements." Such forward-looking
statements involve known and unknown risks, uncertainties and other factors
that may cause our actual results, performance or achievements, or
developments in our industry, to differ materially from the anticipated results,
performance or achievements expressed or implied by such forward-looking
statements. Forward looking statements are statements that are not historical
facts and are generally, but not always, identified by the words "expects,"
"aims," "plans," "anticipates," "believes," "intends," "estimates," "projects,"
"potential" and similar expressions, or that events or conditions "will," "would,"
"may," "could" or "should" occur. Information inferred from the interpretation of
drilling results and information concerning mineral resource and mineral reserve
estimates may also be deemed to be forward looking statements, as such
information constitutes a prediction of what might be found to be present when
and if a project is actually developed. Forward-looking statements this document
include statements regarding: the Company's expectations regarding drilling
and exploration activities on properties in which the Company has an interest;
and the Company's statements regarding estimates of reserves and resources
on properties in which the Company has an interest.
There can be no assurance that such statements will prove to be accurate.
Actual results and future events could differ materially from those anticipated in
such statements, and readers are cautioned not to place undue reliance on
these forward-looking statements that speak only as of their respective dates.
Important factors that could cause actual results to differ materially from the
Company's expectations include among others, risks related to fluctuations in
mineral prices; uncertainties related to raising sufficient financing to fund
planned work in a timely manner and on acceptable terms; changes in planned
work resulting from weather, logistical, technical or other factors; the possibility
that results of work will not fulfill expectations and realize the perceived potential
of the Company's properties; uncertainties involved in the estimation of
resources and reserves; the possibility that required permits may not be
obtained on a timely manner or at all; the possibility that capital and operating
costs may be higher than currently estimated and may preclude commercial
development or render operations uneconomic; the possibility that the estimated
recovery rates may not be achieved; risk of accidents, equipment breakdowns
and labour disputes or
other unanticipated difficulties or interruptions; the possibility of cost overrun or
unanticipated expenses in the work program; the risk of environmental
contamination or damage resulting from the Company's operations; risks
associated with title to mineral properties; and other risks and uncertainties
discussed appear elsewhere in the Company's documents filed from time to
time with the Toronto Stock Exchange and Canadian securities regulators.
These statements are based on a number of assumptions, including
assumptions regarding general market conditions, the availability of financing for
proposed transactions and programs on reasonable terms, the cost of
exploration and development and the ability of outside service providers to
deliver services in a satisfactory and timely manner. Forward-looking statements
are based on the beliefs, estimates and opinions of the Company's
management on the date the statements are made. Except as expressly
required by applicable securities laws, the Corporation undertakes no obligation
to update these forward-looking statements in the event that management's
beliefs, estimates or opinions, or other factors, should change.
This presentation uses the terms "Inferred Resource", "Indicated Resource",
“Measured Resource” and "Mineral Resource". The Company advises readers
that although these terms are recognized and required by Canadian securities
regulations (under National Instrument 43-101 "Standards of Disclosure for
Mineral Projects"), the US Securities and Exchange Commission does not
recognize these terms. Readers are cautioned not to assume that any part or all
of the mineral deposits in these categories will ever be converted into reserves.
In addition, "Inferred Resources" have a great amount of uncertainty as to their
existence, and economic and legal feasibility. It cannot be assumed that any
part of an Indicated or Inferred Mineral Resource will ever be upgraded to a
higher category. Under Canadian rules, estimates of Inferred Mineral Resources
may not form the basis of feasibility or pre-feasibility studies, or economic
studies except for a Preliminary Assessment as defined and permitted under
National Instrument 43-101. Readers are cautioned not to assume that part or
all of an Inferred Resource exists, or is economically or legally mineable. The
Mineral Resources stated in this presentation are not Mineral Reserves and, in
the absence of a current feasibility study, do not demonstrate economic viability.
The determination of Mineral Reserves can be affected by various factors
including environmental, permitting, legal, title, taxation, socio-political, and
marketing issues.
FORWARD LOOKING STATEMENT
3. www.guygold.com 3
Cash position of US$62M vs. debt of US$50M as at June 30, 2018
Annual gold production expected to grow from 160koz (2017) to +300koz (2022)
Attractive 5-Year
Growth Profile
High grade Au producer with +16 years reserve life with upside
Simple metallurgy and mine plan, positive grade reconciliation to date
A Scarce Asset
US$500M+ of expected free cash flow generated over the next 5 years at US$1,300/oz
Exceptional
Free Cash Flow
Generation
+200,000 acre land package in highly prospective & underexplored greenstone belt
Targeting open pit exploration targets within a 30km radius from Aurora Mill
Focus on East Wallcott Drilling at Aurora, Iroma, Wynamu and Arangoy targets
District Potential
Strong Balance
Sheet
INVESTMENT HIGHLIGHTS
5. www.guygold.com
2.9 2.9
2.7
1.7
1.4 1.3 1.3
1.0 1.0 0.9 0.9 0.8
0.7 0.7 0.6
0.4
Guyana Torex SEMAFO Alacer OceanaGold IAMGOLD Alamos B2Gold Detour Eldorado SSR Mining New Gold Kinross Yamana Tahoe Centerra
Gold Equivalent Grade (g/t Au Eq.)
5
Aurora is a High Grade Gold Mine
Source: Company filings
Note: Gold equivalent grade shown for total reserves and resources (precious metals only).
6. www.guygold.com 6
2018 Guidance
2018 Guidance
Gold production 175,000-185,000
Cost of sales (production costs, royalty and depreciation) $905-955/oz
Cash cost¹, excluding royalty $535-585/oz
All-in sustaining cost¹ (“AISC”) $945-995/oz
• Production is weighted towards the second half of the year due to mine sequencing and
increased throughput with completion of the phase 1 expansion.
• 2018 mine plan is primarily made up of all hard rock ore from the central tonalite/diorite ore at
Rory’s Knoll and East Walcott deposits.
• Costs are based on an increased stripping rate during 2018, offset by the increased and more cost-
efficient production offered by the process plant expansion investments.
(1) This is a non-IFRS measure. Refer to non-IFRS Performance Measures section in the latest MD&A
7. www.guygold.com 7
Q2 2018 Operating Highlights
• Full second quarter 2018 operational and financial results will be released after-market on
Monday, July 30, 2018.
• Production is weighted towards the second half of the year due to mine sequencing and
increased throughput with completion of the phase 1 expansion.
Q1 2018 Q2 2018 Annual Guidance
Gold Produced (ounces poured) 38,500 28,250 175-185k
Gold Sold (ounces) 38,000 31,700
Average Realized Gold Price US$/ounce 1,333 1,300
Gross Revenue (US$) 50M 41M
Cost of sales (production costs, royalty and
depreciation)
913 $905-955/oz
Cash cost¹, excluding royalty 611 $535-585/oz
All-in sustaining cost¹ (“AISC”) 934 $945-995/oz
Tonnes mined per day 36,489 39,717
Tonnes processed per day 6,720 7,100
Head grade g/t Au 2.18 1.65
Recovery (%) 91.7 91.2
8. www.guygold.com 8
Excellent Track Record and Growth Profile
(1) 2018 Guidance of 175k‐185koz
¹
Source: Optimized Life of Mine Plan – Press Release February 20, 2018
0
200
400
600
800
1,000
1,200
‐
50
100
150
200
250
300
350
2017 2018E 2019E 2020E 2021E 2022E
Costs (US$/oz)
Recovered Oz
Gold Recovered / Costs
Underground Open Pit Operating Cash Cost AISC
9. www.guygold.com 9
Optimized LOM Mine Plan: Highlights Comparison
(1) This is a non-IFRS measure. Refer to non-IFRS Performance Measures section
(2) Royalty decreases from 8% to 5% at gold prices at and below US$1,000/oz
Description (@ US$1,200 gold price) 2018 LOM Plan
2017 Updated
FS
Ore tonnes (Mt) 43.0 34.7
Average grade (Au g/t) 2.87 3.00
Process recovery (%) 94.8 93.8
Payable gold (Moz) 3.8 3.1
Annual gold production (2018‐2022 koz) 270 242
Mine Life (years) 16 14
AISC ($/oz)¹ 797 745
Post‐tax NPV5% (M$) 898 821
Financials @ 5%
Discount Rate
$1,000/oz
gold price²
$1,100/oz
gold price
$1,300/oz
gold price
$1,400/oz
gold price
Pre‐tax NPV ($mlns) 722 891 1,393 1,645
Post‐tax NPV ($mlns) 588 713 1,081 1,264
Source: Optimized Life of Mine Plan – Press Release February 20, 2018
11. www.guygold.com 11
MILL EXPANSION
88
89
90
91
92
93
94
5,400
5,600
5,800
6,000
6,200
6,400
6,600
6,800
7,000
7,200
Current Operation Phase 1 Pre‐Crush Install
Recovery (%)
Throughput (tpd)
Throughput Recovery
• Phase 1 Expansion: Completed
• Phase 2 Pre‐crush Expansion: Q4 2018
• Capital cost of $3.5M
• Engineering is complete & construction is 20% underway
• Phase 2 Ball Mill & Gravity Expansion: Q4 2018 ‐ Eliminated
• Due to the highly encouraging results from trials supplementing mill feed with pre‐crushed
ore, as well as the higher than expected recoveries from the Phase 1 expansion, the scope of
the second phase of the mill expansion has been reduced to eliminate the ball mill
• Savings of $2.5M
12. www.guygold.com 12
UPCOMING CATALYSTS
Multiple brownfield and greenfield targetsExploration
Expected completion by the end of Q4 2018
Phase 2
Mill Expansion
Begins Q4 2018
Underground
Development
14. www.guygold.com 14
CUYUNI BASIN: A TRUE MINING DISTRICT: Looking for Mine #2
• 1 Operating Aurora Gold Mine
• 1 Sulphur Rose secondary resource
• 1,200 square km land package
• Long history of artisanal mining
• Highly prospective greenstone belt
• Brownfield Targets:
• East Walcott, Mad Kiss and Aleck Hill
• Greenfield Targets:
• Iroma, Wynamu and Arangoy
Looking for Mine #2
Arangoy
17. www.guygold.com 17
Iroma: Near Mine Open Pit Feed Target
• Located 10km NE of Aurora
• First-ever drilling: 17 holes have been
completed to date totaling 3,721 meters of
drilling.
• Drilling will continue to test the mineralized
zones laterally and at depth. A drill rig road
is currently being pushed towards Areas 2
and 3 along the 8.5km gold anomalous
zone that will be drill tested.
• Gold mineralization is associated with
NNW trending shear zones along an 12km
central zone of anomalous gold.
• Prerequisites:
• Deep plumbing
• Brittle / Ductile Contrast
• Source of iron
• Sulphidation / Gold Event
18. www.guygold.com 18
Wynamu: First Ever Drilling Program
• Regional NE Structure
• First ever drilling: 7 drill
holes have been
completed.
• A ground magnetic survey
commenced which will
cover 50 line-km of the
more significant gold
anomalous trends.
• Drill testing will continue
towards the northeast of
the drilled area to test
anomalous gold in soils
and trenches.
• Anomalous Gold in soil
over 5 km
• Iron rich volcanic host rock
• Pervasive iron carbonate
alteration
19. www.guygold.com 19
Greater Sulphur Rose Area & Arangoy
• Arangoy is located ~ 10 km NW of Sulphur
Rose
• Sulphur Rose Resource:
• M&I: 277,580 oz @ 1.04 g/t Au
Inf: 289,250 oz @ 1.42 g/t Au
• Soil sampling conducted within the vicinity
of the greenstone and intrusive lithological
contact indicated a large and coherent gold
anomaly in soils measuring roughly 1km by
0.5km.
• A trenching and drilling program is currently
being planned to test the gold anomaly.
21. www.guygold.com 21
Symbol: TSX: GUY
Total Shares Outstanding 173,310,801
Options 6,3097,512
Warrants 0
52 week: Hi/Lo C$5.51 / C$3.96
Market Cap (at C$ 4.90) C$850 million
Cash Balance (June 30, 2018) US$62 million
Debt (June 30, 2018) US$50 million
Top 10 Shareholders Shares %
The Baupost Group 23.7M 13.7%
Van Eck 19.1M 11.0%
M&G Investment Mgmt 11.2M 6.5%
Franklin Resources (Templeton) 8.4M 4.5%
Rafferty Asset Management 8.3M 4.8%
Sentry Investments 6.9M 4.0%
Fidelity Investments 6.1M 3.5%
Patrick Sheridan Jr. (Founder) 5.6M 3.2%
Oppenheimer 5.2M 3.0%
Dimensional Fund 3.6M 2.1%
CORPORATE SNAPSHOT
22. www.guygold.com 22
Guyana is the only English speaking country in South America
British common law and secure tenure - part of the Commonwealth
Democratically elected government under parliamentary system
Long history of significant gold production:
Gold was the largest export of the country
Royalty:
5%: Gold price $1,000/oz or less
8%: Gold price $1,000/oz +
Corporate income tax:
27.5% with no withholding tax on interest payments
MINING FRIENDLY JURISDICTION & GOVERNMENT
24. www.guygold.com 24
Focus on health and safety of our employees, the well-being of our
community and the protection of the natural environment
Hiring in the region, giving priority to local communities:
96% are Guyanese nationals
Scholarship and job/skills training
Supporting local communities
Local sourcing of goods and services
Business opportunities
Participation in municipal development
Sustainable development initiatives in community
CSR AND SUSTAINABLE DEVELOPMENT
25. www.guygold.com 25
MINERAL RESERVES
As at December 31, 2017
Category
Quantity
(kt)
Grade
(g/t Au)
Ounces
(k Oz)
Proven
OP Saprolite 108 0.73 3
OP Rock 4,569 2.75 404
Total Proven 4,677 2.70 406
Probable
OP Saprolite 2,291 1.77 130
OP Rock 12,959 2.81 1,172
UG Rock 23,120 3.04 2,262
Total Probable 38,370 2.89 3,565
Total P&P 43,047 2.87 3,971
1. The CIM definitions were followed for mineral reserves.
2. Mineral Reserves are based on a gold price of US$1,200 per ounce, an 8% royalty and an average
metallurgical recovery of 96.0% for saprolite and 94.0% for fresh rock material.
3. Open pit saprolite and rock reserves are reported at a cut-off grade of 0.44 g/t Au and 0.42 g/t Au
for vein and upper saprolite material respectively. Open pit rock reserves are reported at a cut-off
grade of 0.76 g/t Au and 0.64 g/t Au for vein and Rory’s Knoll rock material respectively.
4. Underground fresh rock reserves are reported at a cut-off grade of 1.5 g/t Au.
5. Mineral reserves are contained within mineral resources.
6. All figures have been rounded to reflect the relative accuracy of the estimates. Numbers may not
add due to rounding
7. The mineral reserve estimate was prepared by Tysen Hantelmann, P.Eng. and Gord Doerksen,
P.Eng of JDS Mining and both are a “qualified person” under National Instrument 43-101.
26. www.guygold.com 26
MINERAL RESOURCES
As at December 31, 2017
Category
Quantity
(kt)
Grade
(g/t Au)
Ounces
(k Oz)
Measured
OP Saprolite 108 0.73 3
OP Rock 4,728 2.91 442
Total Measured 4,836 2.86 445
Indicated
OP Saprolite 1,404 0.93 42
OP Rock 20,901 2.60 1,747
UG Rock 30,060 3.91 3,780
Total Indicated 52,365 3.31 5,569
Total M + I 57,201 3.27 6,014
Inferred
OP Saprolite 1,939 0.91 57
OP Rock 2,581 1.93 161
UG Rock 11,810 4.12 1,560
Total Inferred 16,330 3.39 1,777
1. The CIM definitions were followed for mineral resources.
2. Mineral resources are inclusive of mineral reserves. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
3. All figures have been rounded to reflect the relative accuracy of the estimates. Number may not add due to rounding.
4. Open pit mineral resources are reported at a cut-off grade of 0.30 g/t for Saprolite and 0.40 g/t for Fresh rock respectively, and underground mineral resources are reported at a cut-off grade of 1.8 g/t. Cut-off
grades are based on a price of US$1,300 per ounce of gold and a gold recoveries of 97 percent for saprolite and 94.5 percent for fresh material.
5. Mineral resources have been adjusted using the 2017 EOY topography, to account for open pit mining to date, and include ore stockpile inventories as of EOY 2017.
6. The qualified person is not aware of any mining, metallurgical, infrastructure, permitting, or other factors that could materially affect the mineral resource estimates.
7. The mineral resource estimate for Rory’s Knoll was prepared under the supervision of Tim Maunula, of T. Maunula & Associates Consulting Ltd. Mr. Maunula is a “qualified person” under NI 43-101 and
is independent of the Company. The mineral resource estimate for the satellites was prepared under the supervision of Daniel Noone of Guyana Goldfields Inc. Mr. Noone is a “qualified person” under
National Instrument 43-101.
27. www.guygold.com 27
Optimized LOM Plan OPEX
1 This is a non-IFRS measure. Refer to non-IFRS Performance Measures section.
Description Unit 2018 LOM 2017 Updated FS
OP Mining $/tonne mined 2.20 2.09
RK UG Mining $/ore t mined 24.83 25.72
Satellite UG Mining $/ore t mined 48.35 50.82
Processing $/t processed 16.06 14.25
G&A $/t processed 9.12 8.67
Operating Cash Cost¹
(w/ royalty)
$/oz 627 613
Operating Cash Cost¹
(excl. royalty)
$/oz 531 517
AISC¹ $/oz 797 745
Source: Optimized Life of Mine Plan – Press Release February 20, 2018
28. www.guygold.com
28
OPEN PIT TONNES MINED BY SOURCE
‐
10
20
30
40
50
60
70
80
‐
5
10
15
20
25
30
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Mining Rate (ktpd)
Material Mined (Mtonnes)
OP Material by Source
RK AH AN WH MK tpd
Source: Optimized Life of Mine Plan – Press Release February 20, 2018
29. www.guygold.com
29
UG MATERIAL BY SOURCE
‐
1.0
2.0
3.0
4.0
5.0
6.0
‐
0.5
1.0
1.5
2.0
2.5
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Mined Grade (gpt)
Material Mined (Mtonnes)
UG Material by Source
RK Development RK LH RK SLC MK AH RK‐EW LH Grade
Source: Optimized Life of Mine Plan – Press Release February 20, 2018
33. www.guygold.com 33
BOARD & SENIOR OFFICERS
Alan Ferry
Lead Director
Geologist that has been Involved in the investment industry for over 28 years as a mining
analyst and a mining corporate finance specialist.
Patrick Sheridan Jr.
Founder, Executive
Chairman and Director
Over 25 years of experience in the mining industry
Has actively explored in Guyana since 1996 and is the founder of Guyana Goldfields and lead the
discovery of the Aurora and Sulphur Rose deposits
Scott A. Caldwell
President & CEO
and Director
Mining engineer with 35+ years experience building and operating gold and base metal mines worldwide
Former President, CEO and Director of Allied Nevada Gold Corp. from 2006 - 2013
Michael Richings
Director
40+ years of development and operational experience in the resource sector. Mr. Richings is currently
the Chairman of the Board for Vista Gold, where he also served as CEO from 2007 to 2012
Rene Marion
Director
25+ years of diversified management and senior technical experience with resource industry expertise in
operations, mineral exploration, and mine development, along with a successful history of corporate
development.
Wendy Kei
Director
Chartered Professional Accountant and previously served as CFO of Dominion Diamond Corporation
(formerly Harry Winston).
Jean-Pierre Chauvin
Director
40+ years of combined experience in mining operations and construction management.
David Beatty
Director
25+ years of financial capital markets and resource management experience.
Daniel Noone
VP, Exploration
Over 25 years of experience of international mineral exploration and development
Former VP of Peru for Aquiline Resources
Paul J. Murphy
Executive VP,
Finance & CFO
Over 40 years of financial experience and former Head of PricewaterhouseCoopers LLP Western’s
World Mining Practice
34. www.guygold.com 34
Scientific and Technical Information
The compilation of the Optimized LOM Plan was completed by Tysen Hantelmann, P.Eng. and Gord Doerksen, P.Eng of JDS Mining. By
virtue of their education, membership to a recognized professional association and relevant work experience, Tysen Hantelmann and
Gord Doerksen are independent Qualified Persons as defined by National Instrument 43-101 and have reviewed, approved and verified
the technical content of this news release.
The mineral reserve estimates were prepared under the supervision of Tysen Hantelmann, P.Eng. and Gord Doerksen, P.Eng of JDS
Mining. Mr. Hantelmann and Mr. Doerksen are a “qualified person” under NI 43-101 and is independent of the Company. The mineral
resource estimate for Rory’s Knoll was prepared under the supervision of Tim Maunula, of T. Maunula & Associates Consulting. Mr.
Maunula is a “qualified person” under NI 43-101 and is independent of the Company. The mineral resource estimates for the satellite
deposits was prepared under the supervision of Danial Noone of Guyana Goldfields Inc. Daniel Noone is a “qualified person” under
National Instrument 43-101 and has also reviewed the contents of this press release.
Securities Laws
This presentation does not constitute an offer or solicitation to buy or sell any securities discussed herein in any jurisdiction where such
would be prohibited. This presentation is not an offer to sell, or a solicitation of an offer to purchase, any securities in the United States.
The securities referred to in this presentation will not be registered under the U.S. Securities Act of 1933 and may not be offered or sold in
the United States except pursuant to an exemption from the registration requirements of the U.S. Securities Act of 1933 and applicable
state securities laws.
The information contained in this presentation does not and is not intended to constitute a "valuation," "formal valuation," "appraisal,"
"prior valuation," or a "report, statement or opinion of an expert" for purposes of any securities legislation in Canada or otherwise.
Currency
Unless otherwise indicated, all dollar values herein are in United States dollars.
SCIENTIFIC, TECHNICAL AND SECURITIES INFORMATION