The document contains details about four infrastructure projects in Washougal, WA that received grant funding, including the total project costs, amounts of grant funds awarded, and required local matches. The 34th Street Sidewalk project received $470,078.65 from WSDOT's Safe Routes to School program with a $52,230.96 local match. The 34th & Evergreen project received $111,235 from the Transportation Improvement Board and required $27,810 in local funds. The Fueling Facility project was awarded $299,715 from the Department of Ecology with a $99,904 local match. A Traveler Information Sign project received $40,000 from CMAQ funds and needed $7,