SlideShare a Scribd company logo
1 of 2
*** JDE JOB COST PROJECT ***
11-28-2016
Page 1
Jennifer Coggins – (JDE) JD Edwards Sr. Business Analyst
Coggins Technical Associates has largeConstruction Projectwith “Enspire
Partners, Inc –Agent: Mary Binn” Our Duties is to setup the Financials (Chartof
Accounts) for Job Cost[Cost Code Structure] with the Concrete Company that will
be laying the foundation of the building. The Building is our Projectand each
Subproject within it will be the Flooring and Molding for Each Room within the
Building as well as Side Walks, Warehouse withDocking Station and Doorways
that leads into the building from the Parking Structure.
The Project: Building 5000
Subprojects: Rooms Flooring – Concrete Cement (BluePrints – Sides of Rooms)
1) 24 – Rooms Offices 5000.5001.8
2) 4 – Spaces for OfficeCubicles 5000.5002.8
3) 4 – Sets of Restrooms Male & Female 5000.5003,8
4) 5 – Exits Doors 5000.5004.8
5) 5 – Sides Walks that leads into Exit Doors 5000.5004.8
6) 1 – Large WarehouseRamp for Shipping 5000.5005.8
7) 1- Wheel Chair Ramp 5000.5006.8
8) 2 – Sets of Steps into Warehouse 5000.5007.8
9) 4- WarehouseDoors for Trucks Docking Stations 5000.5008.8
10) 1- Large Warehouse(Blue Prints for Square Footage) 5000.5009.8
11) 2- WarehouseOffice Space5000.5010.8
Jennifer Coggins – JDE Sr. Business Analyst Page 2
Financials
GL Chart of Accounts for Job Cost – Job Code Structure
(Job)
Cost Code
1. 5000
2. Cost Types
5001 Rooms Offices
5002 Spaces for OfficeCubical
5003 Set of Restrooms
5004 Exit Doors
5005 SideWalks
5006 LargeWarehouseRamps
5007 Wheel Chair Ramps
5008 Sets of Steps Into Warehouse
5009 WarehouseDoors Truck Docking Station
5010 LargeWarehouseSpace
3. Level of Detail
8 – Labor
9 – Regular Labor
In Section1 Page 1 we coded themall as “8”Regular Labor
which couldbe Contractors Labor or General Contractors Labor
from ConstructionBusiness –SubContractor. Number 9 is Regular Labor
which is daily employee labor.
Any Questions Feel Free to contact me Jennifer Coggins and we can cover this in
my Interview Process.Thanks for theopportunity to speak with you via this brief
presentation model of Job Cost – CostCode Structure.

More Related Content

Similar to JDE JOB COST PROJECT

Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )
Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )
Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )
Rajendra Kumar Sahu
 
Presentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSPresentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPS
Teow Beng Hur
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
Teow Beng Hur
 
Ashwin J-resume
Ashwin J-resumeAshwin J-resume
Ashwin J-resume
Ashwin J
 
Bhaskara_OTM Techno-functional Consultant
Bhaskara_OTM Techno-functional ConsultantBhaskara_OTM Techno-functional Consultant
Bhaskara_OTM Techno-functional Consultant
Bhaskara Rao Guntuku
 
Eng. Omar Yousry CV_2016.11
Eng. Omar Yousry CV_2016.11Eng. Omar Yousry CV_2016.11
Eng. Omar Yousry CV_2016.11
Omar Yousry
 
ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603
ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603
ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603
Isaac An
 
Successful Projects
Successful ProjectsSuccessful Projects
Successful Projects
Ted Noga
 

Similar to JDE JOB COST PROJECT (20)

Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )
Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )
Rajendra Kumar Sahu_243535(Maximo 7 5 Certified )
 
Presentation. jkr lawatan IBS kilang HC Precast System
Presentation.   jkr lawatan IBS kilang HC Precast SystemPresentation.   jkr lawatan IBS kilang HC Precast System
Presentation. jkr lawatan IBS kilang HC Precast System
 
Presentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPSPresentation. _ JKR Lawatan kilang HCPS
Presentation. _ JKR Lawatan kilang HCPS
 
Resume
ResumeResume
Resume
 
Afes
AfesAfes
Afes
 
Building application in a "Microfrontends" way - Matthias Lauf *XConf Manchester
Building application in a "Microfrontends" way - Matthias Lauf *XConf ManchesterBuilding application in a "Microfrontends" way - Matthias Lauf *XConf Manchester
Building application in a "Microfrontends" way - Matthias Lauf *XConf Manchester
 
Dream orbit corporate profile
Dream orbit corporate profileDream orbit corporate profile
Dream orbit corporate profile
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
Building application in a "Microfrontends" way - Prasanna N Venkatesen *XConf...
Building application in a "Microfrontends" way - Prasanna N Venkatesen *XConf...Building application in a "Microfrontends" way - Prasanna N Venkatesen *XConf...
Building application in a "Microfrontends" way - Prasanna N Venkatesen *XConf...
 
Cleared Job Fair Job Seeker Handbook November 7, 2019, BWI, MD
Cleared Job Fair Job Seeker Handbook November 7, 2019, BWI, MDCleared Job Fair Job Seeker Handbook November 7, 2019, BWI, MD
Cleared Job Fair Job Seeker Handbook November 7, 2019, BWI, MD
 
Driving Innovation with Kanban at Jaguar Land Rover
Driving Innovation with Kanban at Jaguar Land RoverDriving Innovation with Kanban at Jaguar Land Rover
Driving Innovation with Kanban at Jaguar Land Rover
 
Ashwin J-resume
Ashwin J-resumeAshwin J-resume
Ashwin J-resume
 
Bhaskara_OTM Techno-functional Consultant
Bhaskara_OTM Techno-functional ConsultantBhaskara_OTM Techno-functional Consultant
Bhaskara_OTM Techno-functional Consultant
 
Srini (1)
Srini (1)Srini (1)
Srini (1)
 
Documenting an Atomic Design System with Jekyll
Documenting an Atomic Design System with JekyllDocumenting an Atomic Design System with Jekyll
Documenting an Atomic Design System with Jekyll
 
Eng. Omar Yousry CV_2016.11
Eng. Omar Yousry CV_2016.11Eng. Omar Yousry CV_2016.11
Eng. Omar Yousry CV_2016.11
 
ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603
ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603
ELIM DMP Company Introduction (General_Email) - 002 - Eng_130603
 
Rheomold Engineering Solutions India Capabilities Presentation
Rheomold Engineering Solutions India Capabilities PresentationRheomold Engineering Solutions India Capabilities Presentation
Rheomold Engineering Solutions India Capabilities Presentation
 
Successful Projects
Successful ProjectsSuccessful Projects
Successful Projects
 
2015 11 24 resume
2015 11 24  resume2015 11 24  resume
2015 11 24 resume
 

JDE JOB COST PROJECT

  • 1. *** JDE JOB COST PROJECT *** 11-28-2016 Page 1 Jennifer Coggins – (JDE) JD Edwards Sr. Business Analyst Coggins Technical Associates has largeConstruction Projectwith “Enspire Partners, Inc –Agent: Mary Binn” Our Duties is to setup the Financials (Chartof Accounts) for Job Cost[Cost Code Structure] with the Concrete Company that will be laying the foundation of the building. The Building is our Projectand each Subproject within it will be the Flooring and Molding for Each Room within the Building as well as Side Walks, Warehouse withDocking Station and Doorways that leads into the building from the Parking Structure. The Project: Building 5000 Subprojects: Rooms Flooring – Concrete Cement (BluePrints – Sides of Rooms) 1) 24 – Rooms Offices 5000.5001.8 2) 4 – Spaces for OfficeCubicles 5000.5002.8 3) 4 – Sets of Restrooms Male & Female 5000.5003,8 4) 5 – Exits Doors 5000.5004.8 5) 5 – Sides Walks that leads into Exit Doors 5000.5004.8 6) 1 – Large WarehouseRamp for Shipping 5000.5005.8 7) 1- Wheel Chair Ramp 5000.5006.8 8) 2 – Sets of Steps into Warehouse 5000.5007.8 9) 4- WarehouseDoors for Trucks Docking Stations 5000.5008.8 10) 1- Large Warehouse(Blue Prints for Square Footage) 5000.5009.8 11) 2- WarehouseOffice Space5000.5010.8
  • 2. Jennifer Coggins – JDE Sr. Business Analyst Page 2 Financials GL Chart of Accounts for Job Cost – Job Code Structure (Job) Cost Code 1. 5000 2. Cost Types 5001 Rooms Offices 5002 Spaces for OfficeCubical 5003 Set of Restrooms 5004 Exit Doors 5005 SideWalks 5006 LargeWarehouseRamps 5007 Wheel Chair Ramps 5008 Sets of Steps Into Warehouse 5009 WarehouseDoors Truck Docking Station 5010 LargeWarehouseSpace 3. Level of Detail 8 – Labor 9 – Regular Labor In Section1 Page 1 we coded themall as “8”Regular Labor which couldbe Contractors Labor or General Contractors Labor from ConstructionBusiness –SubContractor. Number 9 is Regular Labor which is daily employee labor. Any Questions Feel Free to contact me Jennifer Coggins and we can cover this in my Interview Process.Thanks for theopportunity to speak with you via this brief presentation model of Job Cost – CostCode Structure.