Air Energi was awarded a campaign in October 2008-2009 to recruit 10 staff for the PMT project. In October 2014, Air Energi was assigned as the prime vendor. In February 2014, the Jasmine project produced 80,000 barrels of oil per day. The Jasmine project averaged 4 candidates per position started and over 2500 candidates were offered positions, with over 2000 consultants onboarded to date and 288 consultants assigned at the peak in January 2013, though only 58 consultants were originally required.