1. The document contains a site plan for a petrochemical plant showing various buildings, roads, pipe racks, and other infrastructure labeled with coordinates.
2. It includes labels and details for four HVAC rooms showing equipment, ductwork, and other HVAC elements.
3. The site plan and HVAC drawings are for a project owned by Jam Petrochemical Company.
The heat generated in the winding of dry transformers needs to be dissipated via the surface of the coil. Our fans are ideally suited for this purpose. Rosenberg fans help remove the dissipated heat and, at the same time, use the ambient air to cool down the transformer.
An efficiently cooled transformer has the following advantages:
• Higher peak loads can be achieved
• Improved efficiency of the transformer
• Increased power of the transformer
• Longer life due to the more even distribution of temperature of the transformer winding
Rosenberg's Axial Fans: https://www.youtube.com/watch?v=iA7csh5SqnU
The heat generated in the winding of dry transformers needs to be dissipated via the surface of the coil. Our fans are ideally suited for this purpose. Rosenberg fans help remove the dissipated heat and, at the same time, use the ambient air to cool down the transformer.
An efficiently cooled transformer has the following advantages:
• Higher peak loads can be achieved
• Improved efficiency of the transformer
• Increased power of the transformer
• Longer life due to the more even distribution of temperature of the transformer winding
Rosenberg's Axial Fans: https://www.youtube.com/watch?v=iA7csh5SqnU
This is large barrage where afflux is an important issue. Along with all other hydraulic design aspect, afflux is a complex computations require Visual basic programme built in excel is used. The entire computation work sheets are enclose
Study project - Traffic engineering 2019Oleg Buyanov
Signal Setting Design and Synchronization in Via Tuscolana (Italy, Rome):
- Macro and Micro-simulation for transport arteria (Current situation and project) in PTV Visum and PTV Vissim
- Drawing Traffic Organization schemes
- Calculation of Traffic lights for each intersections
This is large barrage where afflux is an important issue. Along with all other hydraulic design aspect, afflux is a complex computations require Visual basic programme built in excel is used. The entire computation work sheets are enclose
Study project - Traffic engineering 2019Oleg Buyanov
Signal Setting Design and Synchronization in Via Tuscolana (Italy, Rome):
- Macro and Micro-simulation for transport arteria (Current situation and project) in PTV Visum and PTV Vissim
- Drawing Traffic Organization schemes
- Calculation of Traffic lights for each intersections
Kubota B2400HSE Tractor Parts Catalogue Manual.pdf
J-88-HV-DWG-3400-0001
1. PIP
E
TR
ENC
H
ROAD-E09X=518.00
ROAD-N01 Y=290.00
ROAD-N02 Y=277.00
24.50 25.80
23.90
28.00
ROA
D-E1
0
C OF FENCE Y=-5.112L
COFFENCEX=61.814L
G ENERAL
B.L.
CO M MON
B.L.
SB/LCBR/SBS
WAREHOUSE
WAREHOUSE
ROAD-E01X=68.00
ROAD-N07 Y=56.50
ROAD-E04X=369.00
ROAD-E07X=449.00
ROAD-E02X=137.00
ROAD-E03X=243.00
ROAD-N06 Y=87.00
ROAD-N03 Y=159.00
ROAD-N05 Y=132.00
ROAD-N03 Y=159.00
ROAD-N08 Y=13.00
23.80
22.80
22.80
22.80
20.80
21.60
ROAD-N04 Y=150.00
22.80
ROAD-E05X=387.00
ROAD-E06X=390.50
ROAD-E08X=494.750
ABS RUBBER
22.80
22.80
22.80
22.80
PIPERACK-4C
22.00
20.8020.30
SEPTICTANK
21.00 21.00
PIPERACK-4B
PIPE RACK-4A
PIPE RACK-4E
COOLING TOWERS AREA
X= 652414.610
Y-3049486.740
X= 652650.930
Y=3049686.380
X= 652698.680
Y=3049616.870
X= 652679.800
Y-3049156.260
X= 652684.810
Y-3049150.020
X= 652679.800
Y-3049156.260
X= 652944.140
Y-3049206.150
X= 653009.010
Y-3049230.140
X= 652995.020
Y-3049247.580
X= 653083.350
Y-3049270.480
X= 653133.340
Y-3049338.220
PEROXIDE STORAGE
Y=459.00
Y=519.00
X=514.50
(BY OTHRS)
T HERM AL OXIDIZER
8 8-TK-9001
STYRENE
G AS CYL INDER
STO RAGE
LABORATORY
BUILDING
PIPE RACK-4D
PIPE RACK-5A
PIPERACK-5B
PIPERACK-1PIPERACK-1PIPERACK-1
REF RIG ERATION
REF RIG ERATION
STYRENE PARK UTILITIES & FEEDTIE IN
PIPE TRENCH
LINE 2600
LINE 1600
LINE 7600
ABS RUBBER
PIPE RACK-2C
PIPERACK-2F
PIPE RACK-2B
PIPERACK-2E
PIPERACK-2G
PIPE RACK-2A
RUBBER O IL TANK
RUBBER W ET SOLVENT TANK
CO NDENSATE
ST O RAG E T ANKSABS
HO T ANDCOLD
O IL SYSTEM
PIPERACK-2D
T HERM AL O IL HEATERS
HOT&COLDTHERMALOILSTORAGE
ELECTRIC SUBSTATION
MAIN CONTROL ROOMS
ST YRENE RUBBER
STO RAGE
EB & O RG ANICPURGES
STO RAGE T ANKS
PIPE RACK-3E
RUBBER
WAREHOUSE
ADDITIVE 2
RUBBER MILLING ABS
WARE HOUSE
PIPERACK-3APIPERACK-3A
LINE5000
PIPE RACK-3D
PIPE RACK-3B
LINE3000
LINE4000
PIPERACK-3CPIPERACK-3C
X= 652603.542
Y-3049248.103
X= 652611.365
Y-3049238.354
(NOTE-4)
PIPE TRENCH PIPE TRENCH (NOTE-4)
X=0.00(652379.910)
Y=0.00 (3049538.150)
28.00
23.80
2"- WASTE WATER LINE TIE-IN
FROM SEPTIC TANK TO TREATEMENT
6"- PROCESS WATER LINE TIE-IN
TO TREATEMENT
X=100.578 (652439.651)
Y=4.111 (3049457.133)
20"- FIRE WATER LINE TIE-IN
X=67.000 (652423.402)
23.80
PELLETIZING
LINE-5000
PELLETIZING
LINE-3000
PELLETIZING
LINE-4000
ST YRENE STORAGE
STORAGE
SADAF
(BY OTHRS)
BUILDING
(BY O T HERS)
XH0
061
XH0008
XH0016
HH0007
XH0059
XH0052
XH0047
XH0033
XH0009
XM 0015
XH0058
XH0010
XM0014
XH0
011
XH0039XM0005XH0038XM0004
XH0041
XH0037
XH0036
XM 0006 XM 0007XH0035
XH0034
XH0050 XH0049 XH0048
XH0032
XH0043XH0042
XH0031XH0030XH0029
XM 0012XH0062
XH0046
XM0011
XH0045XM0010
XH0044
XH0051
XH0057XH0056
XH0053
XH0054XH0063XH0060XH0013
XH0
012
XH0024XM0001XH0023XM0002
XM 0003XH0040
XH0022
XH0014XH0015
XH0017XH0018
XM 0009XH0019XM 0008XH0020
XH0021
XH0006
XH0005
XH0028
XH0004XH0003
XH0002XH0001
XH0027XH0026XH0025
XH0064
XM0013
DRAWING TITLE:
PROJECT:
OWNER:
CONTRACTOR:
JAM PETROCHEMICAL COMPANY
RETURN/EXHAUST AIR GRILLE/
LOUVER (OUT SIDE MOUNTED)
REGISTER (RECTANGULAR)
RETURN/EXHAUST AIR GRILLE/
FAL-EAL
FRESH OR EXHAUST AIR
SUPPLY AIR DIFFUSER
REGISTER (SQUARE)
RECTANGULAR
S.D.
SUPPLY AIR DIFFUSER
SQUARE(4-WAY)
SUPPLY AIR DIFFUSER
SQUARE(2-WAY)
DRAIN (GENERAL)
OBD
BOTTOM OF DUCT ELEVATIONBOD
SA SUPPLY AIR
"W"
"H"
DUCT WIDTH (In)
DUCT HEIGHT (In)
BOD. BOTTOM OF DUCT "EL" ABOVE (±0.00)
BOP. BOTTOM OF PIPE "EL" ABOVE (±0.00)
D
REFRIGERANT RETURNFRR
FRS REFRIGERANT SUPPLY
RA RETURN AIR
EA EXHAUST AIR
OA FRESH AIR
IA INTAKE AIR
TA TRANSFER AIR
RLA RELIEF AIR
OVER PRESSUREOP
S.D.
S.D.
RG./EG.
RG./EG.
S.R. SUPPLY AIR REGISTER
(WALL MOUNTED)
RFAN EXHAUST FAN
(ROOF MOUNTED)
PRD
AFC
PBD
NRD NONE RETURN DAMPER
PARALLEL BLADE DAMPER
AIR DUCT FLEXIBLE
PRESSURE RELIEF DAMPER
OPPOSED BLADE DAMPER
CONNECTION
FD FIRE DAMPER
VD VOLUME DAMPERVD
MD
MANUAL DAMPERMD
M MOTORIZED DAMPER
A.H.U. AIR HANDLING UNIT
A.C.C.U. AIR COOLED CONDENSING UNIT
BDD BACK DRAFT DAMPER
ABOVE (±0.00)
SA
DUCT TURNED DOWN
SUPPLY AIR DUCT TURNED UP
RETURN OR EXHAUST AIR
SUPPLY AIR DUCT TURNED
RETURN OR EXHAUST AIR
DUCT TURNED UP
DOWN
SA
RA & EA
RA & EA
SPLITTER DAMPER
2. PIP
E
TR
ENC
H
ROAD-E09X=518.00
ROAD-N01 Y=290.00
ROAD-N02 Y=277.00
24.50 25.80
23.90
28.00
ROA
D-E1
0
C OF FENCE Y=-5.112L
COFFENCEX=61.814L
G ENERAL
B.L.
CO M MON
B.L.
SB/LCBR/SBS
WAREHOUSE
WAREHOUSE
ROAD-E01X=68.00
ROAD-N07 Y=56.50
ROAD-E04X=369.00
ROAD-E07X=449.00
ROAD-E02X=137.00
ROAD-E03X=243.00
ROAD-N06 Y=87.00
ROAD-N03 Y=159.00
ROAD-N05 Y=132.00
ROAD-N03 Y=159.00
ROAD-N08 Y=13.00
23.80
22.80
22.80
22.80
20.80
21.60
ROAD-N04 Y=150.00
22.80
ROAD-E05X=387.00
ROAD-E06X=390.50
ROAD-E08X=494.750
ABS RUBBER
22.80
22.80
22.80
22.80
PIPERACK-4C
22.00
20.8020.30
SEPTICTANK
21.00 21.00
PIPERACK-4B
PIPE RACK-4A
PIPE RACK-4E
COOLING TOWERS AREA
X= 652414.610
Y-3049486.740
X= 652650.930
Y=3049686.380
X= 652698.680
Y=3049616.870
X= 652679.800
Y-3049156.260
X= 652684.810
Y-3049150.020
X= 652679.800
Y-3049156.260
X= 652944.140
Y-3049206.150
X= 653009.010
Y-3049230.140
X= 652995.020
Y-3049247.580
X= 653083.350
Y-3049270.480
X= 653133.340
Y-3049338.220
PEROXIDE STORAGE
Y=459.00
Y=519.00
X=514.50
(BY OTHRS)
T HERM AL OXIDIZER
8 8-TK-9001
STYRENE
G AS CYL INDER
STO RAGE
LABORATORY
BUILDING
PIPE RACK-4D
PIPE RACK-5A
PIPERACK-5B
PIPERACK-1PIPERACK-1PIPERACK-1
REF RIG ERATION
REF RIG ERATION
STYRENE PARK UTILITIES & FEEDTIE IN
PIPE TRENCH
LINE 2600
LINE 1600
LINE 7600
ABS RUBBER
PIPE RACK-2C
PIPERACK-2F
PIPE RACK-2B
PIPERACK-2E
PIPERACK-2G
PIPE RACK-2A
RUBBER O IL TANK
RUBBER W ET SOLVENT TANK
CO NDENSATE
ST O RAG E T ANKSABS
HO T ANDCOLD
O IL SYSTEM
PIPERACK-2D
T HERM AL O IL HEATERS
HOT&COLDTHERMALOILSTORAGE
ELECTRIC SUBSTATION
MAIN CONTROL ROOMS
ST YRENE RUBBER
STO RAGE
EB & O RG ANICPURGES
STO RAGE T ANKS
PIPE RACK-3E
RUBBER
WAREHOUSE
ADDITIVE 2
RUBBER MILLING ABS
WARE HOUSE
PIPERACK-3APIPERACK-3A
LINE5000
PIPE RACK-3D
PIPE RACK-3B
LINE3000
LINE4000
PIPERACK-3CPIPERACK-3C
X= 652603.542
Y-3049248.103
X= 652611.365
Y-3049238.354
(NOTE-4)
PIPE TRENCH PIPE TRENCH (NOTE-4)
X=0.00(652379.910)
Y=0.00 (3049538.150)
28.00
23.80
2"- WASTE WATER LINE TIE-IN
FROM SEPTIC TANK TO TREATEMENT
6"- PROCESS WATER LINE TIE-IN
TO TREATEMENT
X=100.578 (652439.651)
Y=4.111 (3049457.133)
20"- FIRE WATER LINE TIE-IN
X=67.000 (652423.402)
23.80
PELLETIZING
LINE-5000
PELLETIZING
LINE-3000
PELLETIZING
LINE-4000
ST YRENE STORAGE
STORAGE
SADAF
(BY OTHRS)
BUILDING
(BY O T HERS)
XH0
061
XH0008
XH0016
HH0007
XH0059
XH0052
XH0047
XH0033
XH0009
XM 0015
XH0058
XH0010
XM0014
XH0
011
XH0039XM0005XH0038XM0004
XH0041
XH0037
XH0036
XM 0006 XM 0007XH0035
XH0034
XH0050 XH0049 XH0048
XH0032
XH0043XH0042
XH0031XH0030XH0029
XM 0012XH0062
XH0046
XM0011
XH0045XM0010
XH0044
XH0051
XH0057XH0056
XH0053
XH0054XH0063XH0060XH0013
XH0
012
XH0024XM0001XH0023XM0002
XM 0003XH0040
XH0022
XH0014XH0015
XH0017XH0018
XM 0009XH0019XM 0008XH0020
XH0021
XH0006
XH0005
XH0028
XH0004XH0003
XH0002XH0001
XH0027XH0026XH0025
XH0064
XM0013
DRAWING TITLE:
PROJECT:
OWNER:
CONTRACTOR:
JAM PETROCHEMICAL COMPANY
2 HVAC ROOM TOP VIEW
3 HVAC ROOM LEFT VIEW
3 HVAC ROOM FRONT VIEW
4 HVAC ROOM FRONT VIEW
3. PIP
E
TR
ENC
H
ROAD-E09X=518.00
ROAD-N01 Y=290.00
ROAD-N02 Y=277.00
24.50 25.80
23.90
28.00
ROA
D-E1
0
C OF FENCE Y=-5.112L
COFFENCEX=61.814L
G ENERAL
B.L.
CO M MON
B.L.
SB/LCBR/SBS
WAREHOUSE
WAREHOUSE
ROAD-E01X=68.00
ROAD-N07 Y=56.50
ROAD-E04X=369.00
ROAD-E07X=449.00
ROAD-E02X=137.00
ROAD-E03X=243.00
ROAD-N06 Y=87.00
ROAD-N03 Y=159.00
ROAD-N05 Y=132.00
ROAD-N03 Y=159.00
ROAD-N08 Y=13.00
23.80
22.80
22.80
22.80
20.80
21.60
ROAD-N04 Y=150.00
22.80
ROAD-E05X=387.00
ROAD-E06X=390.50
ROAD-E08X=494.750
ABS RUBBER
22.80
22.80
22.80
22.80
PIPERACK-4C
22.00
20.8020.30
SEPTICTANK
21.00 21.00
PIPERACK-4B
PIPE RACK-4A
PIPE RACK-4E
COOLING TOWERS AREA
X= 652414.610
Y-3049486.740
X= 652650.930
Y=3049686.380
X= 652698.680
Y=3049616.870
X= 652679.800
Y-3049156.260
X= 652684.810
Y-3049150.020
X= 652679.800
Y-3049156.260
X= 652944.140
Y-3049206.150
X= 653009.010
Y-3049230.140
X= 652995.020
Y-3049247.580
X= 653083.350
Y-3049270.480
X= 653133.340
Y-3049338.220
PEROXIDE STORAGE
Y=459.00
Y=519.00
X=514.50
(BY OTHRS)
T HERM AL OXIDIZER
8 8-TK-9001
STYRENE
G AS CYL INDER
STO RAGE
LABORATORY
BUILDING
PIPE RACK-4D
PIPE RACK-5A
PIPERACK-5B
PIPERACK-1PIPERACK-1PIPERACK-1
REF RIG ERATION
REF RIG ERATION
STYRENE PARK UTILITIES & FEEDTIE IN
PIPE TRENCH
LINE 2600
LINE 1600
LINE 7600
ABS RUBBER
PIPE RACK-2C
PIPERACK-2F
PIPE RACK-2B
PIPERACK-2E
PIPERACK-2G
PIPE RACK-2A
RUBBER O IL TANK
RUBBER W ET SOLVENT TANK
CO NDENSATE
ST O RAG E T ANKSABS
HO T ANDCOLD
O IL SYSTEM
PIPERACK-2D
T HERM AL O IL HEATERS
HOT&COLDTHERMALOILSTORAGE
ELECTRIC SUBSTATION
MAIN CONTROL ROOMS
ST YRENE RUBBER
STO RAGE
EB & O RG ANICPURGES
STO RAGE T ANKS
PIPE RACK-3E
RUBBER
WAREHOUSE
ADDITIVE 2
RUBBER MILLING ABS
WARE HOUSE
PIPERACK-3APIPERACK-3A
LINE5000
PIPE RACK-3D
PIPE RACK-3B
LINE3000
LINE4000
PIPERACK-3CPIPERACK-3C
X= 652603.542
Y-3049248.103
X= 652611.365
Y-3049238.354
(NOTE-4)
PIPE TRENCH PIPE TRENCH (NOTE-4)
X=0.00(652379.910)
Y=0.00 (3049538.150)
28.00
23.80
2"- WASTE WATER LINE TIE-IN
FROM SEPTIC TANK TO TREATEMENT
6"- PROCESS WATER LINE TIE-IN
TO TREATEMENT
X=100.578 (652439.651)
Y=4.111 (3049457.133)
20"- FIRE WATER LINE TIE-IN
X=67.000 (652423.402)
23.80
PELLETIZING
LINE-5000
PELLETIZING
LINE-3000
PELLETIZING
LINE-4000
ST YRENE STORAGE
STORAGE
SADAF
(BY OTHRS)
BUILDING
(BY O T HERS)
XH0
061
XH0008
XH0016
HH0007
XH0059
XH0052
XH0047
XH0033
XH0009
XM 0015
XH0058
XH0010
XM0014
XH0
011
XH0039XM0005XH0038XM0004
XH0041
XH0037
XH0036
XM 0006 XM 0007XH0035
XH0034
XH0050 XH0049 XH0048
XH0032
XH0043XH0042
XH0031XH0030XH0029
XM 0012XH0062
XH0046
XM0011
XH0045XM0010
XH0044
XH0051
XH0057XH0056
XH0053
XH0054XH0063XH0060XH0013
XH0
012
XH0024XM0001XH0023XM0002
XM 0003XH0040
XH0022
XH0014XH0015
XH0017XH0018
XM 0009XH0019XM 0008XH0020
XH0021
XH0006
XH0005
XH0028
XH0004XH0003
XH0002XH0001
XH0027XH0026XH0025
XH0064
XM0013
DRAWING TITLE:
PROJECT:
OWNER:
CONTRACTOR:
JAM PETROCHEMICAL COMPANY