Looking for a reliable Application development company?  ITCONS is the right Choice
Recent Awards Microsoft BizSpark Award 2008. A Finalist of TATA NEN Hottest Startup Award 2008. A Finalist of Power of Idea, Economic Times Award 2009. NASSCOM IT Innovator Award 2009.
Agenda ITCONS e-Solutions Pvt Ltd – An Overview Our Main Service Lines Application Development & Maintenance  Technology Consulting and Staff augmentation Value Proposition Contact us Intellectual Property Clause: This document is strictly confidential. It contains confidential material proprietary to ITCONS e-Solutions Pvt Ltd. The materials, ideas, and concepts contained herein are to be used exclusively to evaluate the capabilities of ITCONS e-Solutions Pvt Ltd.
ITCONS e-Solutions Pvt Ltd Overview
Overview ITCONS e-Solutions Pvt Ltd Founded in 2007 with continued growth  Headquartered in Noida. Consistent track record of success in delivering mission critical projects in emerging technologies Specialized in implementing CMM process and execution at Level 5 Specialized in implementing ITIL and BS799 process Experienced in engaging quality consulting resource
Our Services Portfolio ITCONS e-Solutions Pvt Ltd Application Engineering Services (AES) Enterprise Migration Services (EMS)  IV&V and Team Mentoring Services (IVVS)  Business Intelligence Analytics Services  (BIAS) Application Implementation & Infrastructure Management Services (AIIM) Professional Staffing Services (PSS)  Custom Instructor Led Training
Enterprise Migration Services (EMS)  System Migration and Conversion, Data Conversion, Data Entry, Report Migration
Enterprise Migration Services System Knowledge Consolidation – Documentation Migrate Language Conversion Replace Legacy Assessment and Transformation Roadmap Definition (Application Portfolio Analysis, Key Drivers Identification, Gap analysis, Architecture Definition, Build Vs Buy Vs Harvest Options Analysis, Plan Creation) Package Implementation (Reverse Engineering, Package Deployment) Redevelopment (Reverse Engineering, Custom Build) Redesign Interface  Re-engineering (Web-enabling, Application Integration) Restructuring (Better Flexibility and Extensibility) Data Migration Platform Migration Transformation Enablers / Accelerators Best Practices Methodology Processes Products Tools Standards Templates
Enterprise Migration Services … Our Custom 7 phase Data Migration Framework (SDMF) helps our customer for quicker and faster ROI.
Enterprise Migration Services … Our team is capable of using various ETL tools and database programming techniques to optimize the Migration Project for time and quality. Our DATA QUALITY ASSURANCE (DQA) is Guaranty for 100% accuracy by double-verification of data in staging and pre-production area.
Enterprise Migration Services … Specific Service areas are: Reports Migrations   Crystal Reports Migration to MS SQL Server2005 reporting services MS Access Data upsizing and Reports Migration to MS SQL Server2005 reporting services  Competitive database & analytics platform migration to SQL Server 2005 Data Entry & Data Conversion Data Migration Scanning and OCR for Semi-manual Data Conversion
Enterprise Migration Services … Specific Service areas are: Data Extraction, Transformation (Cleansing) and Load (ETL) Check list preparation Data Integrity Check CATS and/or DB-Link uses ETL tool use and data mapping design Incremental or Big-Bang Migration plan Data Synchronization Plan Data cleansing for date, empty strings, string concatenation and splitting Space Estimation and Optimization for project Data Elements Versions Management CASS Address Validation for USPS
Application Engineering Services (AES) Development, Maintenance, Re-engineering, EAI & SDLC Management
Application Engineering Services … Application Development & Maintenance Microsoft .NET (VB.NET, C#, ASP.NET, Win Forms, Web Forms, Web services)  Java/JSP/J2EE/EJB/POJO/JMS  C/C++/PHP  MS SQL Server/MS Access/Oracle/MySQL  RIA/AJAX/XML/XSD  Portals - Customization and Implementation - SharePoint, Web Part development  Web Services Development including web service security implementation  Smart Client and/or Rich Client Application development  Workflow Applications with .NET and SharePoint Portal
Application Engineering Services … Application SDLC Management using RUP Requirement Management using Requisite Pro  Change Management  BPM and Workflow development  Business Process Re-engineering  Re-engineering/Re-factoring/Migration Re-factoring in multi-layer, n-tier using Design Patterns  Re-factoring from monolithic code to component based architecture  Re-factoring of Business Logic into Components and/or Web Services  Web Services Enablement of Legacy Mainframe based applications and its code
Application Engineering Services … Enterprise Application Integration (EAI) using middleware MS Biztalk and MSMQ  MQ Series and JMS compliance Message Oriented Middleware  XML parsing in Java and .NET  Windows Communication Foundation  Data and/or process level integration  Web Services with WS*I Standards
Application Engineering Services … Proven ETVX model
Business Intelligence
Business Intelligence
Business Intelligence … Reports Development, Customization using various tools and technology.  Designing Data Mart data model for reporting purpose using "Star" or "Snowflake" Schema. Use of XML technology for Meta Data Management, Taxonomy, and create variable reports. Implementing Reports Distribution using various technologies and methodology to optimize resources.  Skills in advance technologies like "Report Bursting" in various formats like HTML, PDF, RTF or other.
Business Intelligence … Reports Development and Migration  MS Access Reports Development  Crystal Report Development  MS SQL Report using SQL Reporting Services  Reports using Oracle Reports, Discoverer  Business Intelligence (BI) Reports using Cognos and Business Objects
Business Intelligence … Data Mining and Analysis for Trends   Create average, maximum and minimum reports based on time, cost, customer, category dimension and facts table  Statistical analysis using SPSS  Liner, Least Square and Weighted Analysis / projection  Time series and forecasting analysis  Survey Analysis and Management of Survey results including sampling
IV&V and Team Mentoring Services Enterprise Application Architecture
IV&V and Team Mentoring Services Enterprise Application Architecture Verification for : Object Modeling using UML (Rational XDE, Sparx EA) Use Case modeling Enterprise Requirements Modeling based on Rational Suite Test Case Modeling Layers and Tiers and Framework API, Commonly used design patterns, Code Modularity, Code Cyclomatic Complexity analysis  Code Security Analysis for common security issues Use of API and Distributed Application Development Components Architecture & load balancing
IV&V and Team Mentoring Services Enterprise Application Architecture Verification for : Object Design Verification Database Model Verification for OLTP/Hierarchical/OLAP design 20 points Application Framework Design Verification Unit Test and System Test Verification Quality Assurance Services for Code, Design and Architecture Third Party Verification
IV&V and Team Mentoring Services Our Team can help organizations and mentor their team in defining scalable architecture for Easy Maintenance, Scalability & Performance requirements based on Component Based Development, Object Design and Modeling using UML etc. Re-engineering/Migration/Web Services Enablement of Legacy Mainframe based applications.
Application Implementation & Infrastructure Management Services (AIIM) Based on ITIL Framework
Implementation & Management Services COTS Application Customization & Implementation  MS Enterprise Project Server 2003  Crystal Enterprise Implementation Microsoft CRM 3.0 and Customization
Implementation & Management Services Infrastructure management service basket comprises of the following services :  Help Desk Management, Asset Management, OS (Operating System) Administration, Backup & Restore Management,  Mailing System Management, Database Administration, Virus Management, Vendor Management, Server & Desktop Management, Network Management, DR (Disaster Recovery) Plans, Value Added Services like Network Audit, Technical Updates and User’s Trainings etc.  Though this is a complete pack but is Flexible enough to be customized according to the need of Organization. Customer may select all or a few components from this basket.  Services Management is based on ITIL Framework for services management
Professional Staffing Services (PSS) Enterprise Resourcing
Professional Staffing Services (PSS) At ITCONS e-Solutions we can undertake an assignment to recruit talent viable for your organization. We would analyze, understand and execute a strategy for your resourcing needs, skills and experience required in technology and Subject Matter Knowledge required for performing the job.  Tech-Check Services Our technical screening for candidates is done by qualified resource managers and we help you in developing efficiencies in recruiting process.  Our Internal sourcing team along with 10+ dedicated vendors’ network helps us getting resources with specific skills and subject matter knowledge in a short time.
Professional Staffing Services (PSS) Technology and Project Management Resources On-site and Off-site across India/USA Attracting the talent through:  Advertisements, E-Resources, Headhunting efforts, Campus Selections Matching a candidate’s capabilities with the requirements of the job through:   Walk-in Management, E-Resourcing Support Competency profiling tests and preliminary interviews Interview Coordination with the client,  Assist in Salary Negotiation & Candidate Relationship Management
Professional Staffing Services (PSS) Our expertise covers the entire spectrum of HR activities  The services can be broadly defined as  Executive placement, Specific Executive Search, Senior Management Search Human Resource Administrative Services   Test administration,  Resume Management Services,  Advertisement placement and response handling, Training Administration Activities  We can help Organization find talented professionals in Information Technology and Telecom (in areas like software development, Network support, and Marketing) on a project based needs.  Training & Development We conduct both standard and customized training programs for its customers. We provide Training Needs Assessment and Custom Courseware designing for organizations.
Custom Instructor Led Training Special Technologies
Custom Instructor Led Training Our Experienced professionals & Trainers can provide practical custom training in the following area: Oracle DBA / Oracle Applications DBA/ Oracle RAC  Oracle Application Framework oracle apps developer using BLAF guidelines  Oracle Performance Tuning - Data Base and SQL & PL/SQL  MS SQL Server Performance Tuning - Database and SQL & T-SQL  Code Quality Control for VB.NET and C#  Coding Standards Compliance  Memory Optimization for Performance and resolving any Memory Leak issues  Java - Basic and Advance  Software Build Automation using Open Source tools like NANT/ANT etc.
Our Partial Clients/Projects List
Our Partial Clients/Projects List Clients List IAMNE India Pvt Ltd:  Full-line service provider for social and career networking site. Avartanah IT Solutions:  Full-line service provider for ERP solution comprises of P&P, MM, Finance, Operations, fuel management, Maintenance, Contract Management etc. ISparkles:  A kids school in Delhi. Matrix Inc:  US based Software company, Specializes in enterprise-wide Business Process Management (BPM) workflow software solutions for small to large-sized businesses worldwide. AgeTak:  US based software  company with a mission to enables any organization to control access to sensitive data across multiple databases, from multiple vendors using Agetak ARC (Access Right Control) software.
Our Partial Clients/Projects List Partial Project List ERP modules:  P&P, MM, Finance, Operations, fuel management, Maintenance, Contract Management etc. Social and Career networking site iamne.in  Online resume parser application at onlineresumeparser.com Applicant Tracking System at recruitplus.co.in Energy Accounting and Utilities Tracking System:  Energy Accounting and Utilities Tracking System is migration project to .NET and Web based application using AJAX technology to provide engineering application a user friendly interface for HVAC/ Mechanical engineers.  Extended Stored Procedure for MS SQL Server:   Interface to MQ Series API  SMTP EMAIL without OUTLOOK Accounts
Our Partial Clients/Projects List Partial Project List Software License Manager:  To provide automated license management for software products and services, this system is developed in .NET Winform application as well as Web services backend processing. E-Greeting Migration to .NET Architecture in distributed environment for ASP and Product Model:  E-Greeting was developed as a component for one the project which is a marketing and/or relationship building tool for companies either with customer or employees. Crystal Enterprise 10 Implementation MS Project Server 2003 with Share-Point2003 implementation
Our Value Proposition On-Site, Off-Site and Off-Shore
Our Value Proposition Service offerings based on Onsite – Project team working at customer site Offsite – Project team working from vendors site Offshore – Project team working from offices in India Combination of above Alliance/partnership with well established offshore company Equipped with required infrastructure and skilled resources On demand high speed net connections available  Cost savings more than 40%
Our Value Proposition Onsite – Offshore model Onsite coordinator to facilitate the communication 15% for the effort executed from onsite (based on past experience, effort will be estimated based on the business requirements and nature of the project) Basic infrastructure and software licenses will be provided Specialized software licenses to be provided by the customer Dependency on size and volume of the engagement Team rotation during the analysis period
Our Value Proposition On-Site, Off-Site and Off-Shore based on commitment and total volume of work Effective Cost and Communication Management Cost Model can be based on: Per-Seat – Base + Commission based on engagement length Contract and Project Management
Our Value Proposition Per-Seat Cost Model: Base + Commission based on engagement length We will provide Resources and Infrastructure Your Team will provide Project Management and directly manage resources for work assignment Your will approve resources Our team in India will be responsible for managing HR and other related services for resources
Our Value Proposition Contract and Project based Cost Model: Contract and Project Management We will provide solution and project delivery We will define requirements and estimate the work We will get approval for estimate We will manage change and project delivery We will be responsible of unit and system testing You will be responsible for User Acceptance Testing Cost is based on Hourly Rate and Work Estimate
Summary – Our Strengths Commitment to Customer Relationships Diversified Technology and Business Expertise Proven Methodology and Capabilities Offshore capabilities Huge pool of Qualified and Trained Professionals Strategic Alliances with Global firms Proven Commitment to Quality Flexible to work with the customer requirements
Contact us Piyush  [email_address]   Office: +91-120-4659136/37 Visit us: http://itconsinc.com

ITCONS Software Services Introduction

  • 1.
    ITCONS e-Solutions PvtLtd An Introduction
  • 2.
    Looking for areliable Application development company? ITCONS is the right Choice
  • 3.
    Recent Awards MicrosoftBizSpark Award 2008. A Finalist of TATA NEN Hottest Startup Award 2008. A Finalist of Power of Idea, Economic Times Award 2009. NASSCOM IT Innovator Award 2009.
  • 4.
    Agenda ITCONS e-SolutionsPvt Ltd – An Overview Our Main Service Lines Application Development & Maintenance Technology Consulting and Staff augmentation Value Proposition Contact us Intellectual Property Clause: This document is strictly confidential. It contains confidential material proprietary to ITCONS e-Solutions Pvt Ltd. The materials, ideas, and concepts contained herein are to be used exclusively to evaluate the capabilities of ITCONS e-Solutions Pvt Ltd.
  • 5.
  • 6.
    Overview ITCONS e-SolutionsPvt Ltd Founded in 2007 with continued growth Headquartered in Noida. Consistent track record of success in delivering mission critical projects in emerging technologies Specialized in implementing CMM process and execution at Level 5 Specialized in implementing ITIL and BS799 process Experienced in engaging quality consulting resource
  • 7.
    Our Services PortfolioITCONS e-Solutions Pvt Ltd Application Engineering Services (AES) Enterprise Migration Services (EMS) IV&V and Team Mentoring Services (IVVS) Business Intelligence Analytics Services (BIAS) Application Implementation & Infrastructure Management Services (AIIM) Professional Staffing Services (PSS) Custom Instructor Led Training
  • 8.
    Enterprise Migration Services(EMS) System Migration and Conversion, Data Conversion, Data Entry, Report Migration
  • 9.
    Enterprise Migration ServicesSystem Knowledge Consolidation – Documentation Migrate Language Conversion Replace Legacy Assessment and Transformation Roadmap Definition (Application Portfolio Analysis, Key Drivers Identification, Gap analysis, Architecture Definition, Build Vs Buy Vs Harvest Options Analysis, Plan Creation) Package Implementation (Reverse Engineering, Package Deployment) Redevelopment (Reverse Engineering, Custom Build) Redesign Interface Re-engineering (Web-enabling, Application Integration) Restructuring (Better Flexibility and Extensibility) Data Migration Platform Migration Transformation Enablers / Accelerators Best Practices Methodology Processes Products Tools Standards Templates
  • 10.
    Enterprise Migration Services… Our Custom 7 phase Data Migration Framework (SDMF) helps our customer for quicker and faster ROI.
  • 11.
    Enterprise Migration Services… Our team is capable of using various ETL tools and database programming techniques to optimize the Migration Project for time and quality. Our DATA QUALITY ASSURANCE (DQA) is Guaranty for 100% accuracy by double-verification of data in staging and pre-production area.
  • 12.
    Enterprise Migration Services… Specific Service areas are: Reports Migrations Crystal Reports Migration to MS SQL Server2005 reporting services MS Access Data upsizing and Reports Migration to MS SQL Server2005 reporting services Competitive database & analytics platform migration to SQL Server 2005 Data Entry & Data Conversion Data Migration Scanning and OCR for Semi-manual Data Conversion
  • 13.
    Enterprise Migration Services… Specific Service areas are: Data Extraction, Transformation (Cleansing) and Load (ETL) Check list preparation Data Integrity Check CATS and/or DB-Link uses ETL tool use and data mapping design Incremental or Big-Bang Migration plan Data Synchronization Plan Data cleansing for date, empty strings, string concatenation and splitting Space Estimation and Optimization for project Data Elements Versions Management CASS Address Validation for USPS
  • 14.
    Application Engineering Services(AES) Development, Maintenance, Re-engineering, EAI & SDLC Management
  • 15.
    Application Engineering Services… Application Development & Maintenance Microsoft .NET (VB.NET, C#, ASP.NET, Win Forms, Web Forms, Web services) Java/JSP/J2EE/EJB/POJO/JMS C/C++/PHP MS SQL Server/MS Access/Oracle/MySQL RIA/AJAX/XML/XSD Portals - Customization and Implementation - SharePoint, Web Part development Web Services Development including web service security implementation Smart Client and/or Rich Client Application development Workflow Applications with .NET and SharePoint Portal
  • 16.
    Application Engineering Services… Application SDLC Management using RUP Requirement Management using Requisite Pro Change Management BPM and Workflow development Business Process Re-engineering Re-engineering/Re-factoring/Migration Re-factoring in multi-layer, n-tier using Design Patterns Re-factoring from monolithic code to component based architecture Re-factoring of Business Logic into Components and/or Web Services Web Services Enablement of Legacy Mainframe based applications and its code
  • 17.
    Application Engineering Services… Enterprise Application Integration (EAI) using middleware MS Biztalk and MSMQ MQ Series and JMS compliance Message Oriented Middleware XML parsing in Java and .NET Windows Communication Foundation Data and/or process level integration Web Services with WS*I Standards
  • 18.
    Application Engineering Services… Proven ETVX model
  • 19.
  • 20.
  • 21.
    Business Intelligence …Reports Development, Customization using various tools and technology. Designing Data Mart data model for reporting purpose using "Star" or "Snowflake" Schema. Use of XML technology for Meta Data Management, Taxonomy, and create variable reports. Implementing Reports Distribution using various technologies and methodology to optimize resources. Skills in advance technologies like "Report Bursting" in various formats like HTML, PDF, RTF or other.
  • 22.
    Business Intelligence …Reports Development and Migration MS Access Reports Development Crystal Report Development MS SQL Report using SQL Reporting Services Reports using Oracle Reports, Discoverer Business Intelligence (BI) Reports using Cognos and Business Objects
  • 23.
    Business Intelligence …Data Mining and Analysis for Trends Create average, maximum and minimum reports based on time, cost, customer, category dimension and facts table Statistical analysis using SPSS Liner, Least Square and Weighted Analysis / projection Time series and forecasting analysis Survey Analysis and Management of Survey results including sampling
  • 24.
    IV&V and TeamMentoring Services Enterprise Application Architecture
  • 25.
    IV&V and TeamMentoring Services Enterprise Application Architecture Verification for : Object Modeling using UML (Rational XDE, Sparx EA) Use Case modeling Enterprise Requirements Modeling based on Rational Suite Test Case Modeling Layers and Tiers and Framework API, Commonly used design patterns, Code Modularity, Code Cyclomatic Complexity analysis Code Security Analysis for common security issues Use of API and Distributed Application Development Components Architecture & load balancing
  • 26.
    IV&V and TeamMentoring Services Enterprise Application Architecture Verification for : Object Design Verification Database Model Verification for OLTP/Hierarchical/OLAP design 20 points Application Framework Design Verification Unit Test and System Test Verification Quality Assurance Services for Code, Design and Architecture Third Party Verification
  • 27.
    IV&V and TeamMentoring Services Our Team can help organizations and mentor their team in defining scalable architecture for Easy Maintenance, Scalability & Performance requirements based on Component Based Development, Object Design and Modeling using UML etc. Re-engineering/Migration/Web Services Enablement of Legacy Mainframe based applications.
  • 28.
    Application Implementation &Infrastructure Management Services (AIIM) Based on ITIL Framework
  • 29.
    Implementation & ManagementServices COTS Application Customization & Implementation MS Enterprise Project Server 2003 Crystal Enterprise Implementation Microsoft CRM 3.0 and Customization
  • 30.
    Implementation & ManagementServices Infrastructure management service basket comprises of the following services : Help Desk Management, Asset Management, OS (Operating System) Administration, Backup & Restore Management, Mailing System Management, Database Administration, Virus Management, Vendor Management, Server & Desktop Management, Network Management, DR (Disaster Recovery) Plans, Value Added Services like Network Audit, Technical Updates and User’s Trainings etc. Though this is a complete pack but is Flexible enough to be customized according to the need of Organization. Customer may select all or a few components from this basket. Services Management is based on ITIL Framework for services management
  • 31.
    Professional Staffing Services(PSS) Enterprise Resourcing
  • 32.
    Professional Staffing Services(PSS) At ITCONS e-Solutions we can undertake an assignment to recruit talent viable for your organization. We would analyze, understand and execute a strategy for your resourcing needs, skills and experience required in technology and Subject Matter Knowledge required for performing the job. Tech-Check Services Our technical screening for candidates is done by qualified resource managers and we help you in developing efficiencies in recruiting process. Our Internal sourcing team along with 10+ dedicated vendors’ network helps us getting resources with specific skills and subject matter knowledge in a short time.
  • 33.
    Professional Staffing Services(PSS) Technology and Project Management Resources On-site and Off-site across India/USA Attracting the talent through: Advertisements, E-Resources, Headhunting efforts, Campus Selections Matching a candidate’s capabilities with the requirements of the job through: Walk-in Management, E-Resourcing Support Competency profiling tests and preliminary interviews Interview Coordination with the client, Assist in Salary Negotiation & Candidate Relationship Management
  • 34.
    Professional Staffing Services(PSS) Our expertise covers the entire spectrum of HR activities The services can be broadly defined as Executive placement, Specific Executive Search, Senior Management Search Human Resource Administrative Services Test administration, Resume Management Services, Advertisement placement and response handling, Training Administration Activities We can help Organization find talented professionals in Information Technology and Telecom (in areas like software development, Network support, and Marketing) on a project based needs. Training & Development We conduct both standard and customized training programs for its customers. We provide Training Needs Assessment and Custom Courseware designing for organizations.
  • 35.
    Custom Instructor LedTraining Special Technologies
  • 36.
    Custom Instructor LedTraining Our Experienced professionals & Trainers can provide practical custom training in the following area: Oracle DBA / Oracle Applications DBA/ Oracle RAC Oracle Application Framework oracle apps developer using BLAF guidelines Oracle Performance Tuning - Data Base and SQL & PL/SQL MS SQL Server Performance Tuning - Database and SQL & T-SQL Code Quality Control for VB.NET and C# Coding Standards Compliance Memory Optimization for Performance and resolving any Memory Leak issues Java - Basic and Advance Software Build Automation using Open Source tools like NANT/ANT etc.
  • 37.
  • 38.
    Our Partial Clients/ProjectsList Clients List IAMNE India Pvt Ltd: Full-line service provider for social and career networking site. Avartanah IT Solutions: Full-line service provider for ERP solution comprises of P&P, MM, Finance, Operations, fuel management, Maintenance, Contract Management etc. ISparkles: A kids school in Delhi. Matrix Inc: US based Software company, Specializes in enterprise-wide Business Process Management (BPM) workflow software solutions for small to large-sized businesses worldwide. AgeTak: US based software company with a mission to enables any organization to control access to sensitive data across multiple databases, from multiple vendors using Agetak ARC (Access Right Control) software.
  • 39.
    Our Partial Clients/ProjectsList Partial Project List ERP modules: P&P, MM, Finance, Operations, fuel management, Maintenance, Contract Management etc. Social and Career networking site iamne.in Online resume parser application at onlineresumeparser.com Applicant Tracking System at recruitplus.co.in Energy Accounting and Utilities Tracking System: Energy Accounting and Utilities Tracking System is migration project to .NET and Web based application using AJAX technology to provide engineering application a user friendly interface for HVAC/ Mechanical engineers. Extended Stored Procedure for MS SQL Server: Interface to MQ Series API SMTP EMAIL without OUTLOOK Accounts
  • 40.
    Our Partial Clients/ProjectsList Partial Project List Software License Manager: To provide automated license management for software products and services, this system is developed in .NET Winform application as well as Web services backend processing. E-Greeting Migration to .NET Architecture in distributed environment for ASP and Product Model: E-Greeting was developed as a component for one the project which is a marketing and/or relationship building tool for companies either with customer or employees. Crystal Enterprise 10 Implementation MS Project Server 2003 with Share-Point2003 implementation
  • 41.
    Our Value PropositionOn-Site, Off-Site and Off-Shore
  • 42.
    Our Value PropositionService offerings based on Onsite – Project team working at customer site Offsite – Project team working from vendors site Offshore – Project team working from offices in India Combination of above Alliance/partnership with well established offshore company Equipped with required infrastructure and skilled resources On demand high speed net connections available Cost savings more than 40%
  • 43.
    Our Value PropositionOnsite – Offshore model Onsite coordinator to facilitate the communication 15% for the effort executed from onsite (based on past experience, effort will be estimated based on the business requirements and nature of the project) Basic infrastructure and software licenses will be provided Specialized software licenses to be provided by the customer Dependency on size and volume of the engagement Team rotation during the analysis period
  • 44.
    Our Value PropositionOn-Site, Off-Site and Off-Shore based on commitment and total volume of work Effective Cost and Communication Management Cost Model can be based on: Per-Seat – Base + Commission based on engagement length Contract and Project Management
  • 45.
    Our Value PropositionPer-Seat Cost Model: Base + Commission based on engagement length We will provide Resources and Infrastructure Your Team will provide Project Management and directly manage resources for work assignment Your will approve resources Our team in India will be responsible for managing HR and other related services for resources
  • 46.
    Our Value PropositionContract and Project based Cost Model: Contract and Project Management We will provide solution and project delivery We will define requirements and estimate the work We will get approval for estimate We will manage change and project delivery We will be responsible of unit and system testing You will be responsible for User Acceptance Testing Cost is based on Hourly Rate and Work Estimate
  • 47.
    Summary – OurStrengths Commitment to Customer Relationships Diversified Technology and Business Expertise Proven Methodology and Capabilities Offshore capabilities Huge pool of Qualified and Trained Professionals Strategic Alliances with Global firms Proven Commitment to Quality Flexible to work with the customer requirements
  • 48.
    Contact us Piyush [email_address] Office: +91-120-4659136/37 Visit us: http://itconsinc.com

Editor's Notes

  • #8 Our service offering spans the entire Software Development Lifecycle (SDLC) which includes: Software architecture definition Application design & development QA and testing Maintenance, enhancements & technical support Today we have executed over 50 successful projects using Windows and Microsoft .NET Technologies. These projects have been successfully completed with the help of our Microsoft certified consultants who form the backbone of our service offering. We are amongst the earliest adopters of Microsoft .NET Technologies and have been working extensively on all components of the framework, such as VB.NET, C#, ADO.NET & ASP.NET since 2000. Our Development Services Rich-client and web-based applications, including e-commerce (B2B, B2C) initiatives Mixed-mode applications (pre .NET & .NET technologies, .NET with third party controls & components) Web services Our Technology Services .NET Application Development ASP.NET C#.NET ADO.NET VB.NET Communication, Collaboration & E-Business Servers SharePoint Portal Server Commerce Server Content Management Server Exchange Server Enterprise Application Integration BizTalk Server MSMQ Database development SQL Server For Easy Maintenance, Scalability & Performance requirements Refactoring in multi-layer Refactoring in n-tier Refactoring using Design Patterns Refactoring from monolithic code to component based architecture Special Refactoring for Load Balanced Components Refactoring of Business Logic into Components and/or Web Services Re-engineering/Refactoring/Migration/Web Services Enablement of Legacy Mainframe based applications and its code EAI (enterprise application integration) is a business computing term for the plans, methods, and tools aimed at modernizing, consolidating, and coordinating the computer applications in an enterprise. EAI encompasses methodologies such as object-oriented programming, distributed, cross-platform program communication using message brokers with Common Object Request Broker Architecture and COM+, the modification of enterprise resource planning (ERP) to fit new objectives, enterprise-wide content and data distribution using common databases and data standards implemented with the Extensible Markup Language (XML), middleware (programming that serves to "glue together" or mediate between two separate and often already existing programs), web services message queueing, and other approaches. The systematic tying together of disparate applications, often through the use of middleware, is known as enterprise application integration (EAI). We provide Enterprise Application Integration (EAI) services using various tools and technology incorporating XML or EDI MS Biztalk and MSMQ MQ Series and JMS compliance Message Oriented Middleware XML parsing in Java and .NET Windows Communication Foundation Data and/or process level integration Web Services with WS*I Standards We provide Reports Development, Customization using various tools and technology. We also help in designing Data Mart data model for reporting purpose using "Star" or "Snowflak" Schema. Use of XML technology for Meta Data Management, Taxonomy helps us creating variale reports. We help organizations for implementing Reports Distribution using various technologies and methodology to optimize resources. Our professionals knows advance technologies like "Report Bursting" in various formats like HTML, PDF, RTF or other. MS Access Reports Development Crystal Reprot Development MS SQL Report using SQL Reporting Services Reports using Oracle Reports, Discoveror Business Intelligence(BI) Reports using Cognos and Business Objects Infrastructure management service Basket comprises of the following services : Help Desk Management Services. Asset Management Services. OS (Operating System) Administration. Back & Restore Management Services. Mailing System Management Services. Database Administration Services. Virus Management Services. Vendor Management Services. Server & Desktop Management (Intranet & Application Support as well Development). Network Management Services. DR (Disaster Recovery) Plans. Value Added Services like Network Audit, Technical Updates and User’s Trainings etc. Though this is a complete pack but is Flexible enough to be customized according to the need of Organization. Customer may select all or a few components from this basket. Large Organizations are increasingly looking for service providers that can independently manage HR processes that allow them more time to focus on strategic HR. At Akanksha LLC, we can undertake an assignment to recruit talent viable for your organization. We would analyze, understand and execute a strategy for your resourcing needs, skills and experience required in technology and Subject Matter Knowledge required for performing the job. Our technical screening for candidates are done by qualified resouce managers and we help you in developing efficiencies in recruiting process. We offer the following tools in the hiring process: Attracting the talent through: Advertisements E-Resources Headhunting efforts Campus Selections Matching a candidate’s capabilities with the requirements of the job through: Walk-in Management E-Resourcing Support/ Desks Selection support through- Competency profiling tests and preliminary interviews Interview Coordination with the client Assist in Salary Negotiation Keeping in touch with the selected candidates Printing and Dispatch of Appointment Letters Our expertise covers the entire spectrum of HR activities. The service areas are designed to cover the various aspects for management of human resource for an organization. The services can be broadly defined as Executive placement: Identification and preliminary assessment of candidate’s skills according to client requirements. This is done through a combination of external advertising and computerized search through our databank. Specific Executive Search: We works on specific predefined candidates of interest to the client. This is generally done for senior management levels. Senior Management Search: Our industry knowledge enables it to keep track, locate and fill key management positions in your organization Human Resource Administrative Services: We can take up support HR functions on outsourced basis for e.g. Test administration, Resume Management Services, Advertisement placement and response handling, Payroll processing, Training Administration Activities Outplacement: We helps organizations in outplacement where downsizing of select employees is concerned. Temporary Staffing: We provides I.T and Telecom professionals (in areas like software development, Network support, and Marketing) on a temporary basis. We also supports it customers by taking all professionals currently on direct contract or through other vendors, on its payroll and manage the entire statutory compliances and of the same. Training & Development: We conducts both standard and customized training programs for its customers. Training needs assessment and courseware designing can be done for organizations.