Workshop
on
10/1/2023 1
IoT for Health Care
What is IoT
Intelligent interactivity between human and things to exchange
information & knowledge for new value creation.
viewed as all kinds of objects that communicate using the
Internet.
10/1/2023 IoT for Health Care 2
IoT is made of two words
one is Internet
second is The Things.
Internet is network connects the world widely via
some standard protocols.
Things refers to any Physical Object that may be
involved in connectivity.
IoT uses many technologies like Radio Frequency
Identification(RFID) tag, Sensors, Actuators and
Smart phone and cloud computing support etc
What is IoT? Cont...
10/1/2023 3
IoT for Health Care
10/1/2023 4
IoT for Health Care
Transforming the health care by IOT
10/1/2023 5
IoT for Health Care
In future……………..
10/1/2023 6
IoT for Health Care
IOT in healthcare
It is a heterogeneous computing, wirelessly
communicating system of apps and devices that
connects patients and health providers to
diagnose
monitor
Track and store vital statistics and medical
information.
10/1/2023 7
IoT for Health Care
Iot in healthcare , devices can collect the information
and directly share it as well as data can be backup on the
cloud so that the record can be kept as well.
With the increasing use of sensor by medical device
remotely the continuously monitoring of a patient
becomes easy for a doctor.
10/1/2023 8
IoT for Health Care
10/1/2023 9
IoT for Health Care
Gathering of rich information to evaluate
physical and mental health condition of
the patient by collecting
• Body temperature
• Blood pressure
• Glucose level etc .
10/1/2023 10
IoT for Health Care
10/1/2023 11
IoT for Health Care
Few examples of IoT in Healthcare
Headsets that measure
brainwaves
Clothes with sensing devices
BP monitors
Glucose monitors
ECG monitors
Pulse oximeters
Sensors embedded in
medical equipment,
dispensing systems,
surgical robots
10/1/2023 12
IoT for Health Care
10/1/2023 13
IoT for Health Care
10/1/2023 14
IoT for Health Care
10/1/2023 15
IoT for Health Care
10/1/2023 16
IoT for Health Care
10/1/2023 17
IoT for Health Care
Pros of E-healthcare
• Minimizing human error.
• Simplifying the treatment process
• Quality of life for caregiver as well patient.
• monitoring system helps doctor in treatments and
predict a symptom before starting diagnosis.
• Monitoring system can also alarm in medical
emergency situations like falling of old age patient ,
patient has abnormal behaviour as in the intensive
care unit (ICU).
10/1/2023 18
IoT for Health Care
•Health Monitoring
•Personal Fitness Monitoring
•Chronic Disease Monitoring
•Safety Monitoring
•Medication Monitoring
•Home Rehabilitation
•Real Time Location Tracking
Implementation of e-health system
10/1/2023 19
IoT for Health Care

IOT INTRO.pptx

  • 1.
  • 2.
    What is IoT Intelligentinteractivity between human and things to exchange information & knowledge for new value creation. viewed as all kinds of objects that communicate using the Internet. 10/1/2023 IoT for Health Care 2
  • 3.
    IoT is madeof two words one is Internet second is The Things. Internet is network connects the world widely via some standard protocols. Things refers to any Physical Object that may be involved in connectivity. IoT uses many technologies like Radio Frequency Identification(RFID) tag, Sensors, Actuators and Smart phone and cloud computing support etc What is IoT? Cont... 10/1/2023 3 IoT for Health Care
  • 4.
  • 5.
    Transforming the healthcare by IOT 10/1/2023 5 IoT for Health Care
  • 6.
  • 7.
    IOT in healthcare Itis a heterogeneous computing, wirelessly communicating system of apps and devices that connects patients and health providers to diagnose monitor Track and store vital statistics and medical information. 10/1/2023 7 IoT for Health Care
  • 8.
    Iot in healthcare, devices can collect the information and directly share it as well as data can be backup on the cloud so that the record can be kept as well. With the increasing use of sensor by medical device remotely the continuously monitoring of a patient becomes easy for a doctor. 10/1/2023 8 IoT for Health Care
  • 9.
  • 10.
    Gathering of richinformation to evaluate physical and mental health condition of the patient by collecting • Body temperature • Blood pressure • Glucose level etc . 10/1/2023 10 IoT for Health Care
  • 11.
  • 12.
    Few examples ofIoT in Healthcare Headsets that measure brainwaves Clothes with sensing devices BP monitors Glucose monitors ECG monitors Pulse oximeters Sensors embedded in medical equipment, dispensing systems, surgical robots 10/1/2023 12 IoT for Health Care
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
    Pros of E-healthcare •Minimizing human error. • Simplifying the treatment process • Quality of life for caregiver as well patient. • monitoring system helps doctor in treatments and predict a symptom before starting diagnosis. • Monitoring system can also alarm in medical emergency situations like falling of old age patient , patient has abnormal behaviour as in the intensive care unit (ICU). 10/1/2023 18 IoT for Health Care
  • 19.
    •Health Monitoring •Personal FitnessMonitoring •Chronic Disease Monitoring •Safety Monitoring •Medication Monitoring •Home Rehabilitation •Real Time Location Tracking Implementation of e-health system 10/1/2023 19 IoT for Health Care