TuLIPBerhasil "Cycle Counting"




                             of




            @Mitratama,                         +62 816 729 301
          RODAMAS Group                         wsukmoro@gmail.com
         08 September 2011
                                                21DD9DD1
               Inventory Record Accuracy




                             Partisipasi 100%




                                                            ACCURACY
                                                              Is NOT
                                                         Always absolute.




Inventory Record Accuracy 
@WawangSukmoro                                                                                   1
TuLIPBerhasil "Cycle Counting"




                              WHAT are we
                             GOING to MAKE?




            WHAT does it      WHAT do we
           take to MAKE?        HAVE?




               WHAT do we
              HAVE to GET?               Physical count 
                                         within RANGE 
                 WHEN?
                                               = 
                                          An Accurate 
                                            Record. 

                              Inventory Record Accuracy



Inventory Record Accuracy 
@WawangSukmoro                                                       2
TuLIPBerhasil "Cycle Counting"




                                                            Cycle Counting Status:
         RECORD ACCURACY =
                                                            No.     Record   Counting   Tolerance    Hit   Miss

          TOTAL accurate records                             1       100        94         +2%              X
                                 X 100%                                                                           Inventory
          TOTAL records checked
                                                             2       100        95         +5%        X
                                                             3

                                                             4
                                                                     100

                                                                     100
                                                                                96

                                                                                98
                                                                                           +2%

                                                                                           +2%        X
                                                                                                            X
                                                                                                                  Record
                                                             5       100        99         +2%        X                  y
                                                                                                                  Accuracy
                                                             6       100       100         +2%        X
                                                             7       100       103         +5%        X
                                                             8       100       104         +5%        X
                                                                                                                  = 6 / 10 
                                                             9       100       105         +2%              X     = 60% 
                                                             10      100       106         +5%              X
                                                            TOTAL    1,000     1,000                  6     4




            TOLERANCE?                                      TOLERANCE?
                                                                    5%
                    CLASS    Quantity   Value   Tolerance
                                                                        or
                                                                    2%
                     A         20        80      +0%
                     B         30        15      +2%
                     C         50        5       +5%




            Inventory Record Accuracy                       Inventory Record Accuracy Phase
                   PROGRESS                                                                         Phase #3: 
                                                                    100%
            100%
                                                                                                    Cycle Counting
                                                                                           Phase #2: 
                                                                                           Develop Initial
                                                                    50%
            50%                                                                            Balance
            40%

                                                                             Phase #1: 
                                                                             Design & Preparation

                            TIME                                                                 TIME




Inventory Record Accuracy 
@WawangSukmoro                                                                                                                  3
TuLIPBerhasil "Cycle Counting"




        PHASE #1: Design & Preparation (1/7)                   PHASE #1: Design & Preparation (1/7)




                        +
                              ON HAND                                      +
                                                                                  STOCK
           IN                                       ‐    OUT      IN                              ‐   OUT
                               (record)
                               (     d)                                           (fisik)
                                                                                  (fi ik)


           DESIGN PROCESS TRANSACTION                             DESIGN PROCESS TRANSACTION




        PHASE #1: Design & Preparation (1/7)                   PHASE #1: Design & Preparation (2/7)

              In transit RM                                     ADDRESS = PWF‐Sc01‐WIP
                 On hand
                   Stock                                        Negara     Department         P = Production
             WIP RM + FGS
             WIP RM + FGS                                       Kota       Section            W  WET
                                                                                              W = WET
                                                                Kode Pos   Working Station    F = Filling
                    FGS                                         Jalan      Rack               Sc = Sachet
             In transit FGS                                     Gedung     Katagory           WIP
             Scrap + Losses
           DESIGN PROCESS TRANSACTION                                  MEASURE STARTING POINT




        PHASE #1: Design & Preparation (2/7)                   PHASE #1: Design & Preparation (3/7)
           Address:  PWF‐Sc01‐WIP


                                                                  People
           Description:  ______________________________
           Item No.:        ______________________________

           Unit: 
           QTY: 
                        ______________________________
           QTY: ____________________________________
                  ____________________________________
                                                                  System
           Ref. No.:        ______________________________        Physical
           Tanggal:                           Tanda Tangan:


                MEASURE STARTING POINT                                         PROVIDE TOOLS



Inventory Record Accuracy 
@WawangSukmoro                                                                                                   4
TuLIPBerhasil "Cycle Counting"




        PHASE #1: Design & Preparation (4/7)           PHASE #1: Design & Preparation (4/7)


           Pemetaan                                                           In Transit
        Data per Area                                                         On Going
              Format                                                          WIP
         Rekonsiliasi                                                         Reject
           Pelaporan                                                          Losses
                 POLICY & PROCEDURE                                POLICY & PROCEDURE




        PHASE #1: Design & Preparation (5/7)           PHASE #1: Design & Preparation (6/7)

                                                                    Counter
                                                        Leader on Area (PIC)
                                                                Rekonsiliasi
                                                                  Reporting
                                                                   Verifikasi
                                                           Summary Closing
                                                                    Sign-off

                         TRAINNING                             ASSIGN RESPONSIBILITIES




        PHASE #1: Design & Preparation (7/7)           PHASE #2: Develop Initial balance
               CLASS    Quantity   Value   Tolerance
                 A        20        80      +0%         Purchase                               Sales
                                                                    +                      ‐
                 B        30        15      +2%
                 C        50        5       +5%                            STOCK
                                                                    ‐                      +
           A = 100% Counted = Weekly
           B = Random 50% Counted = Be‐Weekly
           C = Random 50% Counted = Monthly                                  WIP

                       IMPLEMENTATION                        TEORI, PERHITUNGAN, FISIK



Inventory Record Accuracy 
@WawangSukmoro                                                                                            5
TuLIPBerhasil "Cycle Counting"




        PHASE #3: Cycle Counting (1/2)                        PHASE #3: Cycle Counting (2/2)

                                                                            Authorized Person
                                Leader = Accounting                          Counted Twice
                                PIC = Supervisor
                                Counting = ???
                                                                            Clear Instruction
                                Reporting = Admin Floor
                                Reconciliation = PPIC
                                Closing = Accounting


                            CONTROL ‘TEAM’                                   ON GOING PROGRAM




                      Man       Measurement

                                                          I
                                                                Frequency

                                                          R
                                                          A                 WIP     Production
                                                                                      Order          Receiving
            Method
               h d            Machine
                              M hi         Materials
                                                  l
                                                                                                                 Scrap



                                                                                      Type of Error
                       Fishbone 
                       Diagram                                                    Pareto Analysis
          Frequency




                                                                Frequency




                                        Salah label                                              Salah label
                                        Salah transaksi                                          •    Training
                        WIP                                                 WIP                  •    Orang
                                        Salah hitungg
                                                                                                 •    Hilang
                                        Salah lokasi                                             •    Tercampur

                                 Type of Error                                        Type of Error

                              Pareto Analysis                                     Pareto Analysis



Inventory Record Accuracy 
@WawangSukmoro                                                                                                           6
TuLIPBerhasil "Cycle Counting"




                  BOM Accuracy
                  Scrap Records         RECORD ACCURACY =
               Pengantian Materials
                                        TOTAL accurate records
                Alokasi pemakaian                              X 100%
                                        TOTAL records checked
                Pelaporan Produksi
                 On Going Usage
                         g    g




               Ketepatan Dokumentasi




         < 90% ~ Kurang
         90 < Cukup < 95
          96 < Baik < 97
          97 < Puas < 98
        98 < EXCELLENCE!


            Inventory Record Accuracy




Inventory Record Accuracy 
@WawangSukmoro                                                                   7

Inventory Record Accuracy

  • 1.
    TuLIPBerhasil "Cycle Counting" of @Mitratama,  +62 816 729 301 RODAMAS Group wsukmoro@gmail.com 08 September 2011 21DD9DD1 Inventory Record Accuracy Partisipasi 100% ACCURACY Is NOT Always absolute. Inventory Record Accuracy  @WawangSukmoro 1
  • 2.
    TuLIPBerhasil "Cycle Counting" WHAT are we GOING to MAKE? WHAT does it WHAT do we take to MAKE? HAVE? WHAT do we HAVE to GET? Physical count  within RANGE  WHEN? =  An Accurate  Record.  Inventory Record Accuracy Inventory Record Accuracy  @WawangSukmoro 2
  • 3.
    TuLIPBerhasil "Cycle Counting" Cycle Counting Status: RECORD ACCURACY = No. Record Counting Tolerance Hit Miss TOTAL accurate records 1 100 94 +2% X X 100% Inventory TOTAL records checked 2 100 95 +5% X 3 4 100 100 96 98 +2% +2% X X Record 5 100 99 +2% X y Accuracy 6 100 100 +2% X 7 100 103 +5% X 8 100 104 +5% X = 6 / 10  9 100 105 +2% X = 60%  10 100 106 +5% X TOTAL 1,000 1,000 6 4 TOLERANCE? TOLERANCE? 5% CLASS Quantity Value Tolerance or 2% A 20 80 +0% B 30 15 +2% C 50 5 +5% Inventory Record Accuracy Inventory Record Accuracy Phase PROGRESS Phase #3:  100% 100% Cycle Counting Phase #2:  Develop Initial 50% 50% Balance 40% Phase #1:  Design & Preparation TIME TIME Inventory Record Accuracy  @WawangSukmoro 3
  • 4.
    TuLIPBerhasil "Cycle Counting" PHASE #1: Design & Preparation (1/7) PHASE #1: Design & Preparation (1/7) + ON HAND + STOCK IN ‐ OUT IN ‐ OUT (record) ( d) (fisik) (fi ik) DESIGN PROCESS TRANSACTION DESIGN PROCESS TRANSACTION PHASE #1: Design & Preparation (1/7) PHASE #1: Design & Preparation (2/7) In transit RM ADDRESS = PWF‐Sc01‐WIP On hand Stock Negara Department P = Production WIP RM + FGS WIP RM + FGS Kota Section W  WET W = WET Kode Pos Working Station F = Filling FGS Jalan Rack Sc = Sachet In transit FGS Gedung Katagory WIP Scrap + Losses DESIGN PROCESS TRANSACTION MEASURE STARTING POINT PHASE #1: Design & Preparation (2/7) PHASE #1: Design & Preparation (3/7) Address:  PWF‐Sc01‐WIP People Description:  ______________________________ Item No.:  ______________________________ Unit:  QTY:  ______________________________ QTY: ____________________________________ ____________________________________ System Ref. No.:  ______________________________ Physical Tanggal: Tanda Tangan: MEASURE STARTING POINT PROVIDE TOOLS Inventory Record Accuracy  @WawangSukmoro 4
  • 5.
    TuLIPBerhasil "Cycle Counting" PHASE #1: Design & Preparation (4/7) PHASE #1: Design & Preparation (4/7) Pemetaan In Transit Data per Area On Going Format WIP Rekonsiliasi Reject Pelaporan Losses POLICY & PROCEDURE POLICY & PROCEDURE PHASE #1: Design & Preparation (5/7) PHASE #1: Design & Preparation (6/7) Counter Leader on Area (PIC) Rekonsiliasi Reporting Verifikasi Summary Closing Sign-off TRAINNING ASSIGN RESPONSIBILITIES PHASE #1: Design & Preparation (7/7) PHASE #2: Develop Initial balance CLASS Quantity Value Tolerance A 20 80 +0% Purchase Sales + ‐ B 30 15 +2% C 50 5 +5% STOCK ‐ + A = 100% Counted = Weekly B = Random 50% Counted = Be‐Weekly C = Random 50% Counted = Monthly WIP IMPLEMENTATION TEORI, PERHITUNGAN, FISIK Inventory Record Accuracy  @WawangSukmoro 5
  • 6.
    TuLIPBerhasil "Cycle Counting" PHASE #3: Cycle Counting (1/2) PHASE #3: Cycle Counting (2/2) Authorized Person Leader = Accounting Counted Twice PIC = Supervisor Counting = ??? Clear Instruction Reporting = Admin Floor Reconciliation = PPIC Closing = Accounting CONTROL ‘TEAM’ ON GOING PROGRAM Man Measurement I Frequency R A WIP Production Order Receiving Method h d Machine M hi Materials l Scrap Type of Error Fishbone  Diagram Pareto Analysis Frequency Frequency Salah label Salah label Salah transaksi • Training WIP WIP • Orang Salah hitungg • Hilang Salah lokasi • Tercampur Type of Error Type of Error Pareto Analysis Pareto Analysis Inventory Record Accuracy  @WawangSukmoro 6
  • 7.
    TuLIPBerhasil "Cycle Counting" BOM Accuracy Scrap Records RECORD ACCURACY = Pengantian Materials TOTAL accurate records Alokasi pemakaian X 100% TOTAL records checked Pelaporan Produksi On Going Usage g g Ketepatan Dokumentasi < 90% ~ Kurang 90 < Cukup < 95 96 < Baik < 97 97 < Puas < 98 98 < EXCELLENCE! Inventory Record Accuracy Inventory Record Accuracy  @WawangSukmoro 7