Internship Summary
Andrey Korotkov
Kazakhstan, Altay Polymetalls,
“KOKTASZHAL” Site
Ore Mined
• Copper-Gold Ore
Grade:
Cu: 0.54% Au: 0.5 g/ton
Quick Facts about the site
• The non truck technology is used
• Biggest in the World mobile Crusher LT 200
• Ability to crush the material to 90% #3mm
(lower production costs)
Site Layout
Crushing
• Primary crushing stage: LT 200 mobile crusher
(in the quarry)
• Secondary crushing stage: GP 500S crusher
• Tertiary crushing stage: HP6 crusher
• Quaternary crushing stage: Barmac B9100SE
Crushing Process Simulation
Grinding
• 2 Identical Vertimills in the head of the
grinding process. (Grinding section was
incomplete at the moment)
Grinding Flowsheet
Internship Duties Performed
• Studied processes of the Plant
• Became familiar with machinery maintenance
documents
• Participated in training of the future operators of the
crushing plant (Responsible for primary process
training)
• Worked as an operator of the crushing plant
• Became familiar with crushing and grinding flow
sheets
Control Panel of the Plant Operator

Internship Summary