Ensure ladders meet or
exceed standards
• Maintain even rung spacing from
the ground level to the cab.
• Be sure that rungs are flat and deep
enough to place the foot
comfortably.
• Avoid using circular bars or rods as
rungs when possible.
• Choose rungs with small openings
on the tread so contaminants
cannot accumulate.
• Add non-slip coatings or grooves on
the rungs to increase grip.
• Ensure handholds run the entire
length of the ladder.
Did you know?
• Flexible-railed bottom rungs on
mobile equipment can be especially
hazardous.
• Getting off mobile equipment is
more dangerous than getting on.
Provide an access
platform with stairs
• Construct and use access platforms
with stairs and guardrails that allow
operators to enter and exit the cab
directly.
• Eliminate the use of vertical ladders
for access to mobile equipment
when possible.
Did you know?
• Most ingress and egress injuries on
front-end loaders occur on
equipment with vertical ladders.
Provide adequate and
appropriate lighting
• Ensure the lighting is uniform
across the parking area.
• Space lights so adjacent beams
overlap in order to avoid dark
pockets.
• Regularly check light levels in
parking areas using a lux/light
meter to ensure they are between
2-4 foot-candles or 22-43 lux.
• Paint the stairs, ladder, and
platform in a color that has a high
contrast to the contaminant to
make it easier to detect the
contaminant.
Did you know?
• Insufficient lighting around mobile
equipment can make it hard to
detect hazardous ground or ladder
conditions.
Provide a designated
parking area for mobile
equipment
• Keep parking areas free from
hazardous ground conditions like
ruts, rocks, hoses, and ice.
• Provide designated walkways with
clearly marked crosswalks to
parking areas.
Did you know?
• Injuries when accessing equipment
are often due to ruts, grooves,
rocks, hoses, pipes, pallets, crib
blocks, and slippery surfaces like
ice, snow, or mud in the parking
area.
Provide cleaning stations
with housekeeping
supplies in parking areas
• Provide housekeeping supplies at a
designated and marked location in
the parking area to allow workers
to remove contaminants from the
equipment.
• Typical housekeeping supplies
include:
o Shovels
o Brooms
o Brushes
o Ice scrapers
o Salt or sand
o Paper towels
o Window cleaner
Provide boot cleaning
stations close to the
mobile equipment
• Provide boot brushes and boot
cleaning stations on the ground
near mobile equipment to help
workers remove any contaminants
from boots prior to getting on
equipment.
• Provide boot cleaning stations at
entrances to buildings and sheds.
Did you know?
• Muddy boots and hurrying are
some of the contributing factors to
slips when getting onto or off of
front-end loaders.
Conduct a pre-shift and
scheduled inspection
• Include ladders, stairs, handholds,
and platforms in inspections.
• During pre-shift inspections, look
for loose, damaged, or broken
components and contaminants.
• During regularly scheduled
inspections, look for potential
failures like cracks and loose,
damaged, or broken components
like rungs and doors that allow
excessive or unexpected
movement.
• Use a checklist to help ensure no
items are overlooked.
Ensure the mine has a
policy for safe operating
procedures
• Discourage jumping off of equipment
• Always use three points of contact
o Provide backpacks, shoulder straps,
or a pulley system to carry tools,
equipment, lunch bags, and water
bottles onto and off equipment.
• Always use fall protection when
working at heights
o Provide adequate, labelled tie-off
points and encourage the use of a
personal fall arrest system.
o Encourage fall protection use
especially when performing
maintenance, window cleaning, and
other work at heights around mobile
equipment.
• Encourage the use of the “buddy
system” when loading large items
o Have one person at ground level and
one person on the equipment to
transport large items onto and off
the equipment.
• Periodically remind people who access
mobile equipment of best practices and
risks associated with ingress and egress

More Related Content

Similar to Interactive graphic_v4.pdf

Slips,Trips,Falls prevention presentation
Slips,Trips,Falls prevention presentationSlips,Trips,Falls prevention presentation
Slips,Trips,Falls prevention presentation
ARPUTHA SELVARAJ A
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
Ganesan Raju
 
Slips trips falls
Slips trips fallsSlips trips falls
Slips trips falls
fairchildequipment
 
Slips trips falls.ppt
Slips trips falls.pptSlips trips falls.ppt
Slips trips falls.ppt
KangOlink
 
Slips_Trips_Falls_Working_Surfaces.ppt
Slips_Trips_Falls_Working_Surfaces.pptSlips_Trips_Falls_Working_Surfaces.ppt
Slips_Trips_Falls_Working_Surfaces.ppt
MohdAfifiBinHashim
 
Anthropometry design for elderly people
Anthropometry design for elderly peopleAnthropometry design for elderly people
Anthropometry design for elderly people
VISHAKA BOTHRA
 
Walking & Working Surfaces by OSHA
Walking & Working Surfaces by OSHAWalking & Working Surfaces by OSHA
Walking & Working Surfaces by OSHA
Atlantic Training, LLC.
 
WORK AT HEIGHT.pptx
WORK AT HEIGHT.pptxWORK AT HEIGHT.pptx
WORK AT HEIGHT.pptx
DavidNanda3
 
Scaffolding safety at construction site
Scaffolding safety at construction siteScaffolding safety at construction site
Scaffolding safety at construction site
Ali Kamal Mostofa Rubel
 
Slips, Trips & Falls
Slips, Trips & FallsSlips, Trips & Falls
Slips, Trips & Falls
Cathy Marker
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
NMRD Ltd
 
Chapter 8 HFOODSAFE
Chapter 8 HFOODSAFEChapter 8 HFOODSAFE
Chapter 8 HFOODSAFE
Mervyn Maico Aldana
 
10 chapter ten
10 chapter ten10 chapter ten
10 chapter tencheffox
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
NMRD Ltd
 
A toolbox talk on leaning ladder and stepladder safety
A toolbox talk on leaning ladder and stepladder safetyA toolbox talk on leaning ladder and stepladder safety
A toolbox talk on leaning ladder and stepladder safety
Zbut.Eu
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptx
DavidNanda3
 
Ladder safety
Ladder safetyLadder safety
Ladder safety
Kamarudin Kassim
 

Similar to Interactive graphic_v4.pdf (20)

Slips,Trips,Falls prevention presentation
Slips,Trips,Falls prevention presentationSlips,Trips,Falls prevention presentation
Slips,Trips,Falls prevention presentation
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
Slipstripsfalls
SlipstripsfallsSlipstripsfalls
Slipstripsfalls
 
Slips trips falls
Slips trips fallsSlips trips falls
Slips trips falls
 
Slips trips falls.ppt
Slips trips falls.pptSlips trips falls.ppt
Slips trips falls.ppt
 
Slips_Trips_Falls_Working_Surfaces.ppt
Slips_Trips_Falls_Working_Surfaces.pptSlips_Trips_Falls_Working_Surfaces.ppt
Slips_Trips_Falls_Working_Surfaces.ppt
 
Anthropometry design for elderly people
Anthropometry design for elderly peopleAnthropometry design for elderly people
Anthropometry design for elderly people
 
Walking & Working Surfaces by OSHA
Walking & Working Surfaces by OSHAWalking & Working Surfaces by OSHA
Walking & Working Surfaces by OSHA
 
WORK AT HEIGHT.pptx
WORK AT HEIGHT.pptxWORK AT HEIGHT.pptx
WORK AT HEIGHT.pptx
 
Scaffolding safety at construction site
Scaffolding safety at construction siteScaffolding safety at construction site
Scaffolding safety at construction site
 
Slips, Trips & Falls
Slips, Trips & FallsSlips, Trips & Falls
Slips, Trips & Falls
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Staf pp
Staf ppStaf pp
Staf pp
 
Chapter 8 HFOODSAFE
Chapter 8 HFOODSAFEChapter 8 HFOODSAFE
Chapter 8 HFOODSAFE
 
Ladder safety
Ladder safetyLadder safety
Ladder safety
 
10 chapter ten
10 chapter ten10 chapter ten
10 chapter ten
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
A toolbox talk on leaning ladder and stepladder safety
A toolbox talk on leaning ladder and stepladder safetyA toolbox talk on leaning ladder and stepladder safety
A toolbox talk on leaning ladder and stepladder safety
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptx
 
Ladder safety
Ladder safetyLadder safety
Ladder safety
 

More from AlexSandroBorgesPere

rr1156.pdf
rr1156.pdfrr1156.pdf
MobEqpt_Slideshow.pdf
MobEqpt_Slideshow.pdfMobEqpt_Slideshow.pdf
MobEqpt_Slideshow.pdf
AlexSandroBorgesPere
 
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdffy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
AlexSandroBorgesPere
 
IHSA046.pdf
IHSA046.pdfIHSA046.pdf
371261753-Manual-de-Servico-CX220.pdf
371261753-Manual-de-Servico-CX220.pdf371261753-Manual-de-Servico-CX220.pdf
371261753-Manual-de-Servico-CX220.pdf
AlexSandroBorgesPere
 
2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf
AlexSandroBorgesPere
 

More from AlexSandroBorgesPere (6)

rr1156.pdf
rr1156.pdfrr1156.pdf
rr1156.pdf
 
MobEqpt_Slideshow.pdf
MobEqpt_Slideshow.pdfMobEqpt_Slideshow.pdf
MobEqpt_Slideshow.pdf
 
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdffy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
fy13_sh-24861-sh3_FieldGuide-AvoidingRunoversandBackovers.pdf
 
IHSA046.pdf
IHSA046.pdfIHSA046.pdf
IHSA046.pdf
 
371261753-Manual-de-Servico-CX220.pdf
371261753-Manual-de-Servico-CX220.pdf371261753-Manual-de-Servico-CX220.pdf
371261753-Manual-de-Servico-CX220.pdf
 
2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf2017-Collision-Avoidance-Systems-WP-v1.pdf
2017-Collision-Avoidance-Systems-WP-v1.pdf
 

Recently uploaded

Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 

Recently uploaded (20)

Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 

Interactive graphic_v4.pdf

  • 1. Designing safe mobile equipment access areas Click on the highlighted areas to learn more.
  • 2. Ensure ladders meet or exceed standards • Maintain even rung spacing from the ground level to the cab. • Be sure that rungs are flat and deep enough to place the foot comfortably. • Avoid using circular bars or rods as rungs when possible. • Choose rungs with small openings on the tread so contaminants cannot accumulate. • Add non-slip coatings or grooves on the rungs to increase grip. • Ensure handholds run the entire length of the ladder. Did you know? • Flexible-railed bottom rungs on mobile equipment can be especially hazardous. • Getting off mobile equipment is more dangerous than getting on.
  • 3. Provide an access platform with stairs • Construct and use access platforms with stairs and guardrails that allow operators to enter and exit the cab directly. • Eliminate the use of vertical ladders for access to mobile equipment when possible. Did you know? • Most ingress and egress injuries on front-end loaders occur on equipment with vertical ladders.
  • 4. Provide adequate and appropriate lighting • Ensure the lighting is uniform across the parking area. • Space lights so adjacent beams overlap in order to avoid dark pockets. • Regularly check light levels in parking areas using a lux/light meter to ensure they are between 2-4 foot-candles or 22-43 lux. • Paint the stairs, ladder, and platform in a color that has a high contrast to the contaminant to make it easier to detect the contaminant. Did you know? • Insufficient lighting around mobile equipment can make it hard to detect hazardous ground or ladder conditions.
  • 5. Provide a designated parking area for mobile equipment • Keep parking areas free from hazardous ground conditions like ruts, rocks, hoses, and ice. • Provide designated walkways with clearly marked crosswalks to parking areas. Did you know? • Injuries when accessing equipment are often due to ruts, grooves, rocks, hoses, pipes, pallets, crib blocks, and slippery surfaces like ice, snow, or mud in the parking area.
  • 6. Provide cleaning stations with housekeeping supplies in parking areas • Provide housekeeping supplies at a designated and marked location in the parking area to allow workers to remove contaminants from the equipment. • Typical housekeeping supplies include: o Shovels o Brooms o Brushes o Ice scrapers o Salt or sand o Paper towels o Window cleaner
  • 7. Provide boot cleaning stations close to the mobile equipment • Provide boot brushes and boot cleaning stations on the ground near mobile equipment to help workers remove any contaminants from boots prior to getting on equipment. • Provide boot cleaning stations at entrances to buildings and sheds. Did you know? • Muddy boots and hurrying are some of the contributing factors to slips when getting onto or off of front-end loaders.
  • 8. Conduct a pre-shift and scheduled inspection • Include ladders, stairs, handholds, and platforms in inspections. • During pre-shift inspections, look for loose, damaged, or broken components and contaminants. • During regularly scheduled inspections, look for potential failures like cracks and loose, damaged, or broken components like rungs and doors that allow excessive or unexpected movement. • Use a checklist to help ensure no items are overlooked.
  • 9. Ensure the mine has a policy for safe operating procedures • Discourage jumping off of equipment • Always use three points of contact o Provide backpacks, shoulder straps, or a pulley system to carry tools, equipment, lunch bags, and water bottles onto and off equipment. • Always use fall protection when working at heights o Provide adequate, labelled tie-off points and encourage the use of a personal fall arrest system. o Encourage fall protection use especially when performing maintenance, window cleaning, and other work at heights around mobile equipment. • Encourage the use of the “buddy system” when loading large items o Have one person at ground level and one person on the equipment to transport large items onto and off the equipment. • Periodically remind people who access mobile equipment of best practices and risks associated with ingress and egress