This training session discusses how to avoid slips, trips, and falls in the workplace. This includes avoiding hazards on walking and working surfaces and work platforms, as well as how to avoid accidents on ladders and stairs.
anthropometry design for elderly people, all the consideration about the anthropometry of elderly people, safety and precautions while designing for elderly people
Safety at Construction site is the matter of someone's life so it has to give top priority, we are truly professional to follow this and its actually increase our efficiency, just check out our safety standard
This training session discusses how to avoid slips, trips, and falls in the workplace. This includes avoiding hazards on walking and working surfaces and work platforms, as well as how to avoid accidents on ladders and stairs.
anthropometry design for elderly people, all the consideration about the anthropometry of elderly people, safety and precautions while designing for elderly people
Safety at Construction site is the matter of someone's life so it has to give top priority, we are truly professional to follow this and its actually increase our efficiency, just check out our safety standard
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
2. Ensure ladders meet or
exceed standards
• Maintain even rung spacing from
the ground level to the cab.
• Be sure that rungs are flat and deep
enough to place the foot
comfortably.
• Avoid using circular bars or rods as
rungs when possible.
• Choose rungs with small openings
on the tread so contaminants
cannot accumulate.
• Add non-slip coatings or grooves on
the rungs to increase grip.
• Ensure handholds run the entire
length of the ladder.
Did you know?
• Flexible-railed bottom rungs on
mobile equipment can be especially
hazardous.
• Getting off mobile equipment is
more dangerous than getting on.
3. Provide an access
platform with stairs
• Construct and use access platforms
with stairs and guardrails that allow
operators to enter and exit the cab
directly.
• Eliminate the use of vertical ladders
for access to mobile equipment
when possible.
Did you know?
• Most ingress and egress injuries on
front-end loaders occur on
equipment with vertical ladders.
4. Provide adequate and
appropriate lighting
• Ensure the lighting is uniform
across the parking area.
• Space lights so adjacent beams
overlap in order to avoid dark
pockets.
• Regularly check light levels in
parking areas using a lux/light
meter to ensure they are between
2-4 foot-candles or 22-43 lux.
• Paint the stairs, ladder, and
platform in a color that has a high
contrast to the contaminant to
make it easier to detect the
contaminant.
Did you know?
• Insufficient lighting around mobile
equipment can make it hard to
detect hazardous ground or ladder
conditions.
5. Provide a designated
parking area for mobile
equipment
• Keep parking areas free from
hazardous ground conditions like
ruts, rocks, hoses, and ice.
• Provide designated walkways with
clearly marked crosswalks to
parking areas.
Did you know?
• Injuries when accessing equipment
are often due to ruts, grooves,
rocks, hoses, pipes, pallets, crib
blocks, and slippery surfaces like
ice, snow, or mud in the parking
area.
6. Provide cleaning stations
with housekeeping
supplies in parking areas
• Provide housekeeping supplies at a
designated and marked location in
the parking area to allow workers
to remove contaminants from the
equipment.
• Typical housekeeping supplies
include:
o Shovels
o Brooms
o Brushes
o Ice scrapers
o Salt or sand
o Paper towels
o Window cleaner
7. Provide boot cleaning
stations close to the
mobile equipment
• Provide boot brushes and boot
cleaning stations on the ground
near mobile equipment to help
workers remove any contaminants
from boots prior to getting on
equipment.
• Provide boot cleaning stations at
entrances to buildings and sheds.
Did you know?
• Muddy boots and hurrying are
some of the contributing factors to
slips when getting onto or off of
front-end loaders.
8. Conduct a pre-shift and
scheduled inspection
• Include ladders, stairs, handholds,
and platforms in inspections.
• During pre-shift inspections, look
for loose, damaged, or broken
components and contaminants.
• During regularly scheduled
inspections, look for potential
failures like cracks and loose,
damaged, or broken components
like rungs and doors that allow
excessive or unexpected
movement.
• Use a checklist to help ensure no
items are overlooked.
9. Ensure the mine has a
policy for safe operating
procedures
• Discourage jumping off of equipment
• Always use three points of contact
o Provide backpacks, shoulder straps,
or a pulley system to carry tools,
equipment, lunch bags, and water
bottles onto and off equipment.
• Always use fall protection when
working at heights
o Provide adequate, labelled tie-off
points and encourage the use of a
personal fall arrest system.
o Encourage fall protection use
especially when performing
maintenance, window cleaning, and
other work at heights around mobile
equipment.
• Encourage the use of the “buddy
system” when loading large items
o Have one person at ground level and
one person on the equipment to
transport large items onto and off
the equipment.
• Periodically remind people who access
mobile equipment of best practices and
risks associated with ingress and egress