Process Manufacturing
EnterpriseOne v9.2
Configuration, Costing, Shop Floor Control and
Manufacturing Accounting
Agenda
1. Define Process Manufacturing
2. Configuration and Setup
3. Costing
4. Creating and Executing Process WO’s
5. Manufacturing Accounting
1. Definition of Process Manufacturing
Process manufacturing is the branch of manufacturing that is associated with formulas and
manufacturing recipes, and can be contrasted with discrete manufacturing, which is
concerned with bills of material and routing.
■ The simplest and easiest way to grasp the definition of process manufacturing is to
recognize that, once an output is produced by this process, it cannot be distilled or
reworked back to its basic components. In other words, "once you put it together, you
cannot take it apart". A can of soda cannot be returned to its basic components such as
carbonated water, citric acid, potassium benzoate, aspartame, and other ingredients.
Juice cannot be put back into an orange. A plastic card manufactured cannot be
returned to its basic components like PVR sheets, transparent sheets.
A car or computer, on the other hand, can be disassembled and its components, to a large
extent, returned to stock.Process manufacturing is common in the food, beverage,
chemical, pharmaceutical, consumer packaged goods, and biotechnology industries. In
process manufacturing, the relevant factors are ingredients, not parts; formulas, not bill of
materials; and bulk, not individual units.
This is more than a subtle difference in terminology; the terms characterize distinct
manufacturing approaches.
1. Process Manufacturing: Overview
■ Process manufacturing produces products such as liquids, fibers, powders, or
gases. Pharmaceuticals, foodstuffs, and beverages are typical examples of
process products and represent a significant share of the manufacturing
market.
■ Process manufacturing enables multiple products to be made as
coproducts,stocked and sold as separate items; whereas standard discrete
bills of material (P3002) only allow one parent item to be produced per bill
structure. It isnot possible to run or complete a process in terms of decimals.
■ Master routings are not used in process manufacturing because the process
outputs, co and byproducts, are usually different for each process. All of the
variables in the process are controlled by the routing and it is not possible to
make different products with the same ingredients and process.
■ Master routings are used for discrete manufacturing only.
■ Standard Cost is used. Actual or Average Manufacturing costs are not used.
1. Raw Beet to Thick Juice
2. Creating MOL
3. Thick Juice to Crystalized Sugar
4. Molasses to Separator
5. Betaine
6. Wet Pulp to Dry Pulp
Other:
7. Sugar Packaging (Discrete WO’s)
1. Process Manufacturing-Sugar
1. Create weekly Process WO for each Process (6)
2. Record Inventory issues to each Process WO.
3. Record or backflush labor.
4. Backflush machine hours against each WO
5. Record Process Completions every 24 hours
6. Create WIP general Ledger entries daily
7. Materials and labor/machine costs to be recognized at the relevant
process.
8. Close weekly WO’s and record WIP and Variances for the Process
WO’s
1. Process Manufacturing-EnterpriseOne Solution
2. Process Manufacturing Configuration Steps
1. Create item and item branch plant records (G4111/P41026) for
the process, co, byproducts, intermediates
2. Create or validate work centers (G3012/P3006)
3. Enter process routing and operation sequences
(G3012/P3003)
4. Create bill of material, with substitutes (from within
Enter/Change Process)
5. Enter Co/By products list
6. Enter intermediates
7. Run Integrity Analysis (R30601)
8. Setup Costing for Ingredients and Work Centers
9. Simulate and Freeze Costs
2. Inventory: Process, Ingredients, Co/By
Products
2. Process Item Master
Stock Type =R Line Type = M
Process is the Parent Item. No inventory stock maintained.
2. Intermediate Item Master
Stock Type =M Line Type = N
No inventory stock maintained. Consumed in subsequent process.
2. Co Product (Finished Good) Item Master
Stock Type =M Line Type = S
2. By Product (also a Finished Good)
Stock Type =M Line Type = S
2. Relevant Units of Measure
System uses four fields in the Item Master table (F4101) throughout shop floor as
default values in entry forms:
Component, Production, and Primary/Secondary Unit of Measure. Primary Unit
of Measure value must be the smallest of the three units of measure.
Intermediates can be any valid unit of measure as long
as the conversion is set up, however process
manufacturing was not intended to be setup with
Units of Measure conversions for the Process itself.
Since the process is just that, a process, it is a
multiplier for how many of the processes to achieve.
Typically, more than one coproduct is produced by the
process and uses only one bill of material without
using a unit of measure conversion for the process.
The coproducts and ingredients should be set up with
the unit of measure as they are processed.
2. Work Centers
2. WC Rates (with Frozen Costs)
2. Setup the Process
The 'Cons/Prod' column indicates that ingredients are consumed,
co/byproducts will be produced and outputted at this step, or both
happen. Intermediates on the operation will highlight this field in Pink.
2. Setup the Process
■ Enter the Resource Percent % (RSCP). This field controls how much of
the ingredients are issued for each of the co/by products at a certain step.
Ingredients may be issued separately at time of completion or as a total
issue of all ingredients.
■ The Resource % is used when Inventory Issues (P31113) are called from
Work Order Completions (P31114),and the P31114 Processing Option #
2, Issues Ingredients to Co/By Products, on tab 6, Process Mfg, is set
to'1'.
■ For Completions with Backflush, validate that the ingredient issue type
code is set to 'B' and that the processing option of P31113 (the version
called by P31114) has option # 3, Issue Material For, on the ‘Display’ tab
set to 1. Enter the Op Seq # (Operation Sequence number OPSQ). This
is the routing operation where the co or byproduct is produced from.
■ Enter the Co/By Line # (Component Line Number CPNB).
2. Intermediates are Tied to a Sequence
Intermediate products are items defined as a result of a step but are
automatically consumed in the next step. They are nonstock items and are
only defined steps with a paypoint for reporting purposes. Intermediates
enable the tracking of the quantity of output of any operation in a work
center at a specific time. They can be defined in any unit of measure.
Intermediates cannot be defined as an ingredient in the process in which it is
produced. Set up one intermediate per operation, but do not define an
intermediate for the last operation in a routing instruction
2. By/Co Products are Tied to a Routing Sequence
2. BOM/Ingredients Tied to an Op Seqence
Substitutes highlighted in Green
2. Ingredients
2. Co and By Product Inquiry
3. Cost Rollups:
Simulate Costs R30812 and Freeze Costs R30834
3. Product Costing Process and Co/By
Products (P30026)
3. Product Costing Process and Co/By
Products (P30026)
3. Co-Product Costing (P30026)
3. By-Product Costing
3. Costed BOM P30206 (only at Process
Level)
3. Costed Routing P30208 (only at Process
Level)
4. Shop Floor Control: Create WO and Process
WO (R31410)
4. BOM integrated in Routing
4. Co and By Products as WO/Routing Exit
4. Ingredient Parts List
4. Enter/Process WO Time (or Backflush Labor)
4. WO Completions P31114 Processing Option
JD Edwards EnterpriseOne supports both partial and full work
order Completions (P31114), with or without Backflush, and
Super Backflush (P31123) for completing a process work order.
4. WO Completions P31114
4. P31114 calls Co/By Product Completion
4. WO Completions P31114 in Decimal Instance
4. P31114 calls Co/By Product Completion in
Decimal Instance
4. WO Inventory Issues P31113:
Parts displayed by WO Sequence
5. Costing Options relevant Process Manufacturing
5. WIP DMAAI’s: Consume materials in related
Process
5. Manufacturing GL Entries by WC (Material
Issues)
5. Manufacturing GL Entries by WC
(Labor/Machine)
5. Production Inquiry (P31022)
Expected Costs and Variance costs by WC
Questions & Answers
Please complete the session
evaluation
We appreciate your feedback and insight
Session ID# JDE-104910

More Related Content

What's hot

SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infosapdocs. info
 
Set up and utilize internal orders as standard SAP functionality
 Set up and utilize internal orders as standard SAP functionality Set up and utilize internal orders as standard SAP functionality
Set up and utilize internal orders as standard SAP functionalityJohn Jordan
 
Heizer om10 ch14
Heizer om10 ch14Heizer om10 ch14
Heizer om10 ch14remilaw
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projectsSomashekar S.M
 
Accounting entries from production to finished stock
Accounting entries from production to finished stockAccounting entries from production to finished stock
Accounting entries from production to finished stockRavindra Jain
 
Con2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costsCon2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costsaadamserpcorp
 
Make to order document
Make to order document Make to order document
Make to order document Hari Krishna
 
Engineering in oracle
Engineering in oracleEngineering in oracle
Engineering in oracleLarry Sherrod
 
Co interview questions and asnwers.
Co interview questions and asnwers.Co interview questions and asnwers.
Co interview questions and asnwers.Rajeev Kumar
 
What is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali NookellaWhat is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali Nookellamuralikrishnanookella
 
Cutomize sap webinar
Cutomize sap webinarCutomize sap webinar
Cutomize sap webinargabrielsyst
 
LOGBOOk ENTRIES IN SAP PM
LOGBOOk ENTRIES IN SAP PMLOGBOOk ENTRIES IN SAP PM
LOGBOOk ENTRIES IN SAP PMPiyush Bose
 

What's hot (20)

Ppaptr
PpaptrPpaptr
Ppaptr
 
Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
SAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.infoSAP PM Training Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
 
Set up and utilize internal orders as standard SAP functionality
 Set up and utilize internal orders as standard SAP functionality Set up and utilize internal orders as standard SAP functionality
Set up and utilize internal orders as standard SAP functionality
 
Heizer om10 ch14
Heizer om10 ch14Heizer om10 ch14
Heizer om10 ch14
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
SAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account AssignmentSAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account Assignment
 
Topic 8 (short)
Topic 8 (short)Topic 8 (short)
Topic 8 (short)
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projects
 
Accounting entries from production to finished stock
Accounting entries from production to finished stockAccounting entries from production to finished stock
Accounting entries from production to finished stock
 
Con2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costsCon2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costs
 
Make to order document
Make to order document Make to order document
Make to order document
 
Unit 2
Unit 2Unit 2
Unit 2
 
Engineering in oracle
Engineering in oracleEngineering in oracle
Engineering in oracle
 
MRP
MRPMRP
MRP
 
Co interview questions and asnwers.
Co interview questions and asnwers.Co interview questions and asnwers.
Co interview questions and asnwers.
 
What is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali NookellaWhat is SAP Quality Management (QM) ? by Murali Nookella
What is SAP Quality Management (QM) ? by Murali Nookella
 
Cutomize sap webinar
Cutomize sap webinarCutomize sap webinar
Cutomize sap webinar
 
Product Operation Planning & Control
Product Operation Planning & ControlProduct Operation Planning & Control
Product Operation Planning & Control
 
LOGBOOk ENTRIES IN SAP PM
LOGBOOk ENTRIES IN SAP PMLOGBOOk ENTRIES IN SAP PM
LOGBOOk ENTRIES IN SAP PM
 

Viewers also liked

Boys and the American Education System: A Biocultural Review of the Literature
Boys and the American Education System: A Biocultural Review of the LiteratureBoys and the American Education System: A Biocultural Review of the Literature
Boys and the American Education System: A Biocultural Review of the Literatureworldwideww
 
The ADHD Epidemic in America
The ADHD Epidemic in AmericaThe ADHD Epidemic in America
The ADHD Epidemic in Americaworldwideww
 
An Elaboration on the Distinction Between Controversial Parenting and Therape...
An Elaboration on the Distinction Between Controversial Parenting and Therape...An Elaboration on the Distinction Between Controversial Parenting and Therape...
An Elaboration on the Distinction Between Controversial Parenting and Therape...worldwideww
 
Sam the Superkitty Preview
Sam the Superkitty PreviewSam the Superkitty Preview
Sam the Superkitty Previewworldwideww
 

Viewers also liked (6)

Boys and the American Education System: A Biocultural Review of the Literature
Boys and the American Education System: A Biocultural Review of the LiteratureBoys and the American Education System: A Biocultural Review of the Literature
Boys and the American Education System: A Biocultural Review of the Literature
 
The ADHD Epidemic in America
The ADHD Epidemic in AmericaThe ADHD Epidemic in America
The ADHD Epidemic in America
 
Desenhos
Desenhos Desenhos
Desenhos
 
Fiqih shalat
Fiqih shalatFiqih shalat
Fiqih shalat
 
An Elaboration on the Distinction Between Controversial Parenting and Therape...
An Elaboration on the Distinction Between Controversial Parenting and Therape...An Elaboration on the Distinction Between Controversial Parenting and Therape...
An Elaboration on the Distinction Between Controversial Parenting and Therape...
 
Sam the Superkitty Preview
Sam the Superkitty PreviewSam the Superkitty Preview
Sam the Superkitty Preview
 

Similar to Process Manufacturing Configuration in EnterpriseOne

WHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptWHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptHafizurRahman130404
 
Accounting process costing
Accounting process costingAccounting process costing
Accounting process costingrinushalu
 
1BM_S4CLD2302_BPD_EN_US.docx
1BM_S4CLD2302_BPD_EN_US.docx1BM_S4CLD2302_BPD_EN_US.docx
1BM_S4CLD2302_BPD_EN_US.docxnavinsurya3
 
Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryPooja Harkal
 
Documentation in pharmaceutical industry
Documentation in pharmaceutical industryDocumentation in pharmaceutical industry
Documentation in pharmaceutical industryPooja Harkal
 
Routing.pptx scheduling and production plan
Routing.pptx scheduling and production planRouting.pptx scheduling and production plan
Routing.pptx scheduling and production planNehaSharma673767
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answersRichardAment
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answersRandalHoffman
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
Production management openbravo
Production management   openbravoProduction management   openbravo
Production management openbravoAbul Khayer
 
What is bill of materials functionality
What is bill of materials functionalityWhat is bill of materials functionality
What is bill of materials functionalityMRPeasy
 
How OPM benefits your business?
How OPM benefits your business?How OPM benefits your business?
How OPM benefits your business?Blink Consulting
 
Lesson 5 FOOD lesson and and activity
Lesson 5  FOOD  lesson and  and activityLesson 5  FOOD  lesson and  and activity
Lesson 5 FOOD lesson and and activityQuenieCantor
 
Automobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringAutomobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringlovely467637
 

Similar to Process Manufacturing Configuration in EnterpriseOne (20)

JD Edwards EnterpriseOne Process Manufacturing Presentation Quest Infocus 2016
JD Edwards EnterpriseOne Process Manufacturing Presentation Quest Infocus 2016JD Edwards EnterpriseOne Process Manufacturing Presentation Quest Infocus 2016
JD Edwards EnterpriseOne Process Manufacturing Presentation Quest Infocus 2016
 
WHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptWHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.ppt
 
Master formula record
Master formula recordMaster formula record
Master formula record
 
Accounting process costing
Accounting process costingAccounting process costing
Accounting process costing
 
1BM_S4CLD2302_BPD_EN_US.docx
1BM_S4CLD2302_BPD_EN_US.docx1BM_S4CLD2302_BPD_EN_US.docx
1BM_S4CLD2302_BPD_EN_US.docx
 
Documentation in Pharmaceutical Industry
Documentation in Pharmaceutical IndustryDocumentation in Pharmaceutical Industry
Documentation in Pharmaceutical Industry
 
Documentation in pharmaceutical industry
Documentation in pharmaceutical industryDocumentation in pharmaceutical industry
Documentation in pharmaceutical industry
 
Routing.pptx scheduling and production plan
Routing.pptx scheduling and production planRouting.pptx scheduling and production plan
Routing.pptx scheduling and production plan
 
Unit 4 ppc
Unit 4 ppcUnit 4 ppc
Unit 4 ppc
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answers
 
Bam 421 unit 4 examination answers
Bam 421 unit 4 examination answersBam 421 unit 4 examination answers
Bam 421 unit 4 examination answers
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
Production management openbravo
Production management   openbravoProduction management   openbravo
Production management openbravo
 
What is bill of materials functionality
What is bill of materials functionalityWhat is bill of materials functionality
What is bill of materials functionality
 
Sap pp-user-manual
Sap pp-user-manualSap pp-user-manual
Sap pp-user-manual
 
How OPM benefits your business?
How OPM benefits your business?How OPM benefits your business?
How OPM benefits your business?
 
Process costing
Process costingProcess costing
Process costing
 
Lesson 5 FOOD lesson and and activity
Lesson 5  FOOD  lesson and  and activityLesson 5  FOOD  lesson and  and activity
Lesson 5 FOOD lesson and and activity
 
Chapter4EN.PDF.pdf
Chapter4EN.PDF.pdfChapter4EN.PDF.pdf
Chapter4EN.PDF.pdf
 
Automobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringAutomobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineering
 

Process Manufacturing Configuration in EnterpriseOne

  • 1. Prepared by: Keith Figgins, CPIM Senior Consultant Mitchell and Associates Session ID#: JDE-104910 #MAAIMCS Process Manufacturing EnterpriseOne v9.2 Configuration, Costing, Shop Floor Control and Manufacturing Accounting
  • 2. Agenda 1. Define Process Manufacturing 2. Configuration and Setup 3. Costing 4. Creating and Executing Process WO’s 5. Manufacturing Accounting
  • 3. 1. Definition of Process Manufacturing Process manufacturing is the branch of manufacturing that is associated with formulas and manufacturing recipes, and can be contrasted with discrete manufacturing, which is concerned with bills of material and routing. ■ The simplest and easiest way to grasp the definition of process manufacturing is to recognize that, once an output is produced by this process, it cannot be distilled or reworked back to its basic components. In other words, "once you put it together, you cannot take it apart". A can of soda cannot be returned to its basic components such as carbonated water, citric acid, potassium benzoate, aspartame, and other ingredients. Juice cannot be put back into an orange. A plastic card manufactured cannot be returned to its basic components like PVR sheets, transparent sheets. A car or computer, on the other hand, can be disassembled and its components, to a large extent, returned to stock.Process manufacturing is common in the food, beverage, chemical, pharmaceutical, consumer packaged goods, and biotechnology industries. In process manufacturing, the relevant factors are ingredients, not parts; formulas, not bill of materials; and bulk, not individual units. This is more than a subtle difference in terminology; the terms characterize distinct manufacturing approaches.
  • 4. 1. Process Manufacturing: Overview ■ Process manufacturing produces products such as liquids, fibers, powders, or gases. Pharmaceuticals, foodstuffs, and beverages are typical examples of process products and represent a significant share of the manufacturing market. ■ Process manufacturing enables multiple products to be made as coproducts,stocked and sold as separate items; whereas standard discrete bills of material (P3002) only allow one parent item to be produced per bill structure. It isnot possible to run or complete a process in terms of decimals. ■ Master routings are not used in process manufacturing because the process outputs, co and byproducts, are usually different for each process. All of the variables in the process are controlled by the routing and it is not possible to make different products with the same ingredients and process. ■ Master routings are used for discrete manufacturing only. ■ Standard Cost is used. Actual or Average Manufacturing costs are not used.
  • 5.
  • 6. 1. Raw Beet to Thick Juice 2. Creating MOL 3. Thick Juice to Crystalized Sugar 4. Molasses to Separator 5. Betaine 6. Wet Pulp to Dry Pulp Other: 7. Sugar Packaging (Discrete WO’s) 1. Process Manufacturing-Sugar
  • 7. 1. Create weekly Process WO for each Process (6) 2. Record Inventory issues to each Process WO. 3. Record or backflush labor. 4. Backflush machine hours against each WO 5. Record Process Completions every 24 hours 6. Create WIP general Ledger entries daily 7. Materials and labor/machine costs to be recognized at the relevant process. 8. Close weekly WO’s and record WIP and Variances for the Process WO’s 1. Process Manufacturing-EnterpriseOne Solution
  • 8. 2. Process Manufacturing Configuration Steps 1. Create item and item branch plant records (G4111/P41026) for the process, co, byproducts, intermediates 2. Create or validate work centers (G3012/P3006) 3. Enter process routing and operation sequences (G3012/P3003) 4. Create bill of material, with substitutes (from within Enter/Change Process) 5. Enter Co/By products list 6. Enter intermediates 7. Run Integrity Analysis (R30601) 8. Setup Costing for Ingredients and Work Centers 9. Simulate and Freeze Costs
  • 9. 2. Inventory: Process, Ingredients, Co/By Products
  • 10. 2. Process Item Master Stock Type =R Line Type = M Process is the Parent Item. No inventory stock maintained.
  • 11. 2. Intermediate Item Master Stock Type =M Line Type = N No inventory stock maintained. Consumed in subsequent process.
  • 12. 2. Co Product (Finished Good) Item Master Stock Type =M Line Type = S
  • 13. 2. By Product (also a Finished Good) Stock Type =M Line Type = S
  • 14. 2. Relevant Units of Measure System uses four fields in the Item Master table (F4101) throughout shop floor as default values in entry forms: Component, Production, and Primary/Secondary Unit of Measure. Primary Unit of Measure value must be the smallest of the three units of measure. Intermediates can be any valid unit of measure as long as the conversion is set up, however process manufacturing was not intended to be setup with Units of Measure conversions for the Process itself. Since the process is just that, a process, it is a multiplier for how many of the processes to achieve. Typically, more than one coproduct is produced by the process and uses only one bill of material without using a unit of measure conversion for the process. The coproducts and ingredients should be set up with the unit of measure as they are processed.
  • 16. 2. WC Rates (with Frozen Costs)
  • 17. 2. Setup the Process The 'Cons/Prod' column indicates that ingredients are consumed, co/byproducts will be produced and outputted at this step, or both happen. Intermediates on the operation will highlight this field in Pink.
  • 18. 2. Setup the Process ■ Enter the Resource Percent % (RSCP). This field controls how much of the ingredients are issued for each of the co/by products at a certain step. Ingredients may be issued separately at time of completion or as a total issue of all ingredients. ■ The Resource % is used when Inventory Issues (P31113) are called from Work Order Completions (P31114),and the P31114 Processing Option # 2, Issues Ingredients to Co/By Products, on tab 6, Process Mfg, is set to'1'. ■ For Completions with Backflush, validate that the ingredient issue type code is set to 'B' and that the processing option of P31113 (the version called by P31114) has option # 3, Issue Material For, on the ‘Display’ tab set to 1. Enter the Op Seq # (Operation Sequence number OPSQ). This is the routing operation where the co or byproduct is produced from. ■ Enter the Co/By Line # (Component Line Number CPNB).
  • 19. 2. Intermediates are Tied to a Sequence Intermediate products are items defined as a result of a step but are automatically consumed in the next step. They are nonstock items and are only defined steps with a paypoint for reporting purposes. Intermediates enable the tracking of the quantity of output of any operation in a work center at a specific time. They can be defined in any unit of measure. Intermediates cannot be defined as an ingredient in the process in which it is produced. Set up one intermediate per operation, but do not define an intermediate for the last operation in a routing instruction
  • 20. 2. By/Co Products are Tied to a Routing Sequence
  • 21. 2. BOM/Ingredients Tied to an Op Seqence
  • 22. Substitutes highlighted in Green 2. Ingredients
  • 23. 2. Co and By Product Inquiry
  • 24. 3. Cost Rollups: Simulate Costs R30812 and Freeze Costs R30834
  • 25. 3. Product Costing Process and Co/By Products (P30026)
  • 26. 3. Product Costing Process and Co/By Products (P30026)
  • 29. 3. Costed BOM P30206 (only at Process Level)
  • 30. 3. Costed Routing P30208 (only at Process Level)
  • 31. 4. Shop Floor Control: Create WO and Process WO (R31410)
  • 32. 4. BOM integrated in Routing
  • 33. 4. Co and By Products as WO/Routing Exit
  • 35. 4. Enter/Process WO Time (or Backflush Labor)
  • 36. 4. WO Completions P31114 Processing Option JD Edwards EnterpriseOne supports both partial and full work order Completions (P31114), with or without Backflush, and Super Backflush (P31123) for completing a process work order.
  • 38. 4. P31114 calls Co/By Product Completion
  • 39. 4. WO Completions P31114 in Decimal Instance
  • 40. 4. P31114 calls Co/By Product Completion in Decimal Instance
  • 41. 4. WO Inventory Issues P31113: Parts displayed by WO Sequence
  • 42. 5. Costing Options relevant Process Manufacturing
  • 43. 5. WIP DMAAI’s: Consume materials in related Process
  • 44. 5. Manufacturing GL Entries by WC (Material Issues)
  • 45. 5. Manufacturing GL Entries by WC (Labor/Machine)
  • 46. 5. Production Inquiry (P31022) Expected Costs and Variance costs by WC