The Middle East countries go through extreme climatic conditions with temperature crossing 50 Degree Centigrade during peak of summer. The external temperature and atmospheric conditions affect the temperature of ware houses, cold room, vans, trucks, reefers etc. which are used for storage and distribution of medicines. The Middle Eastcountries referred here are generally United Arab Emirates,
Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, Iran, Iraq etc.
Prasanna Kamat has over 8 years of experience as a laboratory supervisor in a gas-based power plant. He holds a B.Sc. and M.Sc. in Chemistry and additional qualifications in IT and medical laboratory technician. His responsibilities include sampling and analyzing water, steam, oil, fuel and other process materials to ensure safe and efficient plant operations. He is proficient in numerous analytical instruments and safety practices. Currently he works in the plant's environment department monitoring air quality, waste water and more.
Calibration involves determining the accuracy of components on a liquid petroleum gas (LPG) terminal and calculating the precise storage capacities of different types of LPG tanks. The document discusses calibrating terminal equipment and tanks, measuring tank volumes, accounting for factors like deadspace, and ensuring operations follow industry standards for safety. It also outlines safety procedures for an LPG terminal, including monitoring for physical, chemical, and oxygen hazards to prepare for potential emergencies.
This document provides a summary of qualifications for a Quality Control Engineer position. It outlines the candidate's 11 years of experience in inspection, quality control, and non-destructive testing for various industrial projects. Responsibilities have included leading inspection personnel, developing quality plans, reviewing welding procedures, witnessing tests, and coordinating with clients. The candidate holds engineering and non-destructive testing certifications and has worked extensively on both onshore and offshore oil and gas projects. Contact information and the candidate's work history with two companies are also provided.
Shoaib Ali Shahid is seeking a position as a QA/QC coating inspector. He has over 5 years of experience in quality control and inspection work, including 4 years specifically relating to QA activities. His experience includes implementing international standards, and performing QA/QC tasks for projects involving piping, tanks, gas plants, fertilizer plants, and fabrication shops. Currently, he works as a QC inspector for coating projects in Iraq, and has previously worked as a QC coating inspector in Pakistan, where his responsibilities included reviewing applicator certifications, conducting coating inspections, performing tests, and ensuring work was done according to international quality standards.
Ali Hashim has over 15 years of experience in environmental services with SGS Pakistan Private Limited. He is currently an Assistant Manager in the Environmental Services division, where he is responsible for planning and executing services, dealing with client queries and projects, quality assurance, and managing employees. Previously, he worked as a Senior Chemist and Lab Head, as well as a Chemist, where he was responsible for laboratory analysis, supervision, and reporting. He also has over 2 years of experience as a Research Officer for the University of Punjab, where he conducted research in chemistry and manufactured various chemicals.
This certificate of analysis from GreenAgroChem provides test results for a shipment of sodium lignosulphonate feed grade liquid, including measurements for appearance, solid content, water-insoluble matter, lignosulphonate, pH, sugar, Brix, and density that all meet or exceed specifications. Shipping details are also listed, such as the customer, invoice number, vessel name, container number, seal number, and dispatch date.
Prasanna Kamat has over 8 years of experience as a laboratory supervisor in a gas-based power plant. He holds a B.Sc. and M.Sc. in Chemistry and additional qualifications in IT and medical laboratory technician. His responsibilities include sampling and analyzing water, steam, oil, fuel and other process materials to ensure safe and efficient plant operations. He is proficient in numerous analytical instruments and safety practices. Currently he works in the plant's environment department monitoring air quality, waste water and more.
Calibration involves determining the accuracy of components on a liquid petroleum gas (LPG) terminal and calculating the precise storage capacities of different types of LPG tanks. The document discusses calibrating terminal equipment and tanks, measuring tank volumes, accounting for factors like deadspace, and ensuring operations follow industry standards for safety. It also outlines safety procedures for an LPG terminal, including monitoring for physical, chemical, and oxygen hazards to prepare for potential emergencies.
This document provides a summary of qualifications for a Quality Control Engineer position. It outlines the candidate's 11 years of experience in inspection, quality control, and non-destructive testing for various industrial projects. Responsibilities have included leading inspection personnel, developing quality plans, reviewing welding procedures, witnessing tests, and coordinating with clients. The candidate holds engineering and non-destructive testing certifications and has worked extensively on both onshore and offshore oil and gas projects. Contact information and the candidate's work history with two companies are also provided.
Shoaib Ali Shahid is seeking a position as a QA/QC coating inspector. He has over 5 years of experience in quality control and inspection work, including 4 years specifically relating to QA activities. His experience includes implementing international standards, and performing QA/QC tasks for projects involving piping, tanks, gas plants, fertilizer plants, and fabrication shops. Currently, he works as a QC inspector for coating projects in Iraq, and has previously worked as a QC coating inspector in Pakistan, where his responsibilities included reviewing applicator certifications, conducting coating inspections, performing tests, and ensuring work was done according to international quality standards.
Ali Hashim has over 15 years of experience in environmental services with SGS Pakistan Private Limited. He is currently an Assistant Manager in the Environmental Services division, where he is responsible for planning and executing services, dealing with client queries and projects, quality assurance, and managing employees. Previously, he worked as a Senior Chemist and Lab Head, as well as a Chemist, where he was responsible for laboratory analysis, supervision, and reporting. He also has over 2 years of experience as a Research Officer for the University of Punjab, where he conducted research in chemistry and manufactured various chemicals.
This certificate of analysis from GreenAgroChem provides test results for a shipment of sodium lignosulphonate feed grade liquid, including measurements for appearance, solid content, water-insoluble matter, lignosulphonate, pH, sugar, Brix, and density that all meet or exceed specifications. Shipping details are also listed, such as the customer, invoice number, vessel name, container number, seal number, and dispatch date.
Guidelines for temperature mapping study and qualification of cold rooms, war...vackerdxb
Vacker UAE has issued these guidelines for temperature mapping study and qualification of cold rooms, ware houses, refrigerators, vans etc. for pharmaceutical and life care segment.
Temperature mapping study & qualification protocol procedurevackerdxb
Detailed Procedure And Guidelines On Temperature Mapping Study & Qualification Of Cold Rooms, Warehouses, Vans, Trucks, Reefers, Refrigerators & Boxes For Pharmaceutical Industry.
Temperature mapping study and Temperature qualification study are carried out generally in pharmaceutical industry. There are different kind of medicines and vaccines which need to be stored and transported at certain temperatures. Majority of these medicines and vaccines are under two categories viz. Those to be stored between 2 to 8 Degree Centigrade and those to be stored between 15 to 25°C.
It is important for the efficacy of the medicine that the same be stored and transported at the recommended temperature limits as above. If the medicine or vaccine goes above these temperature limits, the medicinal properties will be gradually lost and most importantly the products will not show any indication that it has been compromised. In such case the ultimate distributor and user will be unaware of the efficacy of the medicine.
The storage is done in warehouses, cold rooms or refrigerators and transportation is carried out in boxes, vans, reefers and containers.
The whole set of study is carried out to analyze the temperature distribution in a warehouse, cold room, refrigerator, van or reefer trucks to find out whether the temperature inside such facility is always maintained between the desired temperature.
If you are involved in manufacturing, transportation, storage or distribution of medicines and vaccines, you will be interested to know more about temperature mapping study. In all these cases your medicine is kept inside an enclosed area such as a warehouse, cold room, temperature controlled van, reefer truck, refrigerator, insulated boxes etc.
Temperature Mapping & Validation, Monitoring and Alert Solutions for Sensitiv...vackerdxb
Temperature Mapping is the process by which entire area of a warehouse/cold room/vehicle is continuously monitored, recorded and analyzed over a period of time under real operating conditions.
Validation is the process through which the entire recording is analysed and certified by international accredited bodies.
We are associated with Thermal Compliance Ltd, UK for Temperature Mapping & Validation.
TEMPERATURE MAPPING & VALIDATION, MONITORING AND ALERT SOLUTIONS FOR SENSITIV...vackerdxb
Temperature Mapping is the process by which entire area of a warehouse/cold room/vehicle is continuously monitored, recorded and analyzed over a period of time under real operating conditions. Validation is the process through which the entire recording is analysed and certified by international accredited bodies. We are associated with Thermal Compliance Ltd, UK for Temperature Mapping & Validation.
The document discusses temperature mapping, which involves identifying temperature variations within storage areas like warehouses and cold rooms. It outlines GMP requirements for temperature mapping, the mapping process, methodology, and periodic requalification. The methodology involves selecting data loggers, mapping the site, establishing acceptance criteria, determining logger locations, running the study for 7+ days typically, and identifying any hot or cold spots. Periodic requalification is recommended every 3 years or when systems change.
The document summarizes the process of temperature mapping, which involves identifying temperature variations within storage areas like warehouses and cold rooms. It discusses GMP requirements for temperature mapping, the stages of the process including protocol preparation, mapping exercise, report preparation and implementation. Methodology details sensor selection, mapping team designation, site surveying, acceptance criteria establishment and sensor location determination. Periodic requalification is recommended when systems change or every 3 years otherwise.
The data loggers measure temperature, humidity and other parameters accurately, providing robust and reliable data under varying conditions. Our highly qualified team provides world-class data logging solutions for a variety of monitoring applications including healthcare, shipping, research, laboratory, pharmaceuticals and more.
Visit here: http://www.temperaturemonitoringuae.com
The document discusses validation of a fluidized bed dryer. It describes the purpose of equipment validation and the typical stages: installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ). For a fluidized bed dryer, IQ involves installing the equipment according to specifications. OQ involves testing that the dryer operates as intended under normal conditions. PQ involves drying product batches and ensuring the dryer reduces moisture content as specified and maintains quality/quantity of output. The document provides details on procedures, acceptance criteria, and revalidation for each qualification stage of the fluidized bed dryer.
This document discusses cryogenic testing capabilities for valves. It defines cryogenic temperatures as below -180°C/-240°F, where most gases liquefy. Valves are tested at these low temperatures to ensure proper functioning under extreme environmental conditions. The described cryogenic testing facility can test valves up to 56" in size from -196°C to ambient, under pressures up to 200 bar, using test standards to verify performance, leakage, and cycle times at cryogenic conditions. This helps assure safety and minimize issues during plant start-up.
Control, Monitor and Voice Call Alert system for Cold Storages/Freezer/Refrig...vackerdxb
All temperature controlled areas need to be monitored continuously and a deviation from the defined range will not be acceptable even for a short duration.
This document provides an industry standard test method for preconditioning packaged semiconductor devices to simulate typical industry reflow operations. It involves subjecting samples to multiple reflow cycles using specified temperature profiles, as well as moisture absorption and desorption steps. This preconditioning is intended to emulate real-world soldering processes and evaluate any potential reliability impacts before devices undergo further reliability testing. The procedure outlines the required test equipment, environmental conditions, inspection steps, and both preconditioning and post-conditioning electrical tests. Following this process aims to characterize devices and qualify them as reliable under multiple reflow and moisture exposure scenarios.
QinetiQ help aircraft fly more safely and for longer by assuring the safe, efficient and cost-effective delivery of airborne capability. For more information @ http://www.qinetiq.com/services-products/air/Pages/through-life-aircraft-support.aspx
Aqeel Ahmed Shaikh is seeking a position utilizing his 12 years of experience in power plant operations and maintenance. He has worked in Iraq, the UAE, Saudi Arabia, and Pakistan as an operator, charge hand, and local operator in thermal power plants ranging from 340MW to 1020MW fueled by crude oil and residual oil. His responsibilities included overseeing plant operations, equipment monitoring, maintenance coordination, and safety compliance. He has training and certifications in areas such as integrated management systems, firefighting, and steam turbine operations.
The document summarizes a proposed demonstration project to collect long-term data on the behavior of high burnup nuclear fuel in dry storage. It discusses the history of previous low burnup demonstrations, regulatory concerns about high burnup fuel storage and transportation, and the project plan. The demonstration would load high burnup fuel into a dry storage cask and monitor it over 10+ years to confirm integrity and provide data to support long-term licensing. It outlines the participants, timeline, and deliverables through 2018 with examination of the fuel to occur later.
SENTRO Technologies provides online chemical cleaning services to refineries and petrochemical plants to remove fouling from furnaces and heat exchangers. Their SENTROMAX process uses dry chemical granules applied through existing openings to clean radiant and convection sections of furnaces during normal operation, avoiding production shutdowns. This non-abrasive method increases thermal efficiency, reduces fuel consumption and emissions, and lowers corrosion compared to traditional offline mechanical cleaning. Case studies demonstrate benefits like lower temperatures, increased production rates, and payback periods of 2-12 weeks.
This document is a curriculum vitae for Moustafa Mohamed Khamis. It provides personal details such as his name, date of birth, contact information, education history, work experience, skills, and training. He has worked as an RCM Technician at Nile Sugar Company since 2013 and previously held roles as a Senior Utility Operator at Nile Sugar and Alex Carbon Black. His responsibilities have included equipment operation, maintenance, and ensuring proper plant operations. He has computer skills in Microsoft Office and experience with quality management systems and maintenance training.
This document contains test cases for validating requirements for a system. It includes:
1) A test case to verify the power-up state of the system by powering on and ensuring no unexpected actions occur and the display goes to the top category screen.
2) A test case to verify the off state by powering off during a blending operation and ensuring the blender returns to home position with no unexpected activations when powering back on.
3) A test case to verify locking functionality by setting temperature conditions to trigger an error, ensuring the expected error message appears with a check button, and expired products are shown.
Many enterprise mobility manufacturers use military
standards as a guide to ensure their devices can
withstand the challenges of a varying work place.
Military standards include numerous tests with
strict parameters used to simulate how a mobile
device will operate under environmental stress.
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...shadow0702a
This document serves as a comprehensive step-by-step guide on how to effectively use PyCharm for remote debugging of the Windows Subsystem for Linux (WSL) on a local Windows machine. It meticulously outlines several critical steps in the process, starting with the crucial task of enabling permissions, followed by the installation and configuration of WSL.
The guide then proceeds to explain how to set up the SSH service within the WSL environment, an integral part of the process. Alongside this, it also provides detailed instructions on how to modify the inbound rules of the Windows firewall to facilitate the process, ensuring that there are no connectivity issues that could potentially hinder the debugging process.
The document further emphasizes on the importance of checking the connection between the Windows and WSL environments, providing instructions on how to ensure that the connection is optimal and ready for remote debugging.
It also offers an in-depth guide on how to configure the WSL interpreter and files within the PyCharm environment. This is essential for ensuring that the debugging process is set up correctly and that the program can be run effectively within the WSL terminal.
Additionally, the document provides guidance on how to set up breakpoints for debugging, a fundamental aspect of the debugging process which allows the developer to stop the execution of their code at certain points and inspect their program at those stages.
Finally, the document concludes by providing a link to a reference blog. This blog offers additional information and guidance on configuring the remote Python interpreter in PyCharm, providing the reader with a well-rounded understanding of the process.
Guidelines for temperature mapping study and qualification of cold rooms, war...vackerdxb
Vacker UAE has issued these guidelines for temperature mapping study and qualification of cold rooms, ware houses, refrigerators, vans etc. for pharmaceutical and life care segment.
Temperature mapping study & qualification protocol procedurevackerdxb
Detailed Procedure And Guidelines On Temperature Mapping Study & Qualification Of Cold Rooms, Warehouses, Vans, Trucks, Reefers, Refrigerators & Boxes For Pharmaceutical Industry.
Temperature mapping study and Temperature qualification study are carried out generally in pharmaceutical industry. There are different kind of medicines and vaccines which need to be stored and transported at certain temperatures. Majority of these medicines and vaccines are under two categories viz. Those to be stored between 2 to 8 Degree Centigrade and those to be stored between 15 to 25°C.
It is important for the efficacy of the medicine that the same be stored and transported at the recommended temperature limits as above. If the medicine or vaccine goes above these temperature limits, the medicinal properties will be gradually lost and most importantly the products will not show any indication that it has been compromised. In such case the ultimate distributor and user will be unaware of the efficacy of the medicine.
The storage is done in warehouses, cold rooms or refrigerators and transportation is carried out in boxes, vans, reefers and containers.
The whole set of study is carried out to analyze the temperature distribution in a warehouse, cold room, refrigerator, van or reefer trucks to find out whether the temperature inside such facility is always maintained between the desired temperature.
If you are involved in manufacturing, transportation, storage or distribution of medicines and vaccines, you will be interested to know more about temperature mapping study. In all these cases your medicine is kept inside an enclosed area such as a warehouse, cold room, temperature controlled van, reefer truck, refrigerator, insulated boxes etc.
Temperature Mapping & Validation, Monitoring and Alert Solutions for Sensitiv...vackerdxb
Temperature Mapping is the process by which entire area of a warehouse/cold room/vehicle is continuously monitored, recorded and analyzed over a period of time under real operating conditions.
Validation is the process through which the entire recording is analysed and certified by international accredited bodies.
We are associated with Thermal Compliance Ltd, UK for Temperature Mapping & Validation.
TEMPERATURE MAPPING & VALIDATION, MONITORING AND ALERT SOLUTIONS FOR SENSITIV...vackerdxb
Temperature Mapping is the process by which entire area of a warehouse/cold room/vehicle is continuously monitored, recorded and analyzed over a period of time under real operating conditions. Validation is the process through which the entire recording is analysed and certified by international accredited bodies. We are associated with Thermal Compliance Ltd, UK for Temperature Mapping & Validation.
The document discusses temperature mapping, which involves identifying temperature variations within storage areas like warehouses and cold rooms. It outlines GMP requirements for temperature mapping, the mapping process, methodology, and periodic requalification. The methodology involves selecting data loggers, mapping the site, establishing acceptance criteria, determining logger locations, running the study for 7+ days typically, and identifying any hot or cold spots. Periodic requalification is recommended every 3 years or when systems change.
The document summarizes the process of temperature mapping, which involves identifying temperature variations within storage areas like warehouses and cold rooms. It discusses GMP requirements for temperature mapping, the stages of the process including protocol preparation, mapping exercise, report preparation and implementation. Methodology details sensor selection, mapping team designation, site surveying, acceptance criteria establishment and sensor location determination. Periodic requalification is recommended when systems change or every 3 years otherwise.
The data loggers measure temperature, humidity and other parameters accurately, providing robust and reliable data under varying conditions. Our highly qualified team provides world-class data logging solutions for a variety of monitoring applications including healthcare, shipping, research, laboratory, pharmaceuticals and more.
Visit here: http://www.temperaturemonitoringuae.com
The document discusses validation of a fluidized bed dryer. It describes the purpose of equipment validation and the typical stages: installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ). For a fluidized bed dryer, IQ involves installing the equipment according to specifications. OQ involves testing that the dryer operates as intended under normal conditions. PQ involves drying product batches and ensuring the dryer reduces moisture content as specified and maintains quality/quantity of output. The document provides details on procedures, acceptance criteria, and revalidation for each qualification stage of the fluidized bed dryer.
This document discusses cryogenic testing capabilities for valves. It defines cryogenic temperatures as below -180°C/-240°F, where most gases liquefy. Valves are tested at these low temperatures to ensure proper functioning under extreme environmental conditions. The described cryogenic testing facility can test valves up to 56" in size from -196°C to ambient, under pressures up to 200 bar, using test standards to verify performance, leakage, and cycle times at cryogenic conditions. This helps assure safety and minimize issues during plant start-up.
Control, Monitor and Voice Call Alert system for Cold Storages/Freezer/Refrig...vackerdxb
All temperature controlled areas need to be monitored continuously and a deviation from the defined range will not be acceptable even for a short duration.
This document provides an industry standard test method for preconditioning packaged semiconductor devices to simulate typical industry reflow operations. It involves subjecting samples to multiple reflow cycles using specified temperature profiles, as well as moisture absorption and desorption steps. This preconditioning is intended to emulate real-world soldering processes and evaluate any potential reliability impacts before devices undergo further reliability testing. The procedure outlines the required test equipment, environmental conditions, inspection steps, and both preconditioning and post-conditioning electrical tests. Following this process aims to characterize devices and qualify them as reliable under multiple reflow and moisture exposure scenarios.
QinetiQ help aircraft fly more safely and for longer by assuring the safe, efficient and cost-effective delivery of airborne capability. For more information @ http://www.qinetiq.com/services-products/air/Pages/through-life-aircraft-support.aspx
Aqeel Ahmed Shaikh is seeking a position utilizing his 12 years of experience in power plant operations and maintenance. He has worked in Iraq, the UAE, Saudi Arabia, and Pakistan as an operator, charge hand, and local operator in thermal power plants ranging from 340MW to 1020MW fueled by crude oil and residual oil. His responsibilities included overseeing plant operations, equipment monitoring, maintenance coordination, and safety compliance. He has training and certifications in areas such as integrated management systems, firefighting, and steam turbine operations.
The document summarizes a proposed demonstration project to collect long-term data on the behavior of high burnup nuclear fuel in dry storage. It discusses the history of previous low burnup demonstrations, regulatory concerns about high burnup fuel storage and transportation, and the project plan. The demonstration would load high burnup fuel into a dry storage cask and monitor it over 10+ years to confirm integrity and provide data to support long-term licensing. It outlines the participants, timeline, and deliverables through 2018 with examination of the fuel to occur later.
SENTRO Technologies provides online chemical cleaning services to refineries and petrochemical plants to remove fouling from furnaces and heat exchangers. Their SENTROMAX process uses dry chemical granules applied through existing openings to clean radiant and convection sections of furnaces during normal operation, avoiding production shutdowns. This non-abrasive method increases thermal efficiency, reduces fuel consumption and emissions, and lowers corrosion compared to traditional offline mechanical cleaning. Case studies demonstrate benefits like lower temperatures, increased production rates, and payback periods of 2-12 weeks.
This document is a curriculum vitae for Moustafa Mohamed Khamis. It provides personal details such as his name, date of birth, contact information, education history, work experience, skills, and training. He has worked as an RCM Technician at Nile Sugar Company since 2013 and previously held roles as a Senior Utility Operator at Nile Sugar and Alex Carbon Black. His responsibilities have included equipment operation, maintenance, and ensuring proper plant operations. He has computer skills in Microsoft Office and experience with quality management systems and maintenance training.
This document contains test cases for validating requirements for a system. It includes:
1) A test case to verify the power-up state of the system by powering on and ensuring no unexpected actions occur and the display goes to the top category screen.
2) A test case to verify the off state by powering off during a blending operation and ensuring the blender returns to home position with no unexpected activations when powering back on.
3) A test case to verify locking functionality by setting temperature conditions to trigger an error, ensuring the expected error message appears with a check button, and expired products are shown.
Many enterprise mobility manufacturers use military
standards as a guide to ensure their devices can
withstand the challenges of a varying work place.
Military standards include numerous tests with
strict parameters used to simulate how a mobile
device will operate under environmental stress.
Similar to Importance of Temperature mapping study in the Middle East (20)
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...shadow0702a
This document serves as a comprehensive step-by-step guide on how to effectively use PyCharm for remote debugging of the Windows Subsystem for Linux (WSL) on a local Windows machine. It meticulously outlines several critical steps in the process, starting with the crucial task of enabling permissions, followed by the installation and configuration of WSL.
The guide then proceeds to explain how to set up the SSH service within the WSL environment, an integral part of the process. Alongside this, it also provides detailed instructions on how to modify the inbound rules of the Windows firewall to facilitate the process, ensuring that there are no connectivity issues that could potentially hinder the debugging process.
The document further emphasizes on the importance of checking the connection between the Windows and WSL environments, providing instructions on how to ensure that the connection is optimal and ready for remote debugging.
It also offers an in-depth guide on how to configure the WSL interpreter and files within the PyCharm environment. This is essential for ensuring that the debugging process is set up correctly and that the program can be run effectively within the WSL terminal.
Additionally, the document provides guidance on how to set up breakpoints for debugging, a fundamental aspect of the debugging process which allows the developer to stop the execution of their code at certain points and inspect their program at those stages.
Finally, the document concludes by providing a link to a reference blog. This blog offers additional information and guidance on configuring the remote Python interpreter in PyCharm, providing the reader with a well-rounded understanding of the process.
Advanced control scheme of doubly fed induction generator for wind turbine us...IJECEIAES
This paper describes a speed control device for generating electrical energy on an electricity network based on the doubly fed induction generator (DFIG) used for wind power conversion systems. At first, a double-fed induction generator model was constructed. A control law is formulated to govern the flow of energy between the stator of a DFIG and the energy network using three types of controllers: proportional integral (PI), sliding mode controller (SMC) and second order sliding mode controller (SOSMC). Their different results in terms of power reference tracking, reaction to unexpected speed fluctuations, sensitivity to perturbations, and resilience against machine parameter alterations are compared. MATLAB/Simulink was used to conduct the simulations for the preceding study. Multiple simulations have shown very satisfying results, and the investigations demonstrate the efficacy and power-enhancing capabilities of the suggested control system.
Design and optimization of ion propulsion dronebjmsejournal
Electric propulsion technology is widely used in many kinds of vehicles in recent years, and aircrafts are no exception. Technically, UAVs are electrically propelled but tend to produce a significant amount of noise and vibrations. Ion propulsion technology for drones is a potential solution to this problem. Ion propulsion technology is proven to be feasible in the earth’s atmosphere. The study presented in this article shows the design of EHD thrusters and power supply for ion propulsion drones along with performance optimization of high-voltage power supply for endurance in earth’s atmosphere.
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...PriyankaKilaniya
Energy efficiency has been important since the latter part of the last century. The main object of this survey is to determine the energy efficiency knowledge among consumers. Two separate districts in Bangladesh are selected to conduct the survey on households and showrooms about the energy and seller also. The survey uses the data to find some regression equations from which it is easy to predict energy efficiency knowledge. The data is analyzed and calculated based on five important criteria. The initial target was to find some factors that help predict a person's energy efficiency knowledge. From the survey, it is found that the energy efficiency awareness among the people of our country is very low. Relationships between household energy use behaviors are estimated using a unique dataset of about 40 households and 20 showrooms in Bangladesh's Chapainawabganj and Bagerhat districts. Knowledge of energy consumption and energy efficiency technology options is found to be associated with household use of energy conservation practices. Household characteristics also influence household energy use behavior. Younger household cohorts are more likely to adopt energy-efficient technologies and energy conservation practices and place primary importance on energy saving for environmental reasons. Education also influences attitudes toward energy conservation in Bangladesh. Low-education households indicate they primarily save electricity for the environment while high-education households indicate they are motivated by environmental concerns.
Generative AI Use cases applications solutions and implementation.pdfmahaffeycheryld
Generative AI solutions encompass a range of capabilities from content creation to complex problem-solving across industries. Implementing generative AI involves identifying specific business needs, developing tailored AI models using techniques like GANs and VAEs, and integrating these models into existing workflows. Data quality and continuous model refinement are crucial for effective implementation. Businesses must also consider ethical implications and ensure transparency in AI decision-making. Generative AI's implementation aims to enhance efficiency, creativity, and innovation by leveraging autonomous generation and sophisticated learning algorithms to meet diverse business challenges.
https://www.leewayhertz.com/generative-ai-use-cases-and-applications/
Applications of artificial Intelligence in Mechanical Engineering.pdfAtif Razi
Historically, mechanical engineering has relied heavily on human expertise and empirical methods to solve complex problems. With the introduction of computer-aided design (CAD) and finite element analysis (FEA), the field took its first steps towards digitization. These tools allowed engineers to simulate and analyze mechanical systems with greater accuracy and efficiency. However, the sheer volume of data generated by modern engineering systems and the increasing complexity of these systems have necessitated more advanced analytical tools, paving the way for AI.
AI offers the capability to process vast amounts of data, identify patterns, and make predictions with a level of speed and accuracy unattainable by traditional methods. This has profound implications for mechanical engineering, enabling more efficient design processes, predictive maintenance strategies, and optimized manufacturing operations. AI-driven tools can learn from historical data, adapt to new information, and continuously improve their performance, making them invaluable in tackling the multifaceted challenges of modern mechanical engineering.
Gas agency management system project report.pdfKamal Acharya
The project entitled "Gas Agency" is done to make the manual process easier by making it a computerized system for billing and maintaining stock. The Gas Agencies get the order request through phone calls or by personal from their customers and deliver the gas cylinders to their address based on their demand and previous delivery date. This process is made computerized and the customer's name, address and stock details are stored in a database. Based on this the billing for a customer is made simple and easier, since a customer order for gas can be accepted only after completing a certain period from the previous delivery. This can be calculated and billed easily through this. There are two types of delivery like domestic purpose use delivery and commercial purpose use delivery. The bill rate and capacity differs for both. This can be easily maintained and charged accordingly.
Software Engineering and Project Management - Introduction, Modeling Concepts...Prakhyath Rai
Introduction, Modeling Concepts and Class Modeling: What is Object orientation? What is OO development? OO Themes; Evidence for usefulness of OO development; OO modeling history. Modeling
as Design technique: Modeling, abstraction, The Three models. Class Modeling: Object and Class Concept, Link and associations concepts, Generalization and Inheritance, A sample class model, Navigation of class models, and UML diagrams
Building the Analysis Models: Requirement Analysis, Analysis Model Approaches, Data modeling Concepts, Object Oriented Analysis, Scenario-Based Modeling, Flow-Oriented Modeling, class Based Modeling, Creating a Behavioral Model.
Digital Twins Computer Networking Paper Presentation.pptxaryanpankaj78
A Digital Twin in computer networking is a virtual representation of a physical network, used to simulate, analyze, and optimize network performance and reliability. It leverages real-time data to enhance network management, predict issues, and improve decision-making processes.
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELijaia
As digital technology becomes more deeply embedded in power systems, protecting the communication
networks of Smart Grids (SG) has emerged as a critical concern. Distributed Network Protocol 3 (DNP3)
represents a multi-tiered application layer protocol extensively utilized in Supervisory Control and Data
Acquisition (SCADA)-based smart grids to facilitate real-time data gathering and control functionalities.
Robust Intrusion Detection Systems (IDS) are necessary for early threat detection and mitigation because
of the interconnection of these networks, which makes them vulnerable to a variety of cyberattacks. To
solve this issue, this paper develops a hybrid Deep Learning (DL) model specifically designed for intrusion
detection in smart grids. The proposed approach is a combination of the Convolutional Neural Network
(CNN) and the Long-Short-Term Memory algorithms (LSTM). We employed a recent intrusion detection
dataset (DNP3), which focuses on unauthorized commands and Denial of Service (DoS) cyberattacks, to
train and test our model. The results of our experiments show that our CNN-LSTM method is much better
at finding smart grid intrusions than other deep learning algorithms used for classification. In addition,
our proposed approach improves accuracy, precision, recall, and F1 score, achieving a high detection
accuracy rate of 99.50%.
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 08 Doors and Windows.pdf
Importance of Temperature mapping study in the Middle East
1. www.temperaturemonitoringuae.com
Vacker LLC l PO Box 92438 l Dubai l UAE Part of VackerGlobal Group
Phone : (+971) 4 2 66 11 44 l Fax : (+971) 4 2 66 11 55 Our offices : UAE (Corp. Office), India, Oman , Kuwait, USA
email:sales.uae@vackerglobal.com www.vackerglobal.com
Importance of Temperature mapping study in the Middle East
The Middle East countries go through extreme climatic
conditions with temperature crossing 50 Degree Centigrade
during peak of summer. The external temperature and
atmospheric conditions affect the temperature of ware
houses, cold room, vans, trucks, reefers etc. which are used
for storage and distribution of medicines. The Middle East
countries referred here are generally United Arab Emirates,
Saudi Arabia, Qatar, Kuwait, Oman, Bahrain, Iran, Iraq etc.
Regulatory requirement of Temperature mapping study in the Middle East
While this is not a regulatory requirement in most of these countries, it is desirable for most of the
pharmaceutical manufacturers and distributors that a study is carried out atleast once in every three
years. The reason for recommending once in three years is that various critical parameters inside the
enclosed area keep on changing including the performance of the cooling units. Also the number and
arrangement of storage racks are changed many times which are not advisable after carrying out a
mapping study. Even adding a small rack will have its own effects in uniform temperature distribution.
Such a study need to be carried out for entire cold chain
including ware houses, cold room, vans, trucks,reefers
etc.
Do you require Temperature mapping study for
your facilities?
How do you decide whether you need to carry out the
study for your facilities? If you are dealing with
manufacture, storage and transportation of temperature
sensitive products such as medicines, vaccines, frozen or
fresh food items etc., you need to ensure that the products are always within the specified temperature
levels at all stages.
Temperature & Humidity Mapping study of Warehouse
A warehouse is affected extremely by the climatic conditions and hence it is extremely important and
essential that the mapping study is carried out in different climatic conditions such as summer and
winter in the Middle East. Aware house is typically studies for 7 days continuously in both the seasons.
It is practically difficult to carry out ware house study under different loading conditions such as empty
and full loaded conditions because the goods in the ware house will have to be moved outside. This is
generally possible only if the study is carried out immediately upon construction of the ware house. A
ware house is generally studied for a temperature range of 15 to 23 Deg C
Temperature & Humidity Mapping Study of Cold Room
2. www.temperaturemonitoringuae.com
Vacker LLC l PO Box 92438 l Dubai l UAE Part of VackerGlobal Group
Phone : (+971) 4 2 66 11 44 l Fax : (+971) 4 2 66 11 55 Our offices : UAE (Corp. Office), India, Oman , Kuwait, USA
email:sales.uae@vackerglobal.com www.vackerglobal.com
A cold room is very sensitive since the temperature has to be always maintained between 2 and 8 Deg
C. Humidity has to be maintained within a limit of 70% if not specified other wise by the medicine
manufacturers. Any corner of the room should not exceed these temperature levels and hence the
mapping is very elaborate in ascertaining the practical conditions. The test is done under two loaded
conditions viz. Partial and fully loaded conditions. Various tests done are:
• Power failure test to determine the duration for which the temperature will be maintained if power
fails
• Temperature recovery test to determine the time taken to reach the specified time limits after a
power failure
• Door opening test to determine the duration for which
a door can be kept opened without affecting the inside
temperature
• Mapping of Partially loaded (typically 60-70%) cold
room
• Mapping of Fully loaded cold room
Temperature & Humidity Mapping Study of Vans
, Reefers & trucks
The vehicles are always on the move under loaded
conditions and the inside parameters cannot be
monitored to a great extent. Hence it is very important
to analyse the inside conditions for all practical conditions and certify the vehicle. Various tests done
are:
• Power failure test to determine the duration for which the temperature will be maintained if power
fails
• Temperature recovery test to determine the time taken to reach the specified time limits after a
power failure
• Door opening test to determine the duration for which a door can be kept opened without affecting
the inside temperature
• Mapping of empty vehicle
• Mapping of Partially loaded (typically 60-70%) vehicle
• Mapping of Fully loaded vehicle
Protocol & SOP for Mapping study of Reefer truck with Thermoking
A brief of a typical procedure for a 40 ft. reefer truck fitted with Thermoking cooling unit can be viewed
at our website
Case Study : Mapping Study and Qualification of Reefer truck
Project Code of Vacker
LLC Xxxxxxxxxxxxxxx
3. www.temperaturemonitoringuae.com
Vacker LLC l PO Box 92438 l Dubai l UAE Part of VackerGlobal Group
Phone : (+971) 4 2 66 11 44 l Fax : (+971) 4 2 66 11 55 Our offices : UAE (Corp. Office), India, Oman , Kuwait, USA
email:sales.uae@vackerglobal.com www.vackerglobal.com
A cold room is very sensitive since the temperature has to be always maintained between 2 and 8 Deg
C. Humidity has to be maintained within a limit of 70% if not specified other wise by the medicine
manufacturers. Any corner of the room should not exceed these temperature levels and hence the
mapping is very elaborate in ascertaining the practical conditions. The test is done under two loaded
conditions viz. Partial and fully loaded conditions. Various tests done are:
• Power failure test to determine the duration for which the temperature will be maintained if power
fails
• Temperature recovery test to determine the time taken to reach the specified time limits after a
power failure
• Door opening test to determine the duration for which
a door can be kept opened without affecting the inside
temperature
• Mapping of Partially loaded (typically 60-70%) cold
room
• Mapping of Fully loaded cold room
Temperature & Humidity Mapping Study of Vans
, Reefers & trucks
The vehicles are always on the move under loaded
conditions and the inside parameters cannot be
monitored to a great extent. Hence it is very important
to analyse the inside conditions for all practical conditions and certify the vehicle. Various tests done
are:
• Power failure test to determine the duration for which the temperature will be maintained if power
fails
• Temperature recovery test to determine the time taken to reach the specified time limits after a
power failure
• Door opening test to determine the duration for which a door can be kept opened without affecting
the inside temperature
• Mapping of empty vehicle
• Mapping of Partially loaded (typically 60-70%) vehicle
• Mapping of Fully loaded vehicle
Protocol & SOP for Mapping study of Reefer truck with Thermoking
A brief of a typical procedure for a 40 ft. reefer truck fitted with Thermoking cooling unit can be viewed
at our website
Case Study : Mapping Study and Qualification of Reefer truck
Project Code of Vacker
LLC Xxxxxxxxxxxxxxx
4. www.temperaturemonitoringuae.com
Vacker LLC l PO Box 92438 l Dubai l UAE Part of VackerGlobal Group
Phone : (+971) 4 2 66 11 44 l Fax : (+971) 4 2 66 11 55 Our offices : UAE (Corp. Office), India, Oman , Kuwait, USA
email:sales.uae@vackerglobal.com www.vackerglobal.com
Test was carried out as per summary indicated above. All results were satisfactory. Brief details are as
under:
Summary : 2- 8 Deg C Mapping Study
1. Summary of Operational Test 1.0 ; System Start up verification:
Power switched ON and Door closed at : xxxxxxxxx , 14:36:02 hours
Time taken for first data logger to reach below 8 ° C from Ambient : 36 Minutes
Time taken for all data loggers to reach below 8 ° C from Ambient: 48 Minutes
2. Summary of Operational Test 2.0 ; Empty Load Test:
Empty load test started after stabilization at : xxxxxxxxx , 16:24:02 hours
Empty load stopped at : xxxxxxxxx, 09:33:02 hours (Total 17 hours)
Result : All data loggers remained within the range throughout the test
3. Summary of Operational Test 3.0 ; Partial Load Test:
Empty load test started after stabilization at : xxxxxxx , 12:00:02 noon
Empty load stopped at : xxxxxxxx, 16:18:02 hours (Total 4 hours)
Result : All data loggers remained within the range throughout the test
4. Summary of Operational Test 4.0 ; Fully Loaded Test:
Fully load test started after stabilization at : xxxxxxxxx , 18:09:02 hrs
Fully load test stopped at : xxxxxxxxx, 09:54:02 hrs (Total 16 hours)
Result : All data loggers remained within the range throughout the test
5. Summary of Operational Test 5.0 ; Door opening Test:
Door opened at : xxxxxxxxxxx , 14:27:02 hours
Time taken for first data logger to reach above 8 ° C : 3 Minutes
Time taken for all data loggers to reach above 8 ° C : 6 Minutes
6. Summary of Operational Test 6.0 ; Power Failure Verification:
Power switched OFF at : xxxxxxxxx , 10:06:02 hours
Time taken for first data logger to reach above 8 ° C : 21 Minutes
Time taken for all data loggers to reach above 8 ° C : 42 Minutes
7. Summary of Operational Test 7.0 ; Temperature Recovery:
Power switched OFF at : xxxxxxxxx , 11:36:02 hours
Time taken for first data logger to reach below 8 ° C : 33 Minutes
Time taken for all data loggers to reach below 8 ° C : 54 Minutes
5. www.temperaturemonitoringuae.com
Vacker LLC l PO Box 92438 l Dubai l UAE Part of VackerGlobal Group
Phone : (+971) 4 2 66 11 44 l Fax : (+971) 4 2 66 11 55 Our offices : UAE (Corp. Office), India, Oman , Kuwait, USA
email:sales.uae@vackerglobal.com www.vackerglobal.com
Detailed report and graph of the mapping study are available at our website
Please read more:
http://www.temperaturemonitoringuae.com/services/temperature-mapping-validation/cold-
chain-temperature-mapping/
http://www.temperaturemonitoringuae.com/services/temperature-qualification/