                                 strategy as transformation

                                 Strategy: a Driver of real Change and effect
                                 Strategy and Its Pitfalls
                                 your Strategy Must engage hearts and Minds
                                 your Strategy Must Dare to Challenge who you are
                                 your Strategy Must Bring Clarity to Complexity
                                 your Strategy Must Be Firm and Flexible
                                 your Strategy Must Change Conversations




2   Implement Consulting Group
Strategy aS traNSForMatIoN




Strategy: A Driver of Real                   • Today’s organisations are not iso-         too little effort on changing the busi-
Change and Effect                              lated islands. More than ever, they are    ness. to succeed, the strategy must
                                               deeply intertwined in networks with        change the conversations taking
to drive long-term value creation, it’s        suppliers, key customers, and stra-        place in the organisation.
necessary to think and act strategically.      tegic alliance partners. this calls for
as a result, the companies that perform        strategies that challenge the view of     In this article, we elaborate on these
best are the ones that manage to keep          ‘the organisation’ and strategy pro-      challenges and present what we regard
a strong strategic focus as they craft         cesses that take the complexity and       as the five essential elements of dealing
and implement their strategies.                uncertainty of the environment into       with them. we hope you will find some
                                               account. anyone who aims at fore-         practical ideas and principles to apply
this observation is also borne out by          seeing and controlling everything has     in your own approach to strategy.
a recent survey we conducted among             a good chance of ending up being se-
six hundred companies across europe.           verely disappointed. Strategies must
results show that the top companies            be both firm and flexible.
are much more sensitive to market            • The opportunities and challenges
developments and more strategically            that organisations face are many and
flexible than the lower-performing             interrelated. Sometimes they drive a
ones. however, various other surveys           company in opposite directions, and
show that it is still only around 30 per-      often they are fast moving and come
cent of companies that manage to fully         from new, unpredictable directions.
realise their strategies.                      Paradigms change, and so must stra-
                                               tegies. Strategy processes must dare        the idea in brief
this leads us to believe that many             to challenge who you are and bring
organisations today have a vast un-            clarity to complexity.                      the world has become more
realised strategic potential. But simple                                                   dynamic, complex, and globally
                                             • The organisational pyramid has
awareness that this potential exists is                                                    connected, and organisations are
                                               turned upside down. Most organisa-
not enough to release it. as the world                                                     becoming more and more
                                               tions need to perceive themselves as
changes and becomes more dynamic,                                                          knowledge-intensive.
                                               highly knowledge-intensive, with em-
complex, and globally integrated,              ployees holding opinions, viewpoints,
realising an organisation’s potential                                                      this makes strategic capability
                                               and insights valuable for the strategy
requires a new way of thinking about                                                       a key driver of long-term perfor-
                                               as well as playing a key role in its
strategy and strategic transformation.                                                     mance and value creation.
                                               implementation. this calls for stra-
                                               tegy processes that involve people
at Implement Consulting group we set                                                       however, as only around 30 per-
                                               throughout the organisation and for
out to help unleash and facilitate strate-                                                 cent of companies manage to fully
                                               strategies with the power to engage
gic transformation in the organisations                                                    achieve their strategies, a new way
                                               each individual in order to ensure a
we work with, rather than just figuring                                                    to approach strategy and strategic
                                               successful implementation.
out what their ‘right strategy’ should be.                                                 transformation is much needed.
we approach the task with humility and       • Strategy is often disconnected from
without claiming to have all the right         the organisation. Consequently, or-         For a strategy to result in real
answers, but from the feedback we get          ganisations are not aligned with the        change and effect, it turns out, it
from organisations we’ve worked with,          intents of the strategy they claim          must embody five essential ele-
we can tell that our approach to stra-         to follow. Processes like budgeting,        ments:
tegy and our way of working do result          planning, reporting, and appraisals
in real change and in lasting impact.          often focus too much on opera-              •   engage hearts and minds
                                               tions. Management focus and ways            •   Challenge who you are
when it comes to succeeding with stra-         of working do not clearly distinguish       •   Bring clarity to complexity
tegic transformation, these are some           between ‘running the business’ and          •   Be firm and flexible
important things to keep in mind:              ‘changing the business’, which in           •   Change conversations
                                               many organisations means spending




                                                                                                               Strategy & Growth   3
Strategy aS traNSForMatIoN




Strategy and Its Pitfalls                               these organisations’ needs, but the           • who are our customers?
                                                        general concepts are still applicable         • what do we deliver to them?
Understanding strategy and its pitfalls                 and useful.                                   • how do we deliver it to them?
sets the stage for the whole implemen-                                                                • what is the speed and sequence of
tation effort. It makes it possible to plan             Strategy is about answering key
                                                                                                        the strategic moves which have to be
how to succeed at formulating a value-                  questions
                                                                                                        made?
creating strategy that drives change                    For business organisations it often
and creates the effects you want.                       makes sense to distinguish between            taken together, the two levels of stra-
                                                        corporate strategy and business stra-         tegy provide the answer to how the
Strategy is about creating value                        tegy. the aim of corporate strategy is        vision is to be translated into action.
the purpose of a strategy is to trans-                  to set the direction for a portfolio of       Not all organisations have a structure
late the vision of an organisation into                 businesses. as a result, it is necessary to   where this distinction is relevant, and
actions which will enable people in                     focus on answering the following ques-        in such situations a combination of the
the organisation to create value for its                tions:                                        two can be used.
stakeholders. (See Figure 1.) It is only                • which businesses are we in and what
through the actions of individuals that                   is the rationale for this portfolio?        Strategy is about people
value is created. how value is defined                  • which corporate structure should we         organisational change and transforma-
will depend on the type of organisation                   use to manage our businesses?               tion are central to strategy develop-
and its stakeholders.                                                                                 ment and implementation. which
                                                        • what are the possible synergies
                                                          among the businesses and between            actions are most relevant and create
this link to value makes the term stra-                                                               the most value? (that is, which actions
                                                          each business and the corporate cen-
tegy applicable well beyond the military                                                              are most likely to ensure the realisation
                                                          tre?
or business contexts where it is most                                                                 of the vision?) the answer always de-
commonly used. In our experience,                       • what should our capital structure be?
                                                                                                      pends on the given circumstances—and
the concept of strategy can also be                     • how do we allocate resources
                                                                                                      when the circumstances change, so
useful in public sector or third sector                   between businesses?
                                                                                                      must the strategy.
institutions that have a vision (purpose,
values, and long-term goals) to fulfil. It              Business strategy, on the other hand,
                                                                                                      however, since strategies are created
is of course necessary to adapt some                    aims at providing the answers to four
                                                                                                      through interactions among people
of the terminology of strategy to suit                  basic questions of any organisation:
                                                                                                      within the organisation, finding the
                                                                                                      best value-creating strategy is not just
                                                                                                      a question of clear and logical analysis.
                                       strategy                                                       Strategies are rather determined as
                                       What are our business boundaries, corporate                    much by what creates meaning and
                                   1   structure, and capital structure, and how do
                                                                                                      energy for the people in the organisa-
                Vision                 we allocate resources?
                                                                                                      tion—as sketched in Figure 2—as by
                                                                                                      analysis and facts. Both of these per-
                                   2   Who are our customers?
                  =                                                                                   spectives are essential to creating a
                                                                                      action
                                                                                                      successful strategy.
           Core ideology
              Core values          3   What do we deliver to them?                      &
             Core purpose                                                             change
                                                                                                      Beware of pitfalls on the road
                                                                                                      to a successful strategy
                  +                4   how do we deliver it?
                                                                                                      to create value is to do ‘the right thing’
         envisioned future
       ten- to thirty-year bhags                                                                      well—even as challenges, opportunities,
           Vivid descriptions      5   When do we carry out which activities?
                                                                                                      and ambitions change. For an organi-
                                                                                                      sation to stay competitive and deliver
                                                                                                      sustainable value creation over time,
    Figure 1. The strategy must show how to get from vision to action                                 it must therefore constantly transform




4     Implement Consulting Group
even when the need to do so is obvious.
                                                                                                             this happens when the overall goal it-
                                                        ... creating                                         self does not create a call for action for
                                   ... changing      a common point
                                                           of view                                           the organisation, the plan does not con-
                     ... making                                                                              nect to the personal and professional
                     decisions                                            ... thinking                       goals of the people in the organisation,
                                         strategy is                                                         or the implementation has been an-
                  ... managing         about people…                                                         nounced but not followed up, leaving
                 complexity &
                   uncertainty                                               ... acting                      people with a lack of both ownership
                                                                                                             and accountability.
                                   ... creating &     ... seeing things
                                  exploring ideas       in a new light
                                                                                                             friction
                                                                                                             the fourth and last pitfall relates to not
  Figure 2. See strategy as a people process                                                                 being able to carry the strategy all the
                                                                                                             way through even when the organisa-
                                                                                                             tion has overcome its inertia enough to
itself and its strategy. Unfortunately, this        for change. when implementation re-
                                                                                                             get started. often this is attributed to
type of strategic management is not an              sults and experience are regarded as
                                                                                                             the fact that the strategy is not being
easy task, and several potential pitfalls           stand-alone data and not fed into the
                                                                                                             fully integrated and thus ends up as
lurk along the way, as outlined in                  strategy review process, the strategy
                                                                                                             something separate from the organisa-
Figure 3.                                           can be fatally weakened.
                                                                                                             tion’s day-to-day activities. other rea-
                                                                                                             sons are a lack of discipline and focus
strategy as decoration                              twisted Perspective
                                                                                                             in implementation and the reluctance
the first pitfall is the idea that a stra-          the second pitfall is the ease of incor-
                                                                                                             to share results (whether good or bad).
tegy is something you have rather than              rectly gauging the type of response
                                                                                                             when people don’t know what’s hap-
something you do. this can delay dis-               needed to address opportunities and
                                                                                                             pening with a strategy, it recedes from
covery of the need to change and thus               challenges. Many causes can lie behind
                                                                                                             sight and they tend to conclude that it
cause you to move too late. this delay              this. Some of the main ones: not
                                                                                                             doesn’t matter.
puts the strategy process under pres-               managing and chal-
sure, making it a crisis rather than an             lenging assumptions;
orderly response.                                   not balancing goals,
                                                    capabilities, and
                                                                                                                       doing the
Delay is especially likely when strategy            opportunities; hav-                                             right thing and
                                                                                                                      doing it well.      Pitfall
is seen as a yearly event (or one that              ing too many and
                                                                                                                                       strategy as
happens every two or three years) rat-              unclear goals; and                                                                 decoration
her than as a dynamic process. In that              forecasting too far
                                                                                         Pitfall
kind of environment, which is quite                 into the future given               friction
common, no one is following up from                 the uncertainty of
day to day and month to month to                    the competitive
                                                                                 doing the new                                                     discovering
review the realisation of the current               environment. In ad-          right thing, but                                                the right thing
strategy and its critical external precon-          dition, not daring to        doing it poorly                                                 is now wrong.
                                                                                     at first.
ditions.                                            make the necessary
                                                    and tough decisions
In addition, the mental maps of people              and prioritisations
in the organisation influence the way               can lead to a lack of                        Pitfall
                                                                                                                                          Pitfall
                                                                                                                                         twisted
they perceive the world and whether                 focus and clarity.                           inertia
                                                                                                                     figuring out       perspective
they see a need for change. Seeing                                                                                  what the new
                                                                                                                    right thing is.
strategy development and implementa-                inertia
tion as separate activities will increase           the third pitfall re-                 Figure 3.
the risk of not being aware of the need             lates to not acting,                  To succeed at strategy you must be aware of the pitfalls




                                                                                                                                         Strategy & Growth         5
Strategy aS traNSForMatIoN




Your Strategy Must Engage                    Change also brings uncertainty.                  process, as shown in Figure 4. this is
Hearts and Minds                             this uncertainty can take many forms:            necessary to create a process that en-
                                             unsureness about the reasons for the             gages all the individuals who will ulti-
a strategy doesn’t come about until          change, or about what it means ‘for              mately be involved.
people change their behaviours and           me personally’, or about the ability to
align their actions with the intent laid     do new things properly and correctly.            as a result, the strategy process should
out by the strategy.                                                                          be more open and allow for more in-
                                             Meanwhile, people form opinions                  volvement of the organisation than
Involve every participant as early as        early—and the more uncertain they                what is usually the case today. and
possible                                     are, the less likely they are to believe         involvement of the organisation should
                                             any change will be favourable. So                start earlier in the process than would
Most change efforts pay too little           having a strategy process that people            normally feel comfortable for most of
attention to the process required to         have heard about but do not                      who make a profession of leadership
make the strategy happen, and what           participate in will influence how the            and change (either because we feel
attention there is happens too late. the     strategy is accepted—and not for the             we should be the ones providing the
delay is built into the terminology:         better.                                          answers or because we feel that peo-
Implementation tends to be referred to                                                        ple elsewhere in the organisation lack
as ‘rolling out the strategy’, thus imply-   what this means for the approach                 sufficient competence to contribute to
ing that implementation is something         to strategy is that the strategy process         strategic thinking).
that happens at the end, after the stra-     itself and the involvement of the people
tegy is fully formulated. But making a       in the organisation are crucial to deve-         of course, these observations do not
strategy live and succeed requires more      lopment of a successful strategy. they           mean that everybody should be part of
than just a good communication plan          are just as important as the ultimate            every activity in the strategy process—
and a road show.                             content of the strategy itself, because          today’s work still has to get done today.
                                             it does not matter how well a strategy           Nonetheless, every activity should be
Creating change in today’s business          would have worked if it never gets a             considered from two perspectives: First,
organisations can’t be done by simply        chance to prove its worth.                       how does it help create a better stra-
announcing the final strategy, saying                                                         tegic direction? and second, how can
that from tomorrow we will be doing          thinking about implementation should             it be used to support the implementa-
things differently, and installing follow-   begin on the first day of the strategy           tion?
up mechanisms. this approach is more
likely to destroy motivation and energy
than to create it.

Telling and selling is not sufficient            focus

there are many reasons why telling and
selling alone will not bring success, and
most of them relate to how human indi-                                                                    strategy
                                                                                                       implementation
viduals deal with change.

For one, just processing the informa-
tion about the new strategy and under-                        strategy
standing what the implications are will                      formulation
take time. and the way many strategy
processes run today, those whose be-
haviour needs to change the most in                                                                                               time
the organisation are given the
shortest amount of time to prepare for         Figure 4.
the change.                                    You must think about making change happen right from the start of the strategy process




6   Implement Consulting Group
your message should be repeated
                                                                                             many times if it is going to stick, and all
                                         time to                     impact
                                                                                             activities should be related to the stra-
                                         prepare                     of change
                                                                                             tegy. Not because people are stupid.
       executive                                                                             Not because they are uncommitted or
       management                                                                            indifferent. Not because they by nature
                                                                                             are unwilling to change. But simply
       senior                                                                                because it is a demanding act for in-
       management                                                                            dividuals to change their actions and
                                                                                             behaviours—and this is what strategy
       team leaders                                                                          is about.


       employees


  Figure 5. Typically not enough time is allowed for change




Remember that participants need to               leaders take must be in line with what
                                                                                               IDeaS oN how to eNgage
find the strategy personally relevant            they say. you must create trust through
                                                                                               heartS aND MINDS
                                                 your communication by showing re-
Most people are engaged in their pro-
                                                 spect and by talking with the recipients
fessional life. on one hand, they want to                                                      Start strategy development with
                                                 of the message rather than just to them.
see the big picture. excellent strategy                                                        a general mind-setting activity
                                                 you have to show that you believe in
communication and involvement in cre-                                                          where you tell the organisation
                                                 the message and that the message is
ating the strategy (where relevant) sup-                                                       about the strategy process—what
                                                 important to you. It must be a message
port this process. on the other hand,                                                          will happen and what directions
                                                 from the heart—and peculiarly enough,
individuals must see how they fit in                                                           you are looking in.
                                                 you demonstrate that best by listening
and what the strategy means to them.
                                                 to others and being prepared to modify
Much of this happens most smoothly                                                             Be honest about the situation, the
                                                 it to make it something they can also be
during the strategy deployment pro-                                                            reasons, and the direction—the
                                                 passionate about.
cess, where the strategy is translated                                                         smart people in your organisation
into goals and initiatives for units and                                                       already know—and it’s best to
                                                 Stay focused—it isn’t fixed yet
individuals. In this process it is very                                                        assume they’re all smart.
important to allow room for individuals          From a top management perspective,
to interpret and understand the big pic-         strategy thinking is mentally at the top      Challenge your perception about
ture and to adapt their own story and            of the agenda early in the transforma-        who can contribute to the process.
perspectives to it. the usual situation,         tion process. It is very easy and natural     you can use up-and-coming
shown in Figure 5, more or less reverses         to reduce focus and intensity as stra-        young talent, experienced new
the ideal allocation of time.                    tegy formulation ends, but for most           hires, and directors of subsidiaries
                                                 of the organisation the process is just       as well as your usual planners.
Communicate with passion                         beginning. therefore one must establish
and authenticity                                 reinforcement activities to regain the        Focus on creating the right
                                                 focus. Campaigns initiating the next          mood and energy throughout
the communication around the
                                                 phase, consistent ongoing communi-            the process—the mood can be
strategy—both the formal sessions and
                                                 cation, and regular meetings and dia-         more important than what is on
all the informal meetings between
                                                 logues are necessary.                         the PowerPoint slides and what is
leaders and employees—must have pas-
                                                                                               being said.
sion and authenticity. the actions that




                                                                                                                  Strategy & Growth    7
Strategy aS traNSForMatIoN




Your Strategy Must Dare to                  Spend time finding the right questions          challenges are well understood.
Challenge Who You Are                       Strategies are made by people and are
                                                                                            Don’t just pick the first strategic direc-
                                            decided on because of what makes
Strategy is not about finding the easy                                                      tion that comes to mind or seems to
                                            sense and what motivates. however,
answers—it’s about finding the right                                                        present itself. Force yourself to experi-
                                            like innovation, sense-making, learning,
answers.                                                                                    ment with your thinking to spark off
                                            idea-generation, and decision processes
                                                                                            new ideas and explore the full scope of
                                            rarely move in a straight line. Neither
this means taking a good hard look at                                                       possible strategic initiatives.
                                            should the strategy process, as it de-
yourself, challenging your own normal       pends heavily on these very elements.
perceptions and assumptions about                                                           Part of this involves synthesising your
who you are as an organisation: What is                                                     knowledge and ideas into unique per-
                                            the early part of the strategy process
actually our core purpose? What busi-                                                       spectives and hypotheses about the
                                            should be focused on challenging your
ness are we really in? Has the world                                                        future. these hypotheses can then be
                                            preconceptions and assumptions by
changed and rendered us obsolete?                                                           tested through further analysis and
                                            bringing in new views and suitable
                                                                                            local experimentation in the market.
                                            disturbances—that is, challenges to
Doing this as an organisation, as op-       your traditional worldview that get
posed to as an individual, requires a                                                       In this kind of strategy process you are
                                            you thinking in new and productive
different kind of strategy process. you                                                     certainly able to set up a specific
                                            directions focus should be on
need a process that allows for the right                                                    activity plan, but cannot necessarily
                                            searching for the right perspectives
questions to be found and asked, and                                                        predetermine the timing of insights and
                                            and for the right questions to ask.
one that allows for challenging assump-                                                     final results. you will need to keep the
                                            as understanding and insight grow,
tions, learning, and adjusting both hy-                                                     strategy process flexible so it can be
                                            this phase will often bring ‘eureka
potheses and goals along the way.                                                           adjusted to support new ideas and di-
                                            moments’. the aim is to ensure that the
                                                                                            rections as they develop.
                                            current situation, opportunities, and
one way to do this is to treat your
strategy as an innovation process: a
process of exploration, experiments,
and challenges to key assumptions, as
well as logic and structured creati-
vity. avoid attempting to force strategy
development into a linear process—as
with other forms of innovation, it is
often necessary to loop back and incor-
porate new learning.                                                          analysis

this does not mean that the final stra-                                                            Visioning
tegy in itself always has to be ground-
breaking and radically different from its
predecessor. Its content should be dic-
tated by the situation and the particular                                         Challenging
circumstances surrounding it. Perhaps                                             assumptions
your existing strategy already is the
best and most innovative approach—
that’s always a comfort to believe, but
                                                                             navigating social and
you won’t know unless you challenge it
                                                                              political interaction
properly.



                                              Figure 6. To succeed you must be able to combine four distinct competences




8   Implement Consulting Group
Use the innovation approach to avoid      Use creative tension between facts and
decision traps and manage uncertainty     assumptions to develop new ideas             IDeaS oN how to ChalleNge
                                                                                       who yoU are
In a traditional problem-solving and      treating your strategy as an innovation
linear approach to strategy, we often     process requires combining and balan-
                                                                                       Use hypotheses to plan and
see organisations get caught in some      cing four distinct competences: analy-
                                                                                       drive activities. this will allow for
of the following traps:                   sis, visioning, challenging assumptions,
                                                                                       planning to take place without
                                          and navigating social and political inter-
                                                                                       being locked into one direction
• attaching too much importance to        actions. (See Figure 6.)
                                                                                       too early. Be ready to change your
  initial thoughts and data.
                                                                                       hypotheses as understanding
• giving too much weight to the cur-      analysis can provide objective data,
                                                                                       grows.
  rent situation because it feels more    which forms a foundation for challen-
  comfortable than the unknown future.    ging assumptions by painting a clear
                                                                                       try out new settings for the
• Posing questions the wrong way and      and factual picture of the situation.
                                                                                       strategy process.
  thus looking in the wrong direction     Creative tension between the data
  for the answers.                        from analysis and the assumptions can
                                                                                       Create a suitable disturbance by
                                          stimulate fresh and innovative thinking.
• Seeing what you want to see and                                                      bringing customers, partners,
                                          these new ideas and possible future
  making evidence fit with your precon-                                                employees, and other stakeholders
                                          directions can in turn be subjected to
  ceived notions.                                                                      into the process.
                                          analysis for a reality check. this process
                                          is often iterative, going back and forth
treating strategy as an innovation                                                     Create a suitable disturbance by
                                          between formulating and testing ideas
process enhances uncertainties and                                                     appointing a person who always
                                          and solutions.
complexities that affect strategy deve-                                                asks what-if questions to ensure
lopment in most organisations today. It                                                that all aspects of the strategy are
                                          From beginning to end, you must
is uncomfortable but useful to recog-                                                  being looked at.
                                          be able to understand and navigate
nize the uncertainties relating to the
                                          through the social and political interac-
competitive environment and to what is
                                          tions in the organisation. this will allow
perceived to be the opportunities and
                                          you to facilitate the strategy process in
challenges, and also those related to
                                          the cultural context of the organisation,
the understanding, assumptions, and
                                          so it keeps moving forward and ensures
goals of the organisation.
                                          that constructive decisions are being
                                          made.




                                                                                                          Strategy & Growth    9
Strategy aS traNSForMatIoN




Your Strategy Must Bring                          the organisation. It focuses attention on   you need to understand what capabili-
Clarity to Complexity                             core issues and not just symptoms, and      ties would give you a competitive edge
                                                  it allows you to move decisively and        in pursuing opportunities in your mar-
a strategy serves as a guide. to suc-             with commitment.                            ket, and to know which ones you cur-
ceed, it must show how to translate                                                           rently have as well as which ones you
vision into real action, creating insight         Determining what the core issues are        can develop in the future. this requires
and deep understanding of the market              requires knowledge of your organisa-        a clear insight into your business model,
and of your own organisation. It also             tion, your business, and your market.       including the critical drivers of custom-
must tell a clear and compelling story            and it requires a willingness to face the   er value and business economics.
about how to get where you want to                facts of your current situation. acting
go, and it must bring clarity to the dy-          decisively requires an understanding of     Determine what possibilities the
namic and complex setting in which                what needs to be done and a willing-        market presents and whether a good
your organisation—if it is like most              ness to do it, both individually and as     return can be made by pursuing
organisations today—must live and                 an organisation.                            them—and what challen-ges may block
compete.                                                                                      your attempt to capitalise on those
                                                  Create a balance between goals, capa-       possibilities. Identifying opportunities
to create this clarity requires a strategy        bilities, opportunities, and challenges     takes good knowledge of market
that is strong, balanced, and simple—all                                                      structure and development as well
                                                  having a balanced strategy is about
at the same time.                                                                             as of competitor strategies; truly
                                                  creating a fit among goals, capabilities,
                                                                                              understanding the challenges requires
                                                  opportunities, and challenges.
Focus on the core issues and act                                                              the same level of knowledge.
decisively                                        Clear and shared goals are necessary
                                                                                              Strategy development can start at any
what makes a strategy strong? you can             to evaluate which opportunities are
                                                                                              of the three points of the triangle in
recognise a strong strategy because               relevant and which capabilities to build.
                                                                                              Figure 7. to achieve a realistic and co-
it provides for a powerful response to            that means that you must determine
                                                                                              herent strategy, however, all of them
the opportunities and challenges facing           what it is you really want to achieve, as
                                                                                              must be covered by the end.
                                                  sketched in Figure 7.




                                          goals




                                         balance


     Capabilities                                                    opportunities/
                                                                      Challenges

  Figure 7. A good strategy requires balance




10   Implement Consulting Group
n
                                                                                                     n




                                                                                                                           tio
                                                                                                   io
                                                                            s
                                                                          ea




                                                                                                at




                                                                                                                         ta
                es




                                                                                              ic
                                           ls




                                                                        ar




                                                                                                                       en
                                         oa




                                                                                            un
               su




                                                                         s




                                                                                                                     em
                                                                      cu
                                        G




                                                                                           m
             Is




                                                                                          m
                                                                    Fo




                                                                                                                    pl
                                                                                        Co




                                                                                                                  Im
     focus on the                reduce the                select a few              Keep messages           reduce the number
     core issues                 number of goals           must-win-battles          clear and simple        of parallel initiatives




  Figure 8. Simplify your goals, your communication and your plan




Simplify your goals, your communica-             the strategy by creating a clear yet
                                                                                                 IDeaS oN how to BrINg
tion, and your plan                              strong message around the central
                                                                                                 ClarIty to CoMPlexIty
                                                 story line of the strategy, explaining
Simplicity in a strategy is important be-
                                                 what needs to be done to achieve the
cause too much complexity interferes                                                             Keep asking questions to make
                                                 strategic goals.
with implementation. the road to stra-                                                           sure you get to the core of an
tegic simplicity is illustrated in Figure       • third, simplify the implementation             issue.
8. Keeping a strategy simple requires             plan and make sure that projects and
focus on three different areas:                   initiatives not directly supporting the        Use simulations, games, and
                                                  strategy are not allowed to obscure            role-playing to explore different
• First, make the strategy itself as              the view of what needs to be done.             scenarios and test your strategy.
  simple as possible by reducing the              Make roles and responsibilities for            test consequences, market
  number of goals and initiatives and             leading key transformation initiatives         reactions, feasibility, and goals to
  focusing on a few key must-win                  clear and well-known.                          see if your strategy is balanced.
  battles. Make sure that the strategy
  has a clear story line with an inner          the key to successfully simplifying your         Use visualisation (pictures,
  logic from actions to goals.                  strategy is to have consistency between          diagrams, sculptures, movies,
                                                what you want to do, what you say you            and the like) rather than just text
• Second, simplify communication of
                                                will do, and what you actually do.               to describe and express your
                                                                                                 strategy.

                                                                                                 Make a list of the kinds of things
                                                                                                 your organization has done in
                                                                                                 the past but will not do in the
                                                                                                 future. this will help keep focus on
                                                                                                 execution of the new strategy.




                                                                                                                    Strategy & Growth 11
Strategy aS traNSForMatIoN




Your Strategy Must Be Firm                    ignition of a change or adaptation can              complish this, the strategic plan should
and Flexible                                  be a major event (new competitor en-                consider various scenarios, be carried
                                              tering the market, a new technology, a              out frequently, focus on creating stra-
Modern organisations operate in a             new acquisition proposal, or the like), or          tegic agility and resource fluidity, and
complex and dynamic world where it            it can involve several smaller internal or          include strategic options that can be
is rarely possible to predict what the        external actions building up to a tipping           brought into place depending on how
future will bring. Nonetheless, it is still   point that forces (or allows) the com-              the situation develops. the ability to
necessary to think and act strategically      pany to act.                                        identify new signals from the environ-
to keep from floundering in the cross-                                                            ment (customers, competitors, part-
currents.                                     A flexible strategy requires both                   ners, regulators, and so on), learn from
                                              an adaptable plan and an agile                      them, and act fast (that is, allocate time
Strategy is both planned and emergent         organisation                                        and resources promptly and appropri-
                                                                                                  ately), is what makes an organisation
when most organisations look back             Because you need both adaptability
                                                                                                  agile and good at managing emergent
over the last three to five years, they       and agility, being excellent in strategic
                                                                                                  strategy.
will discover that two main sources are       management is not only about being
contributing to the state of their cur-       able to foresee, plan, and execute; it is
                                                                                                  Match your strategy approach to the
rent strategy: executing the actions of       also about sensing, discovering, and
                                                                                                  uncertainty you face
the original strategic plan and reacting      responding. Furthermore, strategy must
to unforeseen situations that emerged         be seen not as something generated                  Determining the right balance between
during the execution phase. Figure 9          once every two or three years but as                how much to plan and in how much
sketches the whole dynamic system.            a dynamic and continuous process.                   detail, and how much room to leave for
                                                                                                  emergence and adaptation, requires a
the planned strategy is typically de-         Successfully creating an adaptable                  good understanding of your competi-
veloped through a formal strategy             strategy requires making the strategic              tive environment as well as a thought-
process, where the aim is to arrive at in-    plan flexible enough to avoid being                 ful balance of the need for flexibility
tended strategic goals, a direction, and      locked into a set of actions which can-             against the extra costs (in the form of
a plan. often this formal strategy pro-       not easily be changed. It also requires             added communication and coordina-
cess is cyclical and carried out at fixed     gearing the organisation as a whole to              tion) that increased flexibility carries
intervals; in the best cases it is deeply     be better at responding to emerging                 with it. It is especially important to
integrated with other cyclical processes      opportunities and challenges. to ac-                understand the degree of complexity,
like board and management meetings,
budgeting, and performance apprai-
sals. the planned strategy is what most
                                                                                                                             strategy
organisations know best, and is what                                                                                      through action
management literature and models
typically describe when defining the
                                                                                                              emergent
concept of strategy.                                                                            emergent       strategy
                                                                                              opportunities
                                                                                               and threats
In contrast, the emergent part of the
realised strategy is cumulative and                   strategic
                                                     intent – the                                                             strategic
grows from the individual actions and                 desirable                                                               outcomes
decisions made by people in the or-                     future                  Unfulfilled
                                                                                strategies
ganisation when they react to new and
previously unknown opportunities and
challenges. the emergent strategy is
often less formal and is in large part
determined by the way the organisation                                                strategic learning
learns, that is, the culture, structures,
                                                Figure 9. Strategy is a dynamic process
and decision-making processes. the




12   Implement Consulting Group
Challenging                      Characteristics of the                  How to approach                        How to express
 assumptions                      competitive environment                 strategy                               the strategy

 A relatively clear future        it is relatively easy to predict the    SENSE > CATEGORISE > RESPOND           Long-term plan which lays out how
                                  future development for the industry                                            to implement the strategy.
                                                                          fact based management.
                                  value drivers.
                                                                          Use of best practices.
                                  Cause-and-effect relationships are      Clear communication.
                                  repeatable, perceivable, and pre-       ensure that proper processes are
                                  dictable.                               in place.

 Complicated – with dis-          it is possible to determine a limited   SENSE > ANALYSE > RESPOND              short-term plan split into
 tinct possible futures           set of clear and mutually exclusive                                            campaigns with frequent/periodic
                                                                          expert diagnosis.
                                  future scenarios for the industry.                                             reviews and adjustments.
                                                                          Listen to conflicting advice.
                  a               Cause-and-effect separate over          scenario planning and systems
                  b
                  C               space and time, but can be deter-       thinking.
                                  mined.

 Complex – with a range           it is not possible to define distinct   PROBE > SENSE > RESPOND                short-term plan split into cam-
 of possible futures              and mutually exclusive scenarios.                                              paigns with frequent or periodic
                                                                          Create experiments that allow
                                  Cause-and-effect are only coherent                                             reviews and adjustments.
                                                                          patterns to emerge.
                                  in retrospect.                          increase levels of interaction and     increase focus on rules and guiding
                                                                          use methods that can generate          principles rather than plans and
                                                                          ideas.                                 fixed processes.

 True ambiguity and               the future is unknown, and it is not    ACT > SENSE > RESPOND                  Create an organisation which is
 chaos                            possible to identify clear scenarios.                                          able to react in the right manner in
                                                                          Look for what works instead of
                                  no clear cause-and-effect relation-                                            any given situation.
                                                                          seeking right answers.
                                  ships, and the drivers of future        take immediate action to re-           establish simple rules and guiding
              ?                   market development might not be         establish order.                       principles for how to make deci-
                                  known.                                  Clear and direct communication.        sions.

  Figure 10. Complexity and uncertainty play a significant role for your strategy




uncertainty, and speed of change that              Ultimately things may become so                        IDeaS oN how to MaKe yoUr
you face, as these factors heavily influ-          complex and ambiguous that it is not                   Strategy FIrM aND FlexIBle
ence the decision on how to approach               possible to form a clear picture of any
the development and execution of a                 possible future—neither by analysis                    Use scenario planning to create
strategy.                                          nor by probing. at that point, strategy                enhanced understanding of the
                                                   is a matter of developing the ability                  possible futures of your industry
when the future is relatively clear and            to quickly understand and respond                      and to prepare for them.
easy to predict, strategy becomes a                to events in the environment. Fast
matter of determining the most prob-               learning and agility are keys to building              establish strategic initiatives
able future and reacting as though it              a sustainable competitive advantage in                 focusing on creating an increased
was a certainty, as shown in the first             such situations.                                       freedom to act by removing
row of Figure 10.                                                                                         constraints (which may involve
                                                   generally we believe that organisa-                    financing, legislation, structural
the greater the uncertainty and com-               tions must prepare for an increasing                   or contractual relationships, or
plexity of the competitive environment,            degree of uncertainty and adjust their                 capabilities).
the greater the number of possible fu-             strategic processes accordingly. an im-
tures. as future possibilities proliferate,        portant and often very challenging part                Increase the number of forward-
strategy development needs to focus                of this is to achieve the right mind-set,              looking indicators in management
more and more on efforts to under-                 stepping away from the planning and                    reports.
stand these possible futures and spot              control that have long been praised as
which one is actually playing out.                 virtues of business and management.                    Don’t ever think, ‘we have finally
                                                                                                          got it right!’




                                                                                                                              Strategy & Growth 13
Strategy aS traNSForMatIoN




Your Strategy Must Change                          you’ll just have one more binder for the       Create momentum around your new
Conversations                                      might-have-been-a-good-idea collec-            strategy
                                                   tion.
                                                                                                  a key element in getting your strategy
Strategy is not just planning, it is also                                                         going is providing symbolic actions and
implementation. without implementa-                a strategy ought to be integrated into
                                                                                                  quick wins early in the transformation
tion value cannot be created, and that             the organisation, and eventually every-
                                                                                                  process. early results not only demon-
means you must make your strategy                  thing should be aligned with the stra-
                                                                                                  strate the benefit of the strategy, they
real and urgent to everyone in the or-             tegy in some way. however, this does
                                                                                                  demonstrate your new strategic focus
ganisation.                                        not always happen as planned, for a
                                                                                                  and commitment to the new way of
                                                   number of reasons. For one, it can be
                                                                                                  working.
Make your strategy live every day                  difficult to keep up the momentum in
                                                   the transition from the first stages of
to make your strategy come alive and                                                              the symbolic actions can be anything
                                                   strategy development through the final
keep living every day, you must change                                                            from buying another company to say-
                                                   stages of strategy implementation—it’s
the conversations at all levels in your or-                                                       ing no to a specific customer because
                                                   easy to grow weary before the new
ganisation. Pursuing a different strategy                                                         your strategic focus is being shifted to
                                                   ways become routine.
means having different conversations                                                              other products.
tomorrow—not instant replays of the                also, the strategy often represents
ones you are having today.                                                                        In addition, making your early actions
                                                   something new—which requires change
                                                                                                  irreversible and public will help to show
                                                   that can be difficult to get going. and
It is not just the conversations within in                                                        the intent and commitment backing the
                                                   new endeavours represent a degree of
your organisation that must change; the                                                           new strategy. one way to do this is to
                                                   risk that add to the difficulties of ma-
ones with your customers and partners                                                             make external commitments in a series
                                                   king change happen. Finally, the organi-
need to change too. and the change                                                                of campaigns that require you to suc-
                                                   sation may have structures—processes,
of conversation should concern not                                                                ceed with the new strategy, as shown in
                                                   procedures, and It systems—that keep
only the topics but also the setting, the                                                         Figure 11.
                                                   making people act according to the
words that you use, and the mood.                  old strategy. overcoming these hurdles
                                                                                                  to keep the momentum going, it is im-
                                                   requires a dedicated effort and strong
If what you talk about and how you                                                                portant to share results broadly in the
                                                   leadership.
talk about it stay the same, your new                                                             organisation so that everybody can see
strategy will never really be adopted.                                                            that things are moving along and learn




                                                           strategy execution through campaigns

                                                                                                                                major
                                                                                                                                strategy
                                                                                                                                review
     strategy                                   review                                  review                                  and
     develop-    mobilise    act and manage     and         mobilise   act and manage   and         mobilise   act and manage   update
     ment                                       adapt                                   adapt                                   (~ new
                                                                                                                                strategy
                                                                                                                                develop-
                                                                                                                                ment)




                              Campaign a                                 Campaign b                             Campaign C
                               4–12 months                               4–12 months                             4–12 months




     Figure 11. Use time-boxed campaigns to ensure quick results and frequent reviews




14     Implement Consulting Group
the business’ and        aligning these structures with your
                                                                        the other around         strategy therefore is the key to making
                                                                        ‘developing the          sure you can realise your strategy.
                                                                        business’—to cre-
                           organisational
                             structure                                  ate the necessary        of course, changing the basic struc-
                                                                        attention on stra-       tures of an organisation takes time and
                                                                        tegic issues.            cannot be completed on day one, but
                                                  management                                     it must be done as quickly as possible.
      Workspace                                       and                 the appraisal and      as with performance appraisal, if this
       design                                     governance
                                People,
                                                                          performance ma-        doesn’t happen, the surviving struc-
                                                   structure
                              values, and                                 nagement systems       tures will keep pushing actions and
                                culture                                   are other areas        behaviours toward the old strategy,
                                                                          where conversa-        making it difficult for people to follow
                                                                          tions should be        the intentions of the new strategy. and
                                                                          shifted to include     after a while they will give up trying.
              Competences
                                           operational                    the strategy. goals
                                            processes                     related to the new
                                                                          strategy must
                                                                          quickly be inclu-
                                                                          ded in corporate
  Figure 12.                                                              performance
  Aligning structures with strategy is important for long-term success    management
                                                                          systems to be
                                                                          visible and part
                                                                                                   IDeaS oN how to ChaNge
from the examples. this also means                                        of the manage-
                                                                                                   CoNverSatIoNS
that both good and bad results should              ment conversations. as noted earlier,
be shared—if something isn’t working,              these systems can put a serious drag
                                                                                                   Change your budgeting cycle and
you won’t be able to keep the secret,              on implementation—as long as you pay
                                                                                                   structure to support the flow and
and attempting to do so will both make             people to carry out the old strategy,
                                                                                                   timing of your strategy.
you look foolish when the word gets                that’s what you’ll get. Instead, individual
out and deprive you of the contribu-               goal-setting sessions on all levels in the
                                                                                                   Make tools and templates to guide
tions people could make towards fixing             organisation should be anchored in the
                                                                                                   the goal-setting sessions where
the problem and getting the strategy               new strategy so that everybody can see
                                                                                                   the new strategy is translated
back on track.                                     how they contribute to making it hap-
                                                                                                   into team and individual goals.
                                                   pen.
                                                                                                   hold introduction sessions for
Keep focus on the strategy                                                                         managers and consider the use
                                                Clear roles and responsibilities for dri-
                                                                                                   of role-playing to illustrate how
to stay alive, the strategy must be a           ving the main strategic initiatives will
                                                                                                   to bring the new strategy into the
natural part of the conversations in            provide the organisation with a number
                                                                                                   conversations.
your organisation. In the beginning this        of ‘champions’ whose actions will serve
requires a conscious effort, as the stra-       as examples of what to do in order to
                                                                                                   Include at least two new goals
tegy is new and unfamiliar.                     realise the strategy.
                                                                                                   related to the strategy in business
                                                                                                   unit performance reports—even if
the conversations must be ritualised            Align organisational structures with
                                                                                                   measuring them has to be done
until it becomes more natural. one              your strategy
                                                                                                   manually at first.
way to do this is to ensure that enough
management time is spent on reali-              one of the main drivers of action
                                                and focus in any organisation are the              Set up new decision-making
sing the strategy. For example, you can
                                                structures (processes, procedures, It              forums centred around the key
divide management meetings into two
                                                systems, and so on) that support them.             focus areas of your strategy.
separate themes—one around ‘running




                                                                                                                     Strategy & Growth 15
Contact
For further information please contact:

Michael Braagaard
tel. +45 2338 0010
email mib@implement.eu

lars Kirkegård
tel. +45 2338 0011
email lk@implement.eu




implement Consulting group a/s
slotsmarken 16                   tel. +45 4586 7900   info@implement.eu
dK-2970 hørsholm                 fax +45 4586 7950    www.implement.eu

Strategy as Transformation

  • 1.
    Strategy as Transformation Strategy& growth Challenge your View of Strategy as a Driver of Real Change and Effect
  • 2.
    Contents strategy as transformation Strategy: a Driver of real Change and effect Strategy and Its Pitfalls your Strategy Must engage hearts and Minds your Strategy Must Dare to Challenge who you are your Strategy Must Bring Clarity to Complexity your Strategy Must Be Firm and Flexible your Strategy Must Change Conversations 2 Implement Consulting Group
  • 3.
    Strategy aS traNSForMatIoN Strategy:A Driver of Real • Today’s organisations are not iso- too little effort on changing the busi- Change and Effect lated islands. More than ever, they are ness. to succeed, the strategy must deeply intertwined in networks with change the conversations taking to drive long-term value creation, it’s suppliers, key customers, and stra- place in the organisation. necessary to think and act strategically. tegic alliance partners. this calls for as a result, the companies that perform strategies that challenge the view of In this article, we elaborate on these best are the ones that manage to keep ‘the organisation’ and strategy pro- challenges and present what we regard a strong strategic focus as they craft cesses that take the complexity and as the five essential elements of dealing and implement their strategies. uncertainty of the environment into with them. we hope you will find some account. anyone who aims at fore- practical ideas and principles to apply this observation is also borne out by seeing and controlling everything has in your own approach to strategy. a recent survey we conducted among a good chance of ending up being se- six hundred companies across europe. verely disappointed. Strategies must results show that the top companies be both firm and flexible. are much more sensitive to market • The opportunities and challenges developments and more strategically that organisations face are many and flexible than the lower-performing interrelated. Sometimes they drive a ones. however, various other surveys company in opposite directions, and show that it is still only around 30 per- often they are fast moving and come cent of companies that manage to fully from new, unpredictable directions. realise their strategies. Paradigms change, and so must stra- tegies. Strategy processes must dare the idea in brief this leads us to believe that many to challenge who you are and bring organisations today have a vast un- clarity to complexity. the world has become more realised strategic potential. But simple dynamic, complex, and globally • The organisational pyramid has awareness that this potential exists is connected, and organisations are turned upside down. Most organisa- not enough to release it. as the world becoming more and more tions need to perceive themselves as changes and becomes more dynamic, knowledge-intensive. highly knowledge-intensive, with em- complex, and globally integrated, ployees holding opinions, viewpoints, realising an organisation’s potential this makes strategic capability and insights valuable for the strategy requires a new way of thinking about a key driver of long-term perfor- as well as playing a key role in its strategy and strategic transformation. mance and value creation. implementation. this calls for stra- tegy processes that involve people at Implement Consulting group we set however, as only around 30 per- throughout the organisation and for out to help unleash and facilitate strate- cent of companies manage to fully strategies with the power to engage gic transformation in the organisations achieve their strategies, a new way each individual in order to ensure a we work with, rather than just figuring to approach strategy and strategic successful implementation. out what their ‘right strategy’ should be. transformation is much needed. we approach the task with humility and • Strategy is often disconnected from without claiming to have all the right the organisation. Consequently, or- For a strategy to result in real answers, but from the feedback we get ganisations are not aligned with the change and effect, it turns out, it from organisations we’ve worked with, intents of the strategy they claim must embody five essential ele- we can tell that our approach to stra- to follow. Processes like budgeting, ments: tegy and our way of working do result planning, reporting, and appraisals in real change and in lasting impact. often focus too much on opera- • engage hearts and minds tions. Management focus and ways • Challenge who you are when it comes to succeeding with stra- of working do not clearly distinguish • Bring clarity to complexity tegic transformation, these are some between ‘running the business’ and • Be firm and flexible important things to keep in mind: ‘changing the business’, which in • Change conversations many organisations means spending Strategy & Growth 3
  • 4.
    Strategy aS traNSForMatIoN Strategyand Its Pitfalls these organisations’ needs, but the • who are our customers? general concepts are still applicable • what do we deliver to them? Understanding strategy and its pitfalls and useful. • how do we deliver it to them? sets the stage for the whole implemen- • what is the speed and sequence of tation effort. It makes it possible to plan Strategy is about answering key the strategic moves which have to be how to succeed at formulating a value- questions made? creating strategy that drives change For business organisations it often and creates the effects you want. makes sense to distinguish between taken together, the two levels of stra- corporate strategy and business stra- tegy provide the answer to how the Strategy is about creating value tegy. the aim of corporate strategy is vision is to be translated into action. the purpose of a strategy is to trans- to set the direction for a portfolio of Not all organisations have a structure late the vision of an organisation into businesses. as a result, it is necessary to where this distinction is relevant, and actions which will enable people in focus on answering the following ques- in such situations a combination of the the organisation to create value for its tions: two can be used. stakeholders. (See Figure 1.) It is only • which businesses are we in and what through the actions of individuals that is the rationale for this portfolio? Strategy is about people value is created. how value is defined • which corporate structure should we organisational change and transforma- will depend on the type of organisation use to manage our businesses? tion are central to strategy develop- and its stakeholders. ment and implementation. which • what are the possible synergies among the businesses and between actions are most relevant and create this link to value makes the term stra- the most value? (that is, which actions each business and the corporate cen- tegy applicable well beyond the military are most likely to ensure the realisation tre? or business contexts where it is most of the vision?) the answer always de- commonly used. In our experience, • what should our capital structure be? pends on the given circumstances—and the concept of strategy can also be • how do we allocate resources when the circumstances change, so useful in public sector or third sector between businesses? must the strategy. institutions that have a vision (purpose, values, and long-term goals) to fulfil. It Business strategy, on the other hand, however, since strategies are created is of course necessary to adapt some aims at providing the answers to four through interactions among people of the terminology of strategy to suit basic questions of any organisation: within the organisation, finding the best value-creating strategy is not just a question of clear and logical analysis. strategy Strategies are rather determined as What are our business boundaries, corporate much by what creates meaning and 1 structure, and capital structure, and how do energy for the people in the organisa- Vision we allocate resources? tion—as sketched in Figure 2—as by analysis and facts. Both of these per- 2 Who are our customers? = spectives are essential to creating a action successful strategy. Core ideology Core values 3 What do we deliver to them? & Core purpose change Beware of pitfalls on the road to a successful strategy + 4 how do we deliver it? to create value is to do ‘the right thing’ envisioned future ten- to thirty-year bhags well—even as challenges, opportunities, Vivid descriptions 5 When do we carry out which activities? and ambitions change. For an organi- sation to stay competitive and deliver sustainable value creation over time, Figure 1. The strategy must show how to get from vision to action it must therefore constantly transform 4 Implement Consulting Group
  • 5.
    even when theneed to do so is obvious. this happens when the overall goal it- ... creating self does not create a call for action for ... changing a common point of view the organisation, the plan does not con- ... making nect to the personal and professional decisions ... thinking goals of the people in the organisation, strategy is or the implementation has been an- ... managing about people… nounced but not followed up, leaving complexity & uncertainty ... acting people with a lack of both ownership and accountability. ... creating & ... seeing things exploring ideas in a new light friction the fourth and last pitfall relates to not Figure 2. See strategy as a people process being able to carry the strategy all the way through even when the organisa- tion has overcome its inertia enough to itself and its strategy. Unfortunately, this for change. when implementation re- get started. often this is attributed to type of strategic management is not an sults and experience are regarded as the fact that the strategy is not being easy task, and several potential pitfalls stand-alone data and not fed into the fully integrated and thus ends up as lurk along the way, as outlined in strategy review process, the strategy something separate from the organisa- Figure 3. can be fatally weakened. tion’s day-to-day activities. other rea- sons are a lack of discipline and focus strategy as decoration twisted Perspective in implementation and the reluctance the first pitfall is the idea that a stra- the second pitfall is the ease of incor- to share results (whether good or bad). tegy is something you have rather than rectly gauging the type of response when people don’t know what’s hap- something you do. this can delay dis- needed to address opportunities and pening with a strategy, it recedes from covery of the need to change and thus challenges. Many causes can lie behind sight and they tend to conclude that it cause you to move too late. this delay this. Some of the main ones: not doesn’t matter. puts the strategy process under pres- managing and chal- sure, making it a crisis rather than an lenging assumptions; orderly response. not balancing goals, capabilities, and doing the Delay is especially likely when strategy opportunities; hav- right thing and doing it well. Pitfall is seen as a yearly event (or one that ing too many and strategy as happens every two or three years) rat- unclear goals; and decoration her than as a dynamic process. In that forecasting too far Pitfall kind of environment, which is quite into the future given friction common, no one is following up from the uncertainty of day to day and month to month to the competitive doing the new discovering review the realisation of the current environment. In ad- right thing, but the right thing strategy and its critical external precon- dition, not daring to doing it poorly is now wrong. at first. ditions. make the necessary and tough decisions In addition, the mental maps of people and prioritisations in the organisation influence the way can lead to a lack of Pitfall Pitfall twisted they perceive the world and whether focus and clarity. inertia figuring out perspective they see a need for change. Seeing what the new right thing is. strategy development and implementa- inertia tion as separate activities will increase the third pitfall re- Figure 3. the risk of not being aware of the need lates to not acting, To succeed at strategy you must be aware of the pitfalls Strategy & Growth 5
  • 6.
    Strategy aS traNSForMatIoN YourStrategy Must Engage Change also brings uncertainty. process, as shown in Figure 4. this is Hearts and Minds this uncertainty can take many forms: necessary to create a process that en- unsureness about the reasons for the gages all the individuals who will ulti- a strategy doesn’t come about until change, or about what it means ‘for mately be involved. people change their behaviours and me personally’, or about the ability to align their actions with the intent laid do new things properly and correctly. as a result, the strategy process should out by the strategy. be more open and allow for more in- Meanwhile, people form opinions volvement of the organisation than Involve every participant as early as early—and the more uncertain they what is usually the case today. and possible are, the less likely they are to believe involvement of the organisation should any change will be favourable. So start earlier in the process than would Most change efforts pay too little having a strategy process that people normally feel comfortable for most of attention to the process required to have heard about but do not who make a profession of leadership make the strategy happen, and what participate in will influence how the and change (either because we feel attention there is happens too late. the strategy is accepted—and not for the we should be the ones providing the delay is built into the terminology: better. answers or because we feel that peo- Implementation tends to be referred to ple elsewhere in the organisation lack as ‘rolling out the strategy’, thus imply- what this means for the approach sufficient competence to contribute to ing that implementation is something to strategy is that the strategy process strategic thinking). that happens at the end, after the stra- itself and the involvement of the people tegy is fully formulated. But making a in the organisation are crucial to deve- of course, these observations do not strategy live and succeed requires more lopment of a successful strategy. they mean that everybody should be part of than just a good communication plan are just as important as the ultimate every activity in the strategy process— and a road show. content of the strategy itself, because today’s work still has to get done today. it does not matter how well a strategy Nonetheless, every activity should be Creating change in today’s business would have worked if it never gets a considered from two perspectives: First, organisations can’t be done by simply chance to prove its worth. how does it help create a better stra- announcing the final strategy, saying tegic direction? and second, how can that from tomorrow we will be doing thinking about implementation should it be used to support the implementa- things differently, and installing follow- begin on the first day of the strategy tion? up mechanisms. this approach is more likely to destroy motivation and energy than to create it. Telling and selling is not sufficient focus there are many reasons why telling and selling alone will not bring success, and most of them relate to how human indi- strategy implementation viduals deal with change. For one, just processing the informa- tion about the new strategy and under- strategy standing what the implications are will formulation take time. and the way many strategy processes run today, those whose be- haviour needs to change the most in time the organisation are given the shortest amount of time to prepare for Figure 4. the change. You must think about making change happen right from the start of the strategy process 6 Implement Consulting Group
  • 7.
    your message shouldbe repeated many times if it is going to stick, and all time to impact activities should be related to the stra- prepare of change tegy. Not because people are stupid. executive Not because they are uncommitted or management indifferent. Not because they by nature are unwilling to change. But simply senior because it is a demanding act for in- management dividuals to change their actions and behaviours—and this is what strategy team leaders is about. employees Figure 5. Typically not enough time is allowed for change Remember that participants need to leaders take must be in line with what IDeaS oN how to eNgage find the strategy personally relevant they say. you must create trust through heartS aND MINDS your communication by showing re- Most people are engaged in their pro- spect and by talking with the recipients fessional life. on one hand, they want to Start strategy development with of the message rather than just to them. see the big picture. excellent strategy a general mind-setting activity you have to show that you believe in communication and involvement in cre- where you tell the organisation the message and that the message is ating the strategy (where relevant) sup- about the strategy process—what important to you. It must be a message port this process. on the other hand, will happen and what directions from the heart—and peculiarly enough, individuals must see how they fit in you are looking in. you demonstrate that best by listening and what the strategy means to them. to others and being prepared to modify Much of this happens most smoothly Be honest about the situation, the it to make it something they can also be during the strategy deployment pro- reasons, and the direction—the passionate about. cess, where the strategy is translated smart people in your organisation into goals and initiatives for units and already know—and it’s best to Stay focused—it isn’t fixed yet individuals. In this process it is very assume they’re all smart. important to allow room for individuals From a top management perspective, to interpret and understand the big pic- strategy thinking is mentally at the top Challenge your perception about ture and to adapt their own story and of the agenda early in the transforma- who can contribute to the process. perspectives to it. the usual situation, tion process. It is very easy and natural you can use up-and-coming shown in Figure 5, more or less reverses to reduce focus and intensity as stra- young talent, experienced new the ideal allocation of time. tegy formulation ends, but for most hires, and directors of subsidiaries of the organisation the process is just as well as your usual planners. Communicate with passion beginning. therefore one must establish and authenticity reinforcement activities to regain the Focus on creating the right focus. Campaigns initiating the next mood and energy throughout the communication around the phase, consistent ongoing communi- the process—the mood can be strategy—both the formal sessions and cation, and regular meetings and dia- more important than what is on all the informal meetings between logues are necessary. the PowerPoint slides and what is leaders and employees—must have pas- being said. sion and authenticity. the actions that Strategy & Growth 7
  • 8.
    Strategy aS traNSForMatIoN YourStrategy Must Dare to Spend time finding the right questions challenges are well understood. Challenge Who You Are Strategies are made by people and are Don’t just pick the first strategic direc- decided on because of what makes Strategy is not about finding the easy tion that comes to mind or seems to sense and what motivates. however, answers—it’s about finding the right present itself. Force yourself to experi- like innovation, sense-making, learning, answers. ment with your thinking to spark off idea-generation, and decision processes new ideas and explore the full scope of rarely move in a straight line. Neither this means taking a good hard look at possible strategic initiatives. should the strategy process, as it de- yourself, challenging your own normal pends heavily on these very elements. perceptions and assumptions about Part of this involves synthesising your who you are as an organisation: What is knowledge and ideas into unique per- the early part of the strategy process actually our core purpose? What busi- spectives and hypotheses about the should be focused on challenging your ness are we really in? Has the world future. these hypotheses can then be preconceptions and assumptions by changed and rendered us obsolete? tested through further analysis and bringing in new views and suitable local experimentation in the market. disturbances—that is, challenges to Doing this as an organisation, as op- your traditional worldview that get posed to as an individual, requires a In this kind of strategy process you are you thinking in new and productive different kind of strategy process. you certainly able to set up a specific directions focus should be on need a process that allows for the right activity plan, but cannot necessarily searching for the right perspectives questions to be found and asked, and predetermine the timing of insights and and for the right questions to ask. one that allows for challenging assump- final results. you will need to keep the as understanding and insight grow, tions, learning, and adjusting both hy- strategy process flexible so it can be this phase will often bring ‘eureka potheses and goals along the way. adjusted to support new ideas and di- moments’. the aim is to ensure that the rections as they develop. current situation, opportunities, and one way to do this is to treat your strategy as an innovation process: a process of exploration, experiments, and challenges to key assumptions, as well as logic and structured creati- vity. avoid attempting to force strategy development into a linear process—as with other forms of innovation, it is often necessary to loop back and incor- porate new learning. analysis this does not mean that the final stra- Visioning tegy in itself always has to be ground- breaking and radically different from its predecessor. Its content should be dic- tated by the situation and the particular Challenging circumstances surrounding it. Perhaps assumptions your existing strategy already is the best and most innovative approach— that’s always a comfort to believe, but navigating social and you won’t know unless you challenge it political interaction properly. Figure 6. To succeed you must be able to combine four distinct competences 8 Implement Consulting Group
  • 9.
    Use the innovationapproach to avoid Use creative tension between facts and decision traps and manage uncertainty assumptions to develop new ideas IDeaS oN how to ChalleNge who yoU are In a traditional problem-solving and treating your strategy as an innovation linear approach to strategy, we often process requires combining and balan- Use hypotheses to plan and see organisations get caught in some cing four distinct competences: analy- drive activities. this will allow for of the following traps: sis, visioning, challenging assumptions, planning to take place without and navigating social and political inter- being locked into one direction • attaching too much importance to actions. (See Figure 6.) too early. Be ready to change your initial thoughts and data. hypotheses as understanding • giving too much weight to the cur- analysis can provide objective data, grows. rent situation because it feels more which forms a foundation for challen- comfortable than the unknown future. ging assumptions by painting a clear try out new settings for the • Posing questions the wrong way and and factual picture of the situation. strategy process. thus looking in the wrong direction Creative tension between the data for the answers. from analysis and the assumptions can Create a suitable disturbance by stimulate fresh and innovative thinking. • Seeing what you want to see and bringing customers, partners, these new ideas and possible future making evidence fit with your precon- employees, and other stakeholders directions can in turn be subjected to ceived notions. into the process. analysis for a reality check. this process is often iterative, going back and forth treating strategy as an innovation Create a suitable disturbance by between formulating and testing ideas process enhances uncertainties and appointing a person who always and solutions. complexities that affect strategy deve- asks what-if questions to ensure lopment in most organisations today. It that all aspects of the strategy are From beginning to end, you must is uncomfortable but useful to recog- being looked at. be able to understand and navigate nize the uncertainties relating to the through the social and political interac- competitive environment and to what is tions in the organisation. this will allow perceived to be the opportunities and you to facilitate the strategy process in challenges, and also those related to the cultural context of the organisation, the understanding, assumptions, and so it keeps moving forward and ensures goals of the organisation. that constructive decisions are being made. Strategy & Growth 9
  • 10.
    Strategy aS traNSForMatIoN YourStrategy Must Bring the organisation. It focuses attention on you need to understand what capabili- Clarity to Complexity core issues and not just symptoms, and ties would give you a competitive edge it allows you to move decisively and in pursuing opportunities in your mar- a strategy serves as a guide. to suc- with commitment. ket, and to know which ones you cur- ceed, it must show how to translate rently have as well as which ones you vision into real action, creating insight Determining what the core issues are can develop in the future. this requires and deep understanding of the market requires knowledge of your organisa- a clear insight into your business model, and of your own organisation. It also tion, your business, and your market. including the critical drivers of custom- must tell a clear and compelling story and it requires a willingness to face the er value and business economics. about how to get where you want to facts of your current situation. acting go, and it must bring clarity to the dy- decisively requires an understanding of Determine what possibilities the namic and complex setting in which what needs to be done and a willing- market presents and whether a good your organisation—if it is like most ness to do it, both individually and as return can be made by pursuing organisations today—must live and an organisation. them—and what challen-ges may block compete. your attempt to capitalise on those Create a balance between goals, capa- possibilities. Identifying opportunities to create this clarity requires a strategy bilities, opportunities, and challenges takes good knowledge of market that is strong, balanced, and simple—all structure and development as well having a balanced strategy is about at the same time. as of competitor strategies; truly creating a fit among goals, capabilities, understanding the challenges requires opportunities, and challenges. Focus on the core issues and act the same level of knowledge. decisively Clear and shared goals are necessary Strategy development can start at any what makes a strategy strong? you can to evaluate which opportunities are of the three points of the triangle in recognise a strong strategy because relevant and which capabilities to build. Figure 7. to achieve a realistic and co- it provides for a powerful response to that means that you must determine herent strategy, however, all of them the opportunities and challenges facing what it is you really want to achieve, as must be covered by the end. sketched in Figure 7. goals balance Capabilities opportunities/ Challenges Figure 7. A good strategy requires balance 10 Implement Consulting Group
  • 11.
    n n tio io s ea at ta es ic ls ar en oa un su s em cu G m Is m Fo pl Co Im focus on the reduce the select a few Keep messages reduce the number core issues number of goals must-win-battles clear and simple of parallel initiatives Figure 8. Simplify your goals, your communication and your plan Simplify your goals, your communica- the strategy by creating a clear yet IDeaS oN how to BrINg tion, and your plan strong message around the central ClarIty to CoMPlexIty story line of the strategy, explaining Simplicity in a strategy is important be- what needs to be done to achieve the cause too much complexity interferes Keep asking questions to make strategic goals. with implementation. the road to stra- sure you get to the core of an tegic simplicity is illustrated in Figure • third, simplify the implementation issue. 8. Keeping a strategy simple requires plan and make sure that projects and focus on three different areas: initiatives not directly supporting the Use simulations, games, and strategy are not allowed to obscure role-playing to explore different • First, make the strategy itself as the view of what needs to be done. scenarios and test your strategy. simple as possible by reducing the Make roles and responsibilities for test consequences, market number of goals and initiatives and leading key transformation initiatives reactions, feasibility, and goals to focusing on a few key must-win clear and well-known. see if your strategy is balanced. battles. Make sure that the strategy has a clear story line with an inner the key to successfully simplifying your Use visualisation (pictures, logic from actions to goals. strategy is to have consistency between diagrams, sculptures, movies, what you want to do, what you say you and the like) rather than just text • Second, simplify communication of will do, and what you actually do. to describe and express your strategy. Make a list of the kinds of things your organization has done in the past but will not do in the future. this will help keep focus on execution of the new strategy. Strategy & Growth 11
  • 12.
    Strategy aS traNSForMatIoN YourStrategy Must Be Firm ignition of a change or adaptation can complish this, the strategic plan should and Flexible be a major event (new competitor en- consider various scenarios, be carried tering the market, a new technology, a out frequently, focus on creating stra- Modern organisations operate in a new acquisition proposal, or the like), or tegic agility and resource fluidity, and complex and dynamic world where it it can involve several smaller internal or include strategic options that can be is rarely possible to predict what the external actions building up to a tipping brought into place depending on how future will bring. Nonetheless, it is still point that forces (or allows) the com- the situation develops. the ability to necessary to think and act strategically pany to act. identify new signals from the environ- to keep from floundering in the cross- ment (customers, competitors, part- currents. A flexible strategy requires both ners, regulators, and so on), learn from an adaptable plan and an agile them, and act fast (that is, allocate time Strategy is both planned and emergent organisation and resources promptly and appropri- ately), is what makes an organisation when most organisations look back Because you need both adaptability agile and good at managing emergent over the last three to five years, they and agility, being excellent in strategic strategy. will discover that two main sources are management is not only about being contributing to the state of their cur- able to foresee, plan, and execute; it is Match your strategy approach to the rent strategy: executing the actions of also about sensing, discovering, and uncertainty you face the original strategic plan and reacting responding. Furthermore, strategy must to unforeseen situations that emerged be seen not as something generated Determining the right balance between during the execution phase. Figure 9 once every two or three years but as how much to plan and in how much sketches the whole dynamic system. a dynamic and continuous process. detail, and how much room to leave for emergence and adaptation, requires a the planned strategy is typically de- Successfully creating an adaptable good understanding of your competi- veloped through a formal strategy strategy requires making the strategic tive environment as well as a thought- process, where the aim is to arrive at in- plan flexible enough to avoid being ful balance of the need for flexibility tended strategic goals, a direction, and locked into a set of actions which can- against the extra costs (in the form of a plan. often this formal strategy pro- not easily be changed. It also requires added communication and coordina- cess is cyclical and carried out at fixed gearing the organisation as a whole to tion) that increased flexibility carries intervals; in the best cases it is deeply be better at responding to emerging with it. It is especially important to integrated with other cyclical processes opportunities and challenges. to ac- understand the degree of complexity, like board and management meetings, budgeting, and performance apprai- sals. the planned strategy is what most strategy organisations know best, and is what through action management literature and models typically describe when defining the emergent concept of strategy. emergent strategy opportunities and threats In contrast, the emergent part of the realised strategy is cumulative and strategic intent – the strategic grows from the individual actions and desirable outcomes decisions made by people in the or- future Unfulfilled strategies ganisation when they react to new and previously unknown opportunities and challenges. the emergent strategy is often less formal and is in large part determined by the way the organisation strategic learning learns, that is, the culture, structures, Figure 9. Strategy is a dynamic process and decision-making processes. the 12 Implement Consulting Group
  • 13.
    Challenging Characteristics of the How to approach How to express assumptions competitive environment strategy the strategy A relatively clear future it is relatively easy to predict the SENSE > CATEGORISE > RESPOND Long-term plan which lays out how future development for the industry to implement the strategy. fact based management. value drivers. Use of best practices. Cause-and-effect relationships are Clear communication. repeatable, perceivable, and pre- ensure that proper processes are dictable. in place. Complicated – with dis- it is possible to determine a limited SENSE > ANALYSE > RESPOND short-term plan split into tinct possible futures set of clear and mutually exclusive campaigns with frequent/periodic expert diagnosis. future scenarios for the industry. reviews and adjustments. Listen to conflicting advice. a Cause-and-effect separate over scenario planning and systems b C space and time, but can be deter- thinking. mined. Complex – with a range it is not possible to define distinct PROBE > SENSE > RESPOND short-term plan split into cam- of possible futures and mutually exclusive scenarios. paigns with frequent or periodic Create experiments that allow Cause-and-effect are only coherent reviews and adjustments. patterns to emerge. in retrospect. increase levels of interaction and increase focus on rules and guiding use methods that can generate principles rather than plans and ideas. fixed processes. True ambiguity and the future is unknown, and it is not ACT > SENSE > RESPOND Create an organisation which is chaos possible to identify clear scenarios. able to react in the right manner in Look for what works instead of no clear cause-and-effect relation- any given situation. seeking right answers. ships, and the drivers of future take immediate action to re- establish simple rules and guiding ? market development might not be establish order. principles for how to make deci- known. Clear and direct communication. sions. Figure 10. Complexity and uncertainty play a significant role for your strategy uncertainty, and speed of change that Ultimately things may become so IDeaS oN how to MaKe yoUr you face, as these factors heavily influ- complex and ambiguous that it is not Strategy FIrM aND FlexIBle ence the decision on how to approach possible to form a clear picture of any the development and execution of a possible future—neither by analysis Use scenario planning to create strategy. nor by probing. at that point, strategy enhanced understanding of the is a matter of developing the ability possible futures of your industry when the future is relatively clear and to quickly understand and respond and to prepare for them. easy to predict, strategy becomes a to events in the environment. Fast matter of determining the most prob- learning and agility are keys to building establish strategic initiatives able future and reacting as though it a sustainable competitive advantage in focusing on creating an increased was a certainty, as shown in the first such situations. freedom to act by removing row of Figure 10. constraints (which may involve generally we believe that organisa- financing, legislation, structural the greater the uncertainty and com- tions must prepare for an increasing or contractual relationships, or plexity of the competitive environment, degree of uncertainty and adjust their capabilities). the greater the number of possible fu- strategic processes accordingly. an im- tures. as future possibilities proliferate, portant and often very challenging part Increase the number of forward- strategy development needs to focus of this is to achieve the right mind-set, looking indicators in management more and more on efforts to under- stepping away from the planning and reports. stand these possible futures and spot control that have long been praised as which one is actually playing out. virtues of business and management. Don’t ever think, ‘we have finally got it right!’ Strategy & Growth 13
  • 14.
    Strategy aS traNSForMatIoN YourStrategy Must Change you’ll just have one more binder for the Create momentum around your new Conversations might-have-been-a-good-idea collec- strategy tion. a key element in getting your strategy Strategy is not just planning, it is also going is providing symbolic actions and implementation. without implementa- a strategy ought to be integrated into quick wins early in the transformation tion value cannot be created, and that the organisation, and eventually every- process. early results not only demon- means you must make your strategy thing should be aligned with the stra- strate the benefit of the strategy, they real and urgent to everyone in the or- tegy in some way. however, this does demonstrate your new strategic focus ganisation. not always happen as planned, for a and commitment to the new way of number of reasons. For one, it can be working. Make your strategy live every day difficult to keep up the momentum in the transition from the first stages of to make your strategy come alive and the symbolic actions can be anything strategy development through the final keep living every day, you must change from buying another company to say- stages of strategy implementation—it’s the conversations at all levels in your or- ing no to a specific customer because easy to grow weary before the new ganisation. Pursuing a different strategy your strategic focus is being shifted to ways become routine. means having different conversations other products. tomorrow—not instant replays of the also, the strategy often represents ones you are having today. In addition, making your early actions something new—which requires change irreversible and public will help to show that can be difficult to get going. and It is not just the conversations within in the intent and commitment backing the new endeavours represent a degree of your organisation that must change; the new strategy. one way to do this is to risk that add to the difficulties of ma- ones with your customers and partners make external commitments in a series king change happen. Finally, the organi- need to change too. and the change of campaigns that require you to suc- sation may have structures—processes, of conversation should concern not ceed with the new strategy, as shown in procedures, and It systems—that keep only the topics but also the setting, the Figure 11. making people act according to the words that you use, and the mood. old strategy. overcoming these hurdles to keep the momentum going, it is im- requires a dedicated effort and strong If what you talk about and how you portant to share results broadly in the leadership. talk about it stay the same, your new organisation so that everybody can see strategy will never really be adopted. that things are moving along and learn strategy execution through campaigns major strategy review strategy review review and develop- mobilise act and manage and mobilise act and manage and mobilise act and manage update ment adapt adapt (~ new strategy develop- ment) Campaign a Campaign b Campaign C 4–12 months 4–12 months 4–12 months Figure 11. Use time-boxed campaigns to ensure quick results and frequent reviews 14 Implement Consulting Group
  • 15.
    the business’ and aligning these structures with your the other around strategy therefore is the key to making ‘developing the sure you can realise your strategy. business’—to cre- organisational structure ate the necessary of course, changing the basic struc- attention on stra- tures of an organisation takes time and tegic issues. cannot be completed on day one, but management it must be done as quickly as possible. Workspace and the appraisal and as with performance appraisal, if this design governance People, performance ma- doesn’t happen, the surviving struc- structure values, and nagement systems tures will keep pushing actions and culture are other areas behaviours toward the old strategy, where conversa- making it difficult for people to follow tions should be the intentions of the new strategy. and shifted to include after a while they will give up trying. Competences operational the strategy. goals processes related to the new strategy must quickly be inclu- ded in corporate Figure 12. performance Aligning structures with strategy is important for long-term success management systems to be visible and part IDeaS oN how to ChaNge from the examples. this also means of the manage- CoNverSatIoNS that both good and bad results should ment conversations. as noted earlier, be shared—if something isn’t working, these systems can put a serious drag Change your budgeting cycle and you won’t be able to keep the secret, on implementation—as long as you pay structure to support the flow and and attempting to do so will both make people to carry out the old strategy, timing of your strategy. you look foolish when the word gets that’s what you’ll get. Instead, individual out and deprive you of the contribu- goal-setting sessions on all levels in the Make tools and templates to guide tions people could make towards fixing organisation should be anchored in the the goal-setting sessions where the problem and getting the strategy new strategy so that everybody can see the new strategy is translated back on track. how they contribute to making it hap- into team and individual goals. pen. hold introduction sessions for Keep focus on the strategy managers and consider the use Clear roles and responsibilities for dri- of role-playing to illustrate how to stay alive, the strategy must be a ving the main strategic initiatives will to bring the new strategy into the natural part of the conversations in provide the organisation with a number conversations. your organisation. In the beginning this of ‘champions’ whose actions will serve requires a conscious effort, as the stra- as examples of what to do in order to Include at least two new goals tegy is new and unfamiliar. realise the strategy. related to the strategy in business unit performance reports—even if the conversations must be ritualised Align organisational structures with measuring them has to be done until it becomes more natural. one your strategy manually at first. way to do this is to ensure that enough management time is spent on reali- one of the main drivers of action and focus in any organisation are the Set up new decision-making sing the strategy. For example, you can structures (processes, procedures, It forums centred around the key divide management meetings into two systems, and so on) that support them. focus areas of your strategy. separate themes—one around ‘running Strategy & Growth 15
  • 16.
    Contact For further informationplease contact: Michael Braagaard tel. +45 2338 0010 email mib@implement.eu lars Kirkegård tel. +45 2338 0011 email lk@implement.eu implement Consulting group a/s slotsmarken 16 tel. +45 4586 7900 info@implement.eu dK-2970 hørsholm fax +45 4586 7950 www.implement.eu