SlideShare a Scribd company logo
1 of 22
Download to read offline
Islamabad Carriage Factory (ICF),
Pakistan Railways
Manufacturing Unit of Passenger Coaches
ISO 9001 – 2015 Certified
Timely delivery of the Railway Carriages for safe,
economical and efficient train operation in the
competitive transport market.
Mission Statement
Profile
Islamabad Carriage Factory (ICF)
Factory Commissioned
Manufacturing Capacity
 1970, in collaboration with Alstom
(previously known as Link Hofman Bush)
 120 coaches per annum
3
4
Factory Area
Covered Area 140.375 acres
Uncovered Area 133.625 acres
Colony Area 83.00 acres
Factory Area 57.375 acres
Profile
Islamabad Carriage Factory (ICF)
Organogram
5
Managing Director/CFI
DY: CME
PE WM
AWM/G
AWM/Fab
AWM/Fur
DCOS
ACOS
SME/D
AME/E
SME 400-C
Project
AEN
DY: CCP
DCP
ACP
SMO APO SAO
AO
AAO Book
AAO Store
AAO Admin
Dy: CCE
SEE
AEE/P 400-C
AEE/TL400-C
Staff Details
6
807
212
0
Skilled staff Semi skilled staff Unskilled staff
Staff Details
7
15 57 41
1088
Officers General administration Technical staff BPS 1-10
Drawing
Office
Purchase
Department
8
Major Departments
Production
Department
Works
Department
Store
Department
Account & Budget
Department
Engineering
Department
9
Projects Completed Coaches (no.)
Manufactured new passenger coaches
(1971-2015)
2011
Rehabilitation, Special Repairs, Conversion,
up-gradation and renovation of old coaches
(1991-2020)
1938
Other manufactured stock
(1996-2017)
162
P.O.H / N. R
(1993-2020)
456
Total 4567
Production History (1970-2020)
Completed Projects
10
Projects Duration
Rehabilitation of 240 coaches Oct, 2000 – Oct, 2002
Rehabilitation of 450 coaches Nov, 2002 to Feb, 2007
Procurement/Manufacture of 175 Chinese coaches Feb, 2002 to May, 2007
Manufacture of 50 Bogie Brake Vans (Chinese design) Sep, 2007 to Jun, 2008
Procurement/Manufacture of 2020 Chinese coaches Aug, 2012 to Jan, 2015
Manufacture of 15 Chinese Bogie Brake Vans (ZNRVs) Feb, 2017 to April, 2017
Manufacture of 10 Chinese Bogie Brake Vans (ZNRVs) Nov, 2017 to Dec, 2017
Drawing
1. Material
Schedule
2. Store
3. Purchase
4. Store
5. Main Store
Production
1. Set outturn
schedule of
fabrication and
furnishing shop
2. Continuous
project monitoring
Fabrication
1. Sub assembly
2. Manufacture
under frame, side
wall, end wall and
roof
3. Assembly
4. Shell assembly
and gauging
5. Flooring, seat
pads, partitioning,
dressing
6. Air brake
piping, buffer,
draw har book,
and screw
coupling
Furnishing
1. Electrical shop
2. Roof wiring
3. Under frame
wiring
4. Electric
appliances and
connection
5. Testing
Paint
1. Interior and
exterior
2. Interior
decoration
3. Paneling,
flooring, lav. Work,
seat berths,
bright plates
Inspection
Rain Test
Division
Open Line
Inspection
Ongoing Projects
 Rehabilitation of 60 German Coaches
 A4 maintenance of 40 Chinese Coaches
 Manufacturing of 40 KCR Coaches
 Rehabilitation of Bogie Frames for MGPR
 Assisting PLF in manufacturing of Jigs and Fixture
 Material supply for Special Repair of German Coaches
12
Transfer of Technology (TOT)
 TOT to manufacture complete new German Coaches
 TOT to manufacture Chinese Coaches
 TOT to manufacture Coil Spring Bogie (CRC)
 TOT to manufacture Tangshan Bogie
13
Way Forward:
i. Out of 230 coaches, 184 coaches planned to be manufactured in CFI
ii. Out of 184 coaches, 92 coaches manufactured from cut-to-size materials
iii. 92 coaches manufactured from raw, un-processed material
iv. The tender also envisages complete TOT of new manufacturing of Air Spring
Bogie (speed 160 km/hr)
14
Procurement/Manufacturing of 230 Coaches
Gallery
16
Tool Shop Machine Shop Wood Shop
Forge Shop
17
Aluminum Shop Anodizing Shop
18
Pipe Section
Trimming Section
Bogie Shop
19
Train Lighting Shop Auxiliary Facilities
20
21
Thank you
Railway Carriage Factory
Address: Sector I-11, Islamabad, Pakistan
Phone#: +92 51 9278349
Fax #: +92 51 9278050
Email: carriagefactory@gmail.com
Website: www.pakrail.com
Islamabad Carriage Factory
(ICF),
Pakistan Railways

More Related Content

Similar to ICF.pdf

Kaman Tooling Ltd
Kaman Tooling Ltd Kaman Tooling Ltd
Kaman Tooling Ltd
Andy Rourke
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016
Darren Bergin
 
Agenda for Civil Aerospace Congress 2015
Agenda for Civil Aerospace Congress 2015Agenda for Civil Aerospace Congress 2015
Agenda for Civil Aerospace Congress 2015
Patrick Gu
 

Similar to ICF.pdf (20)

Kaman Tooling Ltd
Kaman Tooling Ltd Kaman Tooling Ltd
Kaman Tooling Ltd
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,VaranasiINDUSTRIAL TRAINING(PPT) DLW,Varanasi
INDUSTRIAL TRAINING(PPT) DLW,Varanasi
 
BEML Bharath Earth Movers Limited
BEML Bharath Earth Movers Limited BEML Bharath Earth Movers Limited
BEML Bharath Earth Movers Limited
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
Crc presentation refurbishments
Crc presentation refurbishmentsCrc presentation refurbishments
Crc presentation refurbishments
 
general introduction.pdf
general introduction.pdfgeneral introduction.pdf
general introduction.pdf
 
Darren Bergin C.V. April 2016
Darren Bergin C.V.  April 2016Darren Bergin C.V.  April 2016
Darren Bergin C.V. April 2016
 
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport ExtensionESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
 
Anish report
Anish reportAnish report
Anish report
 
Dlw locomotive workshop
Dlw locomotive workshopDlw locomotive workshop
Dlw locomotive workshop
 
Final ams power_point_slides-------newwww
Final ams power_point_slides-------newwwwFinal ams power_point_slides-------newwww
Final ams power_point_slides-------newwww
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
RESUME .ENGLISH 2525
RESUME .ENGLISH 2525RESUME .ENGLISH 2525
RESUME .ENGLISH 2525
 
CV 2016
CV 2016CV 2016
CV 2016
 
Carriage and wagon
Carriage and wagon Carriage and wagon
Carriage and wagon
 
Presentation ep corporate src rev9 eng
Presentation ep corporate src rev9 engPresentation ep corporate src rev9 eng
Presentation ep corporate src rev9 eng
 
A seminar on ir coaches2018
A seminar on ir coaches2018A seminar on ir coaches2018
A seminar on ir coaches2018
 
Agenda for Civil Aerospace Congress 2015
Agenda for Civil Aerospace Congress 2015Agenda for Civil Aerospace Congress 2015
Agenda for Civil Aerospace Congress 2015
 

Recently uploaded

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 

ICF.pdf

  • 1. Islamabad Carriage Factory (ICF), Pakistan Railways Manufacturing Unit of Passenger Coaches ISO 9001 – 2015 Certified
  • 2. Timely delivery of the Railway Carriages for safe, economical and efficient train operation in the competitive transport market. Mission Statement
  • 3. Profile Islamabad Carriage Factory (ICF) Factory Commissioned Manufacturing Capacity  1970, in collaboration with Alstom (previously known as Link Hofman Bush)  120 coaches per annum 3
  • 4. 4 Factory Area Covered Area 140.375 acres Uncovered Area 133.625 acres Colony Area 83.00 acres Factory Area 57.375 acres Profile Islamabad Carriage Factory (ICF)
  • 5. Organogram 5 Managing Director/CFI DY: CME PE WM AWM/G AWM/Fab AWM/Fur DCOS ACOS SME/D AME/E SME 400-C Project AEN DY: CCP DCP ACP SMO APO SAO AO AAO Book AAO Store AAO Admin Dy: CCE SEE AEE/P 400-C AEE/TL400-C
  • 6. Staff Details 6 807 212 0 Skilled staff Semi skilled staff Unskilled staff
  • 7. Staff Details 7 15 57 41 1088 Officers General administration Technical staff BPS 1-10
  • 9. 9 Projects Completed Coaches (no.) Manufactured new passenger coaches (1971-2015) 2011 Rehabilitation, Special Repairs, Conversion, up-gradation and renovation of old coaches (1991-2020) 1938 Other manufactured stock (1996-2017) 162 P.O.H / N. R (1993-2020) 456 Total 4567 Production History (1970-2020)
  • 10. Completed Projects 10 Projects Duration Rehabilitation of 240 coaches Oct, 2000 – Oct, 2002 Rehabilitation of 450 coaches Nov, 2002 to Feb, 2007 Procurement/Manufacture of 175 Chinese coaches Feb, 2002 to May, 2007 Manufacture of 50 Bogie Brake Vans (Chinese design) Sep, 2007 to Jun, 2008 Procurement/Manufacture of 2020 Chinese coaches Aug, 2012 to Jan, 2015 Manufacture of 15 Chinese Bogie Brake Vans (ZNRVs) Feb, 2017 to April, 2017 Manufacture of 10 Chinese Bogie Brake Vans (ZNRVs) Nov, 2017 to Dec, 2017
  • 11. Drawing 1. Material Schedule 2. Store 3. Purchase 4. Store 5. Main Store Production 1. Set outturn schedule of fabrication and furnishing shop 2. Continuous project monitoring Fabrication 1. Sub assembly 2. Manufacture under frame, side wall, end wall and roof 3. Assembly 4. Shell assembly and gauging 5. Flooring, seat pads, partitioning, dressing 6. Air brake piping, buffer, draw har book, and screw coupling Furnishing 1. Electrical shop 2. Roof wiring 3. Under frame wiring 4. Electric appliances and connection 5. Testing Paint 1. Interior and exterior 2. Interior decoration 3. Paneling, flooring, lav. Work, seat berths, bright plates Inspection Rain Test Division Open Line Inspection
  • 12. Ongoing Projects  Rehabilitation of 60 German Coaches  A4 maintenance of 40 Chinese Coaches  Manufacturing of 40 KCR Coaches  Rehabilitation of Bogie Frames for MGPR  Assisting PLF in manufacturing of Jigs and Fixture  Material supply for Special Repair of German Coaches 12
  • 13. Transfer of Technology (TOT)  TOT to manufacture complete new German Coaches  TOT to manufacture Chinese Coaches  TOT to manufacture Coil Spring Bogie (CRC)  TOT to manufacture Tangshan Bogie 13
  • 14. Way Forward: i. Out of 230 coaches, 184 coaches planned to be manufactured in CFI ii. Out of 184 coaches, 92 coaches manufactured from cut-to-size materials iii. 92 coaches manufactured from raw, un-processed material iv. The tender also envisages complete TOT of new manufacturing of Air Spring Bogie (speed 160 km/hr) 14 Procurement/Manufacturing of 230 Coaches
  • 16. 16 Tool Shop Machine Shop Wood Shop Forge Shop
  • 19. 19 Train Lighting Shop Auxiliary Facilities
  • 20. 20
  • 21. 21
  • 22. Thank you Railway Carriage Factory Address: Sector I-11, Islamabad, Pakistan Phone#: +92 51 9278349 Fax #: +92 51 9278050 Email: carriagefactory@gmail.com Website: www.pakrail.com Islamabad Carriage Factory (ICF), Pakistan Railways