Our main activities:
•Prefab wood frame elements;
•Modular construction houses;
•CLT (Cross-laminated timber)
houses.
Prefab wood frame elements
PREFAB WOODEN FRAME
Total: 800 m2
Project: Upplands Väsby
Address: Stockholm, Sweden
Year: 2019
PREFAB WOODEN FRAME
ROOF ELEMENTS
Total: 7 000 m2
Project: Tingstorget
Address: Stockholm, Sweden
Year: 2018
PREFAB WOODEN FRAME
Total: 2144 m2
Project: Vattmyra
Address: Stockholm, Sweden
Year: 2017
PREFAB WOODEN FRAME
Total: 640 m2
Project: Åfjord
Address: Åfjord, Norway
Year: 2014 - 2015
Modular construction houses
Modular construction
Total: 600 m2
Project: Åkersberga
Address: Stockholm,
Sweden
Year: 2019
Modular construction
Total: 1000 m2
Project: Blystadia
Address: Oslo, Norway
Year: 2019
Modular construction
Total: 1200 m2
Project: Bardu 32
Address: Setermoen, Norway
Year: 2017-2018
Modular construction
Total: 880 m2
Project: Forlskolan
Address: Trollhättan, Sweden
Year: 2016
Modular construction
Total: 480 m2
Project : Sylte
Address: Trollhättan, Sweden
Year: 2016
Modular construction
Address: Klaipeda, Lithuania
Year: 2015 - 2016
CLT (Cross laminated timber) houses
CLT panel construction
Assembling and outside
finishing
Tollare 1 - 408 m2
Project: Tollare
Address: Stockholm,
Sweden
Year: 2016 - 2018
CLT panel construction
Assembling and outside
finishing
Tollare 2 - 1958 m2
11 apartmenthouses
Project: Tollare
Address: Stockholm, Sweden
Year: 2016 - 2018
CLT panel construction
Assembling and outside finishing
Tollare 3 - 912 m2
4 houses
Project: Tollare
Address: Stockholm, Sweden
Year: 2016 – 2018
CLT panel construction
Assembling and outside finishing
Tollare 4 - 1089 m2
3 houses 2 appartament/house
Project: Tollare
Address: Stockholm, Sweden
Year: 2016 - 2018
CLT+PREFAB WOODEN
FRAME SYSTEM
Project: Björkö school
Address: Linköping, Sweden
Year: 2006 - 2007
CLT panel construction
Project: Viken skog
Address: Hønefoss, Norway
Year: 2006
CLT panel construction
Project: Svartlemon
Address: Trondheim, Norway
Year: 2005
was building ABBA museum
CLT panel construction
and WOODEN FRAME system
Project: ABBA museum
Address: Stockholm, Sweden
Year: 2012 - 2013
CLT PANEL
Project: Vaxholm
Address: Vaxholm,
Sweden
Year: 2011
Certification
HTCC was certified according to the
ISO 9001:2008 quality management
standard and ISO 14001:2004
environmental management
standard.
The company is currently
undergoing certification according
to the ETA 14/0257 standard. The
operations are being evaluated by
experts from SP Sverges Tekniska
Forskningsinstitut in Sweden.
• Production capacity:
10 000 m2 living area.
• Production plant area:
over 5 000 m2
Contacts:
Ignas Daugėla +370 6942 3794
Rokas Barakauskas +370 6990 3869,
Tomas Barakauskas +370 6990 3891
Email: info@htcc.lt
Web: www.htccgroup.com
Thank you for your time!
We always
do what we
promise!

HTCC presentation 2019.10