specialists in massive wood construction
#CLT #Glulam #MassiveWood #Construction
Company profile
• Established 2012
• Assembly of CLT, glulam, prefab
CLT modules and panels
• CLT material delivery
• Projects in Lithuania, Norway,
Sweden, Denmark, Iceland, UK
MOXY Oslo X hotel, Norway (2016-2017)
MOXY Oslo X
• Stage: finished
• Structure: CLT prefab modules and
elements
• Location: Norway, Oslo
• Building: 7 stories
• Assembly time: 3,5 months of CLT
structure
• Additionally: 2 months gypsum
boards etc.
• Speed: 308 equivalent rooms in 85
working days = average 4
rooms/day, progress to 6 rooms/day
MOXY Glasgow hotel, UK (2017-2018)
• Stage: finished
• Structure: CLT prefab modules and
elements
• Location: Norway, Oslo
• Building: 5 stories
• Assembly time: 2,5 months of CLT
structure
• Additional: 2 months gypsum boards,
roof structure, etc.
MOXY Glasgow
Light industry building, Arlanda, Sweden (2018)
Individual houses in Sweden, Lithuania (2012-2017)
MOXY Copenhagen | project in line
MOXY Copenhagen hotel, Denmark (2018)
Building: 4 storeys, 4.800 m2. Load-bearing structure – CLT. Building system – modules and elements.
Stage: will be assembled in 2018
Landborgir hotel, Iceland (2018)
Building: 3 storeys, 3.690 m2. Load-bearing structure – mainly CLT. Building system – elements.
Stage: will be assembled in 2018
Haheim Prosjekt AS
Project managing
company
Contact person:
Christian Moberg
cm@haapro.no
+47 977 40 241
PROJ.ECO Engineering
S.r.l.
Assembly supervision and
control for VASTINT
(MOXY hotels)
Contact person:
Mauro Albertini
malbertin@proj-eco.com
+39 392 315 9631
Reference
persons
Delivery
Assembly team (i.e.):
• team leader, site engineer
• 3-4 master assembly workers
• 2-3 additional workers
• 2-3 assembly specialists, 1-2 supporting workers
Personal working tools, health & safety equipment
Travel costs and delivery (related to team mobilization)
Additionally:
• acommodation; insurance; rain protection; assembly
materials; CLT, glue-lam material; etc.
Contacts
VYTAUTAS LUBYS
CEO, assembly team leader
info@effectivesolutions.lt
+370 677 15755
PAULIUS MILČIUS
Business Development Partner
paulius.milcius@timberdesign.lt
+370 603 47379

Effective Solutions LT | CLT and glulam assembly (2018)

  • 1.
    specialists in massivewood construction #CLT #Glulam #MassiveWood #Construction
  • 2.
    Company profile • Established2012 • Assembly of CLT, glulam, prefab CLT modules and panels • CLT material delivery • Projects in Lithuania, Norway, Sweden, Denmark, Iceland, UK
  • 3.
    MOXY Oslo Xhotel, Norway (2016-2017)
  • 4.
    MOXY Oslo X •Stage: finished • Structure: CLT prefab modules and elements • Location: Norway, Oslo • Building: 7 stories • Assembly time: 3,5 months of CLT structure • Additionally: 2 months gypsum boards etc. • Speed: 308 equivalent rooms in 85 working days = average 4 rooms/day, progress to 6 rooms/day
  • 5.
    MOXY Glasgow hotel,UK (2017-2018)
  • 6.
    • Stage: finished •Structure: CLT prefab modules and elements • Location: Norway, Oslo • Building: 5 stories • Assembly time: 2,5 months of CLT structure • Additional: 2 months gypsum boards, roof structure, etc. MOXY Glasgow
  • 7.
    Light industry building,Arlanda, Sweden (2018)
  • 8.
    Individual houses inSweden, Lithuania (2012-2017)
  • 9.
    MOXY Copenhagen |project in line MOXY Copenhagen hotel, Denmark (2018) Building: 4 storeys, 4.800 m2. Load-bearing structure – CLT. Building system – modules and elements. Stage: will be assembled in 2018
  • 10.
    Landborgir hotel, Iceland(2018) Building: 3 storeys, 3.690 m2. Load-bearing structure – mainly CLT. Building system – elements. Stage: will be assembled in 2018
  • 11.
    Haheim Prosjekt AS Projectmanaging company Contact person: Christian Moberg cm@haapro.no +47 977 40 241 PROJ.ECO Engineering S.r.l. Assembly supervision and control for VASTINT (MOXY hotels) Contact person: Mauro Albertini malbertin@proj-eco.com +39 392 315 9631 Reference persons
  • 12.
    Delivery Assembly team (i.e.): •team leader, site engineer • 3-4 master assembly workers • 2-3 additional workers • 2-3 assembly specialists, 1-2 supporting workers Personal working tools, health & safety equipment Travel costs and delivery (related to team mobilization) Additionally: • acommodation; insurance; rain protection; assembly materials; CLT, glue-lam material; etc.
  • 13.
    Contacts VYTAUTAS LUBYS CEO, assemblyteam leader info@effectivesolutions.lt +370 677 15755 PAULIUS MILČIUS Business Development Partner paulius.milcius@timberdesign.lt +370 603 47379