HR TRAINING INSTITUTE
GRABIT – HR
Course contents
Our aim is to groom you as well-rounded HR professional:
• To provide a holistic view of key HR domains with thrust on
contemporary HR practices
• To fill knowledge gaps in practical HR concepts
• To equip you to take on day to day challenges in your HR role
• NO PRIOR KNOWLEDGE OF HR IS REQUIRED
• END-TO-END TOPICS COVERAGE FROM BASICS TO ADVANCED
Course Benefits
• Learn essentials of HR functions
• Be aware of Current talent & job market scenario
• Gain insights into prevailing recruitment best practices
• Understand significance of statutory compliances
• Get a holistic view of HR functions
• Apply knowledge immediately at your job
Enter formulas
Enter formulas
Eligibility
• For fresher’s wanting to get into HR/ starting their careers in HR.
Fresh MBA-HR wanting to learn practical HR concepts.
• BPO executives aspiring for a HR career.
• Junior-level HR executives.
• Any graduate interested in HR career.
Enter formulas
COURSE OVERVIEW
• PowerPoint Delivery in LCD Projector
• Comprehensive Real-time Examples & Concepts
•
Interactive Session Assignments & Assessments
(Case Study)
• Online Chat / Training Session/ Telephonic Support.
Enter formulas
Online Certification/ Course Material
• All delegates receive appropriate course material/Academy
Certification, which usually includes complete course notes,
handouts and exercises.
• On successful completion of training a certification would be given
stating that you are a “Certified HR Professional” after which you
would be assisted in placements as an in IT, Manufacturing OR
Service industry.
Courses Outline
.• Manpower Planning &
strategy
• Recruitment & selection
• Employee Onboard
• Hr Legal Compliances
• Payroll Administration
• Compensation & Benefit
• Performance management
• Leave management
• HR –Policy &
Implementation
• Training & development
• Executive HRM
• Reports & Records
• Industrial relations
• Hr Business Partner
• Competency mapping
• Employee Engagement
• CV & Resume writing
• Interview Preparation
• Training & dev.
• Case Study
• Industry overview.
• Interviewing skills
• Hr Title
• Manpower Planning
• Organization development – Structure – Planning – Performance
Man power planning & Structure along with KRA’s of individual
employee.
Getting Started
Recruitment
•Man power request form - Responsible for recruitment through job
portals (Naukri.com), consultant, Headhunting & advertisement
Vacancies Using appropriate mediums for all position for corporate,
sales & units of proficient manpower base on manpower planning.
Screening, evaluating, Short-listing the candidates, arranging
interviews for short-listed candidates.
Post RecRecruitment & Selection
•Pre recruitment
•Induction of Employees, Offer Letter, Acceptance Letter,
Appointment Letter and Completion of all joining formalities.
Responsible for maintenance of data bank of employees.
Employee On Boarding
• Welcome an Employee, Introduce Employee. History of Organization,
Organization chart, Introduce of Company policies, Do’s and Don’ts
• HR activities-Induction & exit interviews:
• Appropriate induction programs for new member & exit interviews,
Introduction with organization background along with current turning
and future business planning. All documentation of personnel during
joining & relieving along with full & final settlement.
• Checking major documents with concerned hired company responsible for
employer verification.
• HR Policies & System Implementation:-
• Initiate various HR policies, its designing (Under Guidance of HR Head)
and implementation as per need of business objective. Strict adherence of
all the policies, standard operating procedures for smooth and error free
system.
HR Legal Compliances
• Labour laws
• Shop acts
• Salary break up
• Time office Management
• Pay Slips
• Payroll Software (manual)
• PF, ESI, (Nomination, Declaration, Updates, Contribution, Returns and
Challan's)
• Professional tax
• Labour welfare
Enter formulas
HR LEGAL Compliances- Labour Laws
• Minimum Wages Act, 1948, State-wise
• Payment of Gratuity Act, 1972
• Contract Labour (Regulation and Abolition) Act, 1970
• Factories Act
• Employees State Insurance Act, 1948
• Employee’s Provident Fund and Misc. Provisions Act, 1952
• Shop & Establishment Act, 1948
• Workmen’s Compensation Act, 1923
• Payment of Bonus Act, 1965
• The Labour Welfare Fund Act, 1953
HR Legal Compliances
• Provident Fund
• Providing PF Reports
• Remittance of Chillan's
• Preparation & Filing of Monthly
returns
• Transfers, Withdrawals and Annual
Returns
• Facilitating PF Inspections
• Maintain 3A, 12 A Register
• Monthly P.F. Statement & Register
• Monthly P.F. Return i.e. 5/10 A
• 12 A. Annual Return
• Annual P.F. Slip
• P.F. Inspection Book & Compliance
with P.F. Authority
• compliance related P.F Authority
•ESIC
•Filling ESIC returns every half yearly
•Keep the track that each and every new
Joinee covered under ESIC ACT, should
receive the ESIC cards.
•PROFESSION TAX
•Providing PT Reports
•Location wise Remittance of Chillan's
•Preparation & Filing of Periodical
returns
•Organizing PT Assessment
•Representing client at PT Hearings
Enter formulas
Payroll Management
• Time Office Management
• - Daily Attendance
supervision.
• - Maintaining Leave Records
• - Joining Report
• - Time Office Norms
• - Time office function
• - Controlling & Maintaining
Muster Roll & Updating &
supervision at total time
office
• - Renewal and Registration
of all the required licenses
(Branch wise / Location
wise) as & when required
• Salary Break up:
• Introduction
• Salary slip formation
• Cost to company
• Introduction
• Designing of CTC
Enter formulas
Compensation & Benefits
• Insurance
• Provident fund
• Bonus
• Gratuity
• Rewards
Enter formulas
Performance Management
• 360* Appraisal/ MBO/Psychological Appraisal/Assessment
Center- FUTURE ORINETED
• Rating Scale/Checklist/Forced Choice/BARS/Field Review/Essay
Method.-PAST ORIENTED
• Self assessment, Annual appraisal, Evaluation techniques, Salary
survey.
• Manage previous year’s appraisal of all employees and co-ordinate
with Business Manger/ Sr. Mgt in the ratings.
• Increments, Compensation review/restructuring/Benefits &
Rewards.
• Necessary Feedback to the employees.
• employee Appraisal Analysis and Feed Back.
Enter formulas
Leave Management
• SL-Sick Leave
• CL- Casual Leave
• EL/PL- Earn Leave
• Compensatory off
• Maternity leave
• Leave without pay-LWP.
HR Policy
Enter formulas
• Forward, with a vision &
mission policy
• Introduction & Customer
Relations
• Work Practice Policy
• Holiday Policy
• Professional Conduct Policy
• Employee Relations Policy
• Business Ethics & Conduct
• Employment status and
Records
• Sexual Harassment Policy
• Health & Safety
Policy/procedure
• Business Expenses Policy
• Internet code of conduct & e
mail policy
• Company e- mail Policy
• Legal Issues
• Disciplinary Rules &
Procedures
• Induction Process
• Performance Appraisal Systems
Policy
• Leave Policy
• Travel Policy
• Provident Fund & Gratuity
Policy
• Separation Policy
Training & Development
• Introduction about the business, Mapping, Skills Required, New
versions, Training methods, Material - Design and Review of the
organizations Skill Matrix & Training & Development Policies and
Procedures.
• Preparation of Training Calendar.
• Competency mapping, Culture change management.
• Post Training Evaluation.
Enter formulas
Executive HRM
• Industrial Relation & dispute
• Employee Grievances
•
• Employee Relationships
• Employee feedback
• Exit Interviews
• Quality Process
• HR Audit, ISO Audit
Enter formulas
Reports and Records
• Preparation of all type of HRIS for HR and Management.
• Payroll Software, HRMS Software
• MIS Reports
Enter formulas
TRADE UNION
• Industrial Dispute Act 1947
• Strikes & Lockouts
• Lay off & retrenchments
• Notice for closing down any Undertaking.
• Unfair Labour Practice
• Unfair Labour practice on part of Employee or workman.
Enter formulas
HR Business Partner
• “A new kind of HR professional is emerging to manage this
transformed function, someone who deeply understands not only
talent-management processes but also an organization’s strategy and
business model.”
 Bring strong technical expertise to the table and an understanding of
your company and its strategy.
 The courage and conviction for change and to be what your
organization wants you to be.
 Develop new skills as needed. Understand the data, the financials,
markets
 Be a true Partner and a true Coach, with honesty, integrity and
courage.
CV/ Resume writing: Things to look out in CV
• Organization of events - Priority accordance
• Clarity of depiction and succinctness
• Unexplained breaks in Service and Education
• Extent of customization to the job applied
• Quality of the CV: mode , spelling errors, verbosity
Enter formulas
HR Interview questions
• Can You Do the Job?
• What did you like most and
least in your last job?
• How many people have you
supervised at any given time?
• What is the most difficult
decision you have had to make
in the last twelve months?
• Which of your achievements
has given you the greatest
• satisfaction?
• Who Are You?
• Tell me about yourself.
• How do you operate under
stress?
• What regrets do you have about
your career?
• What are your strengths and
weaknesses?
• What is your leadership style?
Enter formulas
HR Interview questions
• Will You Fit In at the Company?
• How would you describe your
last boss?
• How would you characterize
your relationships with your
colleagues?
• What types of people do you
have the most difficulty dealing
with?
• What was the outcome of your
last performance evaluation?
• What Will You Cost Us?
• What kind of benefits are you
looking for?
• How important is salary to
you?
• How do you feel about working
overtime?
• What do you expect to be
earning in five years?
Soft skills Training
• Leadership
• Team Building
• Effective Communication Skills
• Motivation
• Management games
Enter formulas
Case Study
• ITC In Rural India
• Dabur India Ltd- Globalization.
• Infosys; The Challenges of Global Branding
• Nano-Tata; The Peoples Car.
• Super Shampoo products & Indian Mass Market.
Enter formulas
Industry Overview
• Current Industry Trends.
• Changing business scenario.
• HR as Business Partner
• Job prospect in coming years.
Enter formulas
INTERVIEW STRUCTURE
1. Opening -
2. Current & Previous
roles
What, why, How well Trends, people are not
static
3. Aspiration /
Awareness
What, why, how realistic
4. Education &
Upbringing
What, why, how well
5. Circumstances &
Interest
What, why, how well
implication
Causes – relate past to
present
6. Closing -
Description
Motivation
Achievement
Structure of Questions
• Open ended Questions
How - What - When - Where - Who - Why
• Close ended Questions
Do you - Did you - Can you - Will you - Could you - Would you - Should
you
• Prompting/ encouraging expressions
Tell me…, Describe …
For example?, For instance?, In what sense?
How come?, In simpler terms
Enter formulas
Interviewing skills
• Interviewers need to be provided with job description & specification
of the requirements of the position to minimize the influence of
stereotypes
• Interview questions need to be job related
• Avoid making quick decisions about an applicant
• Avoid giving too much weight to a few characteristics
• Try to put the applicant at ease during the interview
• Communicate clearly with the applicant
• Maintain consistency in the questions asked
Enter formulas
Interview Tips
• Interviewers need to be provided with job description & specification
of the requirements of the position to minimize the influence of
stereotypes
• Interview questions need to be job related
• Avoid making quick decisions about an applicant
• Avoid giving too much weight to a few characteristics
• Try to put the applicant at ease during the interview
• Communicate clearly with the applicant
• Maintain consistency in the questions asked
Enter formulas
MEDIA/GALLERY
Enter formulas
MEDIA/GALLERY
Enter formulas
Eminent HR Professionals

HR Generalist Practical Training with 100% placement

  • 1.
  • 2.
    Course contents Our aimis to groom you as well-rounded HR professional: • To provide a holistic view of key HR domains with thrust on contemporary HR practices • To fill knowledge gaps in practical HR concepts • To equip you to take on day to day challenges in your HR role • NO PRIOR KNOWLEDGE OF HR IS REQUIRED • END-TO-END TOPICS COVERAGE FROM BASICS TO ADVANCED
  • 3.
    Course Benefits • Learnessentials of HR functions • Be aware of Current talent & job market scenario • Gain insights into prevailing recruitment best practices • Understand significance of statutory compliances • Get a holistic view of HR functions • Apply knowledge immediately at your job Enter formulas
  • 4.
    Enter formulas Eligibility • Forfresher’s wanting to get into HR/ starting their careers in HR. Fresh MBA-HR wanting to learn practical HR concepts. • BPO executives aspiring for a HR career. • Junior-level HR executives. • Any graduate interested in HR career.
  • 5.
    Enter formulas COURSE OVERVIEW •PowerPoint Delivery in LCD Projector • Comprehensive Real-time Examples & Concepts • Interactive Session Assignments & Assessments (Case Study) • Online Chat / Training Session/ Telephonic Support.
  • 6.
    Enter formulas Online Certification/Course Material • All delegates receive appropriate course material/Academy Certification, which usually includes complete course notes, handouts and exercises. • On successful completion of training a certification would be given stating that you are a “Certified HR Professional” after which you would be assisted in placements as an in IT, Manufacturing OR Service industry.
  • 7.
    Courses Outline .• ManpowerPlanning & strategy • Recruitment & selection • Employee Onboard • Hr Legal Compliances • Payroll Administration • Compensation & Benefit • Performance management • Leave management • HR –Policy & Implementation • Training & development • Executive HRM • Reports & Records • Industrial relations • Hr Business Partner • Competency mapping • Employee Engagement • CV & Resume writing • Interview Preparation • Training & dev. • Case Study • Industry overview. • Interviewing skills • Hr Title
  • 8.
    • Manpower Planning •Organization development – Structure – Planning – Performance Man power planning & Structure along with KRA’s of individual employee. Getting Started Recruitment •Man power request form - Responsible for recruitment through job portals (Naukri.com), consultant, Headhunting & advertisement Vacancies Using appropriate mediums for all position for corporate, sales & units of proficient manpower base on manpower planning. Screening, evaluating, Short-listing the candidates, arranging interviews for short-listed candidates. Post RecRecruitment & Selection •Pre recruitment •Induction of Employees, Offer Letter, Acceptance Letter, Appointment Letter and Completion of all joining formalities. Responsible for maintenance of data bank of employees.
  • 9.
    Employee On Boarding •Welcome an Employee, Introduce Employee. History of Organization, Organization chart, Introduce of Company policies, Do’s and Don’ts • HR activities-Induction & exit interviews: • Appropriate induction programs for new member & exit interviews, Introduction with organization background along with current turning and future business planning. All documentation of personnel during joining & relieving along with full & final settlement. • Checking major documents with concerned hired company responsible for employer verification. • HR Policies & System Implementation:- • Initiate various HR policies, its designing (Under Guidance of HR Head) and implementation as per need of business objective. Strict adherence of all the policies, standard operating procedures for smooth and error free system.
  • 10.
    HR Legal Compliances •Labour laws • Shop acts • Salary break up • Time office Management • Pay Slips • Payroll Software (manual) • PF, ESI, (Nomination, Declaration, Updates, Contribution, Returns and Challan's) • Professional tax • Labour welfare Enter formulas
  • 11.
    HR LEGAL Compliances-Labour Laws • Minimum Wages Act, 1948, State-wise • Payment of Gratuity Act, 1972 • Contract Labour (Regulation and Abolition) Act, 1970 • Factories Act • Employees State Insurance Act, 1948 • Employee’s Provident Fund and Misc. Provisions Act, 1952 • Shop & Establishment Act, 1948 • Workmen’s Compensation Act, 1923 • Payment of Bonus Act, 1965 • The Labour Welfare Fund Act, 1953
  • 12.
    HR Legal Compliances •Provident Fund • Providing PF Reports • Remittance of Chillan's • Preparation & Filing of Monthly returns • Transfers, Withdrawals and Annual Returns • Facilitating PF Inspections • Maintain 3A, 12 A Register • Monthly P.F. Statement & Register • Monthly P.F. Return i.e. 5/10 A • 12 A. Annual Return • Annual P.F. Slip • P.F. Inspection Book & Compliance with P.F. Authority • compliance related P.F Authority •ESIC •Filling ESIC returns every half yearly •Keep the track that each and every new Joinee covered under ESIC ACT, should receive the ESIC cards. •PROFESSION TAX •Providing PT Reports •Location wise Remittance of Chillan's •Preparation & Filing of Periodical returns •Organizing PT Assessment •Representing client at PT Hearings
  • 13.
    Enter formulas Payroll Management •Time Office Management • - Daily Attendance supervision. • - Maintaining Leave Records • - Joining Report • - Time Office Norms • - Time office function • - Controlling & Maintaining Muster Roll & Updating & supervision at total time office • - Renewal and Registration of all the required licenses (Branch wise / Location wise) as & when required • Salary Break up: • Introduction • Salary slip formation • Cost to company • Introduction • Designing of CTC
  • 14.
    Enter formulas Compensation &Benefits • Insurance • Provident fund • Bonus • Gratuity • Rewards
  • 15.
    Enter formulas Performance Management •360* Appraisal/ MBO/Psychological Appraisal/Assessment Center- FUTURE ORINETED • Rating Scale/Checklist/Forced Choice/BARS/Field Review/Essay Method.-PAST ORIENTED • Self assessment, Annual appraisal, Evaluation techniques, Salary survey. • Manage previous year’s appraisal of all employees and co-ordinate with Business Manger/ Sr. Mgt in the ratings. • Increments, Compensation review/restructuring/Benefits & Rewards. • Necessary Feedback to the employees. • employee Appraisal Analysis and Feed Back.
  • 16.
    Enter formulas Leave Management •SL-Sick Leave • CL- Casual Leave • EL/PL- Earn Leave • Compensatory off • Maternity leave • Leave without pay-LWP.
  • 17.
    HR Policy Enter formulas •Forward, with a vision & mission policy • Introduction & Customer Relations • Work Practice Policy • Holiday Policy • Professional Conduct Policy • Employee Relations Policy • Business Ethics & Conduct • Employment status and Records • Sexual Harassment Policy • Health & Safety Policy/procedure • Business Expenses Policy • Internet code of conduct & e mail policy • Company e- mail Policy • Legal Issues • Disciplinary Rules & Procedures • Induction Process • Performance Appraisal Systems Policy • Leave Policy • Travel Policy • Provident Fund & Gratuity Policy • Separation Policy
  • 18.
    Training & Development •Introduction about the business, Mapping, Skills Required, New versions, Training methods, Material - Design and Review of the organizations Skill Matrix & Training & Development Policies and Procedures. • Preparation of Training Calendar. • Competency mapping, Culture change management. • Post Training Evaluation. Enter formulas
  • 19.
    Executive HRM • IndustrialRelation & dispute • Employee Grievances • • Employee Relationships • Employee feedback • Exit Interviews • Quality Process • HR Audit, ISO Audit Enter formulas
  • 20.
    Reports and Records •Preparation of all type of HRIS for HR and Management. • Payroll Software, HRMS Software • MIS Reports Enter formulas
  • 21.
    TRADE UNION • IndustrialDispute Act 1947 • Strikes & Lockouts • Lay off & retrenchments • Notice for closing down any Undertaking. • Unfair Labour Practice • Unfair Labour practice on part of Employee or workman. Enter formulas
  • 22.
    HR Business Partner •“A new kind of HR professional is emerging to manage this transformed function, someone who deeply understands not only talent-management processes but also an organization’s strategy and business model.”  Bring strong technical expertise to the table and an understanding of your company and its strategy.  The courage and conviction for change and to be what your organization wants you to be.  Develop new skills as needed. Understand the data, the financials, markets  Be a true Partner and a true Coach, with honesty, integrity and courage.
  • 23.
    CV/ Resume writing:Things to look out in CV • Organization of events - Priority accordance • Clarity of depiction and succinctness • Unexplained breaks in Service and Education • Extent of customization to the job applied • Quality of the CV: mode , spelling errors, verbosity Enter formulas
  • 24.
    HR Interview questions •Can You Do the Job? • What did you like most and least in your last job? • How many people have you supervised at any given time? • What is the most difficult decision you have had to make in the last twelve months? • Which of your achievements has given you the greatest • satisfaction? • Who Are You? • Tell me about yourself. • How do you operate under stress? • What regrets do you have about your career? • What are your strengths and weaknesses? • What is your leadership style? Enter formulas
  • 25.
    HR Interview questions •Will You Fit In at the Company? • How would you describe your last boss? • How would you characterize your relationships with your colleagues? • What types of people do you have the most difficulty dealing with? • What was the outcome of your last performance evaluation? • What Will You Cost Us? • What kind of benefits are you looking for? • How important is salary to you? • How do you feel about working overtime? • What do you expect to be earning in five years?
  • 26.
    Soft skills Training •Leadership • Team Building • Effective Communication Skills • Motivation • Management games Enter formulas
  • 27.
    Case Study • ITCIn Rural India • Dabur India Ltd- Globalization. • Infosys; The Challenges of Global Branding • Nano-Tata; The Peoples Car. • Super Shampoo products & Indian Mass Market. Enter formulas
  • 28.
    Industry Overview • CurrentIndustry Trends. • Changing business scenario. • HR as Business Partner • Job prospect in coming years. Enter formulas
  • 29.
    INTERVIEW STRUCTURE 1. Opening- 2. Current & Previous roles What, why, How well Trends, people are not static 3. Aspiration / Awareness What, why, how realistic 4. Education & Upbringing What, why, how well 5. Circumstances & Interest What, why, how well implication Causes – relate past to present 6. Closing - Description Motivation Achievement
  • 30.
    Structure of Questions •Open ended Questions How - What - When - Where - Who - Why • Close ended Questions Do you - Did you - Can you - Will you - Could you - Would you - Should you • Prompting/ encouraging expressions Tell me…, Describe … For example?, For instance?, In what sense? How come?, In simpler terms Enter formulas
  • 31.
    Interviewing skills • Interviewersneed to be provided with job description & specification of the requirements of the position to minimize the influence of stereotypes • Interview questions need to be job related • Avoid making quick decisions about an applicant • Avoid giving too much weight to a few characteristics • Try to put the applicant at ease during the interview • Communicate clearly with the applicant • Maintain consistency in the questions asked Enter formulas
  • 32.
    Interview Tips • Interviewersneed to be provided with job description & specification of the requirements of the position to minimize the influence of stereotypes • Interview questions need to be job related • Avoid making quick decisions about an applicant • Avoid giving too much weight to a few characteristics • Try to put the applicant at ease during the interview • Communicate clearly with the applicant • Maintain consistency in the questions asked Enter formulas
  • 33.
  • 34.