SlideShare a Scribd company logo
Mezbaul Alam_______________________________
OBJECTIVE: Being a Mechanical Engineer, willing to serve, contribute and sharing my
technical know-how & experiences to any reputed business conglomerate
with my utmost sincerity and integrity.
EXPERIENCE: Year :April 01,2006 to TILL TO DATE
Name of Company : ABUL KHAIR GROUP
Position : ASST. GENERAL MANAGER (MANUFACTURING-
OPERATIONS)
(Head of operations-TOBACCO DIVISION)
REPORTING LINE : CHAIRMAN & DEPUTY MANAGING DIRECTOR
Responsibilities :
1. Has been taking care of Total operations & NEW
PROJECTS of Tobacco Division, which consists of the
following companies:
a)ABUL KHAIR TOBACCO
LTD(CIGARETTE
MANUFACTURING OPERATIONS)
b)ABUL KHAIR MATCH FACTORY LTD
c) ABUL KHAIR GREEN LEAF THRESHING PLANT
2. Recently completed the Cigarette manufacturing project
( Per day 120 million cigarette sticks automatic
Curriculum Vitae
Present & Permanent Address
Mezbaul Alam.
C/O: Hafez Ahmed.
3699,Port Connecting Road.
( Near M.A.Quader petrol pump )
Vill: Sharipara.
Post: Custom Academy.
P.S.: Pahartali.
Chittagong-4219.
Bangladesh.
Mobile:01912-133506,01819-538427
O1913-293664
Phone: +880-031-752868(RES)
Email: masba92@yahoo.com
masba @abul khairgroup.com
bitiba@bttb.net.bd
manufacturing plant i.e value of project is approximately
800 crore & 10 ton/hr GLT(GREEN LEAF THRESHING
PLANT)i.e value of project is approximately 500 crore with
Technical assiantance from KSEC(KUNMING
SHIPBUILDING EQUIPMENT COMPANY ) a sister concern
of CSIC(CHINA SHIPBUILDING COMPANY),ZHENGZHOU
TOBACCO RESEARCH INSTITUTE & CHINA TOBACCO
COMPANY (UNDER TOBACCO MINISTRY)
During project below activities has done :
i) Have started from green fields
ii) Total area of land for Cig manufacturing is 40
acres & GLT(GREEN LEAF THRESHING PLANT)
20 acres.
iii) Constructed RCC(800000 SFT) & PRE
Fabricated steel
Structure
iv) Installed 115 m3/hr WTP
vi) Installed 640 TR H-VAC SYSTEM
vii) Installed 10 MW & 5 MW captive power
plant
viii) Installed 2 no’s 10 ton & 3 nos 6 ton
water Boiler
ix) Installed 33 kva P.D.B substation
capacity
5 MW & 4 MW
x) Installed 10,00000 m3/hr DRF(DUST
RECOVERY FILTER)
system
xi) Installed vacuum system approximately
12000
m 3/hr
xi) Installed compressed air plant
approximately
250 m3/min
xii) Installed 5 no’s EOT crane capacity 5
~ 12 ton
xii) Installed Rotogravure printing press
xiii)Have installed, Erection,
commissioning capital
machineries for cigarette
manufacturing Plant &
GLT .Origin of machineryItaly,
Germany, Korea,
China, India& Indonesia etc.
3. Former-PLANT MANAGER OF ABUL KHAIR TOBACCO LTD
(CIGARETTE MANUFACTURING OPERATIONS)
4. RESPONSIBLE FOR PREPARING MANUFACTURING
“BUSINESS PLAN” FOR TOBACCO DIVISION
5. Responsible for all project including sourcing, Negotiations,
implementation & operation
6. Leading a team of 65 graduate engineers, 200 general
management staffs, 195 diploma engineers and around
4000 operators/workers
7. Installation, erection and commissioning of the machineries within the
stipulated time frame
8. Co-ordination of all project of the DIVISION.
9. Make A.O.P [Annual Operation Plan] For TOBACCO division as per
management vision.
10. Ensure Supply chain Management
11. Making PRODUCTION & MAINTENACE SCHEDULE
12. IMPLEMENT ALL PRODUCTION & MAINTENACE SCHEDULE.
13. QUALITY control
14. ENSURE TIMELY DELIVERY
15. Prepare report on monthly, weekly & annually for TOBACCO division
THROUGH E.R.P SYSTEM
16. Look after all foreign,Local spare for TOBACCO division
17. Look after all operational activities of TOBACCO DIVISION
18. Member of management committee of ABUL KHAIR GROUP.
19. Ensure K.P.I(KEY PERFORMANCE INDICATOR) OF ALL
PLANT OPERATION(CIGARETTE,GLT & MATCH)
Year : May 01,2001 ~ to march,31 2006 l
Name of Company : BANGLADESH STEEL RE-ROLLING MILLS
LTD(B.S.R.M)
(A MEMBER OF BSRM GROUP OF COMPANIES-
AN ISO-
9002 CERTIFIED COMPANY, PIONEER FOR
MANUFACTURING TORSTEEL, DEFORMED
BAR,AND
ANGLE)
Position : MANAGER (Maintenance & project)
Reporting line : Asst General Manager-plant
Responsibilities :
1. Install machinery
2. Look after all project & technical issues of plant
3.Making PRODUCTION & MAINTENACE SCHEDULE of plant
4. IMPLEMENT ALL PRODUCTION & MAINTENACE SCHEDULE.
5 .Design & development of MAINTENANCE WORK,
6.Coordinate all project WORK(block mill,twin channel,backshear
REHEATING FURNACE & 3HI MILL ETC)
7.Sourcing of the machineres
8.QUALITY control
9. ENSURE TIMELY DELIVERY
10 .PREPARE REPORT WEEKLY,MONTHLY & ANUUAL BASIS.
Year : APRIL 01,1999~ APRIL,31-2001.
Name of Company : AFTAB AUTOMOBILES LTD(A
MEMBER OF NAVANA GROUP & ASSEMBLER OF
TOYOTA & HINO VEHICLES
Position : ASSTT. MANAGER. (plant )
REPORTING LINE : PLANT MANAGER
Responsibilities :
1. Install machinery.
2.Incharge of Navana service centre chittagong
3.Total look after assembly of Toyota & hino vehicle
4.Ensure quality ,production of assembly unit(Toyota & hino)
5. To look after bus body fabrication work
3.Design of batteries(NAVANA BATTERY)
4.Supervision of NAVANA battery production.
5.Quality control.
6.In laboratory work &
7. All types of maintenance work.
Education : S.S.C. from Comilla board at 1990 in 1
st
Division.
H.S.C. from Comilla board at 1992 in 1
st
Division.
B.Sc. Engineering ( Mechanical ) from Khulna B.I.T at
1997 ( Held in 1999 ) In 2
nd
Class.
M.B.A(MARKETING) FROM University of science &
technology,ctg grade is 3.47 in scale of 4.
Overseas Training: Thailand : Get training from THAI UNITED INDUSTRY
CO. LTD, Samutprakan,10540 Bangkok, Thailand.
China & KOREA: Get training from JINAN JINXINYUAW
MACHINERY CO. LTD, 155, Yiwgxiowgsmantd,
Jihan Shandong, China.
LOCAL Training: MANAGEMENT: “PROBLEM SOLVING PROCEDURE
IN
T.Q.M FOR MANUFACTURING AND SERVICE
INDUSTRIES” ORGANISE BY AOTS CTG.
* Get training on siemens & omron plc
Other Training & overseas activity: I have visited lot of countries for machine
Sourcing, inspection, negotiation and training purpose.
For
example:France,indonesia,Singapore,india,Thailand,
China(25 times),south korea(7 times) etc.
Computer Literacy: Autocad 2015, Office XP, Qbasic & Networking.
Personal Data :
i. Father’s Name : Hafez Ahmed.
ii. Nationality : Bangladeshi By Birth.
iii. Date of Birth : 10 - 08 - 1974.
iv. Religion : Islam.
v. Marital Status : married.
(MEZBAUL ALAM)
DATE:1/04/15.
HOE
HOE

More Related Content

Similar to HOE

Mohamed Hassan CV 2
Mohamed Hassan CV 2Mohamed Hassan CV 2
Mohamed Hassan CV 2
Mohamed Hassan
 
curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)
Ahmed Hassan
 
Report_Chiller(by Sayan Roy)
Report_Chiller(by Sayan Roy)Report_Chiller(by Sayan Roy)
Report_Chiller(by Sayan Roy)
Sayan Roy
 
Mohamed Hamed'cv
Mohamed Hamed'cvMohamed Hamed'cv
Mohamed Hamed'cv
Mohamed Hamed
 
Round nut caulking process optimization and crack elimination
Round nut caulking process optimization and crack eliminationRound nut caulking process optimization and crack elimination
Round nut caulking process optimization and crack elimination
shravan shanbhog
 
Gka Resume Oct 08
Gka Resume Oct 08Gka Resume Oct 08
Gka Resume Oct 08
kgopalagarwal
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
kartik dogra
 
Aceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updatedAceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updated
beanmatrix
 
Ibraheem CV - final
Ibraheem CV - finalIbraheem CV - final
Ibraheem CV - final
ibraheem Osman
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
Shameek Sushil Kulkarni
 
Kec training report
Kec training reportKec training report
Kec training report
Jasvinder Singh
 
Resume Ayman Shaikh
Resume Ayman ShaikhResume Ayman Shaikh
Resume Ayman Shaikh
Ayman Shaikh
 
PROJECT
PROJECTPROJECT
PROJECT
Sripal Kumar
 
Ahmed Elzafarany.
Ahmed Elzafarany.Ahmed Elzafarany.
Ahmed Elzafarany.
Ahmed Elzafarany
 
ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)
Ahmed Besar
 
my cv
my cvmy cv
Ong-Art CV 170208
Ong-Art CV 170208Ong-Art CV 170208
Ong-Art CV 170208
Ong-Art Sanpinit
 
Personal Profile - Eng PIyathilake
Personal Profile - Eng PIyathilake Personal Profile - Eng PIyathilake
Personal Profile - Eng PIyathilake
BM Piyathilaka
 
OSAMA CV Jan. 2016
OSAMA CV Jan. 2016OSAMA CV Jan. 2016
OSAMA CV Jan. 2016
Osama Elbakory
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
Budi Prihartono
 

Similar to HOE (20)

Mohamed Hassan CV 2
Mohamed Hassan CV 2Mohamed Hassan CV 2
Mohamed Hassan CV 2
 
curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)curriclum vitea up date 19-3-2012 (3)
curriclum vitea up date 19-3-2012 (3)
 
Report_Chiller(by Sayan Roy)
Report_Chiller(by Sayan Roy)Report_Chiller(by Sayan Roy)
Report_Chiller(by Sayan Roy)
 
Mohamed Hamed'cv
Mohamed Hamed'cvMohamed Hamed'cv
Mohamed Hamed'cv
 
Round nut caulking process optimization and crack elimination
Round nut caulking process optimization and crack eliminationRound nut caulking process optimization and crack elimination
Round nut caulking process optimization and crack elimination
 
Gka Resume Oct 08
Gka Resume Oct 08Gka Resume Oct 08
Gka Resume Oct 08
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
 
Aceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updatedAceycorporatepresentation2014 updated
Aceycorporatepresentation2014 updated
 
Ibraheem CV - final
Ibraheem CV - finalIbraheem CV - final
Ibraheem CV - final
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Kec training report
Kec training reportKec training report
Kec training report
 
Resume Ayman Shaikh
Resume Ayman ShaikhResume Ayman Shaikh
Resume Ayman Shaikh
 
PROJECT
PROJECTPROJECT
PROJECT
 
Ahmed Elzafarany.
Ahmed Elzafarany.Ahmed Elzafarany.
Ahmed Elzafarany.
 
ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)ENG - Ahmedbesar(CV)
ENG - Ahmedbesar(CV)
 
my cv
my cvmy cv
my cv
 
Ong-Art CV 170208
Ong-Art CV 170208Ong-Art CV 170208
Ong-Art CV 170208
 
Personal Profile - Eng PIyathilake
Personal Profile - Eng PIyathilake Personal Profile - Eng PIyathilake
Personal Profile - Eng PIyathilake
 
OSAMA CV Jan. 2016
OSAMA CV Jan. 2016OSAMA CV Jan. 2016
OSAMA CV Jan. 2016
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 

HOE

  • 1. Mezbaul Alam_______________________________ OBJECTIVE: Being a Mechanical Engineer, willing to serve, contribute and sharing my technical know-how & experiences to any reputed business conglomerate with my utmost sincerity and integrity. EXPERIENCE: Year :April 01,2006 to TILL TO DATE Name of Company : ABUL KHAIR GROUP Position : ASST. GENERAL MANAGER (MANUFACTURING- OPERATIONS) (Head of operations-TOBACCO DIVISION) REPORTING LINE : CHAIRMAN & DEPUTY MANAGING DIRECTOR Responsibilities : 1. Has been taking care of Total operations & NEW PROJECTS of Tobacco Division, which consists of the following companies: a)ABUL KHAIR TOBACCO LTD(CIGARETTE MANUFACTURING OPERATIONS) b)ABUL KHAIR MATCH FACTORY LTD c) ABUL KHAIR GREEN LEAF THRESHING PLANT 2. Recently completed the Cigarette manufacturing project ( Per day 120 million cigarette sticks automatic Curriculum Vitae Present & Permanent Address Mezbaul Alam. C/O: Hafez Ahmed. 3699,Port Connecting Road. ( Near M.A.Quader petrol pump ) Vill: Sharipara. Post: Custom Academy. P.S.: Pahartali. Chittagong-4219. Bangladesh. Mobile:01912-133506,01819-538427 O1913-293664 Phone: +880-031-752868(RES) Email: masba92@yahoo.com masba @abul khairgroup.com bitiba@bttb.net.bd
  • 2. manufacturing plant i.e value of project is approximately 800 crore & 10 ton/hr GLT(GREEN LEAF THRESHING PLANT)i.e value of project is approximately 500 crore with Technical assiantance from KSEC(KUNMING SHIPBUILDING EQUIPMENT COMPANY ) a sister concern of CSIC(CHINA SHIPBUILDING COMPANY),ZHENGZHOU TOBACCO RESEARCH INSTITUTE & CHINA TOBACCO COMPANY (UNDER TOBACCO MINISTRY) During project below activities has done : i) Have started from green fields ii) Total area of land for Cig manufacturing is 40 acres & GLT(GREEN LEAF THRESHING PLANT) 20 acres. iii) Constructed RCC(800000 SFT) & PRE Fabricated steel Structure iv) Installed 115 m3/hr WTP vi) Installed 640 TR H-VAC SYSTEM vii) Installed 10 MW & 5 MW captive power plant viii) Installed 2 no’s 10 ton & 3 nos 6 ton water Boiler ix) Installed 33 kva P.D.B substation capacity 5 MW & 4 MW x) Installed 10,00000 m3/hr DRF(DUST RECOVERY FILTER) system xi) Installed vacuum system approximately 12000 m 3/hr xi) Installed compressed air plant approximately 250 m3/min xii) Installed 5 no’s EOT crane capacity 5 ~ 12 ton xii) Installed Rotogravure printing press xiii)Have installed, Erection, commissioning capital
  • 3. machineries for cigarette manufacturing Plant & GLT .Origin of machineryItaly, Germany, Korea, China, India& Indonesia etc. 3. Former-PLANT MANAGER OF ABUL KHAIR TOBACCO LTD (CIGARETTE MANUFACTURING OPERATIONS) 4. RESPONSIBLE FOR PREPARING MANUFACTURING “BUSINESS PLAN” FOR TOBACCO DIVISION 5. Responsible for all project including sourcing, Negotiations, implementation & operation 6. Leading a team of 65 graduate engineers, 200 general management staffs, 195 diploma engineers and around 4000 operators/workers 7. Installation, erection and commissioning of the machineries within the stipulated time frame 8. Co-ordination of all project of the DIVISION. 9. Make A.O.P [Annual Operation Plan] For TOBACCO division as per management vision. 10. Ensure Supply chain Management 11. Making PRODUCTION & MAINTENACE SCHEDULE 12. IMPLEMENT ALL PRODUCTION & MAINTENACE SCHEDULE. 13. QUALITY control 14. ENSURE TIMELY DELIVERY 15. Prepare report on monthly, weekly & annually for TOBACCO division THROUGH E.R.P SYSTEM 16. Look after all foreign,Local spare for TOBACCO division 17. Look after all operational activities of TOBACCO DIVISION 18. Member of management committee of ABUL KHAIR GROUP. 19. Ensure K.P.I(KEY PERFORMANCE INDICATOR) OF ALL PLANT OPERATION(CIGARETTE,GLT & MATCH) Year : May 01,2001 ~ to march,31 2006 l Name of Company : BANGLADESH STEEL RE-ROLLING MILLS LTD(B.S.R.M) (A MEMBER OF BSRM GROUP OF COMPANIES- AN ISO- 9002 CERTIFIED COMPANY, PIONEER FOR MANUFACTURING TORSTEEL, DEFORMED BAR,AND
  • 4. ANGLE) Position : MANAGER (Maintenance & project) Reporting line : Asst General Manager-plant Responsibilities : 1. Install machinery 2. Look after all project & technical issues of plant 3.Making PRODUCTION & MAINTENACE SCHEDULE of plant 4. IMPLEMENT ALL PRODUCTION & MAINTENACE SCHEDULE. 5 .Design & development of MAINTENANCE WORK, 6.Coordinate all project WORK(block mill,twin channel,backshear REHEATING FURNACE & 3HI MILL ETC) 7.Sourcing of the machineres 8.QUALITY control 9. ENSURE TIMELY DELIVERY 10 .PREPARE REPORT WEEKLY,MONTHLY & ANUUAL BASIS. Year : APRIL 01,1999~ APRIL,31-2001. Name of Company : AFTAB AUTOMOBILES LTD(A MEMBER OF NAVANA GROUP & ASSEMBLER OF TOYOTA & HINO VEHICLES Position : ASSTT. MANAGER. (plant ) REPORTING LINE : PLANT MANAGER Responsibilities : 1. Install machinery. 2.Incharge of Navana service centre chittagong 3.Total look after assembly of Toyota & hino vehicle 4.Ensure quality ,production of assembly unit(Toyota & hino) 5. To look after bus body fabrication work 3.Design of batteries(NAVANA BATTERY) 4.Supervision of NAVANA battery production. 5.Quality control. 6.In laboratory work & 7. All types of maintenance work. Education : S.S.C. from Comilla board at 1990 in 1 st Division. H.S.C. from Comilla board at 1992 in 1 st Division. B.Sc. Engineering ( Mechanical ) from Khulna B.I.T at 1997 ( Held in 1999 ) In 2 nd Class.
  • 5. M.B.A(MARKETING) FROM University of science & technology,ctg grade is 3.47 in scale of 4. Overseas Training: Thailand : Get training from THAI UNITED INDUSTRY CO. LTD, Samutprakan,10540 Bangkok, Thailand. China & KOREA: Get training from JINAN JINXINYUAW MACHINERY CO. LTD, 155, Yiwgxiowgsmantd, Jihan Shandong, China. LOCAL Training: MANAGEMENT: “PROBLEM SOLVING PROCEDURE IN T.Q.M FOR MANUFACTURING AND SERVICE INDUSTRIES” ORGANISE BY AOTS CTG. * Get training on siemens & omron plc Other Training & overseas activity: I have visited lot of countries for machine Sourcing, inspection, negotiation and training purpose. For example:France,indonesia,Singapore,india,Thailand, China(25 times),south korea(7 times) etc. Computer Literacy: Autocad 2015, Office XP, Qbasic & Networking. Personal Data : i. Father’s Name : Hafez Ahmed. ii. Nationality : Bangladeshi By Birth. iii. Date of Birth : 10 - 08 - 1974. iv. Religion : Islam. v. Marital Status : married. (MEZBAUL ALAM) DATE:1/04/15.