H3C (HP Networking)
   IRF2 Technology &
  Products Introduction




                Wilson Cheung
                Senior Sales Manager
                                 Dec-2012
                                            1
1.   Current Network Challenges
2.   H3C IRF2 Introduction
3.   H3C IRF2 Product Introduction
4.   H3C Green IT
5.   H3C IRF2 Case Study




                                     2
The Challenge of IT Network


• Device Increase !!
• Complex Topology !!
• Difficult to Manage !!
• Compatibility !!
• High Reliability !!
• Load Balance !!
• Able to Failover ??
• Able / Easy to Recover
  after Failover ??




                              3
Common Difficulties of Network Administrator


                           farm
                     erver
              tion s
  WhileApplica are more applications
       there                                                 How to implement remote
  And higher performance requirements,                       disaster recovery of data?
  can the data center support future
  service development?
                                                  How to guarantee security of key
   What will be included in large- and            data that faces soft and hard faults?
   mid-scale networks?
   How to construct them?
                                                How to ensure network reliability
                                                and service continuity?


                                              How to manage the network in a
                                              unified manner and reduce the
                                              management and maintenance cost?


                                         How to address the compatibility problem
                                         of heterogeneous devices purchased
                                         at different times?




                                                                                          4
Network Design Concerns
                          Challenge
                                                                                          VRRP configuration
        Scalability & Availability has becoming more and more
        important for campus network and data center
        construction.                                                                     IGP configuration

        Conventional technology facing challenge
        including : 1. Slow network convergence                                         MSTP+VRRP design of
                        2. Complexity for management                                    flow load balance and
                                                                                            VLAN assign
                        3. Low utilization of bandwidth
                        4. High cost for upgrade network




VRRP Multiple Instance              MSTP                             Multiple service

        Core
                                                                L3   NS
                                                                L2    FW
                                                                      IPS
                                                                      LB




       VRRP instance Master                 MSTP instance
 VRRP Multi-instance                              MSTP                      Multiple service

                                                                                                                5
1.   Current Network Challenges
2.   H3C IRF2 Introduction
3.   H3C IRF2 Product Introduction
4.   H3C Green IT
5.   H3C IRF2 Case Study




                                     6
What’s IRF2



     Virtualization
                             H3C                    Compatibility

    H3C’s Virtual LAN
      Technology.
                            IRF2                 For H3C Full Series Box
                                                  and Chassis Devices
                        Software
                                   Application

                                   Security

                                   Network

     Architecture
                                                     Expansibility
    Create Advanced            hardware
     Framework &                                    Integrate Multiple
      Architecture                                Service and Openness




                                                                           7
H3C Stacking Technology Trend



      H3C leverages abundant
      stacking solution experience



                               First
                                                         IRF1
                                                                        IRF2
                                                      Technology
                                                                     Technology
                                                      L3 10GE box
                                                                     10GE IPv6 box
                                                        switches
                                                                     H3C S5500-EI
                                          XRN         Huahui -3Com    H3C S5800
                                       Technology     S5600/S3600
                                                                     10GE Chassis
                                       L3 GE switch      2005        H3C S7500E
                                                                     H3C S9500E
               1st Stackable              3Com
                                                                      H3C 12500
                 L2 10/100             SuperStack
                   switch                49xx &                          2009
                                       Switch 40x0
                  3Com                    2002
                SuperStack
1 Stackable
 st
                1100/3300
Ethernet Hub
   3Com            1998
    1992
                                                                                     8
How we look at IRF2 Technically?



                                            CPU




                                   Master   CPU
                                   Engine


                                            CPU


                                   Slave
                                   Engine   CPU



                                            CPU

                                   Slave
                                   Engine




                                                  9
Advantage of IRF2 – Doubled Performance




                                      Active device

                                          Active Link




                                      Standby device
      Traditional Network                 Standby link          Vituralize by H3C IRF2
                                                                     Technology
Without IRF, all core and distribution                  With IRF, all core and distribution
devices are working as active and                        are working both active---two
standby---only one at the same time
                                                         devices as one logical device
Without IRF, all links are also active
                                                         With IRF, all uplinks are working in
and standby---Only one link used at the
same time                                                LACP mode---all load sharing


                                                                                                 10
Advantage of IRF2 – Manageable



                                                                              10.2.1.1

    10.1.1.2                 10.2.1.2




                                                                         10.3.1.1


                             10.3.1.5
   10.3.1.2
                 10.3.1.3




  • Aggregated devices are treated as one logical device, all members are managed
    by master device (or master MCU in chassis switch).
  • Only one configuration file works on the entire stack.
  • The entire stack is able to be managed via any port on its member.


                                                                                         11
Advantage of IRF2 – Resilience
Convergence
   Time
                                                                                                                     Speed Network
                                                           WAN
                                IP=10.153.108.2/24
                                                                                                                      Convergence
                                            Virtual IP=10.153.108.1



  N Second                                           IP=10.153.108.3/24

             Gateway=10.153.108.1



                            Gateway=10.153.108.1                                         WAN
                                                              IP=10.153.108.1/24




                                                                                   IP=10.153.108.1/24                                      WAN
   Second                               Gateway=10.153.108.1


                                                                                                                                         IRF2
                                                          Gateway=10.153.108.1
                                                                                                                                   IP=10.153.108.1/24


                                                                                              Gateway=10.153.108.1


    ms
                                                                                                            Gateway=10.153.108.1


                     VRRP                                   MSTP                                              IRF2                              Deployment

                                                                                                                                                             12
IRF2 Benefits
                                                                                    H3C Intelligent Resilient Framework
                                                                                    2 (IRF2) is a network virtualization
                            Enhanced
                                                                                    technology that virtualizes several
                            Performance                      Easy
                                                                                    physical switches into one logic
                                                             Management
                                                                                    switch. In a IRF2 system, the data
                                                                                    plane and switch fabric of all
                    IRF2 Fabric                                                     engines are active at the same time,
                                                                                    thereby providing a multiplied



                              +                     =
Virtual                                                                             switching capacity.
Switching                                                                           IRF2 members are connected by
                                                                                    virtual switch channels (VSCs).
                                                                                    VSCs use standard 10 Gigabit
                                                                                    Ethernet connections (as many as
                                                                                    twelve 10G trunk) between the IRF2
                                        Multi-service                               members. VSCs can carry regular
                                                                                    user traffic in addition to the control
                                                                                    plane communication between the
     High                                                                           IRF2 members without
     Reliability                                                                    compromising functionalities.


  Virtual Switching                      Easy Management                Multi-service
     Virtual L2 switching                  Centralized Management           Sec-blade firewall
     Virtual L3 switching                  Unified OS/CLI                   Load-balancing module
     Virtual MPLS switching                                                 Netstream
                                                                            IPS module
   Enhanced Performance                                                    Wireless controller
                                          High Reliability
     Up to 10 units in an IRF2 Fabric       1:N backup
     Multiplied performance                 Distributed link aggregation
                                            Eliminating the dependency on Spanning Tree Protocol (STP)

                                                                                                                          13
IRF2 Benefits

IRF2 can run on H3C S5800, S5820, S5500-EI, S5120EI
box switches and S7500E, S9500E, S12500 chassis
switches. IRF2 enables the same series switches work as
a single logical unit in the network.
By applying IRF2, either chassis
switches or box switches can be
                                                                                  S12500 Series
virtualized as a single high reliable,
high throughput and high integrated                                               Chassis Switch
logical device.
                                                             S9500E Series
                                                             Series
                                                             Chassis Switch
                                         S7500E Series

                                          Chassis Switch                 5 Breakthroughs of IRF2

                     S5000
                     Series
                     Box Switch
                                                           Break through the limitation of regions

                                                             Break through restriction on performance & bandwidth



                                         IRF2                  Break through the constraints of slots and interfaces

                                                             Break through the restriction on the form of equipments

                                                           Break through the restrictions on services



                                                                                                                       14
IRF2 in SMB network




                                1500
                                User

  100                 200
  user
                      user

                             Focus on
                             • Lower TCO
                             • Higher Price Performance
                               Ratio
                             • Pay while grow

                                                          15
Revolution of Campus LAN Architecture

 H3C IRF2 is transforming enterprise network
 architecture for simplyness and optimization




     Common Network            Stacking Network   IRF2 Network

                                                                 16
IRF2-based 4 Chassis Virtualization



                                       4 x Chassis Switch IRF2
                                           4 x Core switch IRF2
                 2 x Chassis Switch IRF2
                     2 x Core Switch IRF2

8 x Switch IRF




    2003                  2009                 2011




                                                                  17
H3C Optimizes data center with Intelligent
Resilient Framework 2 (IRF2)

                                                                                          L3
                                       Fast Failover                                      L2
                                        MiliSecond
                                        Recovery
                                                                  MSTP instance

                                         H3C IRF2        No STP, only link aggregation, miliseconds failover




                                                       10.1.1.2                10.2.1.2
                                                                                                          10.2.1.1

                                        Simplified
                                       Management                                                     10.3.1.1
                                         Single IP     10.3.1.2
                                                                               10.3.1.5

                                       Management                   10.3.1.3



                                         H3C IRF2        With IRF2 stacking, multiple devices-single config file




                                         Doubled
                                       performance
                                       Active-Active
                                          mode
Two-tier network design suitable for
flat server-to-server connectivity       H3C IRF2        All paths active, performance is doubled                    18
H3C Chassis Base Switch
Double Fault Tolerance Network



                           
                          
                               

        10G                   


 Any two link failure
 Any two switch failure           Whole network        B&F transaction and data
                                   recovery within      base will not be affected
 Any two switch                   milliseconds level
components                                                                          19
H3C “4-in-1” Intelligent Resilient Framework 2
 (IRF2) virtualization solution
                                           Dark Fiber /
                                             DWDM




                      SITE 1                                         SITE 2



                         Dark Fiber /
                           DWDM                             Dark Fiber /
                                                              DWDM



                                        H3C CLOUD NETWORK




                       SITE 4              Dark Fiber /
                                                                   SITE 3
                                             DWDM

H3C 4 CHASSIS VIRTUALIZATION
Four core switches dispersed
among multiple sites into a single
IRF2 logical unit                                                             20
IRF2 in Enterprise network
Extranet




                               Intranet




                                                                                                    Internet
OA Network




                                                               Core Area




                                                                                                    OA Network
                                                                                                    Data Center
             WE
             B
                   WE
                   B
                          WE
                          B
                               AP
                               P
                                          AP
                                          P
                                               AP
                                               P
                                                          DB   DB          DB   IP
                                                                                SAN
                                                                                      IP
                                                                                      SAN
                                                                                              IP
                                                                                              SAN
                                                                                                                  Focus on
                                                                                                                  • Architecture Flexibility
                                    Management Software
                                                                                                                  • Multiple Services
                                                                                                                  • Performance &
                  Management                                                     Management
                  Server                                                         Server



                                                                                                                    Scalability
                                          Management Area

                                                                                                                                         21
IRF2 in Enterprise network
Focus on
• Architecture Flexibility
• Multiple Services
• Performance &
  Scalability




                             22
H3C IMC total network management Solution




      H3C IMC is designed exclusively to control a complicated, multi-
      vendor, highly virtualized network platform across multi-sites. Its
      unified management idea and single pane of glass make it unique in
      the market.
                                                                            23
1.   Current Network Challenges
2.   H3C IRF2 Introduction
3.   H3C IRF2 Product Introduction
4.   H3C Green IT
5.   H3C IRF2 Case Study




                                     24
H3C Switch Product Portfolio
            IRF2   IPv6          IRF2 IPv6 100G           IRF2   IPv6           IRF2 IPv6 100G




Backbone
switch
series

               S7500E               S10500                S9500E                 S12500
                                                                         M-
                    IRF2 IPv6          IRF2 IPv6                        core IRF2 IPv6


GE switch
series

                    S5120SI/EI             S5500SI/EI                      S5800


                                                   IRF2                       IPv6


FE switch
series

             S3100v2EI                             S3600v2SI/EI                      S3610
                                                                                                 25
S12500 Product Introduction
  100G Platform                            4/8/32-port 10GE line card
  Maximum 512 10GE ports                   48-port GE
  200ms buffer capability
                                                              S12508                 S12518
                             Switching
                                                              3.06Tbps              6.66Tbps
                             capacity
                             Throughput                960Mpps/ 1920Mpps      2160Mpps/ 4320Mpps
                             Bandwidth                    360Gbps/ 720Gbps     360Gbps/ 720Gbps
                             CPU                                1+1                    1+1
                             Switching fabric                   8+1                   8+1
                             CPU slots                           2                     2
                             Switching fabric
                                                                 9                     9
                             slots
                             I/O slots                           8                     18
                             GE (max)                           384                   864
                             10GE (max)                         256                   576
                                                       256Mbytes/10G port      256Mbytes/10G port
                             Buffer per port
                                                       21.3Mbytes/GE port      21.3Mbytes/GE port
                             Fan module               Fan N+M, fan frame1+1   Fan N+M, fan frame1+1
                             Power module                       N+M                   N+M




                                                                                                      26
S12508 Product Physical Appearance

                                                Power cooling fan

    Power                                       Power cables
    module
    6 (max)

                                                Fan frame




                       22 RU ( 975mm)
  CPU engine
  1 ~ 2 pieces

                                                Switching fabric
    I/O slots                                   9 (max)
    8 (max)


                                                Fan frame




                                        442mm



                                                                    27
S12500 Benefits

512MB                                  512MB     CLOS multi-layered switching
                                                 Fabric architecture

512MB                                  512MB
                                                 Dynamic non-blocking
                                                 service scheduling

512MB                                  512MB
                                                 180G per slot, smoothly upgrade

512MB                                  512MB
                                                 Update of switching capacity when
                                                 user upgrade their network
             CLOS architecture



                                                512MB buffer
                                               10GE     24GE
 512M buffer for each 2 10GE ports
                                               10GE

 guarantees 200ms buffering to avoid
 TCP retransmission storm                       512MB buffer

                                               10GE       24GE


                                                10GE


                                                                                     28
S12500 Benefits
     Ingress Line card
            512MB
            Cache
                512MB          Egress Line card                   Egress line card: Easy to cause blocking
                 缓存
             512MB                                                when more than one ingress line cards
             Cache                      512MB                     transmit data to one egress line cards
                512MB                   Cache                     at the same time with large burst traffic
                 缓存
            512MB                       512MB                    Distributed buffering can handle the large
            Cache                       Cache
                512MB                       blocking
                                                                 Burst of each interface and avoid blocking
                 缓存                                              At the egress interface
            512MB
            Cache
                512MB




48-port GE copper/fiber full wire speed



 4/8-port 10GE full wire speed (XFP)                            48-port GE copper        48-port GE fiber


8/16-port 10GE full wire speed (SFP+)
32-port 10GE (SFP+)
                                                  8-port 10GE         16-port 10GE       32-port 10GE




                                                                                                              29
S10500 Product introduction


Introducing the NEW S10500 core switch
                                        •   Enables 2-Tier Architectures
                                        •   128 wire speed 10 GbE (for 8-slot
                                            chassis)
                                        •   IRF creates a 1536 GE-port core (4
                                            chassis stacking)
                                        •   3 microsecond latency
                                        •   40G, 100G ready
   S10504    S10508V      S10508




 New generation switches, high-density 10-Gigabit and ultra high-
 density Gigabit applications, future 40G, 100G ready
 The H3C S10500 is engineered for:
  – Core and distribution layer
  – Core layer of large enterprise, data centre and campus networks
                                                                                 30
S10500 benefit-Industry leading Architecture

         Fabric
                                   The forwarding plane is physically separated




                              板
        交换网
       Fabric
                                   from the control plane, so the MPU


              背


                         rd d
                      c a ar
      交换网
      Fabric                       switchover will not affect the forwarding



                     e in c
                                   traffic

                  Lin L
     Fabric


                       U PU        Good scalability; Smooth upgrade to next-
                                   generation 40GE and100GE interfaces
                     MP M




                                   Fabric redundancy; When one failure, others
                         ca card




                                   can take over the work
                           rd
                    Lin Line
                       e




                                   Easy to upgrade bandwidth, only need to
                                   upgrade the fabric modules




                                                                                  31
Multistage CLOS Switching Network

                                               CLOS Architecture Benefits:
Service board Switching fabric Service board
                                               – Simplifying large-scale switching
                                                 architecture
                                               – Reducing possible fault points and
                                                 enhance the switching architecture
                                                 reliability
                                               – Powerful fault defense capability
                                               – Independent switching paths will not affect
                                                 each other. Further enhances reliability
                                                 and expandability
                                               – Supporting recursive expanding. Capacity
   The H3C S10500 adopts the CLOS                expansion is unlimited in theory
   multi-layered switching architecture.
   The service boards and the switching
   fabrics are all physically connected.


  The multi-stage switching architecture implements large-capacity switching capability

                                                                                               32
S10500 benefit
                                                                   CLOS multi-layered switching
                                                                   Fabric architecture


                                                                   Dynamic non-blocking
                                                                   service scheduling


                                                                   480G per slot, smoothly upgrade


                                                                   Update of switching capacity when
                                                                   user upgrade their network
    The multi-stage switching architecture



 48-port GE copper/fiber
 full wire speed

                                                       48-port GE copper       48-port GE fiber

 8/16/32/48-port 10GE
 full wire speed (SFP+)
                                      8-port 10GE   16-port 10GE     32-port 10GE      48-port 10GE

 4-port 40GE full wire speed (QSFP)
                                                            4-port 40GE

                                                                                                       33
S9500E Product Introduction
  Distributed ASIC+NP+Multicore     OAA (Firewall, IPS, wireless, LB, network
  technology                         analysis and etc)
  Maximum 192 10GE ports            IRF2
  2/4/16-port 10GE line card
  48-port GE                      Type                        S9505E     S9508E-V        S9512E

                                   Number of slots               5        8 (vertical)      12

                                   Switching capacity           720G        1.44T         1.44T

                                   Packet forwarding rate     360Mpps     576Mpps        864Mpps

                                   Engine redundancy          Supported   Supported      Supported

                                   Power             supply
                                                                1+1          1+1           1+1
                                   redundancy

                                   Maxi.    number       of
                                                                240          384           576
                                   Gigabit ports

                                   Maxi. number of 10G
                                                                 16           16            16
                                   ports per slot

                                   Maximum number of
                                                                 80          128           192
                                   10G ports

                                   Cabinet size                 11U          22U           17U




                                                                                                     34
S9500E Benefits

                                                         1Ghz CPU                   10ms MSTP
                                                                                      failover

                                  Processor

                                                                     30ms IP FRR                  20k route
                          背板                                           failover                  Per second


                            EMS
                          EMS


                                                       BFD Detection           OAM Detection
                    EMS
                                    FFDR
                                                                     Provide fast
                                                                     Failover and                30ms BFD
                          FFDR                                       convergence                  failover
                                  Fast Fault Detection and
                          主控板     Restoration
                FFDR

                     处
            Main board 理器                                                                          Software
                                                                            Offline               integrated
                                                          Board            diagnosis
              Processor                                  isolation                               management
                                    EMS
           EMS

                                  Embedded                                 detection             detection
Innovative Multi-Engine Design                               POST
                                  Maintenance                             of hardware            of service
                                                                              faults              channels
                                  Subsystem

                                                                                                               35
S9500E Benefits

                 OSPF
                                                                      Packets of each protocol are assigned to a
                                                                      single queue to avoid interference between
                 ARP                                                  protocols

Traffic to CPU
Traffic to CPU
                       ...
                                   Software Control
                                        Policy              CPU
                 BPDU
                                                                       Traffic can be limited based on pps

                 ICMP



      Dedicated CPU traffic control




        Integrate Multiple service capability


                                                      Wireless Controller          NAT            Load
       Security: Firewall/IPS                                                                     Balancing



       Services: AC, NAT, Load balancing
                                                                        Firewall                  IPS




                                                                                                                   36
S7500E Product Introduction
 Distributed ASIC+NP+Multicore           OAA (Firewall, IPS, wireless, LB, network
 technology                               analysis and etc)
 Maximum 84 10GE ports                   IRF2
 2/4/8-port 10GE line card                              S7502E        S7503E          S7506E(V)     S7510E
 48-port GE
                                  No. of Slots              4            5                 8            12

                                  backplane bandwidth     ≥400G         ≥1T              ≥1.6T        ≥2.4T

                                  Switching capacity      192G          480G             768G       1152G/768G

                                  Forwarding Capacity    143Mpps      274Mpps          488Mpps     773M/488Mpps

                                  MCU Redundancy         Support       Support          Support      Support

                                  Power supply
                                                           1+1          1+1              1+1           1+1
                                  redundancy

                                  Max. GE Ports             96          144              288           480

                                  Max. 10G Ports            4            10               16            24




                                                                                                                 37
S7500E Benefits

                                               768G      Switching          MPLS           Netstream
                                                          Routing                            sFlow




                                              Wireless    EPON               EAD             IRF2




                                                IPS      SSL VPN             Load          Firewall
                                                                           balancing
   Full service chassis switch



   Integrate Multiple service capability
                                           Wireless         Load                   EPON
                                                            Balancing


   Security: Firewall/IPS/SSL VPN

                                           Firewall                  IPS               SSL VPN


   Services: 2/4/8-port 10GE
                                           2-port 10GE      4-port 10GE            8-port 10GE


                                                                                                       38
S7500E Benefits

                                             CPU
                              Master
                              Engine
                                             CPU


      IRF2                   Slave
                                             CPU

                              Engine         CPU


                             Slave           CPU
                              Engine




                  S7500E uses 53%~55% less W/G against
                  industry average

                                                         39
S5800 Product Introduction
  GE/10GE L3 switch                            30W PoE+

  IRF2                                         OAA

  IPv6                                         USB
                                                                                                            Upto 84GE per box




        S5800-32C (-PWR)          S5800-32F                    S5800-56C (-PWR)                        S5800-60C-PWR
                                                   SFP       SFP+                                                     Redundant
            Type           Size   10/100/1000                                Extension Module                  OAA
                                                  FE/GE     GE/10GE                                                      PW

                                                                                    2 (Front)
S5800-60C-PWR              2U      48 PoE+          4                                                           1        ○
                                                                      (2 x 2 / 4port 10GE, 2 x 16port GE)

                                                                                     1 (back)
S5800-56C-PWR              1U      48 PoE+                    4                                                           
                                                                      (1 x 2 / 4port 10GE, 1 x 16port GE)

                                                                                     1 (back)
S5800-56C                  1U         48                      4                                                           
                                                                      (1 x 2 / 4port 10GE, 1 x 16port GE)

                                                                                     1 (back)
S5800-32C-PWR              1U     24 PoE+                      4                                                          
                                                                      (1 x 2 / 4port 10GE, 1 x 16port GE)

                                                                                     1 (back)
S5800-32C                  1U         24                      4                                                           
                                                                      (1 x 2 / 4port 10GE, 1 x 16port GE)

                                                                                     1 (back)
S5800-32F                  1U                      24          4                                                        ○ 
                                                                      (1 x 2 / 4port 10GE, 1 x 16port GE)




                                                                                                                             40
S5810&5820 Product Introduction
  S5820X                                                      S5810
  Multiple 10GE ports                                        48GE ports
  IRF2                                                       24MB big buffer size



                                                                          Upto 24 10GE



                        S5820X-28C                          S5820X-28S                                        S5810-50S
                                                         SFP         SFP+                                                       Redundan
             Type                Size    10/100/1000                                     Extension Module                 OAA
                                                        FE/GE       GE/10GE                                                       t PW

                                                                                              2 (Front)
S5820X-28C                        2U         4                            14                                               1       ○
                                                                                         (2 x 2/4port 10GE)

S5820X-28S                        1U         4                           24                                                       ○ 

                                                          2
S5810-50S                         1U         48        (Combo)            2                                                       ○ 
                                                           

                S5800 Extension module                               S5800 OAA module

16 port 10/100/1000BASE-T                              Firewall module

16 port 100/1000 SFP                                   IPS module

2 port 1G/10G SFP+                                     Wireless module

4 port 1G/10G SFP+

Wireless module (small scale)


                                                                                                                                       41
S5800 Market Position
                                               IRF2 Stacking
                                               High performance, flexible expansion
                                               PoE+
                            S5800 series
 (End of Row)
                                               Big buffer (24M)
                                               Dual Power module and hot swappable Fan
                                                dedicated management port
                            S5810 series
 (Top of Rack)

                                               24-port 10GE wire speed
                                               IRF2 stacking
                                               Dual Power module and hot swappable Fan
  10GE card                 S5820X series      Dedicated management port
  (ToR, EoR)


                                                        I
                                                     R F
Wireless control and PoE+   IPS and Firewall           IRF2                  Green
                                                                                          42
S5800 Design Flexibility



                                             Firewall     Wireless       IPS


Upto 4-port 10GE or 16 GE per module
or wireless controller                        OAA service module                     PoE card for PoE function




                                  USB port                           Hot swappable Power module



                                                 Hot swappable
                                                 Fan




                                                                                                            43
S5800 Benefits-HW design

                                                                    Redundant Power module
                                                                    How swappable Fan Design
                                                                 Dedicated   management port
          HW design

  Green                   Security                             NetStream
                                                                  BFD          Multi-Core
              IRF2                                                OAM
                                                                   ….        Dedicated session
Management            Reliability                                           for specific service
                                                               Routing
                                                                            High performance
                                                                Multicast
          Multi-Service                                           STP       processing
                                                                   ….


                                      Power of SFP+ is 1W, which
                                     is 25% of X2 (4W) 25%, 40% of
                                     XFP (2.5W), 17% of XENPAK
                                     (6W)
                                       SFP+ module supports 10GE,
                                     it also support GE SFP module
                                     Compared    with XFP
                                     transceiver, the Cost of SFP+ is
                                     only 50%~80% of XFP
                                                                                                   44
S5800 Benefits-Security
                                                       DMZ                NAT          Flow
                                        FW                                            control
                                       Blade
                                                    Anti-attack        State             HA
                                                                     detection
          HW design
                                                       VPN               Multi-core and session

  Green                   Security                                       upto 256 virtual FW

              IRF2
                                                                                          IPS
                                       Virus       Attack         Protocol               Blade
Management            Reliability    database     database        database


          Multi-Service
                                      Three-in-One unified Intrusion
                                                Protection



                                                        Portal Authentication provides a
                                                       easy way for network security
                                                       Inenterprise network, S5800 can
                                                       work as aggregation equipment, can
                                                       provide L3 Portal authentication to all
                                                       aggregation users.


                                                                                                   45
S5800 Benefits-Reliability
                                                                                              VRRPE (Enhanced VRRP)

                                      Master A                               Master B
                                                                                              VRRP   can only work in
                                      VIP: VIP-A
                                      MAC: MAC-A
                                                                             VIP: VIP-A
                                                                             MAC: MAC-B
                                                                                              active/standby mode, VRRPE
                                                                                              can work in load sharing
          HW design                  GW IP: VIP-A                           GW IP: VIP-A
                                     GW MAC: MAC-A                          GW MAC: MAC-B     mode, more flexible, higher
                                                                                              performance
  Green                   Security

                                                                                              Smart Link Dual uplink Protection
              IRF2
                                           Backup Link
                                                                       B S9500E/7500E
                                                                                              Can  be used to replace STP
                                                                 ng
                                           Active Link      ardi
Management
                                                      F o rw c                                in dual-homing network
                      Reliability               Block tr
                                                         affi
                                                ing
                                            S5800                                             Failovertime can be less
                                                        Metro Ethernet
                                                             Network                          than 50ms
          Multi-Service                      A Block
                                                 ing Forwa                                    Loading  sharing among
                                                      traf     r d in
                                                          f ic        g
                                          Backup Link
                                                                             C S9500E/7500E   dual uplinks via different
                                           Active Link
                                                                                              instances

                                            Master                        Transit             RRPP (Rapid Ring Protection
                                                                                              Protocol)
                                                                                              Ring solution with less than
                                                                                              50ms failover time
                                                           Ring
                                                                                              Loading    sharing among
                                                                                              different links via different
                                                                             S5800
                                                         X                                    instances

                                                                                                                                  46
S5800 Benefits-Multi-Service
                                                    IPv6
                                                    Routing-IPv6 Static/ RIPng/OSPFV3/BGP+/IS-
                                                    ISv6
                                                    Multicast- MLD/MLD Snooping/PIM6/IPv6
                                                    multicast vlan
            Firewall                                Tunneling-Manual/Auto 6to4/ISATA
                                                    ACL-IPv6 ACL
                                                    IPv6 management: IPv6 SNMP/TELNET/ICMPv6




                       Wireless
IPS/Anti-
                       Controller
  virus


                                    Wireless Controller              Wireless Controller
                                    Default   32 AP                 Default   64 AP
              …..
                                    Maximum:     64 AP              Maximum:     256 AP


                                                               PoE+ (802.3AT)
                                                               S5800   series supports PoE+
                                                               Each   port can provide upto
                                                               30W
                                                               Can  be used to power 802.11n
                                                               AP, Video phone and etc


                                                                                                  47
S5800 Benefits-Management
                                                             NTA (Network Traffic Analyzer)
                                                             S5800  can support sFlow and
                                                             Netstream
                                                             Together    with iMC (NTA), S5800
          HW design
                                              NTA (Network      helps customer to analyze
  Green                   Security            Traffic Analyzer) network in details

                                                             BFD (Bidirectional Forwarding
              IRF2                                           Detection)
                                                             Can  be used to detect link
Management            Reliability    OSPF neighbors
                                                             failover, default handover time
                                      BFD neighbors          is 10ms
          Multi-Service                                      BFD can be used with
                                                             OSPF/VRRP/BGP/ISIS/STATIC
                                                             ROUTING, failover time is less
                                                             than 50ms

                                                             SPAN/RSPAN/ERSPAN
                                                             SPAN:  local switch port
                                                      l      mirroring and monitoring
                                                 ne
                                          E   tun            RSPAN: cross switch port
                                       GR                    mirroring and monitoring
                                                             ERSPAN: cross WAN port
                                                             mirroring and monitoring via
                                                             GRE tunnel

                                                                                                  48
S5800 Benefits-Green
                                            Comply with RoHS standard
                                            H3C   complies with restriction of Hazardous
                                            Substances (RoHS) directives that restrict the
                                            use of certain hazardous substances in
                                            electrical components
          HW design                         H3C  also comply with China Ministry of
                                            Information Industry Order of Pollution,
  Green                   Security          referred to China-RoHS.


              IRF2
                                            Comply with WEEE standard
Management            Reliability
                                            H3C enforces guidelines for removing
                                            hazardous substances and comply with
          Multi-Service                     WEEE (Waster Electrical and Electronic
                                            Equipments)
                                     WEEE
                                            S5800 Green feature
                                            Low power mode for all unused
                                            ports, reduce power
                                            Modify power consumption
                                            according to port speed
                                            Add temperature sensor, modify fan
                                            speed, reduce power consumption
                                            PoE power control based on time-
                                            slot
                                                                                             49
1.   Current Network Challenges
2.   H3C IRF2 Introduction
3.   H3C IRF2 Product Introduction
4.   H3C Green IT
5.   H3C IRF2 Case Study




                                     50
H3C Green Concept

Concise design
While ensuring product functionality and performance, reduce the physical dimensions of products
to minimize the use of materials; Reduce the techniques such as electroplating, printing, and
bronzing, and use texture mapping instead; Simple package design to minimize material use;

Re-use
Greater durability of products; Modular design and component standardization to reduce frequency
of structure change;

Recycling
Use recyclable materials and avoid the use of hazardous substances; Use homogenous materials,
and mark each type of material and its lifetime to facilitate recycling;




                                                                                                   51
Power Consumption Saving Design

Using the advanced chip-sets that is superior         Low power mode on unused ports.
energy efficiency.                                     Control port power depend on port speed.
Using the advanced power supply module that is        Disable PoE power by time schedule.
superior energy efficiency.
Using Intelligent Cooling System


                                                                   Control fan rotation speed depend
                                                                    on the environment temperature


                                          Disable power at night
                                               And holiday


                                                                            Disable power on
                                                                              Unused ports




                                                                                                       52
Power Consumption Comparison

   FE switch
                       S3100-26TP-EI       17w    158%   27W       C2960-24TC




  GE switch
                        S5100-24P-EI       46w    156%   72W       C2960G-24TC



     10GE
                                                                    158%
     switch                                       241%
                        S5500-28C-EI       110w          265W      C3750E-24TD




     Mini                                                           158%
    Chassis              S5800X-28C    245W (max) 144%353W (max)     C4900M




    Chassis                                                         158%
                           S7500E         633W*   303% 1917W*        C6500E
 * With 8 10GE and 96GE hardware configuration
                                                                                 53
Low Power consumption certificate
-S5500EI




           H3C S5500-EI uses 42% less Watts/Gbps when
           compared to the industry average.




                                                        54
Low Power consumption certificate
-S7500E




           H3C S7500E uses 53~55% less Watts/Gbps when
           compared to the industry average.




                                                         55
1.   Current Network Challenges
2.   H3C IRF2 Introduction
3.   H3C IRF2 Product Introduction
4.   H3C Green IT
5.   H3C IRF2 Case Study




                                     56
H3C boosts MTR




                                      心緊生活每一
                                      程
                                      Caring for life’s journeys




                 Hong Kong’s MTR Corporation has built one of the
                 world's leading railway systems, well known for its
                 safety, reliability, customer service and cost efficiency.
                 H3C designed a H3C 100G future-proof information
                 superhighway linking 38 stations on the MTR Island,
                 Tsuen Wan and Kwun Tong Line, plus digital media
                 services along Urban Line and a new Resilient Packet

      MTR        Ring (RPR) upgrade along the Airport Express and
                 Tung Chung Line.                                        57
H3C Boosts HP Data Centre in Huston




                                      Huston data centre is one of six major
                                      regional HP data centers around the world.
                                      H3C helped HP build a new flexible open
                                      standard network infrastructure. Achieved a
                                      “Cisco-Free” data centre environment. The
                                      new data centre now double the port density
                                      and capacity while reducing energy
                                      consumption by 50%.
                                      Products: S12500, SR88, S95E, S5820X     58
H3C Boots DreamWorks Make Movie
Magic




                        Dreamworks has deployed H3C12500 and other related
                        products in their data centre. With H3C’s iMC,
                        Dreamworks can manage its own network equipment
                        from other vendors into one single platform which
                        simplify the future network management for the data
                        centre. This new H3C-based network helps
                        Dreamworks create more innovative digital movies and
                        support for future business growth.
                        (Shrek the Fourth) 76TB of data rendered stably on
                        H3C-based network platform !                         59
H3C Supports Tencent Data Centre



Tencent currently ranked as Internet industry’s
3rd most valuable company , followed by
Google and Amazon. The company has more
than 100 million concurrent online subscribers.
H3C ‘s fast response and professional support,
reliable products and supply chain which made
H3C became Tencent’s “Grade A” network
application supplier.




                                                  60
Wilson Cheung
Senior Sales Manager
(852) 2501 1154
wilson_cheung@h3c.com




  H3C cares your so
  much, H3C wants to
  know you more.
                        61

H3C HP Networking IRF2 Technology & Products Introduction 201212

  • 1.
    H3C (HP Networking) IRF2 Technology & Products Introduction Wilson Cheung Senior Sales Manager Dec-2012 1
  • 2.
    1. Current Network Challenges 2. H3C IRF2 Introduction 3. H3C IRF2 Product Introduction 4. H3C Green IT 5. H3C IRF2 Case Study 2
  • 3.
    The Challenge ofIT Network • Device Increase !! • Complex Topology !! • Difficult to Manage !! • Compatibility !! • High Reliability !! • Load Balance !! • Able to Failover ?? • Able / Easy to Recover after Failover ?? 3
  • 4.
    Common Difficulties ofNetwork Administrator farm erver tion s WhileApplica are more applications there How to implement remote And higher performance requirements, disaster recovery of data? can the data center support future service development? How to guarantee security of key What will be included in large- and data that faces soft and hard faults? mid-scale networks? How to construct them? How to ensure network reliability and service continuity? How to manage the network in a unified manner and reduce the management and maintenance cost? How to address the compatibility problem of heterogeneous devices purchased at different times? 4
  • 5.
    Network Design Concerns Challenge VRRP configuration Scalability & Availability has becoming more and more important for campus network and data center construction. IGP configuration Conventional technology facing challenge including : 1. Slow network convergence MSTP+VRRP design of 2. Complexity for management flow load balance and VLAN assign 3. Low utilization of bandwidth 4. High cost for upgrade network VRRP Multiple Instance MSTP Multiple service Core L3 NS L2 FW IPS LB VRRP instance Master MSTP instance VRRP Multi-instance MSTP Multiple service 5
  • 6.
    1. Current Network Challenges 2. H3C IRF2 Introduction 3. H3C IRF2 Product Introduction 4. H3C Green IT 5. H3C IRF2 Case Study 6
  • 7.
    What’s IRF2 Virtualization H3C Compatibility H3C’s Virtual LAN Technology. IRF2 For H3C Full Series Box and Chassis Devices Software Application Security Network Architecture Expansibility Create Advanced hardware Framework & Integrate Multiple Architecture Service and Openness 7
  • 8.
    H3C Stacking TechnologyTrend H3C leverages abundant stacking solution experience First IRF1 IRF2 Technology Technology L3 10GE box 10GE IPv6 box switches H3C S5500-EI XRN Huahui -3Com H3C S5800 Technology S5600/S3600 10GE Chassis L3 GE switch 2005 H3C S7500E H3C S9500E 1st Stackable 3Com H3C 12500 L2 10/100 SuperStack switch 49xx & 2009 Switch 40x0 3Com 2002 SuperStack 1 Stackable st 1100/3300 Ethernet Hub 3Com 1998 1992 8
  • 9.
    How we lookat IRF2 Technically? CPU Master CPU Engine CPU Slave Engine CPU CPU Slave Engine 9
  • 10.
    Advantage of IRF2– Doubled Performance Active device Active Link Standby device Traditional Network Standby link Vituralize by H3C IRF2 Technology Without IRF, all core and distribution With IRF, all core and distribution devices are working as active and are working both active---two standby---only one at the same time devices as one logical device Without IRF, all links are also active With IRF, all uplinks are working in and standby---Only one link used at the same time LACP mode---all load sharing 10
  • 11.
    Advantage of IRF2– Manageable 10.2.1.1 10.1.1.2 10.2.1.2 10.3.1.1 10.3.1.5 10.3.1.2 10.3.1.3 • Aggregated devices are treated as one logical device, all members are managed by master device (or master MCU in chassis switch). • Only one configuration file works on the entire stack. • The entire stack is able to be managed via any port on its member. 11
  • 12.
    Advantage of IRF2– Resilience Convergence Time Speed Network WAN IP=10.153.108.2/24 Convergence Virtual IP=10.153.108.1 N Second IP=10.153.108.3/24 Gateway=10.153.108.1 Gateway=10.153.108.1 WAN IP=10.153.108.1/24 IP=10.153.108.1/24 WAN Second Gateway=10.153.108.1 IRF2 Gateway=10.153.108.1 IP=10.153.108.1/24 Gateway=10.153.108.1 ms Gateway=10.153.108.1 VRRP MSTP IRF2 Deployment 12
  • 13.
    IRF2 Benefits H3C Intelligent Resilient Framework 2 (IRF2) is a network virtualization Enhanced technology that virtualizes several Performance Easy physical switches into one logic Management switch. In a IRF2 system, the data plane and switch fabric of all IRF2 Fabric engines are active at the same time, thereby providing a multiplied + = Virtual switching capacity. Switching IRF2 members are connected by virtual switch channels (VSCs). VSCs use standard 10 Gigabit Ethernet connections (as many as twelve 10G trunk) between the IRF2 Multi-service members. VSCs can carry regular user traffic in addition to the control plane communication between the High IRF2 members without Reliability compromising functionalities. Virtual Switching Easy Management Multi-service Virtual L2 switching Centralized Management Sec-blade firewall Virtual L3 switching Unified OS/CLI Load-balancing module Virtual MPLS switching Netstream IPS module Enhanced Performance Wireless controller High Reliability Up to 10 units in an IRF2 Fabric 1:N backup Multiplied performance Distributed link aggregation Eliminating the dependency on Spanning Tree Protocol (STP) 13
  • 14.
    IRF2 Benefits IRF2 canrun on H3C S5800, S5820, S5500-EI, S5120EI box switches and S7500E, S9500E, S12500 chassis switches. IRF2 enables the same series switches work as a single logical unit in the network. By applying IRF2, either chassis switches or box switches can be S12500 Series virtualized as a single high reliable, high throughput and high integrated Chassis Switch logical device. S9500E Series Series Chassis Switch S7500E Series Chassis Switch 5 Breakthroughs of IRF2 S5000 Series Box Switch Break through the limitation of regions Break through restriction on performance & bandwidth IRF2 Break through the constraints of slots and interfaces Break through the restriction on the form of equipments Break through the restrictions on services 14
  • 15.
    IRF2 in SMBnetwork 1500 User 100 200 user user Focus on • Lower TCO • Higher Price Performance Ratio • Pay while grow 15
  • 16.
    Revolution of CampusLAN Architecture H3C IRF2 is transforming enterprise network architecture for simplyness and optimization Common Network Stacking Network IRF2 Network 16
  • 17.
    IRF2-based 4 ChassisVirtualization 4 x Chassis Switch IRF2 4 x Core switch IRF2 2 x Chassis Switch IRF2 2 x Core Switch IRF2 8 x Switch IRF 2003 2009 2011 17
  • 18.
    H3C Optimizes datacenter with Intelligent Resilient Framework 2 (IRF2) L3 Fast Failover L2 MiliSecond Recovery MSTP instance H3C IRF2 No STP, only link aggregation, miliseconds failover 10.1.1.2 10.2.1.2 10.2.1.1 Simplified Management 10.3.1.1 Single IP 10.3.1.2 10.3.1.5 Management 10.3.1.3 H3C IRF2 With IRF2 stacking, multiple devices-single config file Doubled performance Active-Active mode Two-tier network design suitable for flat server-to-server connectivity H3C IRF2 All paths active, performance is doubled 18
  • 19.
    H3C Chassis BaseSwitch Double Fault Tolerance Network     10G    Any two link failure  Any two switch failure Whole network B&F transaction and data recovery within base will not be affected  Any two switch milliseconds level components 19
  • 20.
    H3C “4-in-1” IntelligentResilient Framework 2 (IRF2) virtualization solution Dark Fiber / DWDM SITE 1 SITE 2 Dark Fiber / DWDM Dark Fiber / DWDM H3C CLOUD NETWORK SITE 4 Dark Fiber / SITE 3 DWDM H3C 4 CHASSIS VIRTUALIZATION Four core switches dispersed among multiple sites into a single IRF2 logical unit 20
  • 21.
    IRF2 in Enterprisenetwork Extranet Intranet Internet OA Network Core Area OA Network Data Center WE B WE B WE B AP P AP P AP P DB DB DB IP SAN IP SAN IP SAN Focus on • Architecture Flexibility Management Software • Multiple Services • Performance & Management Management Server Server Scalability Management Area 21
  • 22.
    IRF2 in Enterprisenetwork Focus on • Architecture Flexibility • Multiple Services • Performance & Scalability 22
  • 23.
    H3C IMC totalnetwork management Solution H3C IMC is designed exclusively to control a complicated, multi- vendor, highly virtualized network platform across multi-sites. Its unified management idea and single pane of glass make it unique in the market. 23
  • 24.
    1. Current Network Challenges 2. H3C IRF2 Introduction 3. H3C IRF2 Product Introduction 4. H3C Green IT 5. H3C IRF2 Case Study 24
  • 25.
    H3C Switch ProductPortfolio IRF2 IPv6 IRF2 IPv6 100G IRF2 IPv6 IRF2 IPv6 100G Backbone switch series S7500E S10500 S9500E S12500 M- IRF2 IPv6 IRF2 IPv6 core IRF2 IPv6 GE switch series S5120SI/EI S5500SI/EI S5800 IRF2 IPv6 FE switch series S3100v2EI S3600v2SI/EI S3610 25
  • 26.
    S12500 Product Introduction 100G Platform 4/8/32-port 10GE line card Maximum 512 10GE ports 48-port GE 200ms buffer capability S12508 S12518 Switching 3.06Tbps 6.66Tbps capacity Throughput 960Mpps/ 1920Mpps 2160Mpps/ 4320Mpps Bandwidth 360Gbps/ 720Gbps 360Gbps/ 720Gbps CPU 1+1 1+1 Switching fabric 8+1 8+1 CPU slots 2 2 Switching fabric 9 9 slots I/O slots 8 18 GE (max) 384 864 10GE (max) 256 576 256Mbytes/10G port 256Mbytes/10G port Buffer per port 21.3Mbytes/GE port 21.3Mbytes/GE port Fan module Fan N+M, fan frame1+1 Fan N+M, fan frame1+1 Power module N+M N+M 26
  • 27.
    S12508 Product PhysicalAppearance Power cooling fan Power Power cables module 6 (max) Fan frame 22 RU ( 975mm) CPU engine 1 ~ 2 pieces Switching fabric I/O slots 9 (max) 8 (max) Fan frame 442mm 27
  • 28.
    S12500 Benefits 512MB 512MB CLOS multi-layered switching Fabric architecture 512MB 512MB Dynamic non-blocking service scheduling 512MB 512MB 180G per slot, smoothly upgrade 512MB 512MB Update of switching capacity when user upgrade their network CLOS architecture 512MB buffer 10GE 24GE 512M buffer for each 2 10GE ports 10GE guarantees 200ms buffering to avoid TCP retransmission storm 512MB buffer 10GE 24GE 10GE 28
  • 29.
    S12500 Benefits Ingress Line card 512MB Cache 512MB Egress Line card Egress line card: Easy to cause blocking 缓存 512MB when more than one ingress line cards Cache 512MB transmit data to one egress line cards 512MB Cache at the same time with large burst traffic 缓存 512MB 512MB Distributed buffering can handle the large Cache Cache 512MB blocking Burst of each interface and avoid blocking 缓存 At the egress interface 512MB Cache 512MB 48-port GE copper/fiber full wire speed 4/8-port 10GE full wire speed (XFP) 48-port GE copper 48-port GE fiber 8/16-port 10GE full wire speed (SFP+) 32-port 10GE (SFP+) 8-port 10GE 16-port 10GE 32-port 10GE 29
  • 30.
    S10500 Product introduction Introducingthe NEW S10500 core switch • Enables 2-Tier Architectures • 128 wire speed 10 GbE (for 8-slot chassis) • IRF creates a 1536 GE-port core (4 chassis stacking) • 3 microsecond latency • 40G, 100G ready S10504 S10508V S10508 New generation switches, high-density 10-Gigabit and ultra high- density Gigabit applications, future 40G, 100G ready The H3C S10500 is engineered for: – Core and distribution layer – Core layer of large enterprise, data centre and campus networks 30
  • 31.
    S10500 benefit-Industry leadingArchitecture Fabric The forwarding plane is physically separated 板 交换网 Fabric from the control plane, so the MPU 背 rd d c a ar 交换网 Fabric switchover will not affect the forwarding e in c traffic Lin L Fabric U PU Good scalability; Smooth upgrade to next- generation 40GE and100GE interfaces MP M Fabric redundancy; When one failure, others ca card can take over the work rd Lin Line e Easy to upgrade bandwidth, only need to upgrade the fabric modules 31
  • 32.
    Multistage CLOS SwitchingNetwork CLOS Architecture Benefits: Service board Switching fabric Service board – Simplifying large-scale switching architecture – Reducing possible fault points and enhance the switching architecture reliability – Powerful fault defense capability – Independent switching paths will not affect each other. Further enhances reliability and expandability – Supporting recursive expanding. Capacity The H3C S10500 adopts the CLOS expansion is unlimited in theory multi-layered switching architecture. The service boards and the switching fabrics are all physically connected. The multi-stage switching architecture implements large-capacity switching capability 32
  • 33.
    S10500 benefit CLOS multi-layered switching Fabric architecture Dynamic non-blocking service scheduling 480G per slot, smoothly upgrade Update of switching capacity when user upgrade their network The multi-stage switching architecture 48-port GE copper/fiber full wire speed 48-port GE copper 48-port GE fiber 8/16/32/48-port 10GE full wire speed (SFP+) 8-port 10GE 16-port 10GE 32-port 10GE 48-port 10GE 4-port 40GE full wire speed (QSFP) 4-port 40GE 33
  • 34.
    S9500E Product Introduction Distributed ASIC+NP+Multicore OAA (Firewall, IPS, wireless, LB, network technology analysis and etc) Maximum 192 10GE ports IRF2 2/4/16-port 10GE line card 48-port GE Type S9505E S9508E-V S9512E Number of slots 5 8 (vertical) 12 Switching capacity 720G 1.44T 1.44T Packet forwarding rate 360Mpps 576Mpps 864Mpps Engine redundancy Supported Supported Supported Power supply 1+1 1+1 1+1 redundancy Maxi. number of 240 384 576 Gigabit ports Maxi. number of 10G 16 16 16 ports per slot Maximum number of 80 128 192 10G ports Cabinet size 11U 22U 17U 34
  • 35.
    S9500E Benefits 1Ghz CPU 10ms MSTP failover Processor 30ms IP FRR 20k route 背板 failover Per second EMS EMS BFD Detection OAM Detection EMS FFDR Provide fast Failover and 30ms BFD FFDR convergence failover Fast Fault Detection and 主控板 Restoration FFDR 处 Main board 理器 Software Offline integrated Board diagnosis Processor isolation management EMS EMS Embedded detection detection Innovative Multi-Engine Design POST Maintenance of hardware of service faults channels Subsystem 35
  • 36.
    S9500E Benefits OSPF Packets of each protocol are assigned to a single queue to avoid interference between ARP protocols Traffic to CPU Traffic to CPU ... Software Control Policy CPU BPDU Traffic can be limited based on pps ICMP Dedicated CPU traffic control Integrate Multiple service capability Wireless Controller NAT Load Security: Firewall/IPS Balancing Services: AC, NAT, Load balancing Firewall IPS 36
  • 37.
    S7500E Product Introduction Distributed ASIC+NP+Multicore OAA (Firewall, IPS, wireless, LB, network technology analysis and etc) Maximum 84 10GE ports IRF2 2/4/8-port 10GE line card S7502E S7503E S7506E(V) S7510E 48-port GE No. of Slots 4 5 8 12 backplane bandwidth ≥400G ≥1T ≥1.6T ≥2.4T Switching capacity 192G 480G 768G 1152G/768G Forwarding Capacity 143Mpps 274Mpps 488Mpps 773M/488Mpps MCU Redundancy Support Support Support Support Power supply 1+1 1+1 1+1 1+1 redundancy Max. GE Ports 96 144 288 480 Max. 10G Ports 4 10 16 24 37
  • 38.
    S7500E Benefits 768G Switching MPLS Netstream Routing sFlow Wireless EPON EAD IRF2 IPS SSL VPN Load Firewall balancing Full service chassis switch Integrate Multiple service capability Wireless Load EPON Balancing Security: Firewall/IPS/SSL VPN Firewall IPS SSL VPN Services: 2/4/8-port 10GE 2-port 10GE 4-port 10GE 8-port 10GE 38
  • 39.
    S7500E Benefits CPU Master Engine CPU IRF2 Slave CPU Engine CPU Slave CPU Engine S7500E uses 53%~55% less W/G against industry average 39
  • 40.
    S5800 Product Introduction GE/10GE L3 switch 30W PoE+ IRF2 OAA IPv6 USB Upto 84GE per box S5800-32C (-PWR) S5800-32F S5800-56C (-PWR) S5800-60C-PWR SFP SFP+ Redundant Type Size 10/100/1000 Extension Module OAA FE/GE GE/10GE PW 2 (Front) S5800-60C-PWR 2U 48 PoE+  4 1 ○ (2 x 2 / 4port 10GE, 2 x 16port GE) 1 (back) S5800-56C-PWR 1U 48 PoE+   4    (1 x 2 / 4port 10GE, 1 x 16port GE) 1 (back) S5800-56C 1U 48   4    (1 x 2 / 4port 10GE, 1 x 16port GE) 1 (back) S5800-32C-PWR 1U 24 PoE+     4   (1 x 2 / 4port 10GE, 1 x 16port GE) 1 (back) S5800-32C 1U 24   4    (1 x 2 / 4port 10GE, 1 x 16port GE) 1 (back) S5800-32F 1U   24 4 ○  (1 x 2 / 4port 10GE, 1 x 16port GE) 40
  • 41.
    S5810&5820 Product Introduction S5820X S5810 Multiple 10GE ports 48GE ports IRF2 24MB big buffer size Upto 24 10GE S5820X-28C S5820X-28S S5810-50S SFP SFP+ Redundan Type Size 10/100/1000 Extension Module OAA FE/GE GE/10GE t PW 2 (Front) S5820X-28C 2U 4   14 1 ○ (2 x 2/4port 10GE) S5820X-28S 1U 4   24   ○  2 S5810-50S 1U 48 (Combo) 2 ○    S5800 Extension module S5800 OAA module 16 port 10/100/1000BASE-T Firewall module 16 port 100/1000 SFP IPS module 2 port 1G/10G SFP+ Wireless module 4 port 1G/10G SFP+ Wireless module (small scale) 41
  • 42.
    S5800 Market Position IRF2 Stacking High performance, flexible expansion PoE+ S5800 series (End of Row) Big buffer (24M) Dual Power module and hot swappable Fan  dedicated management port S5810 series (Top of Rack) 24-port 10GE wire speed IRF2 stacking Dual Power module and hot swappable Fan 10GE card S5820X series Dedicated management port (ToR, EoR) I R F Wireless control and PoE+ IPS and Firewall IRF2 Green 42
  • 43.
    S5800 Design Flexibility Firewall Wireless IPS Upto 4-port 10GE or 16 GE per module or wireless controller OAA service module PoE card for PoE function USB port Hot swappable Power module Hot swappable Fan 43
  • 44.
    S5800 Benefits-HW design  Redundant Power module  How swappable Fan Design Dedicated management port HW design Green Security NetStream BFD  Multi-Core IRF2 OAM ….  Dedicated session Management Reliability for specific service Routing High performance Multicast Multi-Service STP processing ….  Power of SFP+ is 1W, which is 25% of X2 (4W) 25%, 40% of XFP (2.5W), 17% of XENPAK (6W)  SFP+ module supports 10GE, it also support GE SFP module Compared with XFP transceiver, the Cost of SFP+ is only 50%~80% of XFP 44
  • 45.
    S5800 Benefits-Security DMZ NAT Flow FW control Blade Anti-attack State HA detection HW design VPN  Multi-core and session Green Security  upto 256 virtual FW IRF2 IPS Virus Attack Protocol Blade Management Reliability database database database Multi-Service Three-in-One unified Intrusion Protection  Portal Authentication provides a easy way for network security Inenterprise network, S5800 can work as aggregation equipment, can provide L3 Portal authentication to all aggregation users. 45
  • 46.
    S5800 Benefits-Reliability VRRPE (Enhanced VRRP) Master A Master B VRRP can only work in VIP: VIP-A MAC: MAC-A VIP: VIP-A MAC: MAC-B active/standby mode, VRRPE can work in load sharing HW design GW IP: VIP-A GW IP: VIP-A GW MAC: MAC-A GW MAC: MAC-B mode, more flexible, higher performance Green Security Smart Link Dual uplink Protection IRF2 Backup Link B S9500E/7500E Can be used to replace STP ng Active Link ardi Management F o rw c in dual-homing network Reliability Block tr affi ing S5800 Failovertime can be less Metro Ethernet Network than 50ms Multi-Service A Block ing Forwa Loading sharing among traf r d in f ic g Backup Link C S9500E/7500E dual uplinks via different Active Link instances Master Transit RRPP (Rapid Ring Protection Protocol) Ring solution with less than 50ms failover time Ring Loading sharing among different links via different S5800 X instances 46
  • 47.
    S5800 Benefits-Multi-Service IPv6 Routing-IPv6 Static/ RIPng/OSPFV3/BGP+/IS- ISv6 Multicast- MLD/MLD Snooping/PIM6/IPv6 multicast vlan Firewall Tunneling-Manual/Auto 6to4/ISATA ACL-IPv6 ACL IPv6 management: IPv6 SNMP/TELNET/ICMPv6 Wireless IPS/Anti- Controller virus Wireless Controller Wireless Controller Default 32 AP Default 64 AP ….. Maximum: 64 AP Maximum: 256 AP PoE+ (802.3AT) S5800 series supports PoE+ Each port can provide upto 30W Can be used to power 802.11n AP, Video phone and etc 47
  • 48.
    S5800 Benefits-Management NTA (Network Traffic Analyzer) S5800 can support sFlow and Netstream Together with iMC (NTA), S5800 HW design NTA (Network helps customer to analyze Green Security Traffic Analyzer) network in details BFD (Bidirectional Forwarding IRF2 Detection) Can be used to detect link Management Reliability OSPF neighbors failover, default handover time BFD neighbors is 10ms Multi-Service BFD can be used with OSPF/VRRP/BGP/ISIS/STATIC ROUTING, failover time is less than 50ms SPAN/RSPAN/ERSPAN SPAN: local switch port l mirroring and monitoring ne E tun RSPAN: cross switch port GR mirroring and monitoring ERSPAN: cross WAN port mirroring and monitoring via GRE tunnel 48
  • 49.
    S5800 Benefits-Green Comply with RoHS standard H3C complies with restriction of Hazardous Substances (RoHS) directives that restrict the use of certain hazardous substances in electrical components HW design H3C also comply with China Ministry of Information Industry Order of Pollution, Green Security referred to China-RoHS. IRF2 Comply with WEEE standard Management Reliability H3C enforces guidelines for removing hazardous substances and comply with Multi-Service WEEE (Waster Electrical and Electronic Equipments) WEEE S5800 Green feature Low power mode for all unused ports, reduce power Modify power consumption according to port speed Add temperature sensor, modify fan speed, reduce power consumption PoE power control based on time- slot 49
  • 50.
    1. Current Network Challenges 2. H3C IRF2 Introduction 3. H3C IRF2 Product Introduction 4. H3C Green IT 5. H3C IRF2 Case Study 50
  • 51.
    H3C Green Concept Concisedesign While ensuring product functionality and performance, reduce the physical dimensions of products to minimize the use of materials; Reduce the techniques such as electroplating, printing, and bronzing, and use texture mapping instead; Simple package design to minimize material use; Re-use Greater durability of products; Modular design and component standardization to reduce frequency of structure change; Recycling Use recyclable materials and avoid the use of hazardous substances; Use homogenous materials, and mark each type of material and its lifetime to facilitate recycling; 51
  • 52.
    Power Consumption SavingDesign Using the advanced chip-sets that is superior Low power mode on unused ports. energy efficiency. Control port power depend on port speed. Using the advanced power supply module that is Disable PoE power by time schedule. superior energy efficiency. Using Intelligent Cooling System Control fan rotation speed depend on the environment temperature Disable power at night And holiday Disable power on Unused ports 52
  • 53.
    Power Consumption Comparison FE switch S3100-26TP-EI 17w 158% 27W C2960-24TC GE switch S5100-24P-EI 46w 156% 72W C2960G-24TC 10GE 158% switch 241% S5500-28C-EI 110w 265W C3750E-24TD Mini 158% Chassis S5800X-28C 245W (max) 144%353W (max) C4900M Chassis 158% S7500E 633W* 303% 1917W* C6500E * With 8 10GE and 96GE hardware configuration 53
  • 54.
    Low Power consumptioncertificate -S5500EI H3C S5500-EI uses 42% less Watts/Gbps when compared to the industry average. 54
  • 55.
    Low Power consumptioncertificate -S7500E H3C S7500E uses 53~55% less Watts/Gbps when compared to the industry average. 55
  • 56.
    1. Current Network Challenges 2. H3C IRF2 Introduction 3. H3C IRF2 Product Introduction 4. H3C Green IT 5. H3C IRF2 Case Study 56
  • 57.
    H3C boosts MTR 心緊生活每一 程 Caring for life’s journeys Hong Kong’s MTR Corporation has built one of the world's leading railway systems, well known for its safety, reliability, customer service and cost efficiency. H3C designed a H3C 100G future-proof information superhighway linking 38 stations on the MTR Island, Tsuen Wan and Kwun Tong Line, plus digital media services along Urban Line and a new Resilient Packet MTR Ring (RPR) upgrade along the Airport Express and Tung Chung Line. 57
  • 58.
    H3C Boosts HPData Centre in Huston Huston data centre is one of six major regional HP data centers around the world. H3C helped HP build a new flexible open standard network infrastructure. Achieved a “Cisco-Free” data centre environment. The new data centre now double the port density and capacity while reducing energy consumption by 50%. Products: S12500, SR88, S95E, S5820X 58
  • 59.
    H3C Boots DreamWorksMake Movie Magic Dreamworks has deployed H3C12500 and other related products in their data centre. With H3C’s iMC, Dreamworks can manage its own network equipment from other vendors into one single platform which simplify the future network management for the data centre. This new H3C-based network helps Dreamworks create more innovative digital movies and support for future business growth. (Shrek the Fourth) 76TB of data rendered stably on H3C-based network platform ! 59
  • 60.
    H3C Supports TencentData Centre Tencent currently ranked as Internet industry’s 3rd most valuable company , followed by Google and Amazon. The company has more than 100 million concurrent online subscribers. H3C ‘s fast response and professional support, reliable products and supply chain which made H3C became Tencent’s “Grade A” network application supplier. 60
  • 61.
    Wilson Cheung Senior SalesManager (852) 2501 1154 wilson_cheung@h3c.com H3C cares your so much, H3C wants to know you more. 61

Editor's Notes

  • #10 IRF 系统虚拟化为一台逻辑设备 逻辑设备由 1 主控板、 N 备用板和多个接口板组成 主控板管理和控制整个 IRF 系统 主控板和备用板保持配置和运行状态同步,实现 1:N 备份 当主控板工作异常时, IRF 将选择其中一台备用板成为新的主控板,保证高可靠性
  • #18 对于网络产品的虚拟化, H3C 多年来一直是业界的领先者,从 2003 年 到 2009 年,到 2011 年。 IRF2 技术颠覆了传统园区网络 MSTP+VRRP 为主的格局,为用户带来 4 个方面的价值,首先是更简单,简化网络的拓扑,业务部署和管理,第二是更可靠,讲传统技术秒级的故障收敛时间大幅降低至毫秒级,第三是更高效,讲传统园区网的主备工作模式变为分担工作模式,从而提升了网络运行的效率,第四是弹性扩展,用户可以根据业务变化的需要弹性扩展。
  • #19 So what benefits we will get from H3C solution? Compared with other vendors H3C intelligent resilient framework solution enable a flat, low latency network design, which can directly interconnect hundreds of virtual machine at the edge of network, eliminating unnecessary network hops, reduce latency and optimizing performance for high volume server to server traffic flows. H3C data center switches, together with IRF, priovide a flat, low latency, high performance, extremely reslient and easy to manage data center networks. With IRF, multiple switches are can stacked and virtualized as single unit logically (that means via only IP address management and single configuration file), H3C leverages best-in-class switch virtualization technology for core switches as well, improving scalabity and delivering unified high performance data center. As you can see from the left side, after virtualization, MSTP is eliminited, only link aggregation enabled network will bring customer mili-seconds level resilience. Before, too many configuration file will make network management and administration work even worse, now with the help of H3C IRF, one stacking unit has only one configuration file. Lastly, network is not active/standby anymore, we are creating a active/active scenario to make full use of all network resources and paths to increase the return on investment.
  • #21 As we discussed before, within one data centers, H3C use IRF2 to build optimized infrastructure catering for VM scenario. However, enables distributed workloads and replicating data and applications across mutiple, geographically-dispersed data centers are a challenge. Conventional L3 solutions can not meet the high performance and low latency required VM scenario. Above all, a large L2 network is required for VM migration acorss data centers. As we understand, any single point of failure or error means loosing money for B&F, what we going to do is creat a solid platform to create more money. In order to address those issues, H3C provides superior solution that extends L2 domain with superior flexibility, high resilience and easy management. Today we will share two solutions. The first solution is 4-in-1 solution, the newly relased 100G CLOS architecture 10500 core switch is the perfect example of it. It is the first in the industry to use 4 chassis IRF virtualization, which means IRF can be extended across long distance 10GE dark fiber to bring 10500 located among multiple sites into s single giant core switches. Miliseonds level reliability is chineved natively.
  • #24 Network management plays a very important role to relieve the burden of administrators and reduce TCO. H3C IMC (intelligent management center) is one of few solution in the industy which can unify mumtiple sites, multiple vendors, physical and virtual network resources via a single platform. It can help to overcome the challenges of maintaining the new virtual server edge, reduce troubleshooting for virtual networks. Therefore, IMC totally simplifies the new cutting edge data center operation and management. boosting network visibility and availability.
  • #26 14 series, and nearly 200 products with the most comprehensive Ethernet switch product line in the world; Full series of core to edge switches on a virtual switching platform, leverage IRF2 technology; H3C S5500-EI and S7506E earned Miercom’s Green Certification, proving that the two save up to 40% more power than comparable models based on Industry Average. H3C S7506E 和 S55500-EI 的节能特性,经过 Miercom 绿色认证测试技术的严格评估,成功通过了 Miercom 绿色认证,无愧为高效率、符合环境保护要求的网络和数据中心解决方案。 H3C 能够提供业界覆盖最全面的交换机产品。产品包括 14 个系列,多达 200 种产品。产品囊括从园区到数据中心、盒式到箱式、从 FE 、 GE 到 10G 和 100G ,从 L2 到 L4/7 ,从 IPv4 到 IPv6 ,从接入到核心,用户都有最丰富选择和灵活组合。 在以太网领域,经历多年的耕耘和发展, H3C 积累了大量业界领先的知识产权和专利,并且全部通过中国信息产业部、 Tolly Group 、 MetroEthernet 论坛以及 IPv6 Ready 等权威部门的测试和认证,凭借丰富的产品系列和深厚的技术积累, H3C 交换机产品在数据中心、政府、金融、交通、能源、教育、企业、 SOHO 均有广泛成熟稳定的应用。 S12500 是中国国内第一款 100G 平台交换机,支持未来 40GE 和 100GE 以太网标准,整机可以提供 576 个万兆端口,提供业界密度最高的万兆接入能力;面对下一代数据中心突发流量,创新的采用了“分布式入口缓存”技术,可以实现数据 200ms 缓存,满足数据中心、高性能计算等网络突发流量的要求;为了满足数据中心级网络高可靠、高可用、虚拟化的要求, S12500 采用创新 IRF2 (第二代智能弹性架构)设计,将多台高端设备虚拟化为一台逻辑设备,同时支持独立的控制引擎、检测引擎、维护引擎,为系统提供强大的控制能力和 50ms 的高可靠保障。 S9500E 采用创新的硬件设计,通过独立的控制引擎、检测引擎、维护引擎为系统提供强大的控制能力和 50ms 的高可靠保障;通过基于分布式的高性能硬件转发和大容量 Crossbar 无阻塞交换技术,保障了系统的高处理性能和灵活的扩展能力;通过 OAA 开放架构,实现了网络和安全、无线的融合。 H3C S7500E 系列产品是杭州华三通信技术有限公司(以下简称 H3C 公司)面向融合业务网络的高端多业务路由交换机,该产品基于 H3C 自主知识产权的 Comware V5 操作系统,以 IRF2 ( Intelligent Resilient Framework 2 ,第二代智能弹性架构)技术为系统基石的虚拟化软件系统,进一步融合 MPLS VPN 、 IPv6 、网络安全、无线、无源光网络等多种网络业务,提供不间断转发、不间断升级、优雅重启、环网保护等多种高可靠技术,在提高用户生产效率的同时,保证了网络最大正常运行时间,从而降低了客户的总拥有成本( TCO )。 针对互联网数据中心关注的大流量问题, H3C 新一代互联网数据中心解决方案采用创新的分布式缓存、一次性精确调度和精细化 QoS 机制,能帮助搜狐解决突发性大流量带来的问题;同时,解决方案采用创新的 H3C 第二代智能弹性架构技术 IRF2 ,进一步简化了传统数据中心基础架构,初步实现了网络资源的虚拟化,让搜狐能够从容应对未来业务发展。 H3C 集 S12508 数据中心级核心交换机、 S75E 高端多业务路由交换机、 S5800 万兆交换机、 iMC 智能管理中心 搜狐 7*24 小时向全球提供网上贸易实时服务的需要,又具备支持近万台服务器的高密度并发高速访问的能力。因此,该项目对网络设备的可靠性和性能提出了极为苛刻的要求。包括 S12500 、 S9500E 、 S58 系列和 S55 系列在内的多款 H3C 数据中心级交换机,在淘宝网新建的大型数据中心得到了大规模的广泛应用。 美国知名媒体 Network World (网络世界)公布对 3Com 7906E/H3C S7506E 的评测结果,在经过其测试机构对该产品及 Cisco 的 Catalyst 6509 , Nexus 7010 等同类产品展开了长达 5 个月的对比评测后, H3C S7506E 在评测中得到 4.28 (满分 5 分)的高分。 Network World (网络世界)认为:“由于具有的超强性能和低能耗的特点,使得该款交换机成为大中型企业核心层和汇聚层组网的不错选择。” IRF2 功能简单的说,是把多台物理设备互相连接起来,使其成为一台统一的逻辑设备。这样无论在管理还是在使用上就成为了一个整体。也就是说,用户可以将这多台设备看成一台单一设备进行管理和使用。这样一来, IRF 可以为用户带来以下好处: 简化管理: IRF 架构形成之后,可以连接到任何一台设备的任何一个端口就以登录统一的逻辑设备,通过对单台设备的配置达到管理整个智能弹性系统以及系统内所有成员设备的效果,而不用物理连接到每台成员设备上分别对它们进行配置和管理。 简化业务: IRF 形成的逻辑设备中运行的各种控制协议也是作为单一设备统一运行的,例如路由协议会作为单一设备统一计算,而随着跨设备链路聚合技术的应用,可以替代原有的生成树协议,这样就可以省去了设备间大量协议报文的交互,简化了网络运行,缩短了网络动荡时的收敛时间。 弹性扩展:可以按照用户需求实现弹性扩展,保证用户投资。并且新增的设备加入或离开 IRF 架构时可以实现“热插拔”,不影响其他设备的正常运行。 高可靠性: IRF 的高可靠性体现在链路,设备和协议三个方面。成员设备之间物理端口支持聚合功能, IRF 系统和上、下层设备之间的物理连接也支持聚合功能,这样通过多链路备份提高了链路的可靠性; IRF 系统由多台成员设备组成, Master 设备负责系统的运行、管理和维护, Slave 设备在作为备份的同时也可以处理业务,一旦 Master 设备故障,系统会迅速自动选举新的 Master ,以保证通过系统的业务不中断,从而实现了设备级的 1:N 备份; IRF 系统有实时的协议热备份功能,负责将协议的配置信息备份到其他所有成员设备,从而实现 1:N 的协议可靠性。 高性能    对于高端交换机来说,性能和端口密度的提升会受到硬件结构的限制。而 IRF 系统的性能和端口密度是 IRF 内部所有设备性能和端口数量的总和。因此, IRF 技术能够轻易的将设备的核心交换能力、用户端口的密度扩大数倍,从而大幅度提高了设备的性能。 多业务: IRF 支持包括 IPv4 、 IPv6 、 MPLS 、安全特性、 OAA 插卡、高可用性等全部交换机特性,并且能够高效稳定地运行这些功能,大大扩展了 IRF 设备的应用范围。
  • #31 December 10, 2012 HP Confidential
  • #33 A Clos network is a kind of multistage circuit switching network, first formalized by Charles Clos in 1953, which represents a theoretical idealization of practical multi-stage telephone switching systems. Clos networks are required when the physical circuit switching needs exceed the capacity of the largest feasible single crossbar switch. The key advantage of Clos networks is that the number of crosspoints (which make up each crossbar switch) required can be much fewer than were the entire switching system implemented with one large crossbar switch. 100-Gbps ready platform, multi-stage, multi-plane, distributed, ClOS switching architecture, future proof design