GlaxoSmithKline Bangladesh is a pharmaceutical manufacturing site located in Chittagong, Bangladesh. It produces various products like tablets, granules, and topicals. The factory has strict manufacturing guidelines and is tobacco-free. As part of an industrial training, the authors studied the manufacturing processes, effluent treatment plant, and scope for mechanical engineers at the site. They also conducted a feasibility study project on replacing the site's power generators with more efficient gas generators. The training provided learning opportunities in various engineering topics and working in a project team.
Dr. Steve Dritz - Latest Field Research and Available Tools to Evaluate and I...John Blue
Latest Field Research and Available Tools to Evaluate and Improve Feed Efficiency - Dr. Steve Dritz, College of Veterinary Medicine, Kansas State University, from the 2016 Allen D. Leman Swine Conference, September 17-20, 2016, St. Paul, Minnesota, USA.
More presentations at http://www.swinecast.com/2016-leman-swine-conference-material
Dr. Steve Dritz - Latest Field Research and Available Tools to Evaluate and I...John Blue
Latest Field Research and Available Tools to Evaluate and Improve Feed Efficiency - Dr. Steve Dritz, College of Veterinary Medicine, Kansas State University, from the 2016 Allen D. Leman Swine Conference, September 17-20, 2016, St. Paul, Minnesota, USA.
More presentations at http://www.swinecast.com/2016-leman-swine-conference-material
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
Implementation of Business Process Reengineering in Thermax Ltd. to achieve dramatic improvements in critical, contemporary measures of performance such as cost, quality, service and speed by the fundamental rethinking and radical redesign of business processes
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
Implementation of Business Process Reengineering in Thermax Ltd. to achieve dramatic improvements in critical, contemporary measures of performance such as cost, quality, service and speed by the fundamental rethinking and radical redesign of business processes
1. Bangladesh University of Engineering &
Technology
ME 370 : Industrial Training
Sourav Saha (0810012)
Saberul Islam Sharker (0810024)
Md. Maruf Hossain (0810004)
Training Company: GlaxoSmithKline BD Ltd.
Duration: 18 Days
01-11-13 ~ 30-11-13
2. THE ORGANIZATION
• GlaxoSmithKline is one of the world’s leading
research-based pharmaceutical and healthcare
companies.
• This company is committed to improve the quality of
human life by enabling people to do more, feel
better and live longer.
• GSK is headquartered in the UK, with major
business operations in the US.
• It has 80 manufacturing sites in 37 countries and
has offices in over 115 countries.
3. FACTORY INTRODUCTION
• GSK Chittagong is a secondary manufacturing
site.
• It was built in 1967 on 17 acres of land.
• The site has 98 management, 214 fulltime
workers and additional staff for part time jobs.
• The whole factory is run under a strict guideline
which is applicable for all GSK factories
throughout the world.
• GSK Chittagong is a tobacco free site.
6. ETP
• Effluent Treatment Plant
Domestic
Use
Screen
Chamber
Equalization
Tank
Aeration
Tank
Clarifier
Tank
Water
Storage
Tank
Sand Filter
Activated
Carbon
Filter
Treated
Water Tank
7. SCOPE FOR MECHANICAL
ENGINEERS
• HVAC system
• Boiler
• Waste Water Treatment Plant
• Compressors
• Generators
• Pneumatic Systems
• Production Machines
• Pumps
8. PROJECT WORK
• The objective of our project was to do a feasibility
study of replacing the existing power generating
system consisting of PDB and Diesel generators
by Gas generators.
• For this project, we collected Engineering Raw
Data, Factory Peak & Installed Load, Existing
Generator Specs, PDB Bill and KGDCL Bill.
• From the above mentioned data, we came to
these findings…
9. % Decrease with Gas Generator
Month Kg CO2 Cost
January 24.75 87.42
February 21.49 86.41
March 26.01 88.59
April 24.22 88.07
May 18.31 84.37
June 25.74 88.68
July 25.27 87.76
August 23.81 88.50
September 18.54 87.46
10. OUR LEARNINGS
• HVAC system designing.
• Working principle and different components of boiler,
compressor, generator, ETP.
• Manufacturing of pharmaceutical products.
• Dealing with practical problem by theoretical
knowledge.
• Leadership and managerial activity in engineering.
• Market policy of a pharmaceutical company.
• Working in a project as a team member.